# Replacement controls, see mk_CONTROLS_base2012CATR_RERUN_sep2009.sas
# VARIABLES: FIPs,SCC,POLCODE (SMOKE not inventory name), dummy var, Control Efficiency %, rule effectiveness/penetration (def to 100 each),SIC,MACT,APPFLAG,REPFLAG,PLANTID (if available), POINTID (if avail), comments
0     0          106990           -9  69.00 100 100 -9   1641   Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9  64.00 100 100 -9   1635   Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     0          106990           -9   0.00 100 100 -9   0710   Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          106990           -9  63.00 100 100 -9   0703   Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          106990           -9   5.00 100 100 -9   0308   Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     0          106990           -9  70.00 100 100 -9   0707   Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9   0.00 100 100 -9   0709   Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          106990           -9   0.00 100 100 -9   0704   Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          106990           -9  64.00 100 100 -9   1642   Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9  80.00 100 100 -9   0711   Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9   0.00 100 100 -9   0712   Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          106990           -9  39.00 100 100 -9   1337   Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          106990           -9  83.00 100 100 -9   1415   Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9  85.00 100 100 -9   0418   Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9  44.00 100 100 -9   1405   Y R                                 ! MACT: Cyanide Chemical Manufacturing (formerly Cyanuric Chloride Production) (Generic MACT).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9  44.00 100 100 -9   1636   Y R                                 ! MACT: Friction Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9  51.00 100 100 -9   1634   Y R                                 ! MACT: Leather Finishing Operations.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9  70.00 100 100 -9   0602   Y R                                 ! MACT: Organic Liquids Distribution (Non-gasoline).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9  81.00 100 100 -9   0406   Y R                                 ! MACT:Refractory Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9  50.00 100 100 -9   0805   Y R                                 ! MACT:Site Remediation.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          106990           -9  75.00 100 100 -9   0802   Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          106990           -9  54.00 100 100 -9   1624   Y R                                 ! MACT: Plywood and Composite Wood Products
0     30100509   106990           -9  83.00 100 100 -9   -9     Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101010   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101011   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101012   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101021   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101022   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101030   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101055   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101080   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101099   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101401   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101402   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101403   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101404   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101415   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101416   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101418   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101430   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101432   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101433   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101434   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101435   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101450   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101451   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101452   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101453   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101454   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101460   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101461   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101462   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101463   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101470   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101471   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101472   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101498   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101499   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101501   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101502   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101503   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101505   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101515   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101520   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101530   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101599   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101602   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101603   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101801   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polymerized Vinylidene Chloride). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101837   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polyester Resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101838   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101839   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101840   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102001   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102002   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102003   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102004   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102005   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102015   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102030   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102031   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102032   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102036   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102039   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102050   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102051   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102053   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102054   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102060   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102063   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102070   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102072   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102099   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102410   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACT II (Spandex production).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30103101   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103102   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103103   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103104   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103105   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103199   106990           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30105001   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30119701   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119705   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119799   106990           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30400301   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400302   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400303   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400304   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400305   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400310   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400314   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400315   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400316   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400317   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400318   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400319   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400320   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400321   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400322   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400325   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400330   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400331   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400332   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400333   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400340   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400341   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400342   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400350   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400351   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400352   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400353   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400354   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400355   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400356   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400357   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400358   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400360   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400370   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400371   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400398   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400399   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400701   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400702   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400703   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400704   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400705   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400706   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400707   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400708   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400709   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400710   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400711   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400712   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400713   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400714   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400715   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400716   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400717   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400718   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400720   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400721   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400722   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400723   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400724   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400725   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400726   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400730   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400731   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400732   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400733   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400735   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400736   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400737   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400739   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400740   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400741   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400742   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400743   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400744   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400745   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400760   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400765   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400768   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400770   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400775   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400780   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400785   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400799   106990           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30500101   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500102   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500103   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500104   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500105   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500106   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500107   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500108   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500110   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500111   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500112   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500113   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500114   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500115   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500116   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500117   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500118   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500119   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500120   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500121   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500130   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500131   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500132   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500133   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500134   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500135   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500140   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500141   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500142   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500143   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500144   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500145   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500146   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500147   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500150   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500151   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500152   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500153   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500154   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500198   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500199   106990           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30700602   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700604   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700606   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700607   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700608   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700610   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700611   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700621   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700625   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700626   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700628   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700629   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700630   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700631   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700632   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700635   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700640   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700651   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700655   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700661   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700664   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700665   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700699   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700701   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700702   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700703   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700704   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700705   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700706   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700707   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700708   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700709   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700710   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700711   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700712   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700713   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700714   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700715   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700716   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700717   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700718   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700720   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700725   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700727   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700730   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700734   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700735   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700736   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700737   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700740   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700744   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700746   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700747   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700750   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700752   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700753   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700756   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700757   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700760   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700762   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700763   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700766   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700767   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700769   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700770   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700771   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700780   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700781   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700783   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700785   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700788   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700789   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700790   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700791   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700792   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700793   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700798   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700799   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700801   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700802   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700895   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700921   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700923   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700925   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700927   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700931   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700932   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700933   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700934   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700935   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700936   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700937   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700939   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700940   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700950   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700960   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700971   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700980   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700981   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700982   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700983   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700984   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701001   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701008   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701009   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701010   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701015   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701020   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701030   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701040   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701053   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701054   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701055   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701057   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701060   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701062   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701064   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701199   106990           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30701410   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701415   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701416   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701420   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701425   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701430   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701440   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701442   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701480   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701482   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701484   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701486   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701510   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701512   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701530   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701540   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701550   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701610   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701611   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701630   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701640   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701642   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701710   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701712   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701720   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701740   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701742   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30702021   106990           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30800699   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800701   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800702   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800703   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800704   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800705   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800720   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800721   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800722   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800723   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800724   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800730   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800731   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800732   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800799   106990           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30901601   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40200410   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     40200701   106990           -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200706   106990           -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200707   106990           -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200710   106990           -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201301   106990           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201303   106990           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201304   106990           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201305   106990           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201310   106990           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201320   106990           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201330   106990           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201399   106990           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201401   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201402   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201403   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201404   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201405   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201406   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201431   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201432   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201433   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201435   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201499   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201501   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201502   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201503   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201505   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201531   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201599   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201702   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201703   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201704   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201705   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201706   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201721   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201722   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201723   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201724   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201725   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201726   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201727   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201728   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201729   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201731   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201732   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201733   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201734   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201735   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201736   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201737   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201738   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201739   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201799   106990           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202001   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202002   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202003   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202004   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202005   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202010   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202011   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202012   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202013   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202014   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202015   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202020   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202021   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202022   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202023   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202024   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202025   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202031   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202032   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202033   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202034   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202035   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202036   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202037   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202038   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202039   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202099   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202101   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202103   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202104   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202105   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202106   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202107   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202108   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202109   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202110   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202111   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202117   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202118   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202131   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202132   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202133   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202140   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202199   106990           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202201   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202202   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202203   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202204   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202205   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202206   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202207   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202208   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202209   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202210   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202211   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202212   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202213   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202214   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202215   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202220   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202229   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202230   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202239   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202240   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202249   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202250   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202259   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202270   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202280   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202299   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202501   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202502   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202503   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202504   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202505   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202510   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202511   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202512   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202515   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202520   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202521   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202522   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202523   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202524   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202525   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202531   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202532   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202533   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202534   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202535   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202536   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202537   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202542   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202543   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202544   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202545   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202546   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202599   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202601   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202602   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202603   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202605   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202606   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202607   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202699   106990           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     50100401   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100402   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100403   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100404   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100405   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100406   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100410   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100411   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100412   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100420   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100421   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100422   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100423   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100430   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100431   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100432   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100433   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200601   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200602   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300601   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300602   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300603   106990           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          107028           -9  69.00 100 100 -9   1641   Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9  64.00 100 100 -9   1635   Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     0          107028           -9   0.00 100 100 -9   0710   Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          107028           -9  63.00 100 100 -9   0703   Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          107028           -9   5.00 100 100 -9   0308   Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     0          107028           -9  70.00 100 100 -9   0707   Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9   0.00 100 100 -9   0709   Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          107028           -9   0.00 100 100 -9   0704   Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          107028           -9  64.00 100 100 -9   1642   Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9  80.00 100 100 -9   0711   Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9   0.00 100 100 -9   0712   Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          107028           -9  39.00 100 100 -9   1337   Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          107028           -9  83.00 100 100 -9   1415   Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9  85.00 100 100 -9   0418   Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9  44.00 100 100 -9   1405   Y R                                 ! MACT: Cyanide Chemical Manufacturing (formerly Cyanuric Chloride Production) (Generic MACT).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9  44.00 100 100 -9   1636   Y R                                 ! MACT: Friction Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9  51.00 100 100 -9   1634   Y R                                 ! MACT: Leather Finishing Operations.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9  70.00 100 100 -9   0602   Y R                                 ! MACT: Organic Liquids Distribution (Non-gasoline).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9  81.00 100 100 -9   0406   Y R                                 ! MACT:Refractory Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9  50.00 100 100 -9   0805   Y R                                 ! MACT:Site Remediation.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          107028           -9  75.00 100 100 -9   0802   Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          107028           -9  54.00 100 100 -9   1624   Y R                                 ! MACT: Plywood and Composite Wood Products
0     30100509   107028           -9  83.00 100 100 -9   -9     Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101010   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101011   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101012   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101021   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101022   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101030   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101055   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101080   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101099   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101401   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101402   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101403   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101404   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101415   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101416   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101418   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101430   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101432   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101433   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101434   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101435   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101450   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101451   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101452   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101453   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101454   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101460   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101461   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101462   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101463   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101470   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101471   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101472   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101498   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101499   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101501   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101502   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101503   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101505   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101515   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101520   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101530   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101599   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101602   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101603   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101801   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polymerized Vinylidene Chloride). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101837   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polyester Resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101838   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101839   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101840   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102001   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102002   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102003   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102004   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102005   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102015   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102030   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102031   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102032   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102036   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102039   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102050   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102051   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102053   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102054   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102060   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102063   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102070   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102072   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102099   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102410   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACT II (Spandex production).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30103101   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103102   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103103   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103104   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103105   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103199   107028           -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30105001   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30119701   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119705   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119799   107028           -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30400301   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400302   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400303   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400304   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400305   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400310   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400314   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400315   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400316   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400317   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400318   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400319   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400320   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400321   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400322   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400325   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400330   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400331   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400332   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400333   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400340   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400341   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400342   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400350   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400351   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400352   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400353   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400354   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400355   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400356   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400357   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400358   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400360   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400370   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400371   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400398   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400399   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400701   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400702   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400703   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400704   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400705   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400706   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400707   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400708   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400709   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400710   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400711   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400712   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400713   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400714   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400715   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400716   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400717   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400718   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400720   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400721   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400722   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400723   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400724   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400725   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400726   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400730   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400731   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400732   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400733   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400735   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400736   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400737   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400739   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400740   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400741   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400742   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400743   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400744   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400745   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400760   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400765   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400768   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400770   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400775   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400780   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400785   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400799   107028           -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30500101   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500102   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500103   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500104   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500105   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500106   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500107   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500108   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500110   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500111   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500112   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500113   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500114   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500115   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500116   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500117   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500118   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500119   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500120   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500121   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500130   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500131   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500132   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500133   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500134   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500135   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500140   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500141   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500142   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500143   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500144   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500145   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500146   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500147   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500150   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500151   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500152   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500153   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500154   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500198   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500199   107028           -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30700602   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700604   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700606   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700607   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700608   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700610   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700611   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700621   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700625   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700626   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700628   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700629   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700630   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700631   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700632   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700635   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700640   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700651   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700655   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700661   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700664   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700665   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700699   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700701   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700702   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700703   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700704   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700705   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700706   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700707   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700708   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700709   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700710   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700711   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700712   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700713   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700714   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700715   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700716   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700717   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700718   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700720   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700725   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700727   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700730   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700734   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700735   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700736   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700737   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700740   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700744   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700746   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700747   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700750   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700752   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700753   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700756   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700757   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700760   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700762   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700763   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700766   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700767   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700769   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700770   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700771   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700780   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700781   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700783   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700785   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700788   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700789   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700790   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700791   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700792   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700793   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700798   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700799   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700801   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700802   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700895   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700921   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700923   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700925   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700927   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700931   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700932   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700933   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700934   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700935   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700936   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700937   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700939   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700940   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700950   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700960   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700971   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700980   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700981   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700982   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700983   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700984   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701001   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701008   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701009   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701010   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701015   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701020   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701030   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701040   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701053   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701054   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701055   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701057   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701060   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701062   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701064   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701199   107028           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30701410   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701415   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701416   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701420   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701425   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701430   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701440   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701442   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701480   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701482   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701484   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701486   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701510   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701512   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701530   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701540   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701550   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701610   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701611   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701630   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701640   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701642   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701710   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701712   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701720   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701740   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701742   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30702021   107028           -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30800699   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800701   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800702   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800703   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800704   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800705   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800720   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800721   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800722   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800723   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800724   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800730   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800731   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800732   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800799   107028           -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30901601   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40200410   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     40200701   107028           -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200706   107028           -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200707   107028           -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200710   107028           -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201301   107028           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201303   107028           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201304   107028           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201305   107028           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201310   107028           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201320   107028           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201330   107028           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201399   107028           -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201401   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201402   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201403   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201404   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201405   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201406   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201431   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201432   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201433   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201435   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201499   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201501   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201502   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201503   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201505   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201531   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201599   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201702   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201703   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201704   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201705   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201706   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201721   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201722   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201723   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201724   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201725   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201726   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201727   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201728   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201729   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201731   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201732   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201733   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201734   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201735   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201736   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201737   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201738   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201739   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201799   107028           -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202001   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202002   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202003   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202004   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202005   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202010   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202011   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202012   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202013   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202014   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202015   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202020   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202021   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202022   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202023   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202024   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202025   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202031   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202032   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202033   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202034   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202035   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202036   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202037   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202038   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202039   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202099   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202101   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202103   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202104   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202105   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202106   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202107   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202108   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202109   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202110   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202111   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202117   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202118   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202131   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202132   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202133   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202140   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202199   107028           -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202201   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202202   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202203   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202204   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202205   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202206   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202207   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202208   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202209   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202210   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202211   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202212   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202213   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202214   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202215   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202220   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202229   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202230   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202239   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202240   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202249   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202250   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202259   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202270   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202280   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202299   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202501   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202502   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202503   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202504   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202505   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202510   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202511   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202512   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202515   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202520   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202521   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202522   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202523   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202524   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202525   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202531   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202532   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202533   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202534   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202535   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202536   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202537   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202542   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202543   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202544   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202545   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202546   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202599   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202601   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202602   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202603   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202605   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202606   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202607   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202699   107028           -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     50100401   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100402   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100403   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100404   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100405   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100406   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100410   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100411   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100412   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100420   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100421   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100422   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100423   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100430   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100431   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100432   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100433   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200601   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200602   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300601   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300602   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300603   107028           -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          50000            -9  69.00 100 100 -9   1641   Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9  64.00 100 100 -9   1635   Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     0          50000            -9   0.00 100 100 -9   0710   Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          50000            -9  63.00 100 100 -9   0703   Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          50000            -9   5.00 100 100 -9   0308   Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     0          50000            -9  70.00 100 100 -9   0707   Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9   0.00 100 100 -9   0709   Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          50000            -9   0.00 100 100 -9   0704   Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          50000            -9  64.00 100 100 -9   1642   Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9  80.00 100 100 -9   0711   Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9   0.00 100 100 -9   0712   Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          50000            -9  39.00 100 100 -9   1337   Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          50000            -9  83.00 100 100 -9   1415   Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9  85.00 100 100 -9   0418   Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9  44.00 100 100 -9   1405   Y R                                 ! MACT: Cyanide Chemical Manufacturing (formerly Cyanuric Chloride Production) (Generic MACT).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9  44.00 100 100 -9   1636   Y R                                 ! MACT: Friction Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9  51.00 100 100 -9   1634   Y R                                 ! MACT: Leather Finishing Operations.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9  70.00 100 100 -9   0602   Y R                                 ! MACT: Organic Liquids Distribution (Non-gasoline).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9  81.00 100 100 -9   0406   Y R                                 ! MACT:Refractory Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9  50.00 100 100 -9   0805   Y R                                 ! MACT:Site Remediation.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          50000            -9  75.00 100 100 -9   0802   Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          50000            -9  54.00 100 100 -9   1624   Y R                                 ! MACT: Plywood and Composite Wood Products
0     30100509   50000            -9  83.00 100 100 -9   -9     Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101010   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101011   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101012   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101021   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101022   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101030   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101055   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101080   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101099   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101401   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101402   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101403   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101404   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101415   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101416   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101418   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101430   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101432   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101433   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101434   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101435   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101450   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101451   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101452   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101453   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101454   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101460   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101461   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101462   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101463   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101470   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101471   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101472   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101498   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101499   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101501   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101502   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101503   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101505   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101515   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101520   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101530   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101599   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101602   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101603   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101801   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polymerized Vinylidene Chloride). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101837   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polyester Resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101838   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101839   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101840   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102001   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102002   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102003   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102004   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102005   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102015   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102030   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102031   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102032   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102036   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102039   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102050   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102051   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102053   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102054   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102060   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102063   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102070   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102072   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102099   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102410   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACT II (Spandex production).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30103101   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103102   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103103   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103104   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103105   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103199   50000            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30105001   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30119701   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119705   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119799   50000            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30400301   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400302   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400303   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400304   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400305   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400310   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400314   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400315   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400316   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400317   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400318   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400319   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400320   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400321   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400322   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400325   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400330   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400331   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400332   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400333   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400340   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400341   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400342   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400350   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400351   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400352   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400353   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400354   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400355   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400356   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400357   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400358   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400360   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400370   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400371   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400398   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400399   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400701   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400702   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400703   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400704   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400705   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400706   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400707   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400708   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400709   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400710   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400711   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400712   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400713   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400714   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400715   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400716   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400717   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400718   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400720   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400721   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400722   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400723   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400724   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400725   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400726   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400730   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400731   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400732   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400733   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400735   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400736   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400737   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400739   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400740   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400741   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400742   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400743   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400744   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400745   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400760   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400765   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400768   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400770   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400775   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400780   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400785   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400799   50000            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30500101   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500102   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500103   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500104   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500105   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500106   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500107   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500108   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500110   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500111   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500112   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500113   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500114   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500115   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500116   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500117   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500118   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500119   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500120   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500121   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500130   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500131   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500132   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500133   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500134   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500135   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500140   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500141   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500142   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500143   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500144   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500145   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500146   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500147   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500150   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500151   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500152   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500153   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500154   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500198   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500199   50000            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30700602   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700604   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700606   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700607   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700608   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700610   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700611   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700621   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700625   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700626   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700628   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700629   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700630   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700631   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700632   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700635   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700640   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700651   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700655   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700661   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700664   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700665   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700699   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700701   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700702   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700703   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700704   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700705   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700706   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700707   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700708   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700709   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700710   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700711   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700712   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700713   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700714   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700715   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700716   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700717   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700718   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700720   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700725   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700727   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700730   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700734   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700735   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700736   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700737   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700740   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700744   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700746   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700747   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700750   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700752   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700753   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700756   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700757   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700760   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700762   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700763   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700766   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700767   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700769   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700770   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700771   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700780   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700781   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700783   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700785   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700788   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700789   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700790   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700791   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700792   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700793   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700798   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700799   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700801   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700802   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700895   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700921   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700923   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700925   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700927   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700931   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700932   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700933   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700934   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700935   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700936   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700937   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700939   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700940   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700950   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700960   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700971   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700980   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700981   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700982   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700983   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700984   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701001   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701008   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701009   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701010   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701015   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701020   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701030   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701040   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701053   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701054   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701055   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701057   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701060   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701062   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701064   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701199   50000            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30701410   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701415   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701416   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701420   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701425   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701430   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701440   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701442   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701480   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701482   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701484   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701486   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701510   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701512   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701530   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701540   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701550   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701610   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701611   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701630   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701640   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701642   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701710   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701712   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701720   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701740   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701742   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30702021   50000            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30800699   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800701   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800702   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800703   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800704   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800705   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800720   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800721   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800722   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800723   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800724   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800730   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800731   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800732   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800799   50000            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30901601   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40200410   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     40200701   50000            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200706   50000            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200707   50000            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200710   50000            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201301   50000            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201303   50000            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201304   50000            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201305   50000            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201310   50000            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201320   50000            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201330   50000            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201399   50000            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201401   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201402   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201403   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201404   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201405   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201406   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201431   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201432   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201433   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201435   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201499   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201501   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201502   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201503   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201505   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201531   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201599   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201702   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201703   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201704   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201705   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201706   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201721   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201722   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201723   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201724   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201725   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201726   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201727   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201728   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201729   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201731   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201732   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201733   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201734   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201735   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201736   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201737   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201738   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201739   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201799   50000            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202001   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202002   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202003   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202004   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202005   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202010   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202011   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202012   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202013   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202014   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202015   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202020   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202021   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202022   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202023   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202024   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202025   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202031   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202032   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202033   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202034   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202035   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202036   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202037   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202038   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202039   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202099   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202101   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202103   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202104   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202105   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202106   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202107   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202108   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202109   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202110   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202111   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202117   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202118   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202131   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202132   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202133   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202140   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202199   50000            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202201   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202202   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202203   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202204   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202205   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202206   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202207   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202208   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202209   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202210   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202211   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202212   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202213   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202214   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202215   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202220   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202229   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202230   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202239   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202240   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202249   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202250   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202259   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202270   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202280   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202299   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202501   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202502   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202503   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202504   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202505   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202510   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202511   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202512   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202515   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202520   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202521   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202522   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202523   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202524   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202525   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202531   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202532   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202533   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202534   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202535   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202536   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202537   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202542   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202543   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202544   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202545   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202546   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202599   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202601   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202602   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202603   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202605   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202606   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202607   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202699   50000            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     50100401   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100402   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100403   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100404   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100405   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100406   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100410   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100411   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100412   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100420   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100421   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100422   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100423   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100430   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100431   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100432   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100433   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200601   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200602   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300601   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300602   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300603   50000            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          67561            -9  69.00 100 100 -9   1641   Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9  64.00 100 100 -9   1635   Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     0          67561            -9   0.00 100 100 -9   0710   Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          67561            -9  63.00 100 100 -9   0703   Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          67561            -9   5.00 100 100 -9   0308   Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     0          67561            -9  70.00 100 100 -9   0707   Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9   0.00 100 100 -9   0709   Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          67561            -9   0.00 100 100 -9   0704   Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          67561            -9  64.00 100 100 -9   1642   Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9  80.00 100 100 -9   0711   Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9   0.00 100 100 -9   0712   Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          67561            -9  39.00 100 100 -9   1337   Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          67561            -9  83.00 100 100 -9   1415   Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9  85.00 100 100 -9   0418   Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9  44.00 100 100 -9   1405   Y R                                 ! MACT: Cyanide Chemical Manufacturing (formerly Cyanuric Chloride Production) (Generic MACT).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9  44.00 100 100 -9   1636   Y R                                 ! MACT: Friction Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9  51.00 100 100 -9   1634   Y R                                 ! MACT: Leather Finishing Operations.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9  70.00 100 100 -9   0602   Y R                                 ! MACT: Organic Liquids Distribution (Non-gasoline).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9  81.00 100 100 -9   0406   Y R                                 ! MACT:Refractory Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9  50.00 100 100 -9   0805   Y R                                 ! MACT:Site Remediation.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          67561            -9  75.00 100 100 -9   0802   Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          67561            -9  54.00 100 100 -9   1624   Y R                                 ! MACT: Plywood and Composite Wood Products
0     30100509   67561            -9  83.00 100 100 -9   -9     Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101010   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101011   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101012   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101021   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101022   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101030   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101055   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101080   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101099   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101401   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101402   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101403   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101404   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101415   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101416   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101418   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101430   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101432   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101433   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101434   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101435   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101450   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101451   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101452   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101453   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101454   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101460   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101461   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101462   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101463   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101470   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101471   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101472   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101498   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101499   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101501   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101502   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101503   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101505   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101515   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101520   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101530   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101599   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101602   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101603   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101801   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polymerized Vinylidene Chloride). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101837   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polyester Resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101838   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101839   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101840   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102001   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102002   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102003   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102004   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102005   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102015   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102030   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102031   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102032   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102036   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102039   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102050   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102051   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102053   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102054   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102060   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102063   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102070   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102072   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102099   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102410   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACT II (Spandex production).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30103101   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103102   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103103   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103104   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103105   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103199   67561            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30105001   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30119701   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119705   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119799   67561            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30400301   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400302   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400303   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400304   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400305   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400310   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400314   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400315   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400316   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400317   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400318   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400319   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400320   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400321   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400322   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400325   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400330   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400331   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400332   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400333   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400340   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400341   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400342   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400350   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400351   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400352   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400353   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400354   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400355   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400356   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400357   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400358   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400360   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400370   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400371   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400398   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400399   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400701   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400702   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400703   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400704   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400705   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400706   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400707   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400708   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400709   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400710   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400711   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400712   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400713   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400714   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400715   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400716   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400717   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400718   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400720   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400721   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400722   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400723   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400724   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400725   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400726   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400730   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400731   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400732   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400733   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400735   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400736   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400737   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400739   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400740   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400741   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400742   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400743   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400744   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400745   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400760   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400765   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400768   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400770   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400775   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400780   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400785   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400799   67561            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30500101   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500102   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500103   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500104   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500105   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500106   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500107   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500108   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500110   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500111   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500112   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500113   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500114   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500115   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500116   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500117   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500118   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500119   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500120   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500121   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500130   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500131   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500132   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500133   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500134   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500135   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500140   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500141   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500142   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500143   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500144   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500145   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500146   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500147   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500150   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500151   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500152   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500153   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500154   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500198   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500199   67561            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30700602   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700604   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700606   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700607   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700608   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700610   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700611   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700621   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700625   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700626   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700628   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700629   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700630   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700631   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700632   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700635   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700640   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700651   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700655   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700661   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700664   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700665   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700699   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700701   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700702   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700703   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700704   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700705   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700706   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700707   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700708   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700709   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700710   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700711   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700712   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700713   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700714   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700715   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700716   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700717   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700718   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700720   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700725   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700727   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700730   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700734   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700735   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700736   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700737   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700740   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700744   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700746   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700747   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700750   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700752   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700753   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700756   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700757   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700760   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700762   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700763   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700766   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700767   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700769   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700770   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700771   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700780   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700781   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700783   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700785   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700788   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700789   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700790   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700791   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700792   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700793   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700798   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700799   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700801   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700802   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700895   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700921   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700923   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700925   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700927   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700931   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700932   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700933   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700934   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700935   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700936   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700937   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700939   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700940   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700950   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700960   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700971   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700980   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700981   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700982   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700983   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700984   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701001   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701008   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701009   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701010   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701015   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701020   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701030   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701040   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701053   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701054   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701055   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701057   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701060   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701062   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701064   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701199   67561            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30701410   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701415   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701416   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701420   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701425   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701430   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701440   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701442   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701480   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701482   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701484   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701486   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701510   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701512   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701530   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701540   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701550   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701610   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701611   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701630   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701640   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701642   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701710   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701712   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701720   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701740   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701742   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30702021   67561            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30800699   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800701   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800702   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800703   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800704   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800705   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800720   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800721   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800722   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800723   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800724   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800730   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800731   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800732   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800799   67561            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30901601   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40200410   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     40200701   67561            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200706   67561            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200707   67561            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200710   67561            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201301   67561            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201303   67561            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201304   67561            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201305   67561            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201310   67561            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201320   67561            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201330   67561            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201399   67561            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201401   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201402   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201403   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201404   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201405   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201406   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201431   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201432   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201433   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201435   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201499   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201501   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201502   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201503   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201505   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201531   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201599   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201702   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201703   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201704   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201705   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201706   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201721   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201722   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201723   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201724   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201725   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201726   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201727   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201728   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201729   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201731   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201732   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201733   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201734   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201735   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201736   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201737   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201738   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201739   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201799   67561            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202001   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202002   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202003   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202004   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202005   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202010   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202011   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202012   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202013   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202014   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202015   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202020   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202021   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202022   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202023   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202024   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202025   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202031   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202032   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202033   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202034   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202035   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202036   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202037   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202038   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202039   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202099   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202101   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202103   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202104   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202105   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202106   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202107   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202108   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202109   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202110   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202111   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202117   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202118   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202131   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202132   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202133   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202140   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202199   67561            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202201   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202202   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202203   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202204   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202205   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202206   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202207   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202208   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202209   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202210   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202211   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202212   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202213   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202214   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202215   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202220   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202229   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202230   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202239   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202240   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202249   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202250   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202259   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202270   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202280   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202299   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202501   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202502   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202503   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202504   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202505   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202510   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202511   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202512   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202515   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202520   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202521   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202522   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202523   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202524   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202525   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202531   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202532   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202533   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202534   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202535   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202536   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202537   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202542   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202543   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202544   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202545   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202546   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202599   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202601   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202602   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202603   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202605   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202606   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202607   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202699   67561            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     50100401   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100402   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100403   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100404   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100405   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100406   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100410   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100411   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100412   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100420   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100421   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100422   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100423   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100430   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100431   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100432   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100433   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200601   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200602   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300601   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300602   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300603   67561            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          71432            -9  69.00 100 100 -9   1641   Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9  64.00 100 100 -9   1635   Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     0          71432            -9   0.00 100 100 -9   0710   Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          71432            -9  63.00 100 100 -9   0703   Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          71432            -9   5.00 100 100 -9   0308   Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     0          71432            -9  70.00 100 100 -9   0707   Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9   0.00 100 100 -9   0709   Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          71432            -9   0.00 100 100 -9   0704   Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          71432            -9  64.00 100 100 -9   1642   Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9  80.00 100 100 -9   0711   Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9   0.00 100 100 -9   0712   Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          71432            -9  39.00 100 100 -9   1337   Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          71432            -9  83.00 100 100 -9   1415   Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9  85.00 100 100 -9   0418   Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9  44.00 100 100 -9   1405   Y R                                 ! MACT: Cyanide Chemical Manufacturing (formerly Cyanuric Chloride Production) (Generic MACT).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9  44.00 100 100 -9   1636   Y R                                 ! MACT: Friction Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9  51.00 100 100 -9   1634   Y R                                 ! MACT: Leather Finishing Operations.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9  70.00 100 100 -9   0602   Y R                                 ! MACT: Organic Liquids Distribution (Non-gasoline).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9  81.00 100 100 -9   0406   Y R                                 ! MACT:Refractory Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9  50.00 100 100 -9   0805   Y R                                 ! MACT:Site Remediation.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          71432            -9  75.00 100 100 -9   0802   Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          71432            -9  54.00 100 100 -9   1624   Y R                                 ! MACT: Plywood and Composite Wood Products
0     30100509   71432            -9  83.00 100 100 -9   -9     Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101010   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101011   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101012   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101021   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101022   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101030   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101055   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101080   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101099   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101401   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101402   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101403   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101404   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101415   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101416   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101418   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101430   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101432   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101433   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101434   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101435   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101450   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101451   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101452   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101453   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101454   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101460   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101461   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101462   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101463   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101470   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101471   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101472   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101498   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101499   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101501   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101502   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101503   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101505   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101515   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101520   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101530   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101599   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101602   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101603   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101801   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polymerized Vinylidene Chloride). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101837   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polyester Resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101838   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101839   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101840   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102001   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102002   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102003   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102004   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102005   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102015   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102030   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102031   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102032   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102036   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102039   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102050   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102051   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102053   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102054   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102060   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102063   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102070   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102072   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102099   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102410   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACT II (Spandex production).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30103101   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103102   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103103   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103104   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103105   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103199   71432            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30105001   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30119701   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119705   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119799   71432            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30400301   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400302   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400303   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400304   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400305   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400310   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400314   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400315   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400316   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400317   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400318   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400319   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400320   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400321   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400322   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400325   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400330   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400331   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400332   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400333   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400340   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400341   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400342   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400350   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400351   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400352   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400353   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400354   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400355   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400356   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400357   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400358   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400360   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400370   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400371   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400398   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400399   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400701   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400702   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400703   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400704   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400705   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400706   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400707   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400708   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400709   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400710   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400711   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400712   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400713   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400714   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400715   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400716   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400717   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400718   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400720   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400721   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400722   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400723   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400724   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400725   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400726   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400730   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400731   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400732   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400733   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400735   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400736   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400737   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400739   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400740   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400741   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400742   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400743   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400744   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400745   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400760   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400765   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400768   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400770   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400775   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400780   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400785   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400799   71432            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30500101   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500102   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500103   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500104   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500105   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500106   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500107   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500108   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500110   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500111   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500112   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500113   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500114   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500115   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500116   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500117   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500118   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500119   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500120   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500121   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500130   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500131   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500132   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500133   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500134   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500135   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500140   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500141   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500142   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500143   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500144   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500145   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500146   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500147   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500150   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500151   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500152   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500153   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500154   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500198   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500199   71432            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30700602   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700604   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700606   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700607   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700608   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700610   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700611   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700621   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700625   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700626   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700628   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700629   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700630   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700631   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700632   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700635   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700640   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700651   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700655   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700661   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700664   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700665   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700699   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700701   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700702   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700703   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700704   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700705   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700706   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700707   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700708   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700709   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700710   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700711   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700712   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700713   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700714   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700715   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700716   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700717   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700718   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700720   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700725   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700727   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700730   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700734   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700735   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700736   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700737   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700740   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700744   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700746   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700747   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700750   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700752   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700753   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700756   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700757   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700760   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700762   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700763   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700766   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700767   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700769   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700770   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700771   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700780   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700781   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700783   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700785   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700788   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700789   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700790   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700791   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700792   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700793   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700798   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700799   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700801   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700802   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700895   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700921   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700923   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700925   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700927   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700931   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700932   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700933   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700934   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700935   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700936   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700937   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700939   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700940   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700950   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700960   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700971   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700980   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700981   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700982   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700983   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700984   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701001   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701008   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701009   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701010   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701015   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701020   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701030   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701040   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701053   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701054   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701055   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701057   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701060   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701062   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701064   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701199   71432            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30701410   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701415   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701416   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701420   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701425   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701430   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701440   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701442   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701480   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701482   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701484   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701486   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701510   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701512   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701530   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701540   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701550   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701610   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701611   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701630   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701640   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701642   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701710   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701712   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701720   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701740   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701742   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30702021   71432            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30800699   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800701   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800702   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800703   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800704   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800705   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800720   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800721   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800722   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800723   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800724   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800730   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800731   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800732   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800799   71432            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30901601   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40200410   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     40200701   71432            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200706   71432            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200707   71432            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200710   71432            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201301   71432            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201303   71432            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201304   71432            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201305   71432            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201310   71432            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201320   71432            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201330   71432            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201399   71432            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201401   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201402   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201403   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201404   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201405   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201406   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201431   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201432   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201433   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201435   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201499   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201501   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201502   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201503   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201505   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201531   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201599   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201702   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201703   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201704   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201705   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201706   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201721   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201722   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201723   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201724   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201725   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201726   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201727   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201728   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201729   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201731   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201732   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201733   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201734   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201735   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201736   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201737   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201738   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201739   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201799   71432            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202001   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202002   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202003   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202004   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202005   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202010   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202011   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202012   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202013   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202014   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202015   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202020   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202021   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202022   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202023   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202024   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202025   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202031   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202032   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202033   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202034   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202035   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202036   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202037   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202038   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202039   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202099   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202101   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202103   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202104   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202105   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202106   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202107   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202108   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202109   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202110   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202111   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202117   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202118   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202131   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202132   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202133   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202140   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202199   71432            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202201   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202202   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202203   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202204   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202205   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202206   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202207   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202208   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202209   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202210   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202211   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202212   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202213   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202214   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202215   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202220   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202229   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202230   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202239   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202240   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202249   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202250   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202259   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202270   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202280   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202299   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202501   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202502   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202503   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202504   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202505   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202510   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202511   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202512   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202515   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202520   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202521   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202522   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202523   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202524   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202525   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202531   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202532   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202533   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202534   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202535   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202536   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202537   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202542   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202543   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202544   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202545   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202546   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202599   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202601   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202602   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202603   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202605   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202606   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202607   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202699   71432            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     50100401   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100402   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100403   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100404   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100405   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100406   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100410   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100411   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100412   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100420   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100421   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100422   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100423   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100430   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100431   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100432   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100433   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200601   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200602   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300601   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300602   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300603   71432            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          75070            -9  69.00 100 100 -9   1641   Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9  64.00 100 100 -9   1635   Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     0          75070            -9   0.00 100 100 -9   0710   Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          75070            -9  63.00 100 100 -9   0703   Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          75070            -9   5.00 100 100 -9   0308   Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     0          75070            -9  70.00 100 100 -9   0707   Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9   0.00 100 100 -9   0709   Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          75070            -9   0.00 100 100 -9   0704   Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          75070            -9  64.00 100 100 -9   1642   Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9  80.00 100 100 -9   0711   Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9   0.00 100 100 -9   0712   Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          75070            -9  39.00 100 100 -9   1337   Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          75070            -9  83.00 100 100 -9   1415   Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9  85.00 100 100 -9   0418   Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9  44.00 100 100 -9   1405   Y R                                 ! MACT: Cyanide Chemical Manufacturing (formerly Cyanuric Chloride Production) (Generic MACT).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9  44.00 100 100 -9   1636   Y R                                 ! MACT: Friction Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9  51.00 100 100 -9   1634   Y R                                 ! MACT: Leather Finishing Operations.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9  70.00 100 100 -9   0602   Y R                                 ! MACT: Organic Liquids Distribution (Non-gasoline).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9  81.00 100 100 -9   0406   Y R                                 ! MACT:Refractory Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9  50.00 100 100 -9   0805   Y R                                 ! MACT:Site Remediation.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          75070            -9  75.00 100 100 -9   0802   Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          75070            -9  54.00 100 100 -9   1624   Y R                                 ! MACT: Plywood and Composite Wood Products
0     30100509   75070            -9  83.00 100 100 -9   -9     Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101010   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101011   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101012   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101021   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101022   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101030   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101055   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101080   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101099   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101401   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101402   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101403   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101404   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101415   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101416   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101418   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101430   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101432   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101433   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101434   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101435   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101450   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101451   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101452   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101453   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101454   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101460   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101461   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101462   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101463   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101470   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101471   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101472   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101498   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101499   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101501   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101502   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101503   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101505   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101515   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101520   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101530   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101599   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101602   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101603   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101801   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polymerized Vinylidene Chloride). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101837   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polyester Resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101838   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101839   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101840   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102001   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102002   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102003   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102004   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102005   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102015   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102030   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102031   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102032   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102036   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102039   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102050   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102051   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102053   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102054   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102060   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102063   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102070   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102072   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102099   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102410   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACT II (Spandex production).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30103101   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103102   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103103   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103104   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103105   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103199   75070            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30105001   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30119701   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119705   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119799   75070            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30400301   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400302   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400303   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400304   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400305   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400310   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400314   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400315   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400316   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400317   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400318   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400319   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400320   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400321   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400322   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400325   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400330   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400331   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400332   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400333   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400340   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400341   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400342   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400350   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400351   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400352   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400353   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400354   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400355   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400356   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400357   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400358   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400360   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400370   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400371   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400398   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400399   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400701   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400702   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400703   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400704   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400705   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400706   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400707   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400708   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400709   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400710   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400711   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400712   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400713   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400714   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400715   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400716   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400717   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400718   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400720   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400721   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400722   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400723   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400724   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400725   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400726   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400730   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400731   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400732   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400733   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400735   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400736   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400737   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400739   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400740   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400741   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400742   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400743   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400744   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400745   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400760   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400765   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400768   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400770   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400775   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400780   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400785   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400799   75070            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30500101   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500102   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500103   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500104   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500105   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500106   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500107   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500108   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500110   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500111   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500112   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500113   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500114   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500115   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500116   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500117   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500118   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500119   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500120   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500121   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500130   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500131   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500132   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500133   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500134   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500135   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500140   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500141   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500142   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500143   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500144   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500145   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500146   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500147   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500150   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500151   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500152   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500153   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500154   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500198   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500199   75070            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30700602   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700604   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700606   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700607   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700608   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700610   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700611   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700621   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700625   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700626   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700628   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700629   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700630   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700631   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700632   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700635   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700640   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700651   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700655   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700661   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700664   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700665   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700699   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700701   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700702   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700703   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700704   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700705   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700706   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700707   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700708   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700709   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700710   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700711   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700712   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700713   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700714   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700715   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700716   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700717   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700718   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700720   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700725   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700727   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700730   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700734   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700735   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700736   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700737   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700740   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700744   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700746   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700747   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700750   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700752   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700753   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700756   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700757   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700760   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700762   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700763   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700766   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700767   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700769   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700770   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700771   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700780   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700781   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700783   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700785   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700788   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700789   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700790   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700791   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700792   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700793   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700798   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700799   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700801   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700802   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700895   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700921   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700923   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700925   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700927   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700931   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700932   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700933   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700934   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700935   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700936   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700937   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700939   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700940   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700950   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700960   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700971   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700980   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700981   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700982   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700983   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700984   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701001   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701008   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701009   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701010   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701015   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701020   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701030   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701040   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701053   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701054   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701055   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701057   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701060   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701062   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701064   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701199   75070            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30701410   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701415   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701416   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701420   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701425   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701430   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701440   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701442   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701480   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701482   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701484   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701486   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701510   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701512   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701530   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701540   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701550   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701610   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701611   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701630   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701640   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701642   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701710   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701712   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701720   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701740   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701742   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30702021   75070            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30800699   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800701   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800702   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800703   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800704   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800705   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800720   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800721   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800722   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800723   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800724   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800730   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800731   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800732   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800799   75070            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30901601   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40200410   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     40200701   75070            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200706   75070            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200707   75070            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200710   75070            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201301   75070            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201303   75070            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201304   75070            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201305   75070            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201310   75070            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201320   75070            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201330   75070            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201399   75070            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201401   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201402   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201403   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201404   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201405   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201406   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201431   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201432   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201433   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201435   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201499   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201501   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201502   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201503   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201505   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201531   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201599   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201702   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201703   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201704   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201705   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201706   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201721   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201722   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201723   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201724   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201725   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201726   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201727   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201728   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201729   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201731   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201732   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201733   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201734   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201735   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201736   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201737   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201738   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201739   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201799   75070            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202001   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202002   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202003   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202004   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202005   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202010   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202011   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202012   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202013   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202014   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202015   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202020   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202021   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202022   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202023   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202024   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202025   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202031   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202032   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202033   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202034   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202035   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202036   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202037   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202038   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202039   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202099   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202101   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202103   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202104   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202105   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202106   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202107   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202108   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202109   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202110   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202111   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202117   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202118   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202131   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202132   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202133   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202140   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202199   75070            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202201   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202202   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202203   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202204   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202205   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202206   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202207   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202208   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202209   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202210   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202211   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202212   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202213   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202214   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202215   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202220   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202229   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202230   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202239   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202240   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202249   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202250   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202259   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202270   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202280   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202299   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202501   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202502   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202503   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202504   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202505   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202510   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202511   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202512   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202515   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202520   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202521   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202522   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202523   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202524   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202525   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202531   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202532   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202533   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202534   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202535   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202536   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202537   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202542   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202543   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202544   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202545   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202546   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202599   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202601   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202602   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202603   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202605   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202606   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202607   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202699   75070            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     50100401   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100402   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100403   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100404   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100405   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100406   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100410   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100411   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100412   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100420   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100421   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100422   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100423   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100430   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100431   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100432   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100433   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200601   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200602   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300601   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300602   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300603   75070            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          91203            -9  69.00 100 100 -9   1641   Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9  64.00 100 100 -9   1635   Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     0          91203            -9   0.00 100 100 -9   0710   Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          91203            -9  63.00 100 100 -9   0703   Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          91203            -9   5.00 100 100 -9   0308   Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     0          91203            -9  70.00 100 100 -9   0707   Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9   0.00 100 100 -9   0709   Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          91203            -9   0.00 100 100 -9   0704   Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          91203            -9  64.00 100 100 -9   1642   Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9  80.00 100 100 -9   0711   Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9   0.00 100 100 -9   0712   Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          91203            -9  39.00 100 100 -9   1337   Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          91203            -9  83.00 100 100 -9   1415   Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9  85.00 100 100 -9   0418   Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9  44.00 100 100 -9   1405   Y R                                 ! MACT: Cyanide Chemical Manufacturing (formerly Cyanuric Chloride Production) (Generic MACT).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9  44.00 100 100 -9   1636   Y R                                 ! MACT: Friction Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9  51.00 100 100 -9   1634   Y R                                 ! MACT: Leather Finishing Operations.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9  70.00 100 100 -9   0602   Y R                                 ! MACT: Organic Liquids Distribution (Non-gasoline).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9  81.00 100 100 -9   0406   Y R                                 ! MACT:Refractory Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9  50.00 100 100 -9   0805   Y R                                 ! MACT:Site Remediation.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          91203            -9  75.00 100 100 -9   0802   Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          91203            -9  54.00 100 100 -9   1624   Y R                                 ! MACT: Plywood and Composite Wood Products
0     30100509   91203            -9  83.00 100 100 -9   -9     Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101010   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101011   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101012   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101021   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101022   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101030   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101055   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101080   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101099   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101401   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101402   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101403   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101404   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101415   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101416   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101418   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101430   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101432   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101433   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101434   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101435   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101450   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101451   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101452   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101453   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101454   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101460   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101461   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101462   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101463   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101470   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101471   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101472   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101498   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101499   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101501   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101502   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101503   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101505   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101515   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101520   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101530   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101599   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101602   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101603   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101801   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polymerized Vinylidene Chloride). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101837   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polyester Resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101838   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101839   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101840   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102001   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102002   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102003   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102004   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102005   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102015   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102030   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102031   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102032   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102036   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102039   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102050   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102051   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102053   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102054   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102060   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102063   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102070   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102072   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102099   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102410   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACT II (Spandex production).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30103101   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103102   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103103   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103104   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103105   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103199   91203            -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30105001   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30119701   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119705   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119799   91203            -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30400301   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400302   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400303   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400304   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400305   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400310   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400314   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400315   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400316   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400317   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400318   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400319   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400320   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400321   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400322   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400325   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400330   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400331   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400332   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400333   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400340   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400341   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400342   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400350   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400351   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400352   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400353   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400354   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400355   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400356   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400357   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400358   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400360   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400370   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400371   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400398   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400399   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400701   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400702   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400703   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400704   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400705   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400706   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400707   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400708   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400709   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400710   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400711   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400712   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400713   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400714   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400715   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400716   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400717   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400718   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400720   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400721   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400722   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400723   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400724   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400725   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400726   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400730   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400731   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400732   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400733   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400735   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400736   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400737   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400739   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400740   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400741   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400742   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400743   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400744   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400745   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400760   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400765   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400768   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400770   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400775   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400780   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400785   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400799   91203            -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30500101   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500102   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500103   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500104   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500105   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500106   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500107   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500108   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500110   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500111   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500112   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500113   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500114   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500115   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500116   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500117   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500118   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500119   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500120   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500121   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500130   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500131   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500132   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500133   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500134   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500135   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500140   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500141   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500142   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500143   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500144   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500145   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500146   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500147   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500150   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500151   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500152   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500153   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500154   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500198   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500199   91203            -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30700602   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700604   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700606   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700607   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700608   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700610   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700611   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700621   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700625   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700626   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700628   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700629   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700630   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700631   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700632   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700635   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700640   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700651   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700655   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700661   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700664   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700665   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700699   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700701   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700702   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700703   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700704   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700705   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700706   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700707   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700708   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700709   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700710   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700711   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700712   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700713   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700714   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700715   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700716   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700717   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700718   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700720   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700725   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700727   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700730   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700734   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700735   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700736   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700737   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700740   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700744   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700746   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700747   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700750   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700752   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700753   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700756   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700757   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700760   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700762   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700763   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700766   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700767   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700769   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700770   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700771   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700780   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700781   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700783   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700785   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700788   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700789   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700790   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700791   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700792   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700793   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700798   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700799   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700801   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700802   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700895   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700921   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700923   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700925   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700927   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700931   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700932   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700933   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700934   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700935   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700936   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700937   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700939   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700940   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700950   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700960   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700971   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700980   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700981   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700982   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700983   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700984   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701001   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701008   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701009   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701010   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701015   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701020   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701030   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701040   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701053   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701054   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701055   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701057   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701060   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701062   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701064   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701199   91203            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30701410   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701415   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701416   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701420   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701425   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701430   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701440   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701442   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701480   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701482   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701484   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701486   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701510   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701512   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701530   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701540   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701550   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701610   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701611   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701630   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701640   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701642   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701710   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701712   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701720   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701740   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701742   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30702021   91203            -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30800699   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800701   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800702   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800703   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800704   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800705   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800720   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800721   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800722   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800723   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800724   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800730   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800731   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800732   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800799   91203            -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30901601   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40200410   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     40200701   91203            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200706   91203            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200707   91203            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200710   91203            -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201301   91203            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201303   91203            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201304   91203            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201305   91203            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201310   91203            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201320   91203            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201330   91203            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201399   91203            -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201401   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201402   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201403   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201404   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201405   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201406   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201431   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201432   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201433   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201435   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201499   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201501   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201502   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201503   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201505   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201531   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201599   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201702   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201703   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201704   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201705   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201706   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201721   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201722   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201723   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201724   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201725   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201726   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201727   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201728   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201729   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201731   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201732   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201733   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201734   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201735   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201736   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201737   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201738   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201739   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201799   91203            -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202001   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202002   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202003   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202004   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202005   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202010   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202011   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202012   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202013   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202014   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202015   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202020   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202021   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202022   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202023   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202024   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202025   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202031   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202032   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202033   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202034   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202035   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202036   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202037   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202038   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202039   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202099   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202101   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202103   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202104   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202105   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202106   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202107   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202108   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202109   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202110   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202111   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202117   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202118   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202131   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202132   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202133   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202140   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202199   91203            -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202201   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202202   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202203   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202204   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202205   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202206   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202207   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202208   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202209   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202210   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202211   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202212   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202213   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202214   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202215   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202220   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202229   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202230   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202239   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202240   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202249   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202250   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202259   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202270   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202280   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202299   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202501   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202502   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202503   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202504   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202505   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202510   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202511   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202512   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202515   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202520   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202521   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202522   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202523   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202524   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202525   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202531   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202532   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202533   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202534   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202535   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202536   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202537   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202542   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202543   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202544   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202545   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202546   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202599   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202601   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202602   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202603   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202605   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202606   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202607   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202699   91203            -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     50100401   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100402   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100403   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100404   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100405   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100406   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100410   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100411   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100412   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100420   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100421   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100422   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100423   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100430   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100431   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100432   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100433   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200601   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200602   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300601   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300602   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300603   91203            -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100505   NOX              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200501   NOX              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200502   NOX              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200503   NOX              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200504   NOX              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200505   NOX              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50100505   PM10             -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200501   PM10             -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200502   PM10             -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200503   PM10             -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200504   PM10             -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200505   PM10             -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50100505   PM2_5            -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200501   PM2_5            -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200502   PM2_5            -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200503   PM2_5            -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200504   PM2_5            -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200505   PM2_5            -9  88.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50100505   SO2              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200501   SO2              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200502   SO2              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200503   SO2              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200504   SO2              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     50200505   SO2              -9  20.00 100 100 -9   -9     Y R                                 ! MACT: Medical Waste Incinerators
0     0          VOC              -9  69.00 100 100 -9   1641   Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9  64.00 100 100 -9   1635   Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     0          VOC              -9   0.00 100 100 -9   0710   Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          VOC              -9  63.00 100 100 -9   0703   Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          VOC              -9   5.00 100 100 -9   0308   Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     0          VOC              -9  70.00 100 100 -9   0707   Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9   0.00 100 100 -9   0709   Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          VOC              -9   0.00 100 100 -9   0704   Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          VOC              -9  64.00 100 100 -9   1642   Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9  80.00 100 100 -9   0711   Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9   0.00 100 100 -9   0712   Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     0          VOC              -9  39.00 100 100 -9   1337   Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          VOC              -9  83.00 100 100 -9   1415   Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9  85.00 100 100 -9   0418   Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9  44.00 100 100 -9   1405   Y R                                 ! MACT: Cyanide Chemical Manufacturing (formerly Cyanuric Chloride Production) (Generic MACT).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9  44.00 100 100 -9   1636   Y R                                 ! MACT: Friction Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9  51.00 100 100 -9   1634   Y R                                 ! MACT: Leather Finishing Operations.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9  70.00 100 100 -9   0602   Y R                                 ! MACT: Organic Liquids Distribution (Non-gasoline).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9  81.00 100 100 -9   0406   Y R                                 ! MACT:Refractory Products Manufacturing.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9  50.00 100 100 -9   0805   Y R                                 ! MACT:Site Remediation.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     0          VOC              -9  75.00 100 100 -9   0802   Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     0          VOC              -9  54.00 100 100 -9   1624   Y R                                 ! MACT: Plywood and Composite Wood Products
0     30100509   VOC              -9  83.00 100 100 -9   -9     Y R                                 ! MACT:Carbon Black Production (Generic MACT) Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101010   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101011   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101012   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101021   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101022   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101030   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101055   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101080   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101099   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Explosives).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101401   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101402   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101403   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101404   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101415   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101416   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101418   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101430   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101432   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101433   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101434   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101435   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101450   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101451   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101452   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101453   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101454   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101460   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101461   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101462   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101463   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101470   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101471   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101472   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101498   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101499   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101501   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101502   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101503   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101505   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101515   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101520   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101530   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101599   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101602   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101603   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Chelating agents). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101801   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polymerized Vinylidene Chloride). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101837   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Polyester Resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30101838   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101839   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30101840   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Alkyd resins). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102001   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102002   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102003   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102004   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102005   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102015   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102030   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102031   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102032   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102036   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102039   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102050   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102051   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102053   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102054   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102060   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102063   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102070   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102072   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102099   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30102410   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACT II (Spandex production).  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30103101   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103102   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103103   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103104   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103105   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30103199   VOC              -9  69.00 100 100 -9   -9     Y R                                 ! MACT: MON (Phthalate plasicizers). Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30105001   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Miscellaneous Coating Manufacturing Based on HAP reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30119701   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119705   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30119799   VOC              -9  64.00 100 100 -9   -9     Y R                                 ! MACT: Generic MACTII (Ethylene manufacture).  Based on  VOC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT r
0     30400301   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400302   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400303   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400304   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400305   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400310   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400314   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400315   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400316   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400317   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400318   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400319   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400320   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400321   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400322   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400325   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400330   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400331   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400332   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400333   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400340   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400341   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400342   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400350   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400351   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400352   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400353   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400354   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400355   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400356   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400357   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400358   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400360   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400370   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400371   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400398   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400399   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400701   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400702   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400703   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400704   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400705   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400706   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400707   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400708   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400709   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400710   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400711   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400712   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400713   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400714   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400715   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400716   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400717   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400718   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400720   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400721   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400722   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400723   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400724   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400725   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400726   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400730   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400731   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400732   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400733   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400735   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400736   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400737   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400739   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400740   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400741   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400742   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400743   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400744   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400745   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400760   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400765   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400768   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400770   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400775   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400780   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400785   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30400799   VOC              -9   5.00 100 100 -9   -9     Y R                                 ! MACT: Iron & Steel Foundries.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules which is based on Project Lead Information.
0     30500101   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500102   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500103   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500104   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500105   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500106   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500107   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500108   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500110   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500111   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500112   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500113   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500114   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500115   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500116   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500117   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500118   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500119   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500120   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500121   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500130   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500131   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500132   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500133   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500134   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500135   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500140   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500141   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500142   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500143   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500144   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500145   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500146   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500147   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500150   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500151   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500152   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500153   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500154   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500198   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30500199   VOC              -9  85.00 100 100 -9   -9     Y R                                 ! MACT: Asphalt Processing & Roofing.  Based on THC percent reduction estimate in final rule preamble.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30700602   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700604   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700606   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700607   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700608   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700610   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700611   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700621   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700625   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700626   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700628   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700629   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700630   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700631   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700632   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700635   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700640   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700651   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700655   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700661   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700664   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700665   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700699   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700701   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700702   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700703   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700704   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700705   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700706   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700707   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700708   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700709   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700710   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700711   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700712   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700713   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700714   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700715   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700716   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700717   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700718   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700720   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700725   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700727   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700730   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700734   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700735   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700736   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700737   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700740   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700744   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700746   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700747   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700750   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700752   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700753   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700756   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700757   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700760   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700762   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700763   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700766   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700767   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700769   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700770   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700771   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700780   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700781   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700783   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700785   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700788   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700789   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700790   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700791   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700792   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700793   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700798   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700799   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700801   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700802   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700895   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700921   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700923   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700925   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700927   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700931   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700932   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700933   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700934   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700935   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700936   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700937   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700939   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700940   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700950   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700960   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700971   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700980   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700981   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700982   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700983   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30700984   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701001   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701008   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701009   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701010   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701015   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701020   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701030   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701040   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701053   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701054   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701055   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701057   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701060   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701062   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701064   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701199   VOC              -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     30701410   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701415   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701416   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701420   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701425   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701430   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701440   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701442   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701480   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701482   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701484   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701486   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701510   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701512   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701530   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701540   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701550   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701610   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701611   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701630   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701640   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701642   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701710   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701712   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701720   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701740   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30701742   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30702021   VOC              -9  54.00 100 100 -9   -9     Y R                                 ! MACT: Plywood and Composite Wood Products
0     30800699   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800701   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800702   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800703   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800704   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800705   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800720   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800721   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800722   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800723   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800724   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800730   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800731   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800732   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30800799   VOC              -9  39.00 100 100 -9   -9     Y R                                 ! MACT: Reinforced plastics.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     30901601   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40200410   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT:  Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     40200701   VOC              -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200706   VOC              -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200707   VOC              -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40200710   VOC              -9  78.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201301   VOC              -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201303   VOC              -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201304   VOC              -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201305   VOC              -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201310   VOC              -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201320   VOC              -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201330   VOC              -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201399   VOC              -9  80.00 100 100 -9   -9     Y R                                 ! MACT: Paper and Other Web.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201401   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201402   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201403   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201404   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201405   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201406   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201431   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201432   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201433   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201435   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201499   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Large Appliances.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201501   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201502   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201503   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201505   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201531   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201599   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40201702   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201703   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201704   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201705   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201706   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201721   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201722   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201723   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201724   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201725   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201726   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201727   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201728   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201729   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201731   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201732   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201733   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201734   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201735   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201736   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201737   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201738   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201739   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40201799   VOC              -9  70.00 100 100 -9   -9     Y R                                 ! MACT: Metal Can.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202001   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202002   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202003   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202004   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202005   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202010   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202011   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202012   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202013   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202014   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202015   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202020   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202021   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202022   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202023   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202024   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202025   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202031   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202032   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202033   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202034   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202035   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202036   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202037   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202038   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202039   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202099   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Metal Furniture. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202101   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202103   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202104   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202105   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202106   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202107   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202108   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202109   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202110   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202111   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202117   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202118   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202131   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202132   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202133   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202140   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202199   VOC              -9  63.00 100 100 -9   -9     Y R                                 ! MACT: Wood Building Products Surface Coating.   Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules
0     40202201   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202202   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202203   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202204   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202205   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202206   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202207   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202208   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202209   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202210   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202211   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202212   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202213   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202214   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202215   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202220   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202229   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202230   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202239   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202240   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202249   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202250   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202259   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202270   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202280   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202299   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Plastic Parts. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202501   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202502   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202503   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202504   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202505   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202510   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202511   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202512   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202515   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202520   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202521   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202522   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202523   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202524   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202525   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202531   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202532   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202533   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202534   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202535   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202536   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202537   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202542   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202543   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202544   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202545   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202546   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202599   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202601   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202602   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202603   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202605   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202606   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202607   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     40202699   VOC              -9   0.00 100 100 -9   -9     Y R                                 ! MACT: Misc. Metal Parts & Products. Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules. Conservative estimate of 0.
0     50100401   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100402   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100403   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100404   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100405   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100406   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100410   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100411   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100412   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100420   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100421   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100422   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100423   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100430   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100431   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100432   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50100433   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200601   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50200602   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300601   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300602   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
0     50300603   VOC              -9  75.00 100 100 -9   -9     Y R                                 ! MACT: Municipal Solid Waste Landfills.  Consistent with draft guidance for estimating VOC and NOX emission changes from MACT rules.
01001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 36067NNCMP100JE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4628                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0023                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B12                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4649                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730248                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 010730269                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 010737122                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15472                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 36732GLFSTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01091 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4731                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01099 0          106990           -9   0.00 100 100 -9   1624   Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700602   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700604   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700606   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700607   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700608   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700610   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700611   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700621   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700625   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700626   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700628   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700629   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700630   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700631   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700632   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700635   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700640   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700651   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700655   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700661   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700664   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700665   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700701   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700702   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700703   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700704   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700705   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700706   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700707   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700708   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700709   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700710   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700711   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700712   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700713   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700714   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700715   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700716   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700717   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700718   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700720   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700725   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700727   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700730   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700734   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700735   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700736   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700737   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700740   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700744   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700746   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700747   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700750   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700752   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700753   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700756   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700757   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700760   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700762   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700763   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700766   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700767   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700769   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700770   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700771   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700780   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700781   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700783   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700785   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700788   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700789   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700790   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700791   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700792   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700793   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700798   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700799   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700801   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700802   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700895   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700921   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700923   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700925   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700927   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700931   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700932   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700933   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700934   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700935   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700936   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700939   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700940   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700950   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700960   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700971   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700980   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700981   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700982   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700983   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700984   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701001   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701008   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701009   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701010   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701015   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701020   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701030   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701040   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701053   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701054   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701055   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701057   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701060   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701062   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701064   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701410   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701415   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701416   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701420   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701425   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701430   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701440   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701442   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701480   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701482   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701484   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701486   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701510   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701512   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701530   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701540   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701550   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701610   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701611   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701630   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701640   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701642   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701710   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701712   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701720   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701740   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701742   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30702021   106990           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 0          107028           -9   0.00 100 100 -9   1624   Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700602   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700604   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700606   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700607   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700608   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700610   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700611   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700621   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700625   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700626   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700628   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700629   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700630   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700631   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700632   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700635   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700640   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700651   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700655   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700661   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700664   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700665   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700701   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700702   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700703   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700704   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700705   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700706   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700707   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700708   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700709   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700710   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700711   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700712   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700713   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700714   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700715   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700716   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700717   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700718   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700720   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700725   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700727   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700730   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700734   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700735   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700736   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700737   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700740   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700744   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700746   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700747   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700750   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700752   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700753   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700756   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700757   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700760   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700762   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700763   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700766   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700767   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700769   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700770   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700771   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700780   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700781   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700783   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700785   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700788   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700789   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700790   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700791   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700792   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700793   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700798   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700799   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700801   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700802   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700895   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700921   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700923   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700925   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700927   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700931   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700932   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700933   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700934   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700935   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700936   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700939   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700940   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700950   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700960   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700971   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700980   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700981   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700982   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700983   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700984   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701001   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701008   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701009   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701010   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701015   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701020   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701030   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701040   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701053   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701054   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701055   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701057   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701060   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701062   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701064   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701410   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701415   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701416   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701420   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701425   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701430   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701440   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701442   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701480   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701482   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701484   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701486   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701510   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701512   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701530   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701540   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701550   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701610   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701611   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701630   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701640   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701642   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701710   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701712   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701720   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701740   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701742   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30702021   107028           -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 0          50000            -9   0.00 100 100 -9   1624   Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700602   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700604   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700606   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700607   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700608   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700610   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700611   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700621   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700625   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700626   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700628   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700629   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700630   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700631   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700632   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700635   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700640   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700651   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700655   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700661   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700664   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700665   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700701   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700702   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700703   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700704   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700705   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700706   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700707   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700708   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700709   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700710   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700711   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700712   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700713   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700714   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700715   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700716   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700717   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700718   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700720   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700725   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700727   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700730   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700734   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700735   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700736   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700737   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700740   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700744   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700746   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700747   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700750   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700752   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700753   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700756   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700757   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700760   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700762   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700763   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700766   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700767   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700769   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700770   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700771   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700780   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700781   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700783   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700785   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700788   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700789   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700790   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700791   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700792   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700793   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700798   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700799   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700801   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700802   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700895   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700921   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700923   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700925   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700927   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700931   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700932   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700933   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700934   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700935   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700936   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700939   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700940   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700950   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700960   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700971   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700980   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700981   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700982   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700983   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700984   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701001   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701008   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701009   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701010   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701015   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701020   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701030   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701040   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701053   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701054   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701055   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701057   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701060   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701062   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701064   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701410   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701415   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701416   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701420   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701425   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701430   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701440   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701442   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701480   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701482   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701484   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701486   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701510   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701512   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701530   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701540   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701550   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701610   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701611   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701630   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701640   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701642   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701710   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701712   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701720   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701740   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701742   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30702021   50000            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 0          67561            -9   0.00 100 100 -9   1624   Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700602   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700604   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700606   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700607   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700608   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700610   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700611   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700621   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700625   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700626   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700628   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700629   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700630   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700631   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700632   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700635   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700640   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700651   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700655   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700661   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700664   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700665   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700701   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700702   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700703   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700704   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700705   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700706   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700707   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700708   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700709   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700710   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700711   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700712   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700713   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700714   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700715   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700716   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700717   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700718   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700720   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700725   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700727   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700730   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700734   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700735   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700736   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700737   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700740   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700744   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700746   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700747   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700750   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700752   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700753   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700756   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700757   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700760   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700762   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700763   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700766   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700767   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700769   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700770   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700771   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700780   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700781   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700783   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700785   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700788   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700789   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700790   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700791   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700792   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700793   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700798   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700799   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700801   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700802   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700895   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700921   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700923   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700925   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700927   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700931   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700932   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700933   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700934   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700935   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700936   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700939   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700940   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700950   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700960   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700971   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700980   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700981   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700982   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700983   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700984   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701001   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701008   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701009   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701010   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701015   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701020   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701030   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701040   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701053   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701054   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701055   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701057   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701060   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701062   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701064   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701410   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701415   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701416   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701420   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701425   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701430   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701440   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701442   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701480   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701482   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701484   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701486   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701510   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701512   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701530   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701540   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701550   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701610   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701611   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701630   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701640   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701642   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701710   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701712   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701720   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701740   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701742   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30702021   67561            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 0          71432            -9   0.00 100 100 -9   1624   Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700602   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700604   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700606   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700607   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700608   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700610   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700611   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700621   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700625   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700626   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700628   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700629   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700630   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700631   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700632   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700635   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700640   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700651   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700655   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700661   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700664   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700665   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700701   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700702   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700703   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700704   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700705   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700706   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700707   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700708   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700709   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700710   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700711   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700712   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700713   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700714   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700715   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700716   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700717   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700718   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700720   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700725   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700727   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700730   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700734   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700735   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700736   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700737   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700740   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700744   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700746   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700747   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700750   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700752   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700753   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700756   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700757   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700760   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700762   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700763   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700766   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700767   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700769   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700770   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700771   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700780   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700781   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700783   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700785   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700788   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700789   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700790   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700791   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700792   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700793   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700798   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700799   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700801   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700802   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700895   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700921   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700923   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700925   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700927   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700931   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700932   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700933   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700934   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700935   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700936   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700939   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700940   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700950   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700960   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700971   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700980   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700981   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700982   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700983   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700984   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701001   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701008   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701009   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701010   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701015   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701020   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701030   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701040   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701053   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701054   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701055   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701057   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701060   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701062   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701064   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701410   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701415   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701416   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701420   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701425   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701430   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701440   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701442   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701480   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701482   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701484   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701486   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701510   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701512   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701530   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701540   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701550   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701610   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701611   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701630   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701640   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701642   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701710   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701712   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701720   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701740   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701742   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30702021   71432            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 0          75070            -9   0.00 100 100 -9   1624   Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700602   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700604   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700606   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700607   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700608   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700610   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700611   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700621   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700625   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700626   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700628   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700629   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700630   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700631   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700632   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700635   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700640   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700651   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700655   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700661   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700664   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700665   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700701   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700702   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700703   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700704   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700705   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700706   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700707   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700708   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700709   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700710   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700711   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700712   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700713   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700714   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700715   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700716   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700717   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700718   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700720   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700725   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700727   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700730   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700734   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700735   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700736   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700737   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700740   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700744   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700746   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700747   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700750   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700752   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700753   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700756   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700757   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700760   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700762   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700763   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700766   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700767   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700769   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700770   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700771   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700780   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700781   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700783   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700785   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700788   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700789   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700790   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700791   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700792   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700793   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700798   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700799   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700801   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700802   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700895   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700921   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700923   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700925   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700927   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700931   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700932   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700933   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700934   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700935   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700936   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700939   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700940   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700950   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700960   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700971   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700980   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700981   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700982   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700983   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700984   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701001   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701008   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701009   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701010   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701015   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701020   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701030   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701040   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701053   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701054   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701055   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701057   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701060   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701062   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701064   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701410   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701415   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701416   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701420   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701425   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701430   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701440   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701442   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701480   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701482   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701484   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701486   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701510   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701512   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701530   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701540   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701550   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701610   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701611   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701630   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701640   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701642   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701710   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701712   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701720   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701740   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701742   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30702021   75070            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 0          91203            -9   0.00 100 100 -9   1624   Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700602   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700604   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700606   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700607   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700608   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700610   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700611   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700621   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700625   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700626   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700628   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700629   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700630   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700631   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700632   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700635   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700640   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700651   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700655   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700661   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700664   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700665   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700701   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700702   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700703   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700704   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700705   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700706   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700707   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700708   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700709   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700710   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700711   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700712   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700713   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700714   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700715   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700716   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700717   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700718   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700720   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700725   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700727   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700730   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700734   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700735   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700736   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700737   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700740   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700744   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700746   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700747   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700750   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700752   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700753   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700756   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700757   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700760   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700762   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700763   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700766   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700767   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700769   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700770   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700771   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700780   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700781   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700783   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700785   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700788   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700789   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700790   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700791   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700792   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700793   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700798   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700799   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700801   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700802   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700895   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700921   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700923   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700925   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700927   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700931   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700932   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700933   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700934   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700935   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700936   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700939   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700940   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700950   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700960   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700971   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700980   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700981   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700982   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700983   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700984   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701001   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701008   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701009   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701010   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701015   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701020   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701030   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701040   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701053   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701054   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701055   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701057   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701060   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701062   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701064   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701410   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701415   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701416   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701420   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701425   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701430   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701440   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701442   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701480   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701482   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701484   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701486   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701510   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701512   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701530   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701540   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701550   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701610   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701611   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701630   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701640   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701642   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701710   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701712   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701720   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701740   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701742   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30702021   91203            -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 0          VOC              -9   0.00 100 100 -9   1624   Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700602   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700604   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700606   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700607   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700608   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700610   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700611   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700621   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700625   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700626   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700628   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700629   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700630   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700631   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700632   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700635   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700640   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700651   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700655   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700661   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700664   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700665   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700701   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700702   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700703   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700704   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700705   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700706   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700707   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700708   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700709   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700710   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700711   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700712   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700713   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700714   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700715   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700716   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700717   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700718   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700720   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700725   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700727   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700730   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700734   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700735   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700736   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700737   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700740   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700744   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700746   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700747   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700750   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700752   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700753   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700756   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700757   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700760   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700762   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700763   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700766   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700767   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700769   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700770   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700771   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700780   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700781   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700783   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700785   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700788   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700789   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700790   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700791   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700792   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700793   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700798   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700799   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700801   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700802   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700895   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700921   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700923   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700925   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700927   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700931   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700932   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700933   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700934   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700935   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700936   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700939   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700940   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700950   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700960   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700971   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700980   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700981   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700982   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700983   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30700984   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701001   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701008   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701009   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701010   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701015   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701020   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701030   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701040   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701053   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701054   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701055   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701057   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701060   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701062   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701064   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701410   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701415   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701416   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701420   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701425   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701430   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701440   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701442   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701480   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701482   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701484   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701486   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701510   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701512   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701530   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701540   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701550   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701610   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701611   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701630   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701640   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701642   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701710   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701712   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701720   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701740   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30701742   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01099 30702021   VOC              -9   0.00 100 100 -9   -9     Y R S008                            ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific Plywood Plant, Monroeville, AL
01103 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 35601MNSNTCOURT                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01103 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4550                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01117 0          PM10             -9  28.00 100 100 -9   -9     Y R 0002                            ! MACT: Lime Manufacturing: DRAVO LIME CO
01117 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0002                            ! MACT: Lime Manufacturing: DRAVO LIME CO
01117 0          SO2              -9  20.00 100 100 -9   -9     Y R 0002                            ! MACT: Lime Manufacturing: DRAVO LIME CO
01117 0          PM10             -9  28.00 100 100 -9   -9     Y R 0008                            ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0008                            ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          SO2              -9  20.00 100 100 -9   -9     Y R 0008                            ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          PM10             -9  28.00 100 100 -9   -9     Y R 0017                            ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0017                            ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          SO2              -9  20.00 100 100 -9   -9     Y R 0017                            ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          PM10             -9  28.00 100 100 -9   -9     Y R 0019                            ! MACT: Lime Manufacturing: CHENEY LIME & CEMENT CO
01117 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0019                            ! MACT: Lime Manufacturing: CHENEY LIME & CEMENT CO
01117 0          SO2              -9  20.00 100 100 -9   -9     Y R 0019                            ! MACT: Lime Manufacturing: CHENEY LIME & CEMENT CO
01117 0          PM10             -9  28.00 100 100 -9   -9     Y R 0039                            ! MACT: Lime Manufacturing: CHEMICAL LIME (O'NEAL)
01117 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0039                            ! MACT: Lime Manufacturing: CHEMICAL LIME (O'NEAL)
01117 0          SO2              -9  20.00 100 100 -9   -9     Y R 0039                            ! MACT: Lime Manufacturing: CHEMICAL LIME (O'NEAL)
01117 0          PM10             -9  28.00 100 100 -9   -9     Y R 35137DRVLM599HW                 ! MACT: Lime Manufacturing: DRAVO LIME CO
01117 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 35137DRVLM599HW                 ! MACT: Lime Manufacturing: DRAVO LIME CO
01117 0          SO2              -9  20.00 100 100 -9   -9     Y R 35137DRVLM599HW                 ! MACT: Lime Manufacturing: DRAVO LIME CO
01117 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15414                         ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15414                         ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15414                         ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15422                         ! MACT: Lime Manufacturing: CHEMICAL LIME (O'NEAL)
01117 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15422                         ! MACT: Lime Manufacturing: CHEMICAL LIME (O'NEAL)
01117 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15422                         ! MACT: Lime Manufacturing: CHEMICAL LIME (O'NEAL)
01117 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15433                         ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15433                         ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15433                         ! MACT: Lime Manufacturing: CHEMICAL LIME CO OF ALABAMA
01117 0          PM10             -9  28.00 100 100 -9   -9     Y R T$4461                          ! MACT: Lime Manufacturing: DRAVO LIME CO
01117 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$4461                          ! MACT: Lime Manufacturing: DRAVO LIME CO
01117 0          SO2              -9  20.00 100 100 -9   -9     Y R T$4461                          ! MACT: Lime Manufacturing: DRAVO LIME CO
01121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 0          106990           -9  28.00 100 100 -9   -9     Y R 0050                            ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          107028           -9  28.00 100 100 -9   -9     Y R 0050                            ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          50000            -9  28.00 100 100 -9   -9     Y R 0050                            ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          67561            -9  28.00 100 100 -9   -9     Y R 0050                            ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          71432            -9  28.00 100 100 -9   -9     Y R 0050                            ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          75070            -9  28.00 100 100 -9   -9     Y R 0050                            ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          91203            -9  28.00 100 100 -9   -9     Y R 0050                            ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          VOC              -9  28.00 100 100 -9   -9     Y R 0050                            ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 35044SPLPNALABA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 0          106990           -9  28.00 100 100 -9   -9     Y R 35096HNDMF1800H                 ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          107028           -9  28.00 100 100 -9   -9     Y R 35096HNDMF1800H                 ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          50000            -9  28.00 100 100 -9   -9     Y R 35096HNDMF1800H                 ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          67561            -9  28.00 100 100 -9   -9     Y R 35096HNDMF1800H                 ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          71432            -9  28.00 100 100 -9   -9     Y R 35096HNDMF1800H                 ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          75070            -9  28.00 100 100 -9   -9     Y R 35096HNDMF1800H                 ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          91203            -9  28.00 100 100 -9   -9     Y R 35096HNDMF1800H                 ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 0          VOC              -9  28.00 100 100 -9   -9     Y R 35096HNDMF1800H                 ! MACT: Autos, plant: HondaManufacturingofAlabamaLLC, VOC 28%: Auto_2002_projections.xls
01121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0023                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4430                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01125 0          106990           -9  28.00 100 100 -9   -9     Y R 0034                            ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          107028           -9  28.00 100 100 -9   -9     Y R 0034                            ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          50000            -9  28.00 100 100 -9   -9     Y R 0034                            ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          67561            -9  28.00 100 100 -9   -9     Y R 0034                            ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          71432            -9  28.00 100 100 -9   -9     Y R 0034                            ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          75070            -9  28.00 100 100 -9   -9     Y R 0034                            ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          91203            -9  28.00 100 100 -9   -9     Y R 0034                            ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          VOC              -9  28.00 100 100 -9   -9     Y R 0034                            ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          106990           -9  28.00 100 100 -9   -9     Y R 35490MRCDS1MERC                 ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          107028           -9  28.00 100 100 -9   -9     Y R 35490MRCDS1MERC                 ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          50000            -9  28.00 100 100 -9   -9     Y R 35490MRCDS1MERC                 ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          67561            -9  28.00 100 100 -9   -9     Y R 35490MRCDS1MERC                 ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          71432            -9  28.00 100 100 -9   -9     Y R 35490MRCDS1MERC                 ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          75070            -9  28.00 100 100 -9   -9     Y R 35490MRCDS1MERC                 ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          91203            -9  28.00 100 100 -9   -9     Y R 35490MRCDS1MERC                 ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01125 0          VOC              -9  28.00 100 100 -9   -9     Y R 35490MRCDS1MERC                 ! MACT: Autos, plant: Mercedes-BenzProjectInc, VOC 28%: Auto_2002_projections.xls
01129 0          10025737         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10025919         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10031137         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10034829         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10049055         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10060125         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10099748         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10101505         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10101538         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10101970         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10108642         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10124364         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10124433         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10294403         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10325947         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10377669         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          10588019         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          109              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          11103869         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          12018018         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          12018198         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          12035722         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          12054487         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          12060003         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          12079651         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          125              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          12626812         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          12640890         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          12710360         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1271289          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1303282          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1304569          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1306190          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1306236          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1307966          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1308061          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1308141          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1308389          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1309600          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1309644          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1313139          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13138459         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1313991          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1314063          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1314416          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1317346          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1317357          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1317368          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1317426          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1327339          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1327533          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1333820          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1335257          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1335326          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1336932          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1345046          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          1345160          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13462889         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13463393         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13510491         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13530659         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13530682         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13586828         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13597994         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          136              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          136527           -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13765190         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13770893         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          13814965         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          139              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          14018952         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          14220178         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          14307336         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          14307358         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          14336700         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          14977618         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          16065831         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          16842038         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          16925250         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          18454121         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          18540299         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          195              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          198              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          199              -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          200              -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          201              -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          202              -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          21679312         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          2223930          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          226              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          253              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          27253287         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          301042           -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          3141126          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          3333673          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          373024           -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          50922297         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          543908           -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          593748           -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          598630           -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          6018899          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          602              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          603              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          604              -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          61789513         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          61790145         -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          62384            -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7428480          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7439921          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7439965          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7440020          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7440360          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7440382          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7440417          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7440439          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7440473          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7440484          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7446084          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7446142          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7446277          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7446346          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7488564          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7542098          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7718549          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7722647          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7738945          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7758976          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7775113          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7778394          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7778509          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7782492          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7783008          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7783075          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7783166          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7783702          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7783791          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7784409          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7784421          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7785877          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7786814          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7787475          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7787497          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7788967          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7788989          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7789006          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7789062          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7789095          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7789120          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7789426          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          7790809          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          78002            -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          8030704          -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          88               -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          92               -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          93               -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          EXH__16065831    -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          EXH__18540299    -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          EXH__7439965     -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          EXH__7440020     -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Vantico Corp  (formerly Ciba Geigy) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          PM10             -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CibaSpecialtyChemicalsCorporation/Van: NEI_UNIQUE_ID=NEI18398: cdate=2008
01129 0          PM2_5            -9  75.42 100 100 -9   0801-2 Y R 490                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CibaSpecialtyChemicalsCorporation/Van: NEI_UNIQUE_ID=NEI18398: cdate=2008
01131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 36769MCMLLHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0028                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R S007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
01131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4735                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0209000001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 020900007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0229000002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 99702LSNRF2258C                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0030                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0031                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0032                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18822                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
02090 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18823                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04003 0          PM10             -9  28.00 100 100 -9   -9     Y R 040032148                       ! MACT: Lime Manufacturing: CHEMICAL LINE COMPANY - DOUGLAS FACI
04003 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 040032148                       ! MACT: Lime Manufacturing: CHEMICAL LINE COMPANY - DOUGLAS FACI
04003 0          SO2              -9  20.00 100 100 -9   -9     Y R 040032148                       ! MACT: Lime Manufacturing: CHEMICAL LINE COMPANY - DOUGLAS FACI
04017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0401700424                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 040171807                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0046                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
04017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12425                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05063 50300503   PM10             -9  68.48 100 100 -9   -9     Y R 0506300036                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOMPANY-ARKEASTMANDIV: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 50300503   PM2_5            -9  68.48 100 100 -9   -9     Y R 0506300036                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOMPANY-ARKEASTMANDIV: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10025737         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10025919         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10031137         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10034829         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10049055         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10060125         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10099748         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10101505         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10101538         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10101970         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10108642         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10124364         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10124433         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10294403         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10325947         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10377669         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10588019         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          109              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          11103869         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12018018         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12018198         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12035722         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12054487         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12060003         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12079651         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          125              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12626812         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12640890         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12710360         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1271289          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1303282          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1304569          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1306190          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1306236          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1307966          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1308061          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1308141          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1308389          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1309600          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1309644          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1313139          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13138459         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1313991          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1314063          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1314416          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317346          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317357          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317368          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317426          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1327339          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1327533          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1333820          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1335257          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1335326          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1336932          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1345046          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1345160          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13462889         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13463393         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13510491         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13530659         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13530682         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13586828         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13597994         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          136              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          136527           -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13765190         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13770893         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13814965         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          139              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14018952         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14220178         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14307336         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14307358         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14336700         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14977618         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          16065831         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          16842038         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          16925250         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          18454121         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          18540299         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          195              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          198              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          199              -9   0.00 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          200              -9   0.00 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          201              -9   0.00 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          202              -9   0.00 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          21679312         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          2223930          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          226              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          22967926         -9   0.00 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          253              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          27253287         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          301042           -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          3141126          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          3333673          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          373024           -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          50922297         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          543908           -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          593748           -9   0.00 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          598630           -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          6018899          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          602              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          603              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          604              -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          61789513         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          61790145         -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          62384            -9   0.00 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7428480          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7439921          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7439965          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7439976          -9   0.00 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440020          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440360          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440382          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440417          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440439          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440473          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440484          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446084          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446142          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446277          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446346          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7487947          -9   0.00 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7488564          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7542098          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7647010          -9  66.05 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7718549          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7722647          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7738945          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7758976          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7775113          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7778394          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7778509          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7782492          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7782505          -9  66.05 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783008          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783075          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783166          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783702          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783791          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7784409          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7784421          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7785877          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7786814          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7787475          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7787497          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7788967          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7788989          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789006          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789062          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789095          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789120          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789426          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7790809          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          78002            -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          8030704          -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          88               -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          92               -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          93               -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__16065831    -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__18540299    -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__7439965     -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__7440020     -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          PM10             -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOMPANY-ARKEASTMANDIV: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          PM2_5            -9  68.48 100 100 -9   0801-5 Y R 1009                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOMPANY-ARKEASTMANDIV: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10025737         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10025919         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10031137         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10034829         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10049055         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10060125         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10099748         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10101505         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10101538         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10101970         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10108642         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10124364         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10124433         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10294403         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10325947         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10377669         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10588019         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          109              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          11103869         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12018018         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12018198         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12035722         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12054487         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12060003         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12079651         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          125              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12626812         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12640890         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12710360         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1271289          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1303282          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1304569          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1306190          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1306236          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1307966          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1308061          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1308141          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1308389          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1309600          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1309644          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1313139          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13138459         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1313991          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1314063          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1314416          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317346          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317357          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317368          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317426          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1327339          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1327533          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1333820          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1335257          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1335326          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1336932          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1345046          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1345160          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13462889         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13463393         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13510491         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13530659         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13530682         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13586828         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13597994         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          136              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          136527           -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13765190         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13770893         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13814965         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          139              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14018952         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14220178         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14307336         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14307358         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14336700         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14977618         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          16065831         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          16842038         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          16925250         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          18454121         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          18540299         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          195              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          198              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          199              -9   0.00 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          200              -9   0.00 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          201              -9   0.00 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          202              -9   0.00 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          21679312         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          2223930          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          226              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          22967926         -9   0.00 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          253              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          27253287         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          301042           -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          3141126          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          3333673          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          373024           -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          50922297         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          543908           -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          593748           -9   0.00 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          598630           -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          6018899          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          602              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          603              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          604              -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          61789513         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          61790145         -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          62384            -9   0.00 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7428480          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7439921          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7439965          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7439976          -9   0.00 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440020          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440360          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440382          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440417          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440439          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440473          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440484          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446084          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446142          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446277          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446346          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7487947          -9   0.00 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7488564          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7542098          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7647010          -9  66.05 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7718549          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7722647          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7738945          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7758976          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7775113          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7778394          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7778509          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7782492          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7782505          -9  66.05 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783008          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783075          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783166          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783702          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783791          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7784409          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7784421          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7785877          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7786814          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7787475          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7787497          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7788967          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7788989          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789006          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789062          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789095          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789120          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789426          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7790809          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          78002            -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          8030704          -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          88               -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          92               -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          93               -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__16065831    -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__18540299    -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__7439965     -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__7440020     -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          PM10             -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOMPANY-ARKEASTMANDIV: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          PM2_5            -9  68.48 100 100 -9   0801-5 Y R 1009A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOMPANY-ARKEASTMANDIV: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10025737         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10025919         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10031137         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10034829         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10049055         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10060125         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10099748         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10101505         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10101538         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10101970         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10108642         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10124364         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10124433         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10294403         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10325947         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10377669         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          10588019         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          109              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          11103869         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12018018         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12018198         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12035722         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12054487         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12060003         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12079651         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          125              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12626812         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12640890         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          12710360         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1271289          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1303282          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1304569          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1306190          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1306236          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1307966          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1308061          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1308141          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1308389          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1309600          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1309644          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1313139          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13138459         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1313991          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1314063          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1314416          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317346          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317357          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317368          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1317426          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1327339          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1327533          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1333820          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1335257          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1335326          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1336932          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1345046          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          1345160          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13462889         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13463393         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13510491         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13530659         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13530682         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13586828         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13597994         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          136              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          136527           -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13765190         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13770893         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          13814965         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          139              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14018952         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14220178         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14307336         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14307358         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14336700         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          14977618         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          16065831         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          16842038         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          16925250         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          18454121         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          18540299         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          195              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          198              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          199              -9   0.00 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          200              -9   0.00 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          201              -9   0.00 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          202              -9   0.00 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          21679312         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          2223930          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          226              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          253              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          27253287         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          301042           -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          3141126          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          3333673          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          373024           -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          50922297         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          543908           -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          593748           -9   0.00 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          598630           -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          6018899          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          602              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          603              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          604              -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          61789513         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          61790145         -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          62384            -9   0.00 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7428480          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7439921          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7439965          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440020          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440360          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440382          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440417          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440439          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440473          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7440484          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446084          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446142          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446277          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7446346          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7488564          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7542098          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7647010          -9  87.32 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7718549          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7722647          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7738945          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7758976          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7775113          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7778394          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7778509          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7782492          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7782505          -9  87.32 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783008          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783075          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783166          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783702          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7783791          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7784409          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7784421          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7785877          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7786814          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7787475          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7787497          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7788967          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7788989          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789006          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789062          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789095          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789120          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7789426          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          7790809          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          78002            -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          8030704          -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          88               -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          92               -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          93               -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__16065831    -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__18540299    -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__7439965     -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          EXH__7440020     -9  95.49 100 100 -9   0801-2 Y R 484                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Arkansas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          PM10             -9  68.48 100 100 -9   0801-2 Y R 484                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOMPANY-ARKEASTMANDIV: NEI_UNIQUE_ID=NEI839: cdate=2008
05063 0          PM2_5            -9  68.48 100 100 -9   0801-2 Y R 484                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOMPANY-ARKEASTMANDIV: NEI_UNIQUE_ID=NEI839: cdate=2008
05081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0508100002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 0          10025737         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10025919         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10031137         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10034829         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10049055         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10060125         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10099748         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10101505         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10101538         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10101970         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10108642         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10124364         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10124433         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10294403         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10325947         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10377669         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10588019         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          109              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          11103869         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12018018         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12018198         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12035722         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12054487         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12060003         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12079651         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          125              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12626812         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12640890         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12710360         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1271289          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1303282          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1304569          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1306190          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1306236          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1307966          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1308061          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1308141          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1308389          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1309600          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1309644          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1313139          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13138459         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1313991          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1314063          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1314416          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317346          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317357          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317368          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317426          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1327339          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1327533          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1333820          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1335257          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1335326          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1336932          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1345046          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1345160          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13462889         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13463393         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13510491         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13530659         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13530682         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13586828         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13597994         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          136              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          136527           -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13765190         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13770893         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13814965         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          139              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14018952         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14220178         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14307336         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14307358         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14336700         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14977618         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          16065831         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          16842038         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          16925250         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          18454121         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          18540299         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          195              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          198              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          199              -9   9.57 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          200              -9   9.57 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          201              -9   9.57 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          202              -9   9.57 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          21679312         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          2223930          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          226              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          22967926         -9   9.57 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          253              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          27253287         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          301042           -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          3141126          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          3333673          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          373024           -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          50922297         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          543908           -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          593748           -9   9.57 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          598630           -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          6018899          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          602              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          603              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          604              -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          61789513         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          61790145         -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          62384            -9   9.57 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7428480          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7439921          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7439965          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7439976          -9   9.57 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440020          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440360          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440382          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440417          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440439          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440473          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440484          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446084          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446142          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446277          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446346          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7487947          -9   9.57 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7488564          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7542098          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7647010          -9  58.37 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7718549          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7722647          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7738945          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7758976          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7775113          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7778394          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7778509          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7782492          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7782505          -9  58.37 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783008          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783075          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783166          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783702          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783791          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7784409          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7784421          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7785877          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7786814          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7787475          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7787497          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7788967          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7788989          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789006          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789062          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789095          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789120          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789426          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7790809          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          78002            -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          8030704          -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          88               -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          92               -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          93               -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__16065831    -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__18540299    -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__7439965     -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__7440020     -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          PM10             -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AshGroveCementCompany: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          PM2_5            -9  53.04 100 100 -9   0801-3 Y R 228                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AshGroveCementCompany: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10025737         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10025919         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10031137         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10034829         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10049055         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10060125         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10099748         -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10101505         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10101538         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10101970         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10108642         -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10124364         -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10124433         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10294403         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10325947         -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10377669         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10588019         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          109              -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          11103869         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12018018         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12018198         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12035722         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12054487         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12060003         -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12079651         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          125              -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12626812         -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12640890         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12710360         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1271289          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1303282          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1304569          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1306190          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1306236          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1307966          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1308061          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1308141          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1308389          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1309600          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1309644          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1313139          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13138459         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1313991          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1314063          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1314416          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317346          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317357          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317368          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317426          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1327339          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1327533          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1333820          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1335257          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1335326          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1336932          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1345046          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1345160          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13462889         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13463393         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13510491         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13530659         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13530682         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13586828         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13597994         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          136              -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          136527           -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13765190         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13770893         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13814965         -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          139              -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14018952         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14220178         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14307336         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14307358         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14336700         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14977618         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          16065831         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          16842038         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          16925250         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          18454121         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          18540299         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          195              -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          198              -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          199              -9   9.57 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          200              -9   9.57 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          201              -9   9.57 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          202              -9   9.57 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          21679312         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          2223930          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          226              -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          22967926         -9   9.57 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          253              -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          27253287         -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          301042           -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          3141126          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          3333673          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          373024           -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          50922297         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          543908           -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          593748           -9   9.57 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          598630           -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          6018899          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          602              -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          603              -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          604              -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          61789513         -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          61790145         -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          62384            -9   9.57 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7428480          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7439921          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7439965          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7439976          -9   9.57 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440020          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440360          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440382          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440417          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440439          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440473          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440484          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446084          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446142          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446277          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446346          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7487947          -9   9.57 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7488564          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7542098          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7718549          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7722647          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7738945          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7758976          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7775113          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7778394          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7778509          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7782492          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783008          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783075          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783166          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783702          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783791          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7784409          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7784421          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7785877          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7786814          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7787475          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7787497          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7788967          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7788989          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789006          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789062          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789095          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789120          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789426          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7790809          -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          78002            -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          8030704          -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          88               -9  94.73 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          92               -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          93               -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__16065831    -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__18540299    -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__7439965     -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__7440020     -9  81.91 100 100 -9   0801-3 Y R 403                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          PM10             -9  53.04 100 100 -9   0801-3 Y R 403                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AshGroveCementCompany: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          PM2_5            -9  53.04 100 100 -9   0801-3 Y R 403                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AshGroveCementCompany: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10025737         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10025919         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10031137         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10034829         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10049055         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10060125         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10099748         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10101505         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10101538         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10101970         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10108642         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10124364         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10124433         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10294403         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10325947         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10377669         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          10588019         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          109              -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          11103869         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12018018         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12018198         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12035722         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12054487         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12060003         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12079651         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          125              -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12626812         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12640890         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          12710360         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1271289          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1303282          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1304569          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1306190          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1306236          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1307966          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1308061          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1308141          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1308389          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1309600          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1309644          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1313139          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13138459         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1313991          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1314063          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1314416          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317346          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317357          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317368          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1317426          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1327339          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1327533          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1333820          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1335257          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1335326          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1336932          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1345046          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          1345160          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13462889         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13463393         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13510491         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13530659         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13530682         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13586828         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13597994         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          136              -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          136527           -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13765190         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13770893         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          13814965         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          139              -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14018952         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14220178         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14307336         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14307358         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14336700         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          14977618         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          16065831         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          16842038         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          16925250         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          18454121         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          18540299         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          195              -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          198              -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          199              -9   9.57 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          200              -9   9.57 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          201              -9   9.57 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          202              -9   9.57 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          21679312         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          2223930          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          226              -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          22967926         -9   9.57 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          253              -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          27253287         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          301042           -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          3141126          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          3333673          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          373024           -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          50922297         -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          543908           -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          593748           -9   9.57 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          598630           -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          6018899          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          602              -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          603              -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          604              -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          61789513         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          61790145         -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          62384            -9   9.57 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7428480          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7439921          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7439965          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7439976          -9   9.57 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440020          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440360          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440382          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440417          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440439          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440473          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7440484          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446084          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446142          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446277          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7446346          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7487947          -9   9.57 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7488564          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7542098          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7718549          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7722647          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7738945          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7758976          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7775113          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7778394          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7778509          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7782492          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783008          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783075          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783166          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783702          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7783791          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7784409          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7784421          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7785877          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7786814          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7787475          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7787497          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7788967          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7788989          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789006          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789062          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789095          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789120          -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7789426          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          7790809          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          78002            -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          8030704          -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          88               -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          92               -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          93               -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__16065831    -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__18540299    -9  57.84 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__7439965     -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          EXH__7440020     -9  10.11 100 100 -9   0801-3 Y R 404                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ash Grove Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          PM10             -9  53.04 100 100 -9   0801-3 Y R 404                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AshGroveCementCompany: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 0          PM2_5            -9  53.04 100 100 -9   0801-3 Y R 404                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AshGroveCementCompany: NEI_UNIQUE_ID=NEI13475: cdate=2008
05081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0063                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10771                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
05139 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 0513900016                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 0513900016                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 0513900016                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 0513900016                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 0513900016                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 50300504   PM10             -9  84.49 100 100 -9   -9     Y R 0513900098                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CLEANHARBORSELDORADO,L.L.C./ENSCO/TE: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 50300504   PM2_5            -9  84.49 100 100 -9   -9     Y R 0513900098                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CLEANHARBORSELDORADO,L.L.C./ENSCO/TE: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10025737         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10025919         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10031137         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10034829         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10049055         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10060125         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10099748         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10101505         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10101538         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10101970         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10108642         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10124364         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10124433         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10294403         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10325947         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10377669         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10588019         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          109              -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          11103869         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12018018         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12018198         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12035722         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12054487         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12060003         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12079651         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          125              -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12626812         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12640890         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12710360         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1271289          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1303282          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1304569          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1306190          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1306236          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1307966          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1308061          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1308141          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1308389          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1309600          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1309644          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1313139          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13138459         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1313991          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1314063          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1314416          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1317346          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1317357          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1317368          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1317426          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1327339          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1327533          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1333820          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1335257          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1335326          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1336932          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1345046          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1345160          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13462889         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13463393         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13510491         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13530659         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13530682         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13586828         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13597994         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          136              -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          136527           -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13765190         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13770893         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13814965         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          139              -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14018952         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14220178         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14307336         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14307358         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14336700         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14977618         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          16065831         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          16842038         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          16925250         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          18454121         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          18540299         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          195              -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          198              -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          199              -9  77.45 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          200              -9  77.45 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          201              -9  77.45 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          202              -9  77.45 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          21679312         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          2223930          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          226              -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          22967926         -9  77.45 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          253              -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          27253287         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          301042           -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          3141126          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          3333673          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          373024           -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          50922297         -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          543908           -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          593748           -9  77.45 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          598630           -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          6018899          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          602              -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          603              -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          604              -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          61789513         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          61790145         -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          62384            -9  77.45 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7428480          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7439921          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7439965          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7439976          -9  77.45 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440020          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440360          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440382          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440417          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440439          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440473          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440484          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7446084          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7446142          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7446277          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7446346          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7487947          -9  77.45 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7488564          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7542098          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7647010          -9   0.00 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7718549          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7722647          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7738945          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7758976          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7775113          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7778394          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7778509          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7782492          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7782505          -9   0.00 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7783008          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7783075          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7783166          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7783702          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7783791          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7784409          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7784421          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7785877          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7786814          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7787475          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7787497          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7788967          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7788989          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7789006          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7789062          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7789095          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7789120          -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7789426          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7790809          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          78002            -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          8030704          -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          88               -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          92               -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          93               -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          EXH__16065831    -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          EXH__18540299    -9  93.98 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          EXH__7439965     -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          EXH__7440020     -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          PM10             -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CLEANHARBORSELDORADO,L.L.C./ENSCO/TE: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          PM2_5            -9  84.49 100 100 -9   0801-1 Y R 486                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CLEANHARBORSELDORADO,L.L.C./ENSCO/TE: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10025737         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10025919         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10031137         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10034829         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10049055         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10060125         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10099748         -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10101505         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10101538         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10101970         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10108642         -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10124364         -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10124433         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10294403         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10325947         -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10377669         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          10588019         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          109              -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          11103869         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12018018         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12018198         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12035722         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12054487         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12060003         -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12079651         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          125              -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12626812         -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12640890         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          12710360         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1271289          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1303282          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1304569          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1306190          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1306236          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1307966          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1308061          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1308141          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1308389          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1309600          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1309644          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1313139          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13138459         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1313991          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1314063          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1314416          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1317346          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1317357          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1317368          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1317426          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1327339          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1327533          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1333820          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1335257          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1335326          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1336932          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1345046          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          1345160          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13462889         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13463393         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13510491         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13530659         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13530682         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13586828         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13597994         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          136              -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          136527           -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13765190         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13770893         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          13814965         -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          139              -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14018952         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14220178         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14307336         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14307358         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14336700         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          14977618         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          16065831         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          16842038         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          16925250         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          18454121         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          18540299         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          195              -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          198              -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          199              -9  58.06 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          200              -9  58.06 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          201              -9  58.06 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          202              -9  58.06 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          21679312         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          2223930          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          226              -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          22967926         -9  58.06 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          253              -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          27253287         -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          301042           -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          3141126          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          3333673          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          373024           -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          50922297         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          543908           -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          593748           -9  58.06 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          598630           -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          6018899          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          602              -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          603              -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          604              -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          61789513         -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          61790145         -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          62384            -9  58.06 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7428480          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7439921          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7439965          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7439976          -9  58.06 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440020          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440360          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440382          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440417          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440439          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440473          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7440484          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7446084          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7446142          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7446277          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7446346          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7487947          -9  58.06 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7488564          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7542098          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7647010          -9   0.00 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7718549          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7722647          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7738945          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7758976          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7775113          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7778394          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7778509          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7782492          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7782505          -9   0.00 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7783008          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7783075          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7783166          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7783702          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7783791          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7784409          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7784421          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7785877          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7786814          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7787475          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7787497          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7788967          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7788989          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7789006          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7789062          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7789095          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7789120          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7789426          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          7790809          -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          78002            -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          8030704          -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          88               -9  99.32 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          92               -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          93               -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          EXH__16065831    -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          EXH__18540299    -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          EXH__7439965     -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          EXH__7440020     -9  94.13 100 100 -9   0801-1 Y R 487                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ENSCO MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          PM10             -9  84.49 100 100 -9   0801-1 Y R 487                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CLEANHARBORSELDORADO,L.L.C./ENSCO/TE: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 0          PM2_5            -9  84.49 100 100 -9   0801-1 Y R 487                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CLEANHARBORSELDORADO,L.L.C./ENSCO/TE: NEI_UNIQUE_ID=NEI880: cdate=2008
05139 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 71730LNLRF1000M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 71730LNLRF1000M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 71730LNLRF1000M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 71730LNLRF1000M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 71730LNLRF1000M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$10754                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$10754                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$10754                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$10754                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
05139 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$10754                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI876, Plant=Lion Oil Co., El Dorado, AR, compliance date: 31DEC2006
06001 0          106990           -9  28.00 100 100 -9   -9     Y R 113031438                       ! MACT: Autos, plant: NEWUNITEDMOTORMANUFACTURING, VOC 28%: Auto_2002_projections.xls
06001 0          107028           -9  28.00 100 100 -9   -9     Y R 113031438                       ! MACT: Autos, plant: NEWUNITEDMOTORMANUFACTURING, VOC 28%: Auto_2002_projections.xls
06001 0          50000            -9  28.00 100 100 -9   -9     Y R 113031438                       ! MACT: Autos, plant: NEWUNITEDMOTORMANUFACTURING, VOC 28%: Auto_2002_projections.xls
06001 0          67561            -9  28.00 100 100 -9   -9     Y R 113031438                       ! MACT: Autos, plant: NEWUNITEDMOTORMANUFACTURING, VOC 28%: Auto_2002_projections.xls
06001 0          71432            -9  28.00 100 100 -9   -9     Y R 113031438                       ! MACT: Autos, plant: NEWUNITEDMOTORMANUFACTURING, VOC 28%: Auto_2002_projections.xls
06001 0          75070            -9  28.00 100 100 -9   -9     Y R 113031438                       ! MACT: Autos, plant: NEWUNITEDMOTORMANUFACTURING, VOC 28%: Auto_2002_projections.xls
06001 0          91203            -9  28.00 100 100 -9   -9     Y R 113031438                       ! MACT: Autos, plant: NEWUNITEDMOTORMANUFACTURING, VOC 28%: Auto_2002_projections.xls
06001 0          VOC              -9  28.00 100 100 -9   -9     Y R 113031438                       ! MACT: Autos, plant: NEWUNITEDMOTORMANUFACTURING, VOC 28%: Auto_2002_projections.xls
06001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130362H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1130383H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13144                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18550                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200710   NOX              -9  40.00 100 100 -9   -9     Y R 07130310                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 20300203   NOX              -9  40.00 100 100 -9   -9     Y R 07130310                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 07130310                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 07130310                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130310                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 07130310                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 07130310                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 07130310                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 10200710   NOX              -9  40.00 100 100 -9   -9     Y R 07130315230                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 20300203   NOX              -9  40.00 100 100 -9   -9     Y R 07130315230                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 07130315230                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 07130315230                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 07130315230                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 07130315230                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 07130315230                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 07130315230                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 10200710   NOX              -9  40.00 100 100 -9   -9     Y R 7130310                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 20300203   NOX              -9  40.00 100 100 -9   -9     Y R 7130310                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 7130310                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 7130310                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 7130310                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 7130310                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 7130310                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 10200710   NOX              -9  40.00 100 100 -9   -9     Y R 7130310H                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 20300203   NOX              -9  40.00 100 100 -9   -9     Y R 7130310H                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 7130310H                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 7130310H                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 7130310H                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 7130310H                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 7130310H                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 7130310H                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 0          10025737         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10025919         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10031137         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10034829         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10049055         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10060125         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10099748         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10101505         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10101538         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10101970         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10108642         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10124364         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10124433         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10294403         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10325947         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10377669         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          10588019         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          109              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          11103869         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          12018018         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          12018198         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          12035722         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          12054487         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          12060003         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          12079651         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          125              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          12626812         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          12640890         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          12710360         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1271289          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1303282          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1304569          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1306190          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1306236          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1307966          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1308061          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1308141          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1308389          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1309600          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1309644          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1313139          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13138459         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1313991          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1314063          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1314416          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1317346          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1317357          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1317368          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1317426          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1327339          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1327533          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1333820          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1335257          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1335326          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1336932          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1345046          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          1345160          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13462889         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13463393         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13510491         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13530659         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13530682         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13586828         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13597994         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          136              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          136527           -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13765190         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13770893         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          13814965         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          139              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          14018952         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          14220178         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          14307336         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          14307358         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          14336700         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          14977618         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          16065831         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          16842038         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          16925250         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          18454121         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          18540299         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          195              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          198              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          199              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          200              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          201              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          202              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          21679312         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          2223930          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          226              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          22967926         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          253              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          27253287         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          301042           -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          3141126          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          3333673          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          373024           -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          50922297         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          543908           -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          593748           -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          598630           -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          6018899          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          602              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          603              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          604              -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          61789513         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          61790145         -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          62384            -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7428480          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7439921          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7439965          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7439976          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7440020          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7440360          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7440382          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7440417          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7440439          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7440473          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7440484          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7446084          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7446142          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7446277          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7446346          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7487947          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7488564          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7542098          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7647010          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7718549          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7722647          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7738945          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7758976          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7775113          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7778394          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7778509          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7782492          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7782505          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7783008          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7783075          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7783166          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7783702          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7783791          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7784409          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7784421          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7785877          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7786814          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7787475          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7787497          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7788967          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7788989          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7789006          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7789062          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7789095          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7789120          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7789426          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          7790809          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          78002            -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          8030704          -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          88               -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          92               -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          93               -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          EXH__16065831    -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          EXH__18540299    -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          EXH__7439965     -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 0          EXH__7440020     -9   0.00 100 100 -9   0801-7 Y R 851                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL COMPANY MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI19644: cdate=2008
06013 10200710   NOX              -9  40.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 20300203   NOX              -9  40.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 94802CHVRN841ST                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 10200710   NOX              -9  40.00 100 100 -9   -9     Y R T$13157                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 20300203   NOX              -9  40.00 100 100 -9   -9     Y R T$13157                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600105   NOX              -9  40.00 100 100 -9   -9     Y R T$13157                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$13157                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 30JUN2011
06013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13157                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06013 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$13157                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$13157                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06013 30600401   SO2              -9  90.00 100 100 -9   -9     Y R T$13157                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI19587, Plant=Chevron USA Products Co., Richmond, CA, compliance date: 27JUN2005
06025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 13151110H                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18406                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1808149                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B45                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06037 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 19102616213                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 20200301   NOX              -9  40.00 100 100 -9   -9     Y R 19102616213                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 19102616213                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 19102616213                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 19102616213                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 26AUG2005
06037 0          106990           -9  28.00 100 100 -9   -9     Y R 1910263968                      ! MACT: Autos, plant: TABCINC, VOC 28%: Auto_2002_projections.xls
06037 0          107028           -9  28.00 100 100 -9   -9     Y R 1910263968                      ! MACT: Autos, plant: TABCINC, VOC 28%: Auto_2002_projections.xls
06037 0          50000            -9  28.00 100 100 -9   -9     Y R 1910263968                      ! MACT: Autos, plant: TABCINC, VOC 28%: Auto_2002_projections.xls
06037 0          67561            -9  28.00 100 100 -9   -9     Y R 1910263968                      ! MACT: Autos, plant: TABCINC, VOC 28%: Auto_2002_projections.xls
06037 0          71432            -9  28.00 100 100 -9   -9     Y R 1910263968                      ! MACT: Autos, plant: TABCINC, VOC 28%: Auto_2002_projections.xls
06037 0          75070            -9  28.00 100 100 -9   -9     Y R 1910263968                      ! MACT: Autos, plant: TABCINC, VOC 28%: Auto_2002_projections.xls
06037 0          91203            -9  28.00 100 100 -9   -9     Y R 1910263968                      ! MACT: Autos, plant: TABCINC, VOC 28%: Auto_2002_projections.xls
06037 0          VOC              -9  28.00 100 100 -9   -9     Y R 1910263968                      ! MACT: Autos, plant: TABCINC, VOC 28%: Auto_2002_projections.xls
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 191026800026H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21466, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 191026800026H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21466, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 191026800030                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 20200301   NOX              -9  40.00 100 100 -9   -9     Y R 191026800030                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 191026800030                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 191026800030                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 191026800030                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 191026800030                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 191026800030                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 191026800030                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 30JUN2009
06037 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 191026800030H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 20200301   NOX              -9  40.00 100 100 -9   -9     Y R 191026800030H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 191026800030H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 191026800030H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 191026800030H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 191026800030H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 191026800030H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 191026800030H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 30JUN2009
06037 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 191026800089                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 20200301   NOX              -9  40.00 100 100 -9   -9     Y R 191026800089                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 191026800089                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 191026800089                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 191026800089                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 26AUG2005
06037 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 191026800089H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 20200301   NOX              -9  40.00 100 100 -9   -9     Y R 191026800089H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 191026800089H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 191026800089H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 191026800089H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 26AUG2005
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 191026800393                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20797, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 191026800393                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20797, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 191026800393H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20797, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 191026800393H                   ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20797, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10099748         -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10108642         -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10124364         -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10325947         -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          109              -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12060003         -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          125              -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12626812         -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1306190          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1306236          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1309600          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1314416          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1317368          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1335257          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1335326          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          136              -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          136527           -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13814965         -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          139              -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          195              -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          198              -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          199              -9   4.55 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          200              -9   4.55 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          201              -9   4.55 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          202              -9   4.55 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          2223930          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          226              -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          22967926         -9   4.55 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          253              -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          27253287         -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          301042           -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          373024           -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          543908           -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          593748           -9   4.55 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          598630           -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          602              -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          603              -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          604              -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          61790145         -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          62384            -9   4.55 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7428480          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7439921          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7439976          -9   4.55 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440439          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7446142          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7446277          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7487947          -9   4.55 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7789426          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7790809          -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          78002            -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          88               -9  23.17 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          92               -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          93               -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 733                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10099748         -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10108642         -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10124364         -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10325947         -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          109              -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12060003         -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          125              -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12626812         -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1306190          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1306236          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1309600          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1314416          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1317368          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1335257          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1335326          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          136              -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          136527           -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          13814965         -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          139              -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          195              -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          198              -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          199              -9   3.45 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          200              -9   3.45 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          201              -9   3.45 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          202              -9   3.45 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          2223930          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          226              -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          22967926         -9   3.45 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          253              -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          27253287         -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          301042           -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          373024           -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          543908           -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          593748           -9   3.45 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          598630           -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          602              -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          603              -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          604              -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          61790145         -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          62384            -9   3.45 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7428480          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7439921          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7439976          -9   3.45 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440439          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7446142          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7446277          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7487947          -9   3.45 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7789426          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          7790809          -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          78002            -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          88               -9  23.17 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          92               -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          93               -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 733A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEM U.S.A. (NSR USE) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI20605: cdate=2008
06037 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 90245CHVRN324WE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 20200301   NOX              -9  40.00 100 100 -9   -9     Y R 90245CHVRN324WE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 90245CHVRN324WE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 90245CHVRN324WE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 90245CHVRN324WE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 90245CHVRN324WE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 90245CHVRN324WE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 90245CHVRN324WE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 30JUN2009
06037 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 90509MBLLC3700W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 20200301   NOX              -9  40.00 100 100 -9   -9     Y R 90509MBLLC3700W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 90509MBLLC3700W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 90509MBLLC3700W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 90509MBLLC3700W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 26AUG2005
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 90744HNTWY1651A                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20797, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 90744HNTWY1651A                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20797, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 90748NNPCF2402E                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21466, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 90748NNPCF2402E                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21466, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 20200202   NOX              -9  40.00 100 100 -9   -9     Y R T$12602                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 20200301   NOX              -9  40.00 100 100 -9   -9     Y R T$12602                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600105   NOX              -9  40.00 100 100 -9   -9     Y R T$12602                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$12602                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 31DEC2008
06037 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$12602                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$12602                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$12602                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 27JUN2005
06037 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$12602                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20467, Plant=Chevron USA Products Co., El Segundo, CA, compliance date: 30JUN2009
06037 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$12648                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 20200301   NOX              -9  40.00 100 100 -9   -9     Y R T$12648                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600105   NOX              -9  40.00 100 100 -9   -9     Y R T$12648                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$12648                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 31DEC2009
06037 30600201   NOX              -9  90.00 100 100 -9   -9     Y R T$12648                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21034, Plant=ExxonMobil Corp. (formerly Mobil), Torrance, CA, compliance date: 26AUG2005
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$12690                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20797, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$12690                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI20797, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$12706                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21466, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06037 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$12706                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI21466, Plant=Valero (formerly Ultramar Diamond Shamrock), Wilmington, CA, compliance date: 31DEC2005
06053 0          PM10             -9  28.00 100 100 -9   -9     Y R 270715256                       ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
06053 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 270715256                       ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
06053 0          SO2              -9  20.00 100 100 -9   -9     Y R 270715256                       ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
06053 0          PM10             -9  28.00 100 100 -9   -9     Y R 93902CHMCL11771                 ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
06053 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 93902CHMCL11771                 ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
06053 0          SO2              -9  20.00 100 100 -9   -9     Y R 93902CHMCL11771                 ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
06053 0          PM10             -9  28.00 100 100 -9   -9     Y R T$18511                         ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
06053 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$18511                         ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
06053 0          SO2              -9  20.00 100 100 -9   -9     Y R T$18511                         ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
06059 0          PM10             -9  28.00 100 100 -9   -9     Y R 30102614091                     ! MACT: Lime Manufacturing: HAMILTON MATERIALS INC
06059 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 30102614091                     ! MACT: Lime Manufacturing: HAMILTON MATERIALS INC
06059 0          SO2              -9  20.00 100 100 -9   -9     Y R 30102614091                     ! MACT: Lime Manufacturing: HAMILTON MATERIALS INC
06059 0          PM10             -9  28.00 100 100 -9   -9     Y R 30102614091H                    ! MACT: Lime Manufacturing: HAMILTON MATERIALS INC
06059 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 30102614091H                    ! MACT: Lime Manufacturing: HAMILTON MATERIALS INC
06059 0          SO2              -9  20.00 100 100 -9   -9     Y R 30102614091H                    ! MACT: Lime Manufacturing: HAMILTON MATERIALS INC
06061 0          106990           -9   0.00 100 100 -9   1624   Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700602   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700604   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700606   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700607   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700608   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700610   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700611   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700621   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700625   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700626   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700628   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700629   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700630   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700631   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700632   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700635   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700640   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700651   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700655   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700661   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700664   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700665   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700701   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700702   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700703   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700704   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700705   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700706   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700707   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700708   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700709   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700710   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700711   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700712   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700713   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700714   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700715   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700716   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700717   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700718   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700720   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700725   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700727   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700730   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700734   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700735   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700736   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700737   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700740   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700744   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700746   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700747   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700750   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700752   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700753   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700756   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700757   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700760   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700762   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700763   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700766   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700767   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700769   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700770   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700771   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700780   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700781   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700783   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700785   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700788   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700789   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700790   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700791   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700792   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700793   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700798   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700799   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700801   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700802   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700895   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700921   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700923   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700925   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700927   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700931   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700932   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700933   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700934   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700935   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700936   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700939   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700940   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700950   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700960   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700971   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700980   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700981   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700982   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700983   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700984   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701001   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701008   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701009   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701010   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701015   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701020   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701030   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701040   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701053   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701054   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701055   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701057   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701060   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701062   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701064   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701410   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701415   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701416   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701420   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701425   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701430   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701440   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701442   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701480   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701482   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701484   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701486   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701510   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701512   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701530   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701540   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701550   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701610   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701611   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701630   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701640   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701642   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701710   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701712   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701720   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701740   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701742   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30702021   106990           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 0          107028           -9   0.00 100 100 -9   1624   Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700602   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700604   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700606   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700607   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700608   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700610   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700611   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700621   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700625   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700626   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700628   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700629   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700630   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700631   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700632   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700635   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700640   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700651   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700655   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700661   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700664   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700665   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700701   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700702   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700703   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700704   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700705   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700706   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700707   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700708   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700709   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700710   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700711   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700712   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700713   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700714   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700715   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700716   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700717   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700718   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700720   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700725   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700727   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700730   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700734   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700735   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700736   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700737   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700740   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700744   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700746   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700747   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700750   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700752   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700753   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700756   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700757   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700760   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700762   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700763   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700766   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700767   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700769   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700770   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700771   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700780   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700781   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700783   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700785   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700788   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700789   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700790   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700791   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700792   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700793   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700798   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700799   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700801   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700802   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700895   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700921   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700923   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700925   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700927   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700931   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700932   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700933   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700934   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700935   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700936   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700939   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700940   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700950   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700960   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700971   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700980   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700981   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700982   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700983   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700984   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701001   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701008   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701009   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701010   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701015   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701020   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701030   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701040   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701053   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701054   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701055   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701057   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701060   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701062   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701064   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701410   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701415   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701416   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701420   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701425   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701430   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701440   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701442   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701480   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701482   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701484   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701486   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701510   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701512   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701530   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701540   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701550   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701610   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701611   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701630   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701640   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701642   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701710   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701712   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701720   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701740   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701742   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30702021   107028           -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 0          50000            -9   0.00 100 100 -9   1624   Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700602   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700604   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700606   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700607   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700608   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700610   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700611   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700621   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700625   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700626   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700628   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700629   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700630   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700631   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700632   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700635   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700640   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700651   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700655   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700661   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700664   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700665   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700701   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700702   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700703   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700704   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700705   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700706   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700707   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700708   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700709   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700710   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700711   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700712   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700713   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700714   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700715   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700716   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700717   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700718   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700720   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700725   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700727   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700730   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700734   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700735   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700736   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700737   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700740   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700744   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700746   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700747   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700750   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700752   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700753   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700756   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700757   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700760   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700762   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700763   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700766   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700767   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700769   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700770   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700771   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700780   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700781   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700783   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700785   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700788   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700789   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700790   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700791   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700792   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700793   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700798   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700799   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700801   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700802   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700895   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700921   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700923   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700925   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700927   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700931   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700932   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700933   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700934   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700935   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700936   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700939   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700940   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700950   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700960   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700971   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700980   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700981   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700982   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700983   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700984   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701001   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701008   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701009   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701010   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701015   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701020   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701030   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701040   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701053   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701054   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701055   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701057   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701060   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701062   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701064   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701410   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701415   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701416   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701420   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701425   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701430   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701440   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701442   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701480   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701482   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701484   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701486   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701510   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701512   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701530   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701540   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701550   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701610   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701611   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701630   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701640   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701642   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701710   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701712   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701720   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701740   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701742   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30702021   50000            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 0          67561            -9   0.00 100 100 -9   1624   Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700602   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700604   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700606   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700607   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700608   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700610   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700611   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700621   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700625   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700626   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700628   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700629   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700630   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700631   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700632   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700635   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700640   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700651   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700655   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700661   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700664   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700665   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700701   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700702   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700703   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700704   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700705   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700706   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700707   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700708   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700709   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700710   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700711   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700712   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700713   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700714   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700715   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700716   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700717   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700718   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700720   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700725   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700727   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700730   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700734   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700735   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700736   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700737   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700740   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700744   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700746   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700747   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700750   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700752   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700753   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700756   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700757   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700760   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700762   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700763   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700766   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700767   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700769   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700770   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700771   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700780   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700781   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700783   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700785   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700788   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700789   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700790   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700791   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700792   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700793   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700798   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700799   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700801   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700802   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700895   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700921   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700923   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700925   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700927   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700931   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700932   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700933   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700934   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700935   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700936   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700939   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700940   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700950   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700960   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700971   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700980   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700981   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700982   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700983   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700984   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701001   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701008   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701009   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701010   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701015   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701020   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701030   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701040   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701053   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701054   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701055   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701057   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701060   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701062   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701064   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701410   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701415   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701416   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701420   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701425   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701430   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701440   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701442   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701480   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701482   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701484   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701486   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701510   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701512   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701530   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701540   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701550   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701610   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701611   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701630   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701640   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701642   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701710   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701712   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701720   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701740   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701742   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30702021   67561            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 0          71432            -9   0.00 100 100 -9   1624   Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700602   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700604   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700606   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700607   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700608   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700610   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700611   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700621   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700625   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700626   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700628   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700629   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700630   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700631   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700632   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700635   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700640   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700651   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700655   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700661   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700664   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700665   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700701   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700702   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700703   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700704   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700705   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700706   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700707   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700708   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700709   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700710   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700711   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700712   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700713   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700714   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700715   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700716   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700717   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700718   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700720   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700725   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700727   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700730   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700734   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700735   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700736   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700737   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700740   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700744   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700746   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700747   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700750   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700752   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700753   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700756   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700757   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700760   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700762   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700763   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700766   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700767   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700769   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700770   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700771   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700780   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700781   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700783   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700785   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700788   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700789   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700790   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700791   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700792   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700793   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700798   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700799   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700801   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700802   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700895   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700921   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700923   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700925   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700927   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700931   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700932   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700933   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700934   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700935   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700936   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700939   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700940   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700950   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700960   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700971   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700980   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700981   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700982   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700983   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700984   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701001   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701008   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701009   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701010   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701015   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701020   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701030   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701040   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701053   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701054   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701055   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701057   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701060   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701062   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701064   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701410   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701415   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701416   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701420   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701425   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701430   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701440   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701442   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701480   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701482   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701484   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701486   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701510   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701512   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701530   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701540   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701550   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701610   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701611   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701630   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701640   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701642   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701710   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701712   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701720   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701740   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701742   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30702021   71432            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 0          75070            -9   0.00 100 100 -9   1624   Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700602   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700604   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700606   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700607   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700608   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700610   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700611   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700621   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700625   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700626   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700628   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700629   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700630   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700631   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700632   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700635   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700640   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700651   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700655   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700661   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700664   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700665   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700701   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700702   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700703   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700704   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700705   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700706   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700707   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700708   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700709   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700710   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700711   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700712   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700713   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700714   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700715   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700716   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700717   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700718   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700720   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700725   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700727   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700730   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700734   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700735   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700736   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700737   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700740   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700744   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700746   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700747   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700750   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700752   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700753   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700756   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700757   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700760   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700762   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700763   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700766   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700767   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700769   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700770   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700771   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700780   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700781   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700783   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700785   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700788   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700789   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700790   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700791   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700792   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700793   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700798   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700799   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700801   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700802   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700895   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700921   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700923   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700925   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700927   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700931   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700932   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700933   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700934   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700935   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700936   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700939   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700940   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700950   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700960   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700971   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700980   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700981   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700982   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700983   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700984   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701001   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701008   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701009   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701010   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701015   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701020   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701030   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701040   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701053   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701054   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701055   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701057   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701060   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701062   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701064   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701410   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701415   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701416   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701420   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701425   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701430   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701440   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701442   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701480   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701482   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701484   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701486   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701510   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701512   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701530   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701540   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701550   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701610   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701611   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701630   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701640   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701642   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701710   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701712   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701720   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701740   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701742   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30702021   75070            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 0          91203            -9   0.00 100 100 -9   1624   Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700602   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700604   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700606   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700607   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700608   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700610   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700611   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700621   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700625   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700626   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700628   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700629   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700630   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700631   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700632   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700635   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700640   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700651   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700655   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700661   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700664   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700665   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700701   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700702   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700703   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700704   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700705   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700706   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700707   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700708   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700709   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700710   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700711   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700712   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700713   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700714   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700715   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700716   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700717   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700718   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700720   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700725   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700727   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700730   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700734   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700735   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700736   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700737   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700740   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700744   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700746   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700747   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700750   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700752   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700753   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700756   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700757   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700760   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700762   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700763   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700766   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700767   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700769   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700770   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700771   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700780   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700781   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700783   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700785   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700788   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700789   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700790   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700791   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700792   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700793   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700798   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700799   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700801   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700802   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700895   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700921   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700923   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700925   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700927   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700931   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700932   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700933   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700934   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700935   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700936   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700939   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700940   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700950   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700960   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700971   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700980   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700981   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700982   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700983   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700984   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701001   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701008   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701009   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701010   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701015   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701020   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701030   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701040   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701053   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701054   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701055   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701057   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701060   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701062   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701064   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701410   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701415   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701416   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701420   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701425   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701430   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701440   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701442   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701480   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701482   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701484   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701486   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701510   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701512   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701530   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701540   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701550   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701610   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701611   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701630   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701640   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701642   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701710   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701712   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701720   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701740   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701742   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30702021   91203            -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 0          VOC              -9   0.00 100 100 -9   1624   Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700602   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700604   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700606   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700607   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700608   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700610   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700611   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700621   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700625   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700626   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700628   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700629   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700630   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700631   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700632   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700635   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700640   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700651   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700655   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700661   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700664   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700665   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700701   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700702   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700703   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700704   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700705   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700706   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700707   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700708   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700709   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700710   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700711   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700712   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700713   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700714   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700715   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700716   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700717   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700718   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700720   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700725   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700727   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700730   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700734   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700735   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700736   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700737   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700740   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700744   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700746   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700747   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700750   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700752   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700753   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700756   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700757   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700760   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700762   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700763   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700766   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700767   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700769   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700770   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700771   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700780   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700781   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700783   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700785   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700788   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700789   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700790   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700791   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700792   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700793   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700798   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700799   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700801   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700802   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700895   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700921   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700923   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700925   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700927   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700931   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700932   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700933   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700934   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700935   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700936   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700939   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700940   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700950   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700960   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700971   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700980   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700981   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700982   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700983   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30700984   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701001   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701008   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701009   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701010   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701015   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701020   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701030   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701040   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701053   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701054   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701055   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701057   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701060   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701062   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701064   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701410   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701415   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701416   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701420   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701425   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701430   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701440   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701442   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701480   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701482   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701484   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701486   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701510   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701512   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701530   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701540   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701550   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701610   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701611   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701630   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701640   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701642   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701710   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701712   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701720   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701740   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30701742   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06061 30702021   VOC              -9   0.00 100 100 -9   -9     Y R 31162328                        ! MACT: Plywood and Composite Wood Products: plant=SierraPine Limited, Rocklin MDF, Rocklin, CA
06071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 360518900002H                   ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0137                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 39143020613                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430410                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 391430645H                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 95203PSDFP2526W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
06095 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 48130312626H                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30103202   SO2              -9  98.00 100 100 -9   -9     Y R 48130312626H                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2005
06095 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 48130312626H                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 48130312626H                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 48130312626H                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31MAR2010
06095 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 48130312626H                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 48130312626H                    ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 48130315987                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30103202   SO2              -9  98.00 100 100 -9   -9     Y R 48130315987                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2005
06095 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 48130315987                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 48130315987                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 48130315987                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31MAR2010
06095 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 48130315987                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 48130315987                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 48130395                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30103202   SO2              -9  98.00 100 100 -9   -9     Y R 48130395                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2005
06095 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 48130395                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 48130395                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 48130395                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31MAR2010
06095 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 48130395                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 48130395                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$13092                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30103202   SO2              -9  98.00 100 100 -9   -9     Y R T$13092                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2005
06095 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$13092                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$13092                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$13092                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31MAR2010
06095 30600401   SO2              -9  90.00 100 100 -9   -9     Y R T$13092                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
06095 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$13092                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI25450, Plant=Valero ( formerly Exxon Co. USA), Benicia, CA, compliance date: 31DEC2007
08001 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 0003                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 31JUL2009
08001 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 0003                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 31JUL2009
08001 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 0003                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 01NOV2005
08001 30103201   SO2              -9  98.00 100 100 -9   -9     Y R 0003                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 31DEC2008
08001 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 0003                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 01NOV2005
08001 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 0004                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 31DEC2008
08001 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 0004                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 28FEB2011
08001 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 0004                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 28FEB2011
08001 30103202   SO2              -9  98.00 100 100 -9   -9     Y R 0004                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 31DEC2007
08001 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 0004                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 31DEC2005
08001 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 0004                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 31DEC2005
08001 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 0004                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 28FEB2011
08001 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 0004                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 31DEC2005
08001 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 80022CNCDN5801B                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 31JUL2009
08001 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 80022CNCDN5801B                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 31JUL2009
08001 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 80022CNCDN5801B                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 01NOV2005
08001 30103201   SO2              -9  98.00 100 100 -9   -9     Y R 80022CNCDN5801B                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 31DEC2008
08001 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 80022CNCDN5801B                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 01NOV2005
08001 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$12039                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 31DEC2008
08001 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$12039                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 28FEB2011
08001 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$12039                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 28FEB2011
08001 30103202   SO2              -9  98.00 100 100 -9   -9     Y R T$12039                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 31DEC2007
08001 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$12039                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 31DEC2005
08001 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$12039                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 31DEC2005
08001 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$12039                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 28FEB2011
08001 30600401   SO2              -9  90.00 100 100 -9   -9     Y R T$12039                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI415, Plant=Valero Energy (formerly Ultramar Diamond Shamrock, f, Denver, CO, compliance date: 31DEC2005
08001 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$12040                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 31JUL2009
08001 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$12040                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 31JUL2009
08001 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$12040                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 01NOV2005
08001 30103201   SO2              -9  98.00 100 100 -9   -9     Y R T$12040                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 31DEC2008
08001 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$12040                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI889, Plant=Suncor Energy (formerly Conoco Inc.), Commerce City, CO, compliance date: 01NOV2005
08041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0054                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08059 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12081                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18019                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
08101 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
09011 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          109              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          125              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          136              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          136527           -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          139              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          195              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          198              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          199              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          200              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          201              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          202              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          226              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          253              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          301042           -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          373024           -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          543908           -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          593748           -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          598630           -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          602              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          603              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          604              -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          62384            -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7647010          -9  79.20 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7782505          -9  79.20 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          78002            -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          88               -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          92               -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          93               -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
09011 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 729                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL CO MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43289: cdate=2008
10001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000100127                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0203                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 0          106990           -9  28.00 100 100 -9   -9     Y R 1000300015                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          107028           -9  28.00 100 100 -9   -9     Y R 1000300015                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          50000            -9  28.00 100 100 -9   -9     Y R 1000300015                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          67561            -9  28.00 100 100 -9   -9     Y R 1000300015                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          71432            -9  28.00 100 100 -9   -9     Y R 1000300015                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          75070            -9  28.00 100 100 -9   -9     Y R 1000300015                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          91203            -9  28.00 100 100 -9   -9     Y R 1000300015                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          VOC              -9  28.00 100 100 -9   -9     Y R 1000300015                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          PM10             -9  29.88 100 100 -9   -9     Y R 1000300016      012             ! Premcor (formerly MOTIVA, NEI_UNIQUE_ID=NEI26218) 2012 plant-level estimate derived from Gobeail McKinley workbook "Premcor Emissions 02 vs 12_ram.xls" with wet scrubber controls assumed on 1 PM2.5 (and PM10) unit (012): 4/1/09,3:17pm
10003 0          PM2_5            -9  29.88 100 100 -9   -9     Y R 1000300016      012             ! Premcor (formerly MOTIVA, NEI_UNIQUE_ID=NEI26218) 2012 plant-level estimate derived from Gobeail McKinley workbook "Premcor Emissions 02 vs 12_ram.xls" with wet scrubber controls assumed on 1 PM2.5 (and PM10) unit (012): 4/1/09,3:17pm
10003 0          SO2              -9  98.07 100 100 -9   -9     Y R 1000300016      002             ! Premcor (formerly MOTIVA, NEI_UNIQUE_ID=NEI26218) 2012 plant-level estimate derived from Gobeail McKinley workbook "Premcor Emissions 02 vs 12_ram.xls" with wet scrubber controls assumed on 2 SO2 units (002 and 012): 3/18/09, 11:39am
10003 0          SO2              -9  98.07 100 100 -9   -9     Y R 1000300016      012             ! Premcor (formerly MOTIVA, NEI_UNIQUE_ID=NEI26218) 2012 plant-level estimate derived from Gobeail McKinley workbook "Premcor Emissions 02 vs 12_ram.xls" with wet scrubber controls assumed on 2 SO2 units (002 and 012): 3/18/09, 11:39am
10003 0          106990           -9  28.00 100 100 -9   -9     Y R 1000300128                      ! MACT: Autos, plant: DAIMLERCHRYSLERCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          107028           -9  28.00 100 100 -9   -9     Y R 1000300128                      ! MACT: Autos, plant: DAIMLERCHRYSLERCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          50000            -9  28.00 100 100 -9   -9     Y R 1000300128                      ! MACT: Autos, plant: DAIMLERCHRYSLERCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          67561            -9  28.00 100 100 -9   -9     Y R 1000300128                      ! MACT: Autos, plant: DAIMLERCHRYSLERCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          71432            -9  28.00 100 100 -9   -9     Y R 1000300128                      ! MACT: Autos, plant: DAIMLERCHRYSLERCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          75070            -9  28.00 100 100 -9   -9     Y R 1000300128                      ! MACT: Autos, plant: DAIMLERCHRYSLERCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          91203            -9  28.00 100 100 -9   -9     Y R 1000300128                      ! MACT: Autos, plant: DAIMLERCHRYSLERCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          VOC              -9  28.00 100 100 -9   -9     Y R 1000300128                      ! MACT: Autos, plant: DAIMLERCHRYSLERCORPORATION, VOC 28%: Auto_2002_projections.xls
10003 0          10025737         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10025919         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10031137         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10034829         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10049055         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10060125         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10099748         -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10101505         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10101538         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10101970         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10108642         -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10124364         -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10124433         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10294403         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10325947         -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10377669         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          10588019         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          109              -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          11103869         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          12018018         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          12018198         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          12035722         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          12054487         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          12060003         -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          12079651         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          125              -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          12626812         -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          12640890         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          12710360         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1271289          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1303282          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1304569          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1306190          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1306236          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1307966          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1308061          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1308141          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1308389          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1309600          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1309644          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1313139          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13138459         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1313991          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1314063          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1314416          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1317346          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1317357          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1317368          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1317426          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1327339          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1327533          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1333820          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1335257          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1335326          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1336932          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1345046          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          1345160          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13462889         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13463393         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13510491         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13530659         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13530682         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13586828         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13597994         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          136              -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          136527           -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13765190         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13770893         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          13814965         -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          139              -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          14018952         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          14220178         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          14307336         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          14307358         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          14336700         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          14977618         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          16065831         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          16842038         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          16925250         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          18454121         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          18540299         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          195              -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          198              -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          199              -9   0.00 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          200              -9   0.00 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          201              -9   0.00 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          202              -9   0.00 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          21679312         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          2223930          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          226              -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          253              -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          27253287         -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          301042           -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          3141126          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          3333673          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          373024           -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          50922297         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          543908           -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          593748           -9   0.00 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          598630           -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          6018899          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          602              -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          603              -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          604              -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          61789513         -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          61790145         -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          62384            -9   0.00 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7428480          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7439921          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7439965          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7440020          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7440360          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7440382          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7440417          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7440439          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7440473          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7440484          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7446084          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7446142          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7446277          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7446346          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7488564          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7542098          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7647010          -9  30.31 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7718549          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7722647          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7738945          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7758976          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7775113          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7778394          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7778509          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7782492          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7782505          -9  30.31 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7783008          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7783075          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7783166          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7783702          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7783791          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7784409          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7784421          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7785877          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7786814          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7787475          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7787497          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7788967          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7788989          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7789006          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7789062          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7789095          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7789120          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7789426          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          7790809          -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          78002            -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          8030704          -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          88               -9  99.52 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          92               -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          93               -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          EXH__16065831    -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          EXH__18540299    -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          EXH__7439965     -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          EXH__7440020     -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT CHESTNUT RUN MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          PM10             -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTCHESTNUTRUN: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 0          PM2_5            -9  94.93 100 100 -9   0801-2 Y R 700                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTCHESTNUTRUN: NEI_UNIQUE_ID=NEIDE00126: cdate=2008
10003 30600201   NOX              -9  60.00 100 100 -9   -9     Y R T$2220                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI26218, Plant=Premcor (formerly Motiva Enterprises, formerly Star), Delaware City, DE, compliance date: 30SEP2005
10003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2220                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1000500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 19973DPNTS400WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0208                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
10005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2252                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
11001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050009                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 32401STNCN1EVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0215                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4105                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0330042                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 32533CHMPN375MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12033 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4123                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0890003                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 32034CNTNRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0253                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4041                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
12107 0          106990           -9   0.00 100 100 -9   1624   Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   106990           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          107028           -9   0.00 100 100 -9   1624   Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   107028           -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          50000            -9   0.00 100 100 -9   1624   Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   50000            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          67561            -9   0.00 100 100 -9   1624   Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   67561            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          71432            -9   0.00 100 100 -9   1624   Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   71432            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          75070            -9   0.00 100 100 -9   1624   Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   75070            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          91203            -9   0.00 100 100 -9   1624   Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   91203            -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          VOC              -9   0.00 100 100 -9   1624   Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   VOC              -9   0.00 100 100 -9   -9     Y R 1070015                         ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          106990           -9   0.00 100 100 -9   1624   Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   106990           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          107028           -9   0.00 100 100 -9   1624   Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   107028           -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          50000            -9   0.00 100 100 -9   1624   Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   50000            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          67561            -9   0.00 100 100 -9   1624   Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   67561            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          71432            -9   0.00 100 100 -9   1624   Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   71432            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          75070            -9   0.00 100 100 -9   1624   Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   75070            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          91203            -9   0.00 100 100 -9   1624   Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   91203            -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 0          VOC              -9   0.00 100 100 -9   1624   Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700602   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700604   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700606   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700607   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700608   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700610   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700611   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700621   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700625   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700626   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700628   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700629   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700630   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700631   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700632   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700635   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700640   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700651   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700655   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700661   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700664   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700665   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700701   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700702   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700703   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700704   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700705   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700706   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700707   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700708   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700709   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700710   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700711   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700712   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700713   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700714   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700715   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700716   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700717   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700718   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700720   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700725   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700727   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700730   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700734   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700735   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700736   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700737   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700740   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700744   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700746   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700747   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700750   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700752   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700753   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700756   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700757   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700760   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700762   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700763   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700766   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700767   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700769   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700770   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700771   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700780   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700781   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700783   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700785   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700788   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700789   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700790   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700791   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700792   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700793   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700798   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700799   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700801   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700802   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700895   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700921   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700923   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700925   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700927   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700931   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700932   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700933   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700934   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700935   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700936   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700939   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700940   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700950   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700960   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700971   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700980   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700981   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700982   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700983   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30700984   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701001   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701008   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701009   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701010   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701015   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701020   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701030   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701040   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701053   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701054   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701055   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701057   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701060   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701062   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701064   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701410   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701415   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701416   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701420   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701425   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701430   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701440   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701442   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701480   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701482   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701484   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701486   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701510   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701512   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701530   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701540   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701550   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701610   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701611   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701630   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701640   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701642   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701710   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701712   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701720   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701740   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30701742   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
12107 30702021   VOC              -9   0.00 100 100 -9   -9     Y R 32460GRGPCGORDO                 ! MACT: Plywood and Composite Wood Products: plant=Georgia-Pacific - Hawthorne Plywood Mill, Hawthorne, FL
13021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 02100055                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 31298BRWNW2600W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0286                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3928                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3936                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0288                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3973                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 05100110                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0290                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0291                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15217                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3946                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 05500001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 30753MNTVROLDUS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3865                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13059 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 05900059                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700022                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 30001STLLB3100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13089 0          106990           -9  28.00 100 100 -9   -9     Y R 8900086                         ! MACT: Autos, plant: GeneralMotorsAssemblyPlant, VOC 28%: Auto_2002_projections.xls
13089 0          107028           -9  28.00 100 100 -9   -9     Y R 8900086                         ! MACT: Autos, plant: GeneralMotorsAssemblyPlant, VOC 28%: Auto_2002_projections.xls
13089 0          50000            -9  28.00 100 100 -9   -9     Y R 8900086                         ! MACT: Autos, plant: GeneralMotorsAssemblyPlant, VOC 28%: Auto_2002_projections.xls
13089 0          67561            -9  28.00 100 100 -9   -9     Y R 8900086                         ! MACT: Autos, plant: GeneralMotorsAssemblyPlant, VOC 28%: Auto_2002_projections.xls
13089 0          71432            -9  28.00 100 100 -9   -9     Y R 8900086                         ! MACT: Autos, plant: GeneralMotorsAssemblyPlant, VOC 28%: Auto_2002_projections.xls
13089 0          75070            -9  28.00 100 100 -9   -9     Y R 8900086                         ! MACT: Autos, plant: GeneralMotorsAssemblyPlant, VOC 28%: Auto_2002_projections.xls
13089 0          91203            -9  28.00 100 100 -9   -9     Y R 8900086                         ! MACT: Autos, plant: GeneralMotorsAssemblyPlant, VOC 28%: Auto_2002_projections.xls
13089 0          VOC              -9  28.00 100 100 -9   -9     Y R 8900086                         ! MACT: Autos, plant: GeneralMotorsAssemblyPlant, VOC 28%: Auto_2002_projections.xls
13095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 09500010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 31708MLLRB405CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3998                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13099 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4009                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 11500021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 30162NLNDR238MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 30165TMPLR380MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0300                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3692                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 13900002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13139 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14337                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 17900001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0307                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3939                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13245 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          109              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          125              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          136              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          136527           -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          139              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          195              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          198              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          199              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          200              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          201              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          202              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          226              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          253              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          301042           -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          373024           -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          543908           -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          593748           -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          598630           -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          602              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          603              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          604              -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          62384            -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          78002            -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          88               -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          92               -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          93               -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 754                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM CHEMICALS NORTH AMERICA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8119: cdate=2008
13245 0          10025737         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10025919         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10034829         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10049055         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10060125         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10099748         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10101505         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10101538         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10101970         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10108642         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10124364         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10124433         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10294403         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10325947         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10377669         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10588019         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          109              -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          11103869         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12018018         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12018198         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12035722         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12054487         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12060003         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12079651         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          125              -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12626812         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12640890         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12710360         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1271289          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1306190          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1306236          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1307966          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1308061          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1308141          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1308389          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1309600          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1309644          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1313139          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13138459         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1313991          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1314063          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1314416          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1317346          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1317357          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1317368          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1317426          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1327339          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1333820          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1335257          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1335326          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1336932          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1345046          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1345160          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13462889         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13463393         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13530659         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13530682         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13586828         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          136              -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          136527           -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13765190         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13770893         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13814965         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          139              -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14018952         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14220178         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14307336         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14307358         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14336700         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14977618         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          16065831         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          16842038         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          16925250         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          18454121         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          18540299         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          195              -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          198              -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          199              -9  10.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          200              -9  10.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          201              -9  10.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          202              -9  10.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          21679312         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          2223930          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          226              -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          22967926         -9  10.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          253              -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          27253287         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          301042           -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          3333673          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          373024           -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          50922297         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          543908           -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          593748           -9  10.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          598630           -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          6018899          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          602              -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          603              -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          604              -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          61789513         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          61790145         -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          62384            -9  10.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7428480          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7439921          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7439965          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7439976          -9  10.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440020          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440360          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440439          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440473          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440484          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7446084          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7446142          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7446277          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7446346          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7487947          -9  10.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7488564          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7542098          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7718549          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7722647          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7738945          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7758976          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7775113          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7778509          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7782492          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7783008          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7783075          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7783166          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7783702          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7783791          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7785877          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7786814          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7788967          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7788989          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7789006          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7789062          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7789095          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7789120          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7789426          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7790809          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          78002            -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          8030704          -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          88               -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          92               -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          93               -9   0.00 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          EXH__16065831    -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          EXH__18540299    -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          EXH__7439965     -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          EXH__7440020     -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          PM10             -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: G.D.SEARLELLC: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          PM2_5            -9  77.04 100 100 -9   0801-6 Y R 776                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: G.D.SEARLELLC: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10025737         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10025919         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10034829         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10049055         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10060125         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10099748         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10101505         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10101538         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10101970         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10108642         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10124364         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10124433         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10294403         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10325947         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10377669         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          10588019         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          109              -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          11103869         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12018018         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12018198         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12035722         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12054487         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12060003         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12079651         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          125              -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12626812         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12640890         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          12710360         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1271289          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1306190          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1306236          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1307966          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1308061          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1308141          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1308389          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1309600          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1309644          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1313139          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13138459         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1313991          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1314063          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1314416          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1317346          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1317357          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1317368          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1317426          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1327339          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1333820          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1335257          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1335326          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1336932          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1345046          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          1345160          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13462889         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13463393         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13530659         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13530682         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13586828         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          136              -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          136527           -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13765190         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13770893         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          13814965         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          139              -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14018952         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14220178         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14307336         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14307358         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14336700         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          14977618         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          16065831         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          16842038         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          16925250         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          18454121         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          18540299         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          195              -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          198              -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          199              -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          200              -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          201              -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          202              -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          21679312         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          2223930          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          226              -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          253              -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          27253287         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          301042           -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          3333673          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          373024           -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          50922297         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          543908           -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          593748           -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          598630           -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          6018899          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          602              -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          603              -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          604              -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          61789513         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          61790145         -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          62384            -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7428480          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7439921          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7439965          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440020          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440360          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440439          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440473          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7440484          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7446084          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7446142          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7446277          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7446346          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7488564          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7542098          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7718549          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7722647          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7738945          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7758976          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7775113          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7778509          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7782492          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7783008          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7783075          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7783166          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7783702          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7783791          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7785877          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7786814          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7788967          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7788989          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7789006          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7789062          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7789095          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7789120          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7789426          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          7790809          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          78002            -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          8030704          -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          88               -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          92               -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          93               -9   0.00 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          EXH__16065831    -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          EXH__18540299    -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          EXH__7439965     -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          EXH__7440020     -9  79.62 100 100 -9   0801-6 Y R 777                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SEARLE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          PM10             -9  77.04 100 100 -9   0801-6 Y R 777                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: G.D.SEARLELLC: NEI_UNIQUE_ID=NEI26516: cdate=2008
13245 0          PM2_5            -9  77.04 100 100 -9   0801-6 Y R 777                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: G.D.SEARLELLC: NEI_UNIQUE_ID=NEI26516: cdate=2008
13285 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13285 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3721                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 29500031                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13295 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15172                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 30720SHWNDHAMIL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300070                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 31300084                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
13313 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3850                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 0          10031137         -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10099748         -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10108642         -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10124364         -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10325947         -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          12060003         -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          125              -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          12626812         -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1306190          -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1306236          -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1309600          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1314416          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1317368          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1335257          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1335326          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          136677093        -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          136677106        -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          13814965         -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          155              -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1746016          -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          18454121         -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          19408743         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          195              -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          199              -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          200              -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          201              -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          202              -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          2223930          -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          22967926         -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          262124           -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          27253287         -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          301042           -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          30402143         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          30402154         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          3268879          -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          34465468         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          35822469         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          36088229         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          37871004         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          38998753         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          39001020         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          39227286         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          40321764         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          41903575         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          51207319         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          543908           -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          55673897         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          55684941         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57117314         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57117416         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57117449         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57653857         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          593748           -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          598630           -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          600              -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          602              -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          603              -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          60851345         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          61790145         -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          62384            -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          626              -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          627              -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          67562394         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          70648269         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          72918219         -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7428480          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7439921          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7439976          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7440439          -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7446142          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7446277          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7487947          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7758976          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7784409          -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7789426          -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7790809          -9  74.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          78002            -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          88               -9  85.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__1746016     -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__19408743    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__3268879     -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__35822469    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__39001020    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__39227286    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__40321764    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__51207319    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__55673897    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57117314    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57117416    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57117449    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57653857    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__60851345    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__67562394    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__70648269    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__72918219    -9  77.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          PM10             -9  34.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          PM2_5            -9  34.00 100 100 -9   -9     Y R 00082                           ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 00503                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 31DEC2006
15003 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 00503                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 27JUN2005
15003 30600111   SO2              -9  90.00 100 100 -9   -9     Y R 00503                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 27JUN2005
15003 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 00503                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 31DEC2006
15003 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 00503                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 27JUN2005
15003 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 96707CHVRN91480                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 31DEC2006
15003 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 96707CHVRN91480                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 27JUN2005
15003 30600111   SO2              -9  90.00 100 100 -9   -9     Y R 96707CHVRN91480                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 27JUN2005
15003 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 96707CHVRN91480                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 31DEC2006
15003 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 96707CHVRN91480                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 27JUN2005
15003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 96707SHWNC91086                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 0          10031137         -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10099748         -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10108642         -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10124364         -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10325947         -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          12060003         -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          125              -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          12626812         -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1306190          -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1306236          -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1309600          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1314416          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1317368          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1335257          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1335326          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          136677093        -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          136677106        -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          13814965         -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          155              -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1746016          -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          18454121         -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          19408743         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          195              -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          199              -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          200              -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          201              -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          202              -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          2223930          -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          22967926         -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          262124           -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          27253287         -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          301042           -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          30402143         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          30402154         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          3268879          -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          34465468         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          35822469         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          36088229         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          37871004         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          38998753         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          39001020         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          39227286         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          40321764         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          41903575         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          51207319         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          543908           -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          55673897         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          55684941         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57117314         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57117416         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57117449         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57653857         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          593748           -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          598630           -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          600              -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          602              -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          603              -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          60851345         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          61790145         -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          62384            -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          626              -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          627              -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          67562394         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          70648269         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          72918219         -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7428480          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7439921          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7439976          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7440439          -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7446142          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7446277          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7487947          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7758976          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7784409          -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7789426          -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7790809          -9  74.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          78002            -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          88               -9  85.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__1746016     -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__19408743    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__3268879     -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__35822469    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__39001020    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__39227286    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__40321764    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__51207319    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__55673897    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57117314    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57117416    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57117449    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57653857    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__60851345    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__67562394    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__70648269    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__72918219    -9  77.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          PM10             -9  34.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          PM2_5            -9  34.00 100 100 -9   -9     Y R EM3441                          ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10031137         -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10099748         -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10108642         -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10124364         -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          10325947         -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          12060003         -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          125              -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          12626812         -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1306190          -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1306236          -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1309600          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1314416          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1317368          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1335257          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1335326          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          136677093        -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          136677106        -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          13814965         -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          155              -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          1746016          -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          18454121         -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          19408743         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          195              -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          199              -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          200              -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          201              -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          202              -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          2223930          -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          22967926         -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          262124           -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          27253287         -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          301042           -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          30402143         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          30402154         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          3268879          -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          34465468         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          35822469         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          36088229         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          37871004         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          38998753         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          39001020         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          39227286         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          40321764         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          41903575         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          51207319         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          543908           -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          55673897         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          55684941         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57117314         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57117416         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57117449         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          57653857         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          593748           -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          598630           -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          600              -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          602              -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          603              -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          60851345         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          61790145         -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          62384            -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          626              -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          627              -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          67562394         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          70648269         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          72918219         -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7428480          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7439921          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7439976          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7440439          -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7446142          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7446277          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7487947          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7758976          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7784409          -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7789426          -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          7790809          -9  74.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          78002            -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          88               -9  85.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__1746016     -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__19408743    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__3268879     -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__35822469    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__39001020    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__39227286    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__40321764    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__51207319    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__55673897    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57117314    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57117416    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57117449    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__57653857    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__60851345    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__67562394    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__70648269    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          EXH__72918219    -9  77.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          PM10             -9  34.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 0          PM2_5            -9  34.00 100 100 -9   -9     Y R LMWC-21                         ! LMWC, Walt Stevenson 2/14/2008: HPOWER (Honolulu Resource Recovery Venture), HI, NEI_ID=NEI26535
15003 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$13288                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 31DEC2006
15003 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$13288                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 27JUN2005
15003 30600111   SO2              -9  90.00 100 100 -9   -9     Y R T$13288                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 27JUN2005
15003 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$13288                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 31DEC2006
15003 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$13288                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI13322, Plant=Chevron USA Inc., Barber's Point, HI, compliance date: 27JUN2005
15003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
15003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13292                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 02300001CPP                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 02700010                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 83651MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16055 0          106990           -9   0.00 100 100 -9   1624   Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700602   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700604   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700606   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700607   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700608   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700610   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700611   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700621   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700625   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700626   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700628   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700629   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700630   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700631   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700632   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700635   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700640   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700651   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700655   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700661   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700664   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700665   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700701   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700702   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700703   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700704   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700705   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700706   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700707   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700708   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700709   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700710   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700711   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700712   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700713   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700714   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700715   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700716   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700717   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700718   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700720   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700725   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700727   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700730   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700734   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700735   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700736   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700737   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700740   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700744   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700746   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700747   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700750   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700752   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700753   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700756   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700757   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700760   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700762   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700763   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700766   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700767   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700769   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700770   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700771   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700780   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700781   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700783   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700785   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700788   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700789   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700790   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700791   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700792   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700793   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700798   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700799   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700801   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700802   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700895   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700921   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700923   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700925   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700927   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700931   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700932   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700933   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700934   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700935   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700936   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700939   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700940   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700950   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700960   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700971   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700980   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700981   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700982   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700983   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700984   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701001   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701008   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701009   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701010   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701015   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701020   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701030   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701040   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701053   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701054   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701055   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701057   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701060   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701062   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701064   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701410   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701415   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701416   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701420   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701425   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701430   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701440   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701442   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701480   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701482   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701484   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701486   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701510   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701512   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701530   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701540   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701550   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701610   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701611   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701630   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701640   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701642   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701710   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701712   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701720   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701740   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701742   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30702021   106990           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 0          107028           -9   0.00 100 100 -9   1624   Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700602   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700604   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700606   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700607   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700608   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700610   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700611   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700621   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700625   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700626   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700628   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700629   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700630   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700631   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700632   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700635   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700640   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700651   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700655   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700661   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700664   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700665   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700701   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700702   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700703   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700704   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700705   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700706   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700707   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700708   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700709   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700710   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700711   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700712   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700713   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700714   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700715   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700716   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700717   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700718   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700720   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700725   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700727   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700730   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700734   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700735   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700736   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700737   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700740   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700744   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700746   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700747   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700750   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700752   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700753   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700756   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700757   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700760   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700762   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700763   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700766   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700767   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700769   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700770   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700771   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700780   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700781   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700783   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700785   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700788   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700789   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700790   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700791   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700792   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700793   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700798   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700799   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700801   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700802   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700895   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700921   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700923   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700925   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700927   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700931   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700932   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700933   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700934   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700935   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700936   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700939   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700940   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700950   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700960   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700971   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700980   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700981   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700982   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700983   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700984   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701001   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701008   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701009   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701010   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701015   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701020   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701030   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701040   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701053   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701054   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701055   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701057   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701060   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701062   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701064   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701410   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701415   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701416   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701420   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701425   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701430   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701440   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701442   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701480   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701482   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701484   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701486   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701510   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701512   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701530   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701540   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701550   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701610   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701611   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701630   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701640   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701642   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701710   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701712   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701720   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701740   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701742   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30702021   107028           -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 0          50000            -9   0.00 100 100 -9   1624   Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700602   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700604   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700606   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700607   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700608   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700610   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700611   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700621   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700625   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700626   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700628   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700629   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700630   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700631   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700632   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700635   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700640   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700651   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700655   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700661   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700664   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700665   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700701   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700702   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700703   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700704   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700705   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700706   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700707   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700708   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700709   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700710   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700711   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700712   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700713   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700714   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700715   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700716   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700717   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700718   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700720   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700725   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700727   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700730   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700734   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700735   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700736   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700737   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700740   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700744   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700746   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700747   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700750   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700752   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700753   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700756   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700757   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700760   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700762   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700763   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700766   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700767   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700769   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700770   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700771   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700780   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700781   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700783   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700785   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700788   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700789   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700790   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700791   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700792   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700793   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700798   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700799   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700801   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700802   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700895   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700921   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700923   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700925   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700927   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700931   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700932   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700933   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700934   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700935   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700936   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700939   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700940   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700950   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700960   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700971   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700980   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700981   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700982   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700983   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700984   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701001   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701008   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701009   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701010   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701015   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701020   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701030   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701040   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701053   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701054   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701055   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701057   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701060   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701062   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701064   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701410   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701415   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701416   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701420   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701425   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701430   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701440   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701442   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701480   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701482   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701484   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701486   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701510   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701512   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701530   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701540   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701550   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701610   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701611   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701630   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701640   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701642   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701710   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701712   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701720   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701740   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701742   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30702021   50000            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 0          67561            -9   0.00 100 100 -9   1624   Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700602   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700604   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700606   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700607   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700608   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700610   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700611   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700621   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700625   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700626   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700628   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700629   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700630   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700631   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700632   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700635   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700640   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700651   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700655   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700661   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700664   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700665   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700701   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700702   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700703   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700704   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700705   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700706   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700707   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700708   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700709   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700710   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700711   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700712   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700713   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700714   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700715   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700716   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700717   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700718   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700720   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700725   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700727   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700730   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700734   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700735   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700736   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700737   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700740   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700744   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700746   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700747   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700750   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700752   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700753   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700756   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700757   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700760   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700762   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700763   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700766   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700767   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700769   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700770   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700771   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700780   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700781   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700783   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700785   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700788   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700789   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700790   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700791   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700792   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700793   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700798   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700799   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700801   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700802   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700895   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700921   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700923   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700925   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700927   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700931   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700932   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700933   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700934   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700935   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700936   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700939   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700940   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700950   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700960   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700971   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700980   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700981   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700982   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700983   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700984   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701001   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701008   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701009   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701010   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701015   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701020   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701030   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701040   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701053   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701054   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701055   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701057   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701060   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701062   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701064   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701410   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701415   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701416   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701420   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701425   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701430   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701440   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701442   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701480   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701482   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701484   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701486   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701510   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701512   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701530   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701540   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701550   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701610   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701611   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701630   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701640   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701642   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701710   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701712   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701720   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701740   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701742   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30702021   67561            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 0          71432            -9   0.00 100 100 -9   1624   Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700602   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700604   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700606   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700607   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700608   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700610   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700611   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700621   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700625   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700626   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700628   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700629   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700630   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700631   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700632   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700635   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700640   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700651   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700655   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700661   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700664   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700665   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700701   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700702   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700703   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700704   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700705   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700706   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700707   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700708   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700709   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700710   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700711   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700712   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700713   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700714   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700715   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700716   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700717   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700718   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700720   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700725   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700727   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700730   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700734   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700735   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700736   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700737   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700740   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700744   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700746   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700747   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700750   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700752   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700753   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700756   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700757   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700760   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700762   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700763   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700766   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700767   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700769   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700770   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700771   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700780   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700781   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700783   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700785   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700788   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700789   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700790   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700791   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700792   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700793   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700798   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700799   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700801   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700802   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700895   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700921   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700923   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700925   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700927   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700931   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700932   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700933   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700934   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700935   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700936   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700939   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700940   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700950   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700960   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700971   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700980   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700981   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700982   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700983   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700984   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701001   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701008   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701009   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701010   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701015   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701020   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701030   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701040   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701053   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701054   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701055   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701057   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701060   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701062   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701064   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701410   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701415   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701416   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701420   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701425   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701430   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701440   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701442   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701480   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701482   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701484   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701486   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701510   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701512   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701530   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701540   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701550   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701610   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701611   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701630   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701640   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701642   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701710   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701712   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701720   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701740   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701742   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30702021   71432            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 0          75070            -9   0.00 100 100 -9   1624   Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700602   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700604   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700606   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700607   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700608   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700610   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700611   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700621   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700625   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700626   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700628   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700629   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700630   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700631   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700632   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700635   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700640   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700651   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700655   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700661   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700664   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700665   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700701   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700702   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700703   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700704   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700705   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700706   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700707   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700708   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700709   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700710   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700711   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700712   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700713   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700714   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700715   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700716   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700717   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700718   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700720   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700725   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700727   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700730   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700734   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700735   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700736   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700737   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700740   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700744   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700746   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700747   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700750   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700752   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700753   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700756   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700757   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700760   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700762   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700763   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700766   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700767   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700769   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700770   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700771   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700780   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700781   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700783   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700785   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700788   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700789   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700790   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700791   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700792   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700793   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700798   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700799   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700801   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700802   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700895   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700921   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700923   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700925   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700927   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700931   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700932   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700933   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700934   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700935   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700936   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700939   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700940   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700950   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700960   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700971   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700980   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700981   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700982   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700983   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700984   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701001   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701008   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701009   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701010   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701015   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701020   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701030   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701040   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701053   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701054   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701055   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701057   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701060   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701062   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701064   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701410   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701415   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701416   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701420   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701425   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701430   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701440   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701442   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701480   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701482   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701484   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701486   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701510   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701512   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701530   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701540   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701550   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701610   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701611   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701630   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701640   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701642   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701710   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701712   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701720   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701740   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701742   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30702021   75070            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 0          91203            -9   0.00 100 100 -9   1624   Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700602   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700604   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700606   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700607   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700608   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700610   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700611   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700621   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700625   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700626   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700628   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700629   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700630   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700631   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700632   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700635   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700640   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700651   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700655   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700661   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700664   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700665   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700701   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700702   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700703   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700704   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700705   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700706   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700707   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700708   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700709   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700710   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700711   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700712   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700713   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700714   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700715   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700716   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700717   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700718   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700720   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700725   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700727   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700730   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700734   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700735   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700736   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700737   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700740   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700744   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700746   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700747   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700750   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700752   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700753   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700756   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700757   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700760   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700762   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700763   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700766   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700767   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700769   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700770   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700771   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700780   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700781   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700783   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700785   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700788   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700789   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700790   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700791   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700792   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700793   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700798   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700799   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700801   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700802   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700895   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700921   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700923   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700925   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700927   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700931   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700932   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700933   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700934   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700935   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700936   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700939   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700940   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700950   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700960   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700971   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700980   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700981   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700982   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700983   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700984   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701001   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701008   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701009   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701010   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701015   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701020   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701030   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701040   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701053   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701054   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701055   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701057   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701060   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701062   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701064   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701410   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701415   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701416   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701420   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701425   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701430   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701440   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701442   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701480   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701482   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701484   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701486   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701510   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701512   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701530   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701540   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701550   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701610   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701611   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701630   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701640   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701642   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701710   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701712   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701720   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701740   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701742   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30702021   91203            -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 0          VOC              -9   0.00 100 100 -9   1624   Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700602   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700604   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700606   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700607   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700608   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700610   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700611   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700621   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700625   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700626   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700628   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700629   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700630   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700631   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700632   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700635   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700640   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700651   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700655   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700661   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700664   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700665   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700701   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700702   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700703   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700704   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700705   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700706   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700707   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700708   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700709   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700710   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700711   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700712   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700713   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700714   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700715   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700716   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700717   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700718   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700720   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700725   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700727   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700730   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700734   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700735   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700736   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700737   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700740   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700744   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700746   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700747   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700750   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700752   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700753   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700756   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700757   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700760   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700762   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700763   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700766   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700767   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700769   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700770   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700771   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700780   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700781   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700783   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700785   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700788   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700789   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700790   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700791   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700792   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700793   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700798   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700799   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700801   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700802   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700895   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700921   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700923   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700925   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700927   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700931   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700932   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700933   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700934   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700935   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700936   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700939   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700940   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700950   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700960   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700971   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700980   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700981   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700982   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700983   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30700984   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701001   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701008   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701009   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701010   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701015   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701020   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701030   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701040   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701053   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701054   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701055   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701057   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701060   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701062   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701064   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701410   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701415   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701416   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701420   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701425   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701430   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701440   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701442   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701480   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701482   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701484   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701486   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701510   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701512   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701530   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701540   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701550   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701610   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701611   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701630   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701640   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701642   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701710   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701712   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701720   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701740   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30701742   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16055 30702021   VOC              -9   0.00 100 100 -9   -9     Y R 05500018                        ! MACT: Plywood and Composite Wood Products: plant=Potlatch Corporation - St. Maries Plywood, St. Maries, ID
16067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 06700001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 83347MLGMT500WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18059                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 08300001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 83303MLGMTPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0330                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
16083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 001065ABP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 001815AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9786                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9848                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 0          106990           -9  28.00 100 100 -9   -9     Y R 007005AAF                       ! MACT: Autos, plant: CHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
17007 0          107028           -9  28.00 100 100 -9   -9     Y R 007005AAF                       ! MACT: Autos, plant: CHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
17007 0          50000            -9  28.00 100 100 -9   -9     Y R 007005AAF                       ! MACT: Autos, plant: CHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
17007 0          67561            -9  28.00 100 100 -9   -9     Y R 007005AAF                       ! MACT: Autos, plant: CHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
17007 0          71432            -9  28.00 100 100 -9   -9     Y R 007005AAF                       ! MACT: Autos, plant: CHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
17007 0          75070            -9  28.00 100 100 -9   -9     Y R 007005AAF                       ! MACT: Autos, plant: CHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
17007 0          91203            -9  28.00 100 100 -9   -9     Y R 007005AAF                       ! MACT: Autos, plant: CHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
17007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 007005AAF                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17007 0          VOC              -9  28.00 100 100 -9   -9     Y R 007005AAF                       ! MACT: Autos, plant: CHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
17027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 027422AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17029 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 029010AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 031012ABI                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 0          106990           -9  28.00 100 100 -9   -9     Y R 031600AAR                       ! MACT: Autos, plant: FORDMOTORCO, VOC 28%: Auto_2002_projections.xls
17031 0          107028           -9  28.00 100 100 -9   -9     Y R 031600AAR                       ! MACT: Autos, plant: FORDMOTORCO, VOC 28%: Auto_2002_projections.xls
17031 0          50000            -9  28.00 100 100 -9   -9     Y R 031600AAR                       ! MACT: Autos, plant: FORDMOTORCO, VOC 28%: Auto_2002_projections.xls
17031 0          67561            -9  28.00 100 100 -9   -9     Y R 031600AAR                       ! MACT: Autos, plant: FORDMOTORCO, VOC 28%: Auto_2002_projections.xls
17031 0          71432            -9  28.00 100 100 -9   -9     Y R 031600AAR                       ! MACT: Autos, plant: FORDMOTORCO, VOC 28%: Auto_2002_projections.xls
17031 0          75070            -9  28.00 100 100 -9   -9     Y R 031600AAR                       ! MACT: Autos, plant: FORDMOTORCO, VOC 28%: Auto_2002_projections.xls
17031 0          91203            -9  28.00 100 100 -9   -9     Y R 031600AAR                       ! MACT: Autos, plant: FORDMOTORCO, VOC 28%: Auto_2002_projections.xls
17031 0          VOC              -9  28.00 100 100 -9   -9     Y R 031600AAR                       ! MACT: Autos, plant: FORDMOTORCO, VOC 28%: Auto_2002_projections.xls
17031 0          PM10             -9  28.00 100 100 -9   -9     Y R 031600ADY                       ! MACT: Lime Manufacturing: MARBLEHEAD LIME CO.-SOUTH CHICAGO PL
17031 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 031600ADY                       ! MACT: Lime Manufacturing: MARBLEHEAD LIME CO.-SOUTH CHICAGO PL
17031 0          SO2              -9  20.00 100 100 -9   -9     Y R 031600ADY                       ! MACT: Lime Manufacturing: MARBLEHEAD LIME CO.-SOUTH CHICAGO PL
17031 0          PM10             -9  28.00 100 100 -9   -9     Y R 60617MRBLH3245E                 ! MACT: Lime Manufacturing: MARBLEHEAD LIME CO.-SOUTH CHICAGO PL
17031 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 60617MRBLH3245E                 ! MACT: Lime Manufacturing: MARBLEHEAD LIME CO.-SOUTH CHICAGO PL
17031 0          SO2              -9  20.00 100 100 -9   -9     Y R 60617MRBLH3245E                 ! MACT: Lime Manufacturing: MARBLEHEAD LIME CO.-SOUTH CHICAGO PL
17031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0334                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9347                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17033 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 033808AAB                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 10200799   NOX              -9  40.00 100 100 -9   -9     Y R 033808AAB                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 033808AAB                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 033808AAB                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 033808AAB                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 033808AAB                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 033808AAD                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 10200799   NOX              -9  40.00 100 100 -9   -9     Y R 033808AAD                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 033808AAD                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 033808AAD                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 033808AAD                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 033808AAD                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 10200401   NOX              -9  40.00 100 100 -9   -9     Y R T$9796                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 10200799   NOX              -9  40.00 100 100 -9   -9     Y R T$9796                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600103   NOX              -9  40.00 100 100 -9   -9     Y R T$9796                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$9796                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$9796                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17033 30600201   NOX              -9  60.00 100 100 -9   -9     Y R T$9796                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI49781, Plant=Marathon Ashland Petrol., Robinson, IL, compliance date: 31DEC2008
17043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 043802AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 051800AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 055070AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17063 0          10025737         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10025919         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10031137         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10034829         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10049055         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10060125         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10099748         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10101505         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10101538         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10101970         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10108642         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10124364         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10124433         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10294403         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10325947         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10377669         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          10588019         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          109              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          11103869         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          12018018         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          12018198         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          12035722         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          12054487         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          12060003         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          12079651         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          125              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          12626812         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          12640890         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          12710360         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1271289          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1303282          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1304569          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1306190          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1306236          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1307966          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1308061          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1308141          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1308389          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1309600          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1309644          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1313139          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13138459         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1313991          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1314063          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1314416          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1317346          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1317357          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1317368          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1317426          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1327339          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1327533          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1333820          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1335257          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1335326          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1336932          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1345046          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          1345160          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13462889         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13463393         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13510491         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13530659         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13530682         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13586828         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13597994         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          136              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          136527           -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13765190         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13770893         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          13814965         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          139              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          14018952         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          14220178         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          14307336         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          14307358         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          14336700         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          14977618         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          16065831         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          16842038         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          16925250         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          18454121         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          18540299         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          195              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          198              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          199              -9   0.00 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          200              -9   0.00 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          201              -9   0.00 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          202              -9   0.00 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          21679312         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          2223930          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          226              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          253              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          27253287         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          301042           -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          3141126          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          3333673          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          373024           -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          50922297         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          543908           -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          593748           -9   0.00 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          598630           -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          6018899          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          602              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          603              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          604              -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          61789513         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          61790145         -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          62384            -9   0.00 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7428480          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7439921          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7439965          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7440020          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7440360          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7440382          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7440417          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7440439          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7440473          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7440484          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7446084          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7446142          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7446277          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7446346          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7488564          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7542098          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7647010          -9  87.58 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7718549          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7722647          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7738945          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7758976          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7775113          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7778394          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7778509          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7782492          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7782505          -9  87.58 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7783008          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7783075          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7783166          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7783702          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7783791          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7784409          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7784421          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7785877          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7786814          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7787475          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7787497          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7788967          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7788989          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7789006          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7789062          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7789095          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7789120          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7789426          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          7790809          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          78002            -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          8030704          -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          88               -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          92               -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          93               -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          EXH__16065831    -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          EXH__18540299    -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          EXH__7439965     -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          EXH__7440020     -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Akzo Chemie America MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          PM10             -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AkzoNobelSurfaceChemistryLLC: NEI_UNIQUE_ID=NEI50457: cdate=2008
17063 0          PM2_5            -9  93.21 100 100 -9   0801-2 Y R 460                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AkzoNobelSurfaceChemistryLLC: NEI_UNIQUE_ID=NEI50457: cdate=2008
17077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 077801AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 087856AAA                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17089 0          10025737         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10025919         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10031137         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10034829         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10049055         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10060125         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10099748         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10101505         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10101538         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10101970         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10108642         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10124364         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10124433         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10294403         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10325947         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10377669         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          10588019         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          109              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          11103869         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          12018018         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          12018198         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          12035722         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          12054487         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          12060003         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          12079651         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          125              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          12626812         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          12640890         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          12710360         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1271289          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1303282          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1304569          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1306190          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1306236          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1307966          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1308061          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1308141          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1308389          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1309600          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1309644          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1313139          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13138459         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1313991          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1314063          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1314416          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1317346          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1317357          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1317368          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1317426          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1327339          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1327533          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1333820          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1335257          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1335326          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1336932          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1345046          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          1345160          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13462889         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13463393         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13510491         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13530659         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13530682         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13586828         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13597994         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          136              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          136527           -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13765190         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13770893         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          13814965         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          139              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          14018952         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          14220178         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          14307336         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          14307358         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          14336700         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          14977618         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          16065831         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          16842038         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          16925250         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          18454121         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          18540299         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          195              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          198              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          199              -9   0.00 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          200              -9   0.00 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          201              -9   0.00 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          202              -9   0.00 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          21679312         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          2223930          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          226              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          253              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          27253287         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          301042           -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          3141126          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          3333673          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          373024           -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          50922297         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          543908           -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          598630           -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          6018899          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          602              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          603              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          604              -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          61789513         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          61790145         -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7428480          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7439921          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7439965          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7440020          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7440360          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7440382          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7440417          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7440439          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7440473          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7440484          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7446084          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7446142          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7446277          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7446346          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7488564          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7542098          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7647010          -9  18.79 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7718549          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7722647          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7738945          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7758976          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7775113          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7778394          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7778509          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7782492          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7782505          -9  18.79 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7783008          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7783075          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7783166          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7783702          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7783791          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7784409          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7784421          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7785877          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7786814          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7787475          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7787497          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7788967          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7788989          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7789006          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7789062          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7789095          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7789120          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7789426          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          7790809          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          78002            -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          8030704          -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          88               -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          92               -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          93               -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          EXH__16065831    -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          EXH__18540299    -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          EXH__7439965     -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          EXH__7440020     -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL CO MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          PM10             -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCO: NEI_UNIQUE_ID=NEI50833: cdate=2008
17089 0          PM2_5            -9  11.22 100 100 -9   0801-2 Y R 3017                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCO: NEI_UNIQUE_ID=NEI50833: cdate=2008
17093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 093807AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 097809AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R ETO-2002-43                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 107802AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 109035AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17113 0          106990           -9  28.00 100 100 -9   -9     Y R 113813AAE                       ! MACT: Autos, plant: MITSUBISHIMOTORMFGOFAMERICAINC, VOC 28%: Auto_2002_projections.xls
17113 0          107028           -9  28.00 100 100 -9   -9     Y R 113813AAE                       ! MACT: Autos, plant: MITSUBISHIMOTORMFGOFAMERICAINC, VOC 28%: Auto_2002_projections.xls
17113 0          50000            -9  28.00 100 100 -9   -9     Y R 113813AAE                       ! MACT: Autos, plant: MITSUBISHIMOTORMFGOFAMERICAINC, VOC 28%: Auto_2002_projections.xls
17113 0          67561            -9  28.00 100 100 -9   -9     Y R 113813AAE                       ! MACT: Autos, plant: MITSUBISHIMOTORMFGOFAMERICAINC, VOC 28%: Auto_2002_projections.xls
17113 0          71432            -9  28.00 100 100 -9   -9     Y R 113813AAE                       ! MACT: Autos, plant: MITSUBISHIMOTORMFGOFAMERICAINC, VOC 28%: Auto_2002_projections.xls
17113 0          75070            -9  28.00 100 100 -9   -9     Y R 113813AAE                       ! MACT: Autos, plant: MITSUBISHIMOTORMFGOFAMERICAINC, VOC 28%: Auto_2002_projections.xls
17113 0          91203            -9  28.00 100 100 -9   -9     Y R 113813AAE                       ! MACT: Autos, plant: MITSUBISHIMOTORMFGOFAMERICAINC, VOC 28%: Auto_2002_projections.xls
17113 0          VOC              -9  28.00 100 100 -9   -9     Y R 113813AAE                       ! MACT: Autos, plant: MITSUBISHIMOTORMFGOFAMERICAINC, VOC 28%: Auto_2002_projections.xls
17115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAK                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 115015ABX                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 62525STLYM2200E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0350                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9801                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9803                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9808                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 119010AAL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 119020AAG                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 119050AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI52159, Plant=ConnocoPhillips (formerly Tosco Refining, Equilon, W, Wood River, IL, compliance date: 31DEC2012
17119 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 119050AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI52159, Plant=ConnocoPhillips (formerly Tosco Refining, Equilon, W, Wood River, IL, compliance date: 31DEC2012
17119 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 119050AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI52159, Plant=ConnocoPhillips (formerly Tosco Refining, Equilon, W, Wood River, IL, compliance date: 31DEC2012
17119 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 119050AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI52159, Plant=ConnocoPhillips (formerly Tosco Refining, Equilon, W, Wood River, IL, compliance date: 31DEC2012
17119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 337                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17119 30600201   NOX              -9  60.00 100 100 -9   -9     Y R T$9742                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI52159, Plant=ConnocoPhillips (formerly Tosco Refining, Equilon, W, Wood River, IL, compliance date: 31DEC2012
17119 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$9742                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI52159, Plant=ConnocoPhillips (formerly Tosco Refining, Equilon, W, Wood River, IL, compliance date: 31DEC2012
17119 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$9742                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI52159, Plant=ConnocoPhillips (formerly Tosco Refining, Equilon, W, Wood River, IL, compliance date: 31DEC2012
17119 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$9742                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI52159, Plant=ConnocoPhillips (formerly Tosco Refining, Equilon, W, Wood River, IL, compliance date: 31DEC2012
17123 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17123 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 123803AAJ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17137 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 137020AAS                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 143065AJE                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17143 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 143810AAB                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 161025AAH                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17161 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 161065AAW                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17163 0          10025737         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10025919         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10031137         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10034829         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10049055         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10060125         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10099748         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10101505         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10101538         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10101970         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10108642         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10124364         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10124433         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10294403         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10325947         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10377669         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10588019         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          109              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          11103869         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12018018         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12018198         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12035722         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12054487         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12060003         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12079651         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          125              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12626812         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12640890         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12710360         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1271289          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1303282          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1304569          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1306190          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1306236          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1307966          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1308061          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1308141          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1308389          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1309600          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1309644          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1313139          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13138459         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1313991          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1314063          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1314416          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1317346          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1317357          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1317368          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1317426          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1327339          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1327533          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1333820          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1335257          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1335326          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1336932          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1345046          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1345160          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13462889         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13463393         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13510491         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13530659         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13530682         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13586828         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13597994         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          136              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          136527           -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13765190         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13770893         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13814965         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          139              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14018952         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14220178         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14307336         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14307358         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14336700         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14977618         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          16065831         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          16842038         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          16925250         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          18454121         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          18540299         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          195              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          198              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          199              -9  97.71 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          200              -9  97.71 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          201              -9  97.71 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          202              -9  97.71 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          21679312         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          2223930          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          226              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          22967926         -9  97.71 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          253              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          27253287         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          301042           -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          3141126          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          3333673          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          373024           -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          50922297         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          543908           -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          593748           -9  97.71 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          598630           -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          6018899          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          602              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          603              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          604              -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          61789513         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          61790145         -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          62384            -9  97.71 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7428480          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7439921          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7439965          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7439976          -9  97.71 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440020          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440360          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440382          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440417          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440439          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440473          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440484          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7446084          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7446142          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7446277          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7446346          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7487947          -9  97.71 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7488564          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7542098          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7647010          -9  66.95 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7718549          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7722647          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7738945          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7758976          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7775113          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7778394          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7778509          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7782492          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7782505          -9  66.95 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7783008          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7783075          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7783166          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7783702          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7783791          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7784409          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7784421          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7785877          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7786814          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7787475          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7787497          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7788967          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7788989          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7789006          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7789062          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7789095          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7789120          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7789426          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7790809          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          78002            -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          8030704          -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          88               -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          92               -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          93               -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          EXH__16065831    -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          EXH__18540299    -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          EXH__7439965     -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          EXH__7440020     -9   0.00 100 100 -9   0801-1 Y R 333                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10025737         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10025919         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10031137         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10034829         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10049055         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10060125         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10099748         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10101505         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10101538         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10101970         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10108642         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10124364         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10124433         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10294403         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10325947         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10377669         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          10588019         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          109              -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          11103869         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12018018         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12018198         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12035722         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12054487         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12060003         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12079651         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          125              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12626812         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12640890         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          12710360         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1271289          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1303282          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1304569          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1306190          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1306236          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1307966          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1308061          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1308141          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1308389          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1309600          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1309644          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1313139          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13138459         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1313991          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1314063          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1314416          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1317346          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1317357          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1317368          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1317426          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1327339          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1327533          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1333820          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1335257          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1335326          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1336932          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1345046          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          1345160          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13462889         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13463393         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13510491         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13530659         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13530682         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13586828         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13597994         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          136              -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          136527           -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13765190         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13770893         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          13814965         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          139              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14018952         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14220178         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14307336         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14307358         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14336700         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          14977618         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          16065831         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          16842038         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          16925250         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          18454121         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          18540299         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          195              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          198              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          199              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          200              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          201              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          202              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          21679312         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          2223930          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          226              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          22967926         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          253              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          27253287         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          301042           -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          3141126          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          3333673          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          373024           -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          50922297         -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          543908           -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          593748           -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          598630           -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          6018899          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          602              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          603              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          604              -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          61789513         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          61790145         -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          62384            -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7428480          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7439921          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7439965          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7439976          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440020          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440360          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440382          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440417          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440439          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440473          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7440484          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7446084          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7446142          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7446277          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7446346          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7487947          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7488564          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7542098          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7647010          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7718549          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7722647          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7738945          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7758976          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7775113          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7778394          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7778509          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7782492          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7782505          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7783008          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7783075          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7783166          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7783702          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7783791          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7784409          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7784421          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7785877          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7786814          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7787475          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7787497          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7788967          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7788989          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7789006          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7789062          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7789095          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7789120          -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7789426          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          7790809          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          78002            -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          8030704          -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          88               -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          92               -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          93               -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          EXH__16065831    -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          EXH__18540299    -9  16.56 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          EXH__7439965     -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17163 0          EXH__7440020     -9   0.00 100 100 -9   0801-1 Y R 612                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Trade Waste Incineration MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI53016: cdate=2008
17167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120ADP                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 167120AHL                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 179060ACR                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9668                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17181 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 181852AAC                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17183 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 183804AAY                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17197 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 10201402   NOX              -9  40.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   PM10             -9  90.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   PM2_5            -9  90.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   SO2              -9  99.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30103201   SO2              -9  98.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2008
17197 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2008
17197 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 197090AAI                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 197800AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 20200201   NOX              -9  40.00 100 100 -9   -9     Y R 197800AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 197800AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 197800AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 197800AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 197800AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 26AUG2005
17197 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 197800AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 26AUG2005
17197 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 197800AAA                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 26AUG2005
17197 0          PM10             -9  28.00 100 100 -9   -9     Y R 197803AAY                       ! MACT: Lime Manufacturing: ILLINOIS MINING CORP.
17197 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 197803AAY                       ! MACT: Lime Manufacturing: ILLINOIS MINING CORP.
17197 0          SO2              -9  20.00 100 100 -9   -9     Y R 197803AAY                       ! MACT: Lime Manufacturing: ILLINOIS MINING CORP.
17197 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 60434MBLJLINTER                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 20200201   NOX              -9  40.00 100 100 -9   -9     Y R 60434MBLJLINTER                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 60434MBLJLINTER                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 60434MBLJLINTER                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 60434MBLJLINTER                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 60434MBLJLINTER                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 26AUG2005
17197 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 60434MBLJLINTER                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 26AUG2005
17197 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 60434MBLJLINTER                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 26AUG2005
17197 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 10201402   NOX              -9  40.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   PM10             -9  90.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   PM2_5            -9  90.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   SO2              -9  99.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30103201   SO2              -9  98.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2008
17197 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2008
17197 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 60439NCLCR135TH                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10200701   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 10201402   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600104   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600106   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600201   NOX              -9  60.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   PM10             -9  90.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30600201   PM10             -9  90.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   PM2_5            -9  90.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   SO2              -9  99.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30103201   SO2              -9  98.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2008
17197 30103204   SO2              -9   0.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2008
17197 30600201   SO2              -9  99.00 100 100 -9   -9     Y R ES0603-039                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$9296                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 20200201   NOX              -9  40.00 100 100 -9   -9     Y R T$9296                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600103   NOX              -9  40.00 100 100 -9   -9     Y R T$9296                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$9296                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$9296                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 31DEC2009
17197 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$9296                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 26AUG2005
17197 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$9296                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 26AUG2005
17197 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$9296                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53718, Plant=ExxonMobil Corp. (formerly Mobil), Joliet, IL, compliance date: 26AUG2005
17197 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 10201402   NOX              -9  40.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 30JUN2011
17197 30600201   NOX              -9  60.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   PM10             -9  90.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   PM2_5            -9  90.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 10201402   SO2              -9  99.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17197 30103201   SO2              -9  98.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2008
17197 30103204   SO2              -9   0.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2008
17197 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$9312                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI53702, Plant=Citgo Petrol. (formerly UNO-VEN), Lemont, IL, compliance date: 31DEC2007
17199 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 199055AAZ                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
17199 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 199862AAD                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 46733CNTRL1200N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7042                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18003 0          106990           -9  28.00 100 100 -9   -9     Y R 00036                           ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          107028           -9  28.00 100 100 -9   -9     Y R 00036                           ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          50000            -9  28.00 100 100 -9   -9     Y R 00036                           ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          67561            -9  28.00 100 100 -9   -9     Y R 00036                           ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          71432            -9  28.00 100 100 -9   -9     Y R 00036                           ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          75070            -9  28.00 100 100 -9   -9     Y R 00036                           ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          91203            -9  28.00 100 100 -9   -9     Y R 00036                           ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          VOC              -9  28.00 100 100 -9   -9     Y R 00036                           ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          106990           -9  28.00 100 100 -9   -9     Y R 46783GMCTR12200                 ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          107028           -9  28.00 100 100 -9   -9     Y R 46783GMCTR12200                 ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          50000            -9  28.00 100 100 -9   -9     Y R 46783GMCTR12200                 ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          67561            -9  28.00 100 100 -9   -9     Y R 46783GMCTR12200                 ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          71432            -9  28.00 100 100 -9   -9     Y R 46783GMCTR12200                 ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          75070            -9  28.00 100 100 -9   -9     Y R 46783GMCTR12200                 ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          91203            -9  28.00 100 100 -9   -9     Y R 46783GMCTR12200                 ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18003 0          VOC              -9  28.00 100 100 -9   -9     Y R 46783GMCTR12200                 ! MACT: Autos, plant: GENERALMOTORSNATPFORTWAYNEASSEMBLY, VOC 28%: Auto_2002_projections.xls
18017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18017 0          PM10             -9  81.46 100 100 -9   0801-3 Y R 00005                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EssrocCementCorp.: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          PM2_5            -9  81.46 100 100 -9   0801-3 Y R 00005                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EssrocCementCorp.: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10025737         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10025919         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10031137         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10034829         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10049055         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10060125         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10099748         -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10101505         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10101538         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10101970         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10108642         -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10124364         -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10124433         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10294403         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10325947         -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10377669         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10588019         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          109              -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          11103869         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12018018         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12018198         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12035722         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12054487         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12060003         -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12079651         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          125              -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12626812         -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12640890         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12710360         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1271289          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1303282          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1304569          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1306190          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1306236          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1307966          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1308061          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1308141          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1308389          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1309600          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1309644          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1313139          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13138459         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1313991          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1314063          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1314416          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1317346          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1317357          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1317368          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1317426          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1327339          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1327533          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1333820          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1335257          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1335326          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1336932          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1345046          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1345160          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13462889         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13463393         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13510491         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13530659         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13530682         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13586828         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13597994         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          136              -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          136527           -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13765190         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13770893         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13814965         -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          139              -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14018952         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14220178         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14307336         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14307358         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14336700         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14977618         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          16065831         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          16842038         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          16925250         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          18454121         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          18540299         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          195              -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          198              -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          199              -9  42.48 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          200              -9  42.48 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          201              -9  42.48 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          202              -9  42.48 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          21679312         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          2223930          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          226              -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          22967926         -9  42.48 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          253              -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          27253287         -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          301042           -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          3141126          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          3333673          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          373024           -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          50922297         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          543908           -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          593748           -9  42.48 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          598630           -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          6018899          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          602              -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          603              -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          604              -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          61789513         -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          61790145         -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          62384            -9  42.48 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7428480          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7439921          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7439965          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7439976          -9  42.48 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440020          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440360          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440382          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440417          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440439          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440473          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440484          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7446084          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7446142          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7446277          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7446346          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7487947          -9  42.48 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7488564          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7542098          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7718549          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7722647          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7738945          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7758976          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7775113          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7778394          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7778509          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7782492          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7783008          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7783075          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7783166          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7783702          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7783791          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7784409          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7784421          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7785877          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7786814          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7787475          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7787497          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7788967          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7788989          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7789006          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7789062          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7789095          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7789120          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7789426          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7790809          -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          78002            -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          8030704          -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          88               -9  85.26 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          92               -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          93               -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          EXH__16065831    -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          EXH__18540299    -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          EXH__7439965     -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          EXH__7440020     -9  81.46 100 100 -9   0801-3 Y R 300                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10025737         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10025919         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10031137         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10034829         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10049055         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10060125         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10099748         -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10101505         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10101538         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10101970         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10108642         -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10124364         -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10124433         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10294403         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10325947         -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10377669         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          10588019         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          109              -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          11103869         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12018018         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12018198         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12035722         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12054487         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12060003         -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12079651         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          125              -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12626812         -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12640890         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          12710360         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1271289          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1303282          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1304569          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1306190          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1306236          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1307966          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1308061          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1308141          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1308389          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1309600          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1309644          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1313139          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13138459         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1313991          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1314063          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1314416          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1317346          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1317357          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1317368          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1317426          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1327339          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1327533          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1333820          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1335257          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1335326          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1336932          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1345046          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          1345160          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13462889         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13463393         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13510491         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13530659         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13530682         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13586828         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13597994         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          136              -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          136527           -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13765190         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13770893         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          13814965         -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          139              -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14018952         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14220178         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14307336         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14307358         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14336700         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          14977618         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          16065831         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          16842038         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          16925250         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          18454121         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          18540299         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          195              -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          198              -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          199              -9  42.48 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          200              -9  42.48 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          201              -9  42.48 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          202              -9  42.48 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          21679312         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          2223930          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          226              -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          22967926         -9  42.48 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          253              -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          27253287         -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          301042           -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          3141126          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          3333673          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          373024           -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          50922297         -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          543908           -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          593748           -9  42.48 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          598630           -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          6018899          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          602              -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          603              -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          604              -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          61789513         -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          61790145         -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          62384            -9  42.48 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7428480          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7439921          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7439965          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7439976          -9  42.48 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440020          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440360          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440382          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440417          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440439          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440473          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7440484          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7446084          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7446142          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7446277          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7446346          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7487947          -9  42.48 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7488564          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7542098          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7718549          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7722647          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7738945          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7758976          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7775113          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7778394          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7778509          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7782492          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7783008          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7783075          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7783166          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7783702          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7783791          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7784409          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7784421          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7785877          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7786814          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7787475          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7787497          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7788967          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7788989          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7789006          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7789062          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7789095          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7789120          -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7789426          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          7790809          -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          78002            -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          8030704          -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          88               -9  85.26 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          92               -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          93               -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          EXH__16065831    -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          EXH__18540299    -9  89.46 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          EXH__7439965     -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18017 0          EXH__7440020     -9  84.04 100 100 -9   0801-3 Y R 491                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ESSROC Corporation MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16354: cdate=2008
18023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16155                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18029 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00016                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00085                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00107                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1228                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1230                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7283                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18051 0          106990           -9  28.00 100 100 -9   -9     Y R 00037                           ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          107028           -9  28.00 100 100 -9   -9     Y R 00037                           ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          50000            -9  28.00 100 100 -9   -9     Y R 00037                           ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          67561            -9  28.00 100 100 -9   -9     Y R 00037                           ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          71432            -9  28.00 100 100 -9   -9     Y R 00037                           ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          75070            -9  28.00 100 100 -9   -9     Y R 00037                           ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          91203            -9  28.00 100 100 -9   -9     Y R 00037                           ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          VOC              -9  28.00 100 100 -9   -9     Y R 00037                           ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          106990           -9  28.00 100 100 -9   -9     Y R 47670TYTMT4000T                 ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          107028           -9  28.00 100 100 -9   -9     Y R 47670TYTMT4000T                 ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          50000            -9  28.00 100 100 -9   -9     Y R 47670TYTMT4000T                 ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          67561            -9  28.00 100 100 -9   -9     Y R 47670TYTMT4000T                 ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          71432            -9  28.00 100 100 -9   -9     Y R 47670TYTMT4000T                 ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          75070            -9  28.00 100 100 -9   -9     Y R 47670TYTMT4000T                 ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          91203            -9  28.00 100 100 -9   -9     Y R 47670TYTMT4000T                 ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18051 0          VOC              -9  28.00 100 100 -9   -9     Y R 47670TYTMT4000T                 ! MACT: Autos, plant: TOYOTAMOTORMANUFACTURINGOFINDIANA, VOC 28%: Auto_2002_projections.xls
18053 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18053 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16280                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00008                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 46902KKMTR2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7119                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 50300506   PM10             -9  94.82 100 100 -9   -9     Y R 00003                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BPPRODUCTSNORTHAMERICAINC,WHITINGR: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 50300506   PM2_5            -9  94.82 100 100 -9   -9     Y R 00003                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BPPRODUCTSNORTHAMERICAINC,WHITINGR: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          PM10             -9  28.00 100 100 -9   -9     Y R 00112                           ! MACT: Lime Manufacturing: MARBLEHEAD LIME INCORPORATED
18089 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 00112                           ! MACT: Lime Manufacturing: MARBLEHEAD LIME INCORPORATED
18089 0          SO2              -9  20.00 100 100 -9   -9     Y R 00112                           ! MACT: Lime Manufacturing: MARBLEHEAD LIME INCORPORATED
18089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00316                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 46312NLNDS3210W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 0          PM10             -9  28.00 100 100 -9   -9     Y R 46402MRBLHCLARK                 ! MACT: Lime Manufacturing: MARBLEHEAD LIME INCORPORATED
18089 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 46402MRBLHCLARK                 ! MACT: Lime Manufacturing: MARBLEHEAD LIME INCORPORATED
18089 0          SO2              -9  20.00 100 100 -9   -9     Y R 46402MRBLHCLARK                 ! MACT: Lime Manufacturing: MARBLEHEAD LIME INCORPORATED
18089 0          10025737         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10025919         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10031137         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10034829         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10049055         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10060125         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10099748         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10101505         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10101538         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10101970         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10108642         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10124364         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10124433         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10294403         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10325947         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10377669         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          10588019         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          109              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          11103869         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          12018018         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          12018198         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          12035722         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          12054487         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          12060003         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          12079651         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          125              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          12626812         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          12640890         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          12710360         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1271289          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1303282          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1304569          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1306190          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1306236          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1307966          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1308061          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1308141          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1308389          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1309600          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1309644          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1313139          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13138459         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1313991          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1314063          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1314416          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1317346          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1317357          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1317368          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1317426          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1327339          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1327533          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1333820          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1335257          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1335326          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1336932          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1345046          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          1345160          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13462889         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13463393         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13510491         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13530659         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13530682         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13586828         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13597994         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          136              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          136527           -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13765190         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13770893         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          13814965         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          139              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          14018952         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          14220178         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          14307336         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          14307358         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          14336700         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          14977618         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          16065831         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          16842038         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          16925250         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          18454121         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          18540299         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          195              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          198              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          199              -9  81.46 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          200              -9  81.46 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          201              -9  81.46 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          202              -9  81.46 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          21679312         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          2223930          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          226              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          22967926         -9  81.46 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          253              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          27253287         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          301042           -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          3141126          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          3333673          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          373024           -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          50922297         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          543908           -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          593748           -9  81.46 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          598630           -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          6018899          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          602              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          603              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          604              -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          61789513         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          61790145         -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          62384            -9  81.46 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7428480          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7439921          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7439965          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7439976          -9  81.46 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7440020          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7440360          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7440382          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7440417          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7440439          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7440473          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7440484          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7446084          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7446142          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7446277          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7446346          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7487947          -9  81.46 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7488564          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7542098          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7647010          -9  57.93 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7718549          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7722647          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7738945          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7758976          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7775113          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7778394          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7778509          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7782492          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7782505          -9  57.93 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7783008          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7783075          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7783166          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7783702          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7783791          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7784409          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7784421          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7785877          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7786814          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7787475          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7787497          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7788967          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7788989          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7789006          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7789062          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7789095          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7789120          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7789426          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          7790809          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          78002            -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          8030704          -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          88               -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          92               -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          93               -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          EXH__16065831    -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          EXH__18540299    -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          EXH__7439965     -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          EXH__7440020     -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BP PRODUCTS NORTH AMERICA INC, WHITING R MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          PM10             -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BPPRODUCTSNORTHAMERICAINC,WHITINGR: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 0          PM2_5            -9  94.82 100 100 -9   0801-2 Y R 806                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BPPRODUCTSNORTHAMERICAINC,WHITINGR: NEI_UNIQUE_ID=NEI11715: cdate=2008
18089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0384                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 0          PM10             -9  28.00 100 100 -9   -9     Y R T$16205                         ! MACT: Lime Manufacturing: MARBLEHEAD LIME INCORPORATED
18089 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$16205                         ! MACT: Lime Manufacturing: MARBLEHEAD LIME INCORPORATED
18089 0          SO2              -9  20.00 100 100 -9   -9     Y R T$16205                         ! MACT: Lime Manufacturing: MARBLEHEAD LIME INCORPORATED
18089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6820                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18097 0          10025737         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10025919         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10031137         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10034829         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10049055         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10060125         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10099748         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10101505         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10101538         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10101970         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10108642         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10124364         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10124433         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10294403         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10325947         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10377669         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10588019         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          109              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          11103869         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12018018         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12018198         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12035722         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12054487         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12060003         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12079651         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          125              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12626812         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12640890         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12710360         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1271289          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1303282          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1304569          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1306190          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1306236          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1307966          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1308061          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1308141          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1308389          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1309600          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1309644          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1313139          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13138459         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1313991          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1314063          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1314416          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317346          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317357          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317368          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317426          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1327339          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1327533          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1333820          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1335257          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1335326          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1336932          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1345046          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1345160          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13462889         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13463393         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13510491         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13530659         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13530682         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13586828         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13597994         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          136              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          136527           -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13765190         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13770893         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13814965         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          139              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14018952         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14220178         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14307336         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14307358         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14336700         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14977618         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          16065831         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          16842038         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          16925250         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          18454121         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          18540299         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          195              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          198              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          199              -9   0.00 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          200              -9   0.00 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          201              -9   0.00 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          202              -9   0.00 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          21679312         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          2223930          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          226              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          253              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          27253287         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          301042           -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          3141126          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          3333673          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          373024           -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          50922297         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          543908           -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          593748           -9   0.00 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          598630           -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          6018899          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          602              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          603              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          604              -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          61789513         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          61790145         -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          62384            -9   0.00 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7428480          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7439921          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7439965          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440020          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440360          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440382          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440417          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440439          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440473          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440484          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446084          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446142          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446277          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446346          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7488564          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7542098          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7647010          -9  78.93 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7718549          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7722647          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7738945          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7758976          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7775113          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7778394          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7778509          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7782492          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7782505          -9  78.93 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783008          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783075          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783166          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783702          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783791          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7784409          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7784421          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7785877          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7786814          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7787475          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7787497          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7788967          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7788989          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789006          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789062          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789095          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789120          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789426          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7790809          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          78002            -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          8030704          -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          88               -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          92               -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          93               -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__16065831    -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__18540299    -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__7439965     -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__7440020     -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          PM10             -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: REILLYINDUSTRIES,INC./VERTELLUSSPECIA: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          PM2_5            -9  73.64 100 100 -9   0801-6 Y R 735                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: REILLYINDUSTRIES,INC./VERTELLUSSPECIA: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10025737         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10025919         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10031137         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10034829         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10049055         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10060125         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10099748         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10101505         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10101538         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10101970         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10108642         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10124364         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10124433         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10294403         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10325947         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10377669         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10588019         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          109              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          11103869         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12018018         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12018198         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12035722         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12054487         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12060003         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12079651         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          125              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12626812         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12640890         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12710360         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1271289          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1303282          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1304569          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1306190          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1306236          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1307966          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1308061          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1308141          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1308389          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1309600          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1309644          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1313139          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13138459         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1313991          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1314063          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1314416          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317346          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317357          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317368          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317426          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1327339          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1327533          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1333820          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1335257          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1335326          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1336932          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1345046          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1345160          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13462889         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13463393         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13510491         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13530659         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13530682         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13586828         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13597994         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          136              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          136527           -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13765190         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13770893         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13814965         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          139              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14018952         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14220178         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14307336         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14307358         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14336700         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14977618         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          16065831         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          16842038         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          16925250         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          18454121         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          18540299         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          195              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          198              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          199              -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          200              -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          201              -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          202              -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          21679312         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          2223930          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          226              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          253              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          27253287         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          301042           -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          3141126          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          3333673          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          373024           -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          50922297         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          543908           -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          593748           -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          598630           -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          6018899          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          602              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          603              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          604              -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          61789513         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          61790145         -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          62384            -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7428480          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7439921          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7439965          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440020          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440360          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440382          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440417          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440439          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440473          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440484          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446084          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446142          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446277          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446346          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7488564          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7542098          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7718549          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7722647          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7738945          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7758976          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7775113          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7778394          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7778509          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7782492          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783008          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783075          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783166          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783702          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783791          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7784409          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7784421          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7785877          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7786814          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7787475          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7787497          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7788967          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7788989          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789006          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789062          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789095          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789120          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789426          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7790809          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          78002            -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          8030704          -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          88               -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          92               -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          93               -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__16065831    -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__18540299    -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__7439965     -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__7440020     -9  82.51 100 100 -9   0801-6 Y R 737                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          PM10             -9  73.64 100 100 -9   0801-6 Y R 737                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: REILLYINDUSTRIES,INC./VERTELLUSSPECIA: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          PM2_5            -9  73.64 100 100 -9   0801-6 Y R 737                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: REILLYINDUSTRIES,INC./VERTELLUSSPECIA: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10025737         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10025919         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10031137         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10034829         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10049055         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10060125         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10099748         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10101505         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10101538         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10101970         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10108642         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10124364         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10124433         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10294403         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10325947         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10377669         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          10588019         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          109              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          11103869         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12018018         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12018198         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12035722         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12054487         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12060003         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12079651         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          125              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12626812         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12640890         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          12710360         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1271289          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1303282          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1304569          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1306190          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1306236          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1307966          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1308061          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1308141          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1308389          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1309600          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1309644          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1313139          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13138459         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1313991          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1314063          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1314416          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317346          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317357          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317368          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1317426          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1327339          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1327533          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1333820          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1335257          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1335326          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1336932          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1345046          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          1345160          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13462889         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13463393         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13510491         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13530659         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13530682         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13586828         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13597994         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          136              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          136527           -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13765190         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13770893         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          13814965         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          139              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14018952         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14220178         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14307336         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14307358         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14336700         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          14977618         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          16065831         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          16842038         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          16925250         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          18454121         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          18540299         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          195              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          198              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          199              -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          200              -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          201              -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          202              -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          21679312         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          2223930          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          226              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          253              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          27253287         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          301042           -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          3141126          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          3333673          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          373024           -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          50922297         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          543908           -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          593748           -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          598630           -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          6018899          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          602              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          603              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          604              -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          61789513         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          61790145         -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          62384            -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7428480          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7439921          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7439965          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440020          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440360          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440382          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440417          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440439          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440473          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7440484          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446084          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446142          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446277          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7446346          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7488564          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7542098          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7718549          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7722647          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7738945          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7758976          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7775113          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7778394          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7778509          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7782492          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783008          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783075          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783166          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783702          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7783791          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7784409          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7784421          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7785877          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7786814          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7787475          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7787497          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7788967          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7788989          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789006          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789062          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789095          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789120          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7789426          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          7790809          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          78002            -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          8030704          -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          88               -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          92               -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          93               -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__16065831    -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__18540299    -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__7439965     -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          EXH__7440020     -9  81.23 100 100 -9   0801-6 Y R 738                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: REILLY INDUSTRIES, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          PM10             -9  73.64 100 100 -9   0801-6 Y R 738                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: REILLYINDUSTRIES,INC./VERTELLUSSPECIA: NEI_UNIQUE_ID=NEI32186: cdate=2008
18097 0          PM2_5            -9  73.64 100 100 -9   0801-6 Y R 738                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: REILLYINDUSTRIES,INC./VERTELLUSSPECIA: NEI_UNIQUE_ID=NEI32186: cdate=2008
18105 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18105 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 47620GPLSTLEXAN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 0          10025737         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10025919         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10031137         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10034829         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10049055         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10060125         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10099748         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10101505         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10101538         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10101970         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10108642         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10124364         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10124433         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10294403         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10325947         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10377669         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          10588019         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          109              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          11103869         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          12018018         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          12018198         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          12035722         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          12054487         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          12060003         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          12079651         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          125              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          12626812         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          12640890         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          12710360         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1271289          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1303282          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1304569          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1306190          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1306236          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1307966          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1308061          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1308141          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1308389          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1309600          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1309644          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1313139          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13138459         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1313991          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1314063          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1314416          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1317346          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1317357          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1317368          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1317426          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1327339          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1327533          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1333820          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1335257          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1335326          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1336932          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1345046          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          1345160          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13462889         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13463393         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13510491         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13530659         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13530682         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13586828         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13597994         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          136              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          136527           -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13765190         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13770893         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          13814965         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          139              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          14018952         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          14220178         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          14307336         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          14307358         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          14336700         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          14977618         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          16065831         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          16842038         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          16925250         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          18454121         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          18540299         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          195              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          198              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          199              -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          200              -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          201              -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          202              -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          21679312         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          2223930          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          226              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          253              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          27253287         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          301042           -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          3141126          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          3333673          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          373024           -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          50922297         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          543908           -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          593748           -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          598630           -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          6018899          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          602              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          603              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          604              -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          61789513         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          61790145         -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          62384            -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7428480          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7439921          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7439965          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7440020          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7440360          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7440382          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7440417          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7440439          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7440473          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7440484          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7446084          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7446142          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7446277          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7446346          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7488564          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7542098          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7718549          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7722647          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7738945          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7758976          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7775113          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7778394          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7778509          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7782492          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7783008          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7783075          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7783166          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7783702          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7783791          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7784409          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7784421          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7785877          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7786814          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7787475          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7787497          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7788967          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7788989          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7789006          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7789062          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7789095          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7789120          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7789426          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          7790809          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          78002            -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          8030704          -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          88               -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          92               -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          93               -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          EXH__16065831    -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          EXH__18540299    -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          EXH__7439965     -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 0          EXH__7440020     -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GE PLASTICS MT. VERNON INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 0          PM10             -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GEPLASTICSMT.VERNONINC.: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 764                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 0          PM2_5            -9  82.60 100 100 -9   0801-6 Y R 764                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GEPLASTICSMT.VERNONINC.: NEI_UNIQUE_ID=NEI32357: cdate=2008
18129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7301                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18133 0          PM10             -9   3.91 100 100 -9   0801-3 Y R 00002                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LONESTARINDUSTRIESLANDFILL: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          PM2_5            -9   3.91 100 100 -9   0801-3 Y R 00002                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LONESTARINDUSTRIESLANDFILL: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10025737         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10025919         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10031137         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10034829         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10049055         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10060125         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10099748         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10101505         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10101538         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10101970         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10108642         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10124364         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10124433         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10294403         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10325947         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10377669         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          10588019         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          109              -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          11103869         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          12018018         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          12018198         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          12035722         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          12054487         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          12060003         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          12079651         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          125              -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          12626812         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          12640890         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          12710360         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1271289          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1303282          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1304569          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1306190          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1306236          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1307966          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1308061          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1308141          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1308389          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1309600          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1309644          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1313139          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13138459         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1313991          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1314063          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1314416          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1317346          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1317357          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1317368          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1317426          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1327339          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1327533          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1333820          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1335257          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1335326          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1336932          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1345046          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          1345160          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13462889         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13463393         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13510491         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13530659         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13530682         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13586828         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13597994         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          136              -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          136527           -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13765190         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13770893         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          13814965         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          139              -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          14018952         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          14220178         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          14307336         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          14307358         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          14336700         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          14977618         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          16065831         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          16842038         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          16925250         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          18454121         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          18540299         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          195              -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          198              -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          199              -9   2.16 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          200              -9   2.16 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          201              -9   2.16 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          202              -9   2.16 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          21679312         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          2223930          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          226              -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          22967926         -9   2.16 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          253              -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          27253287         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          301042           -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          3141126          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          3333673          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          373024           -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          50922297         -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          543908           -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          593748           -9   2.16 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          598630           -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          6018899          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          602              -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          603              -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          604              -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          61789513         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          61790145         -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          62384            -9   2.16 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7428480          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7439921          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7439965          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7439976          -9   2.16 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7440020          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7440360          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7440382          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7440417          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7440439          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7440473          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7440484          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7446084          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7446142          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7446277          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7446346          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7487947          -9   2.16 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7488564          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7542098          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7718549          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7722647          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7738945          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7758976          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7775113          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7778394          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7778509          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7782492          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7783008          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7783075          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7783166          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7783702          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7783791          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7784409          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7784421          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7785877          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7786814          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7787475          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7787497          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7788967          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7788989          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7789006          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7789062          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7789095          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7789120          -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7789426          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          7790809          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          78002            -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          8030704          -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          88               -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          92               -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          93               -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          EXH__16065831    -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          EXH__18540299    -9  75.63 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          EXH__7439965     -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18133 0          EXH__7440020     -9   3.91 100 100 -9   0801-3 Y R 3029                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONE STAR INDUSTRIES, INC MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI32373: cdate=2008
18141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0404                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7019                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 50300501   PM10             -9  91.21 100 100 -9   -9     Y R 00006                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-TIPPECANOELABS: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 50300503   PM10             -9  91.21 100 100 -9   -9     Y R 00006                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-TIPPECANOELABS: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 50300501   PM2_5            -9  91.21 100 100 -9   -9     Y R 00006                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-TIPPECANOELABS: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 50300503   PM2_5            -9  91.21 100 100 -9   -9     Y R 00006                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-TIPPECANOELABS: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 0          10025737         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10025919         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10031137         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10034829         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10049055         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10060125         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10099748         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10101505         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10101538         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10101970         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10108642         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10124364         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10124433         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10294403         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10325947         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10377669         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          10588019         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          109              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          11103869         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          12018018         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          12018198         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          12035722         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          12054487         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          12060003         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          12079651         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          125              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          12626812         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          12640890         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          12710360         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1271289          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1303282          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1304569          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1306190          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1306236          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1307966          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1308061          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1308141          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1308389          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1309600          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1309644          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1313139          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13138459         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1313991          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1314063          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1314416          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1317346          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1317357          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1317368          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1317426          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1327339          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1327533          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1333820          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1335257          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1335326          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1336932          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1345046          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          1345160          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13462889         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13463393         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13510491         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13530659         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13530682         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13586828         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13597994         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          136              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          136527           -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13765190         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13770893         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          13814965         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          139              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          14018952         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          14220178         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          14307336         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          14307358         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          14336700         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          14977618         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          16065831         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          16842038         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          16925250         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          18454121         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          18540299         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          195              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          198              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          199              -9  46.46 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          200              -9  46.46 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          201              -9  46.46 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          202              -9  46.46 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          21679312         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          2223930          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          226              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          22967926         -9  46.46 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          253              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          27253287         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          301042           -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          3141126          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          3333673          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          373024           -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          50922297         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          543908           -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          593748           -9  46.46 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          598630           -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          6018899          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          602              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          603              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          604              -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          61789513         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          61790145         -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          62384            -9  46.46 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7428480          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7439921          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7439965          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7439976          -9  46.46 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7440020          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7440360          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7440382          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7440417          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7440439          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7440473          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7440484          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7446084          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7446142          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7446277          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7446346          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7487947          -9  46.46 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7488564          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7542098          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7647010          -9  79.24 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7718549          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7722647          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7738945          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7758976          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7775113          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7778394          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7778509          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7782492          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7782505          -9  79.24 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7783008          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7783075          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7783166          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7783702          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7783791          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7784409          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7784421          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7785877          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7786814          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7787475          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7787497          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7788967          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7788989          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7789006          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7789062          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7789095          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7789120          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7789426          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          7790809          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          78002            -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          8030704          -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          88               -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          92               -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          93               -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          EXH__16065831    -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          EXH__18540299    -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          EXH__7439965     -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 0          EXH__7440020     -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-TIPPECANOE LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 0          PM10             -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-TIPPECANOELABS: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 0          PM2_5            -9  91.21 100 100 -9   0801-2 Y R 3033B                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-TIPPECANOELABS: NEI_UNIQUE_ID=NEI32342: cdate=2008
18157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 358                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 47902STLYM2245N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0407                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7343                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7350                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00015                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7321                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 0          10025737         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10025919         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10031137         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10034829         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10049055         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10060125         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10099748         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10101505         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10101538         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10101970         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10108642         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10124364         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10124433         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10294403         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10325947         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10377669         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10588019         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          109              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          11103869         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12018018         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12018198         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12035722         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12054487         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12060003         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12079651         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          125              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12626812         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12640890         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12710360         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1271289          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1303282          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1304569          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1306190          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1306236          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1307966          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1308061          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1308141          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1308389          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1309600          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1309644          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1313139          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13138459         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1313991          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1314063          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1314416          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317346          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317357          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317368          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317426          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1327339          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1327533          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1333820          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1335257          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1335326          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1336932          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1345046          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1345160          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13462889         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13463393         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13510491         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13530659         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13530682         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13586828         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13597994         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          136              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          136527           -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13765190         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13770893         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13814965         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          139              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14018952         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14220178         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14307336         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14307358         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14336700         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14977618         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          16065831         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          16842038         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          16925250         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          18454121         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          18540299         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          195              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          198              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          199              -9  44.10 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          200              -9  44.10 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          201              -9  44.10 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          202              -9  44.10 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          21679312         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          2223930          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          226              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          22967926         -9  44.10 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          253              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          27253287         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          301042           -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          3141126          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          3333673          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          373024           -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          50922297         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          543908           -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          593748           -9  44.10 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          598630           -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          6018899          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          602              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          603              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          604              -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          61789513         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          61790145         -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          62384            -9  44.10 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7428480          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7439921          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7439965          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7439976          -9  44.10 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440020          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440360          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440382          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440417          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440439          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440473          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440484          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446084          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446142          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446277          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446346          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7487947          -9  44.10 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7488564          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7542098          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7647010          -9  79.24 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7718549          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7722647          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7738945          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7758976          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7775113          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7778394          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7778509          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7782492          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7782505          -9  79.24 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783008          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783075          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783166          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783702          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783791          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7784409          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7784421          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7785877          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7786814          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7787475          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7787497          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7788967          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7788989          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789006          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789062          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789095          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789120          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789426          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7790809          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          78002            -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          8030704          -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          88               -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          92               -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          93               -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__16065831    -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__18540299    -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__7439965     -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__7440020     -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 0          PM10             -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-CLINTONLABS: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 0          PM2_5            -9  91.21 100 100 -9   0801-2 Y R 3033                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-CLINTONLABS: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10025737         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10025919         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10031137         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10034829         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10049055         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10060125         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10099748         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10101505         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10101538         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10101970         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10108642         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10124364         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10124433         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10294403         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10325947         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10377669         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10588019         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          109              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          11103869         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12018018         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12018198         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12035722         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12054487         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12060003         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12079651         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          125              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12626812         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12640890         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12710360         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1271289          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1303282          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1304569          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1306190          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1306236          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1307966          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1308061          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1308141          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1308389          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1309600          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1309644          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1313139          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13138459         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1313991          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1314063          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1314416          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317346          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317357          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317368          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317426          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1327339          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1327533          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1333820          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1335257          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1335326          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1336932          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1345046          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1345160          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13462889         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13463393         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13510491         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13530659         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13530682         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13586828         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13597994         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          136              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          136527           -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13765190         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13770893         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13814965         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          139              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14018952         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14220178         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14307336         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14307358         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14336700         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14977618         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          16065831         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          16842038         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          16925250         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          18454121         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          18540299         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          195              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          198              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          199              -9  46.46 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          200              -9  46.46 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          201              -9  46.46 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          202              -9  46.46 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          21679312         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          2223930          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          226              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          22967926         -9  46.46 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          253              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          27253287         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          301042           -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          3141126          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          3333673          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          373024           -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          50922297         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          543908           -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          593748           -9  46.46 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          598630           -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          6018899          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          602              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          603              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          604              -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          61789513         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          61790145         -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          62384            -9  46.46 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7428480          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7439921          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7439965          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7439976          -9  46.46 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440020          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440360          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440382          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440417          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440439          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440473          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440484          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446084          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446142          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446277          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446346          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7487947          -9  46.46 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7488564          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7542098          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7647010          -9  79.24 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7718549          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7722647          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7738945          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7758976          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7775113          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7778394          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7778509          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7782492          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7782505          -9  79.24 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783008          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783075          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783166          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783702          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783791          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7784409          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7784421          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7785877          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7786814          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7787475          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7787497          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7788967          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7788989          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789006          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789062          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789095          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789120          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789426          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7790809          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          78002            -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          8030704          -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          88               -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          92               -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          93               -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__16065831    -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__18540299    -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__7439965     -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__7440020     -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 0          PM10             -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-CLINTONLABS: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3033A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 0          PM2_5            -9  91.21 100 100 -9   0801-2 Y R 3033A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-CLINTONLABS: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 47842LLLLYSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 0          10025737         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10025919         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10031137         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10034829         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10049055         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10060125         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10099748         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10101505         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10101538         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10101970         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10108642         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10124364         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10124433         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10294403         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10325947         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10377669         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          10588019         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          109              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          11103869         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12018018         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12018198         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12035722         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12054487         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12060003         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12079651         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          125              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12626812         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12640890         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          12710360         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1271289          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1303282          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1304569          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1306190          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1306236          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1307966          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1308061          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1308141          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1308389          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1309600          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1309644          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1313139          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13138459         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1313991          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1314063          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1314416          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317346          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317357          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317368          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1317426          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1327339          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1327533          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1333820          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1335257          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1335326          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1336932          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1345046          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          1345160          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13462889         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13463393         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13510491         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13530659         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13530682         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13586828         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13597994         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          136              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          136527           -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13765190         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13770893         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          13814965         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          139              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14018952         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14220178         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14307336         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14307358         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14336700         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          14977618         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          16065831         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          16842038         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          16925250         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          18454121         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          18540299         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          195              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          198              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          199              -9   7.41 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          200              -9   7.41 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          201              -9   7.41 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          202              -9   7.41 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          21679312         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          2223930          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          226              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          22967926         -9   7.41 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          253              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          27253287         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          301042           -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          3141126          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          3333673          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          373024           -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          50922297         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          543908           -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          593748           -9   7.41 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          598630           -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          6018899          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          602              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          603              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          604              -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          61789513         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          61790145         -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          62384            -9   7.41 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7428480          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7439921          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7439965          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7439976          -9   7.41 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440020          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440360          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440382          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440417          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440439          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440473          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7440484          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446084          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446142          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446277          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7446346          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7487947          -9   7.41 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7488564          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7542098          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7647010          -9  20.01 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7718549          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7722647          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7738945          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7758976          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7775113          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7778394          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7778509          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7782492          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7782505          -9  20.01 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783008          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783075          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783166          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783702          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7783791          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7784409          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7784421          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7785877          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7786814          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7787475          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7787497          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7788967          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7788989          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789006          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789062          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789095          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789120          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7789426          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          7790809          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          78002            -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          8030704          -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          88               -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          92               -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          93               -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__16065831    -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__18540299    -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__7439965     -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 0          EXH__7440020     -9  95.82 100 100 -9   0801-2 Y R 701                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ELI LILLY & COMPANY-CLINTON LABS MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 0          PM10             -9  91.21 100 100 -9   0801-2 Y R 701                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-CLINTONLABS: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18165 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 701                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18165 0          PM2_5            -9  91.21 100 100 -9   0801-2 Y R 701                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ELILILLY&COMPANY-CLINTONLABS: NEI_UNIQUE_ID=NEIIN12844: cdate=2008
18167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00022                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16341                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7327                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18169 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7144                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 47167KMBLLHWY56                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
18175 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7177                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 07-01-077                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8016                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 23-01-006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 52732DMCRN1251B                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0417                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8141                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 29-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 351                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 727                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8129                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 31-01-009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 52004JHNDRHWY38                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0420                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8059                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16579                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8127                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 57-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8096                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 52761MNSNTWIGGI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 70-01-008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 906                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8150                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19139 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8156                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 85-01-007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B25                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19169 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0434                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 50533GPRCS500NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 99-01-001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
19197 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7988                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20099 0          10025737         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10025919         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10031137         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10034829         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10049055         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10060125         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10099748         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10101505         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10101538         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10101970         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10108642         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10124364         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10124433         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10294403         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10325947         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10377669         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          10588019         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          109              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          11103869         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          12018018         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          12018198         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          12035722         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          12054487         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          12060003         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          12079651         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          125              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          12626812         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          12640890         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          12710360         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1271289          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1303282          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1304569          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1306190          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1306236          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1307966          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1308061          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1308141          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1308389          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1309600          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1309644          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1313139          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13138459         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1313991          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1314063          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1314416          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1317346          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1317357          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1317368          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1317426          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1327339          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1327533          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1333820          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1335257          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1335326          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1336932          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1345046          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          1345160          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13462889         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13463393         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13510491         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13530659         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13530682         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13586828         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13597994         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          136              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          136527           -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13765190         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13770893         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          13814965         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          139              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          14018952         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          14220178         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          14307336         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          14307358         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          14336700         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          14977618         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          16065831         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          16842038         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          16925250         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          18454121         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          18540299         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          195              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          198              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          199              -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          200              -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          201              -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          202              -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          21679312         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          2223930          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          226              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          253              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          27253287         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          301042           -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          3141126          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          3333673          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          373024           -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          50922297         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          543908           -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          598630           -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          6018899          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          602              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          603              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          604              -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          61789513         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          61790145         -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7428480          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7439921          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7439965          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7440020          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7440360          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7440382          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7440417          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7440439          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7440473          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7440484          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7446084          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7446142          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7446277          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7446346          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7488564          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7542098          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7718549          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7722647          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7738945          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7758976          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7775113          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7778394          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7778509          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7782492          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7783008          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7783075          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7783166          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7783702          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7783791          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7784409          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7784421          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7785877          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7786814          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7787475          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7787497          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7788967          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7788989          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7789006          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7789062          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7789095          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7789120          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7789426          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          7790809          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          78002            -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          8030704          -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          88               -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          92               -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          93               -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          EXH__16065831    -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          EXH__18540299    -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          EXH__7439965     -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          EXH__7440020     -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: KANSAS ARMY AMMUNITION PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          PM10             -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: KANSASARMYAMMUNITIONPLANT: NEI_UNIQUE_ID=NEI32793: cdate=2008
20099 0          PM2_5            -9  90.74 100 100 -9   0801-2 Y R 3012                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: KANSASARMYAMMUNITIONPLANT: NEI_UNIQUE_ID=NEI32793: cdate=2008
20113 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 0003                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32801, Plant=National Cooperative Refinery Association, McPherson, KS, compliance date: 30JUL2005
20113 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 0003                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32801, Plant=National Cooperative Refinery Association, McPherson, KS, compliance date: 30JUN2005
20113 30600201   NOX              -9  60.00 100 100 -9   -9     Y R T$10355                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32801, Plant=National Cooperative Refinery Association, McPherson, KS, compliance date: 30JUL2005
20113 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$10355                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32801, Plant=National Cooperative Refinery Association, McPherson, KS, compliance date: 30JUN2005
20133 0          10025737         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10031137         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10034829         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10049055         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10060125         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10099748         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10101538         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10108642         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10124364         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10294403         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10325947         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          10588019         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          109              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          11103869         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          12018018         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          12018198         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          12060003         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          125              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          12626812         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1303282          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1304569          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1306190          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1306236          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1308141          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1308389          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1309600          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1314416          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1317368          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1327533          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1333820          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1335257          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1335326          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13510491         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13530659         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13530682         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13597994         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          136              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          136527           -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13765190         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          13814965         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          139              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          14018952         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          14307336         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          14307358         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          14977618         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          16065831         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          18454121         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          18540299         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          195              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          198              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          199              -9  21.42 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          200              -9  21.42 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          201              -9  21.42 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          202              -9  21.42 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          21679312         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          2223930          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          226              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          22967926         -9  21.42 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          253              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          27253287         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          301042           -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          3141126          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          373024           -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          50922297         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          543908           -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          593748           -9  21.42 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          598630           -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          602              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          603              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          604              -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          61790145         -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          62384            -9  21.42 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7428480          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7439921          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7439976          -9  21.42 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7440382          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7440417          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7440439          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7440473          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7446142          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7446277          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7487947          -9  21.42 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7738945          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7758976          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7775113          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7778394          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7778509          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7784409          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7784421          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7787475          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7787497          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7788967          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7788989          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7789006          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7789062          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7789095          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7789120          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7789426          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          7790809          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          78002            -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          88               -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          92               -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          93               -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          EXH__16065831    -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          EXH__18540299    -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20133 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 3031                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ASH GROVE CEMENT COMPANY MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16356: cdate=2008
20155 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20155 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10359                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
20173 0          10025737         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10025919         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10031137         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10034829         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10049055         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10060125         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10099748         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10101505         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10101538         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10101970         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10124433         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10294403         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10377669         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          10588019         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          109              -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          11103869         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          12018018         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          12018198         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          12035722         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          12054487         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          12060003         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          12079651         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          125              -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          12626812         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          12640890         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          12710360         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1271289          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1303282          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1307966          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1308061          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1308141          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1308389          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1309600          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1309644          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1313139          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13138459         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1313991          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1314063          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1314416          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1317346          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1317357          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1317368          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1317426          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1327339          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1327533          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1333820          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1335257          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1335326          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1336932          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1345046          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          1345160          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13462889         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13463393         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13530659         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13530682         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13586828         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          136              -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          136527           -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13765190         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13770893         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          13814965         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          139              -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          14018952         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          14220178         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          14307336         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          14307358         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          14336700         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          14977618         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          16065831         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          16842038         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          16925250         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          18454121         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          18540299         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          195              -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          198              -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          199              -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          200              -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          201              -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          202              -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          21679312         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          226              -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          253              -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          27253287         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          301042           -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          3141126          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          3333673          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          373024           -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          50922297         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          543908           -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          598630           -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          6018899          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          602              -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          603              -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          604              -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          61789513         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          61790145         -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7428480          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7439921          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7439965          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7440020          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7440360          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7440382          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7440473          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7440484          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7446084          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7446142          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7446277          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7446346          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7488564          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7542098          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7718549          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7722647          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7738945          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7758976          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7775113          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7778394          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7778509          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7782492          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7783008          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7783075          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7783166          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7783702          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7783791          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7784409          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7784421          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7785877          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7786814          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7788967          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7788989          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7789006          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7789062          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7789095          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7789120          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          78002            -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          8030704          -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          88               -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          92               -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          93               -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          EXH__16065831    -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          EXH__18540299    -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          EXH__7439965     -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          EXH__7440020     -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: AIR PRODUCTS MANUFACTURING CORP. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          PM10             -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AIRPRODUCTSMANUFACTURINGCORP.: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20173 0          PM2_5            -9  69.70 100 100 -9   0801-6 Y R 2007                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AIRPRODUCTSMANUFACTURINGCORP.: NEI_UNIQUE_ID=NEIKS697: cdate=2008
20205 0          10025737         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10025919         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10031137         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10034829         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10049055         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10060125         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10099748         -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10101505         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10101538         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10101970         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10108642         -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10124364         -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10124433         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10294403         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10325947         -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10377669         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10588019         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          109              -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          11103869         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12018018         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12018198         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12035722         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12054487         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12060003         -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12079651         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          125              -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12626812         -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12640890         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12710360         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1271289          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1303282          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1304569          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1306190          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1306236          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1307966          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1308061          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1308141          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1308389          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1309600          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1309644          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1313139          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13138459         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1313991          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1314063          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1314416          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1317346          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1317357          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1317368          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1317426          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1327339          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1327533          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1333820          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1335257          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1335326          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1336932          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1345046          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1345160          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13462889         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13463393         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13510491         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13530659         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13530682         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13586828         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13597994         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          136              -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          136527           -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13765190         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13770893         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13814965         -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          139              -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14018952         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14220178         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14307336         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14307358         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14336700         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14977618         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          16065831         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          16842038         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          16925250         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          18454121         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          18540299         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          195              -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          198              -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          199              -9  24.60 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          200              -9  24.60 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          201              -9  24.60 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          202              -9  24.60 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          21679312         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          2223930          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          226              -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          22967926         -9  24.60 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          253              -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          27253287         -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          301042           -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          3141126          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          3333673          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          373024           -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          50922297         -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          543908           -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          593748           -9  24.60 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          598630           -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          6018899          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          602              -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          603              -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          604              -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          61789513         -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          61790145         -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          62384            -9  24.60 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7428480          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7439921          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7439965          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7439976          -9  24.60 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440020          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440360          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440382          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440417          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440439          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440473          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440484          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7446084          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7446142          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7446277          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7446346          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7487947          -9  24.60 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7488564          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7542098          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7718549          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7722647          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7738945          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7758976          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7775113          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7778394          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7778509          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7782492          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7783008          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7783075          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7783166          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7783702          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7783791          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7784409          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7784421          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7785877          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7786814          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7787475          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7787497          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7788967          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7788989          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7789006          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7789062          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7789095          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7789120          -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7789426          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7790809          -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          78002            -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          8030704          -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          88               -9  57.84 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          92               -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          93               -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          EXH__16065831    -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          EXH__18540299    -9  44.17 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          EXH__7439965     -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          EXH__7440020     -9  23.08 100 100 -9   0801-3 Y R 322                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10025737         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10025919         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10031137         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10034829         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10049055         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10060125         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10099748         -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10101505         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10101538         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10101970         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10108642         -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10124364         -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10124433         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10294403         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10325947         -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10377669         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          10588019         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          109              -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          11103869         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12018018         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12018198         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12035722         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12054487         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12060003         -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12079651         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          125              -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12626812         -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12640890         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          12710360         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1271289          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1303282          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1304569          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1306190          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1306236          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1307966          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1308061          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1308141          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1308389          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1309600          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1309644          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1313139          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13138459         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1313991          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1314063          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1314416          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1317346          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1317357          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1317368          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1317426          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1327339          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1327533          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1333820          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1335257          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1335326          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1336932          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1345046          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          1345160          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13462889         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13463393         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13510491         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13530659         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13530682         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13586828         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13597994         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          136              -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          136527           -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13765190         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13770893         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          13814965         -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          139              -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14018952         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14220178         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14307336         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14307358         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14336700         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          14977618         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          16065831         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          16842038         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          16925250         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          18454121         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          18540299         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          195              -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          198              -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          199              -9  24.60 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          200              -9  24.60 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          201              -9  24.60 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          202              -9  24.60 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          21679312         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          2223930          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          226              -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          22967926         -9  24.60 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          253              -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          27253287         -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          301042           -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          3141126          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          3333673          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          373024           -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          50922297         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          543908           -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          593748           -9  24.60 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          598630           -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          6018899          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          602              -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          603              -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          604              -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          61789513         -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          61790145         -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          62384            -9  24.60 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7428480          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7439921          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7439965          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7439976          -9  24.60 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440020          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440360          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440382          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440417          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440439          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440473          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7440484          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7446084          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7446142          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7446277          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7446346          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7487947          -9  24.60 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7488564          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7542098          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7718549          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7722647          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7738945          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7758976          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7775113          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7778394          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7778509          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7782492          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7783008          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7783075          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7783166          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7783702          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7783791          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7784409          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7784421          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7785877          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7786814          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7787475          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7787497          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7788967          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7788989          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7789006          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7789062          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7789095          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7789120          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7789426          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          7790809          -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          78002            -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          8030704          -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          88               -9  67.37 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          92               -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          93               -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          EXH__16065831    -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          EXH__18540299    -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          EXH__7439965     -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          EXH__7440020     -9  61.54 100 100 -9   0801-3 Y R 323                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LAFARGE MIDWEST, INC. MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          PM10             -9  23.08 100 100 -9   0801-3 Y R 7022                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LafargeN.A.: NEI_UNIQUE_ID=NEI16355: cdate=2008
20205 0          PM2_5            -9  23.08 100 100 -9   0801-3 Y R 7022                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LafargeN.A.: NEI_UNIQUE_ID=NEI16355: cdate=2008
20209 0          106990           -9  28.00 100 100 -9   -9     Y R 0046                            ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          107028           -9  28.00 100 100 -9   -9     Y R 0046                            ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          50000            -9  28.00 100 100 -9   -9     Y R 0046                            ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          67561            -9  28.00 100 100 -9   -9     Y R 0046                            ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          71432            -9  28.00 100 100 -9   -9     Y R 0046                            ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          75070            -9  28.00 100 100 -9   -9     Y R 0046                            ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          91203            -9  28.00 100 100 -9   -9     Y R 0046                            ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          VOC              -9  28.00 100 100 -9   -9     Y R 0046                            ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          106990           -9  28.00 100 100 -9   -9     Y R 66115GMCCP3201F                 ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          107028           -9  28.00 100 100 -9   -9     Y R 66115GMCCP3201F                 ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          50000            -9  28.00 100 100 -9   -9     Y R 66115GMCCP3201F                 ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          67561            -9  28.00 100 100 -9   -9     Y R 66115GMCCP3201F                 ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          71432            -9  28.00 100 100 -9   -9     Y R 66115GMCCP3201F                 ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          75070            -9  28.00 100 100 -9   -9     Y R 66115GMCCP3201F                 ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          91203            -9  28.00 100 100 -9   -9     Y R 66115GMCCP3201F                 ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
20209 0          VOC              -9  28.00 100 100 -9   -9     Y R 66115GMCCP3201F                 ! MACT: Autos, plant: GENERALMOTORSCORPFAIRFAXPLANT, VOC 28%: Auto_2002_projections.xls
21005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2100500003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00091                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2101300091                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21019 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 00004                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200601   NOX              -9  40.00 100 100 -9   -9     Y R 00004                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200602   NOX              -9  40.00 100 100 -9   -9     Y R 00004                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200604   NOX              -9  40.00 100 100 -9   -9     Y R 00004                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 00004                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 00004                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 00004                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 00004                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 00004                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 05OCT2006
21019 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 2101900004                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200601   NOX              -9  40.00 100 100 -9   -9     Y R 2101900004                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200602   NOX              -9  40.00 100 100 -9   -9     Y R 2101900004                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200604   NOX              -9  40.00 100 100 -9   -9     Y R 2101900004                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 2101900004                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 2101900004                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 2101900004                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 2101900004                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 2101900004                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 05OCT2006
21019 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 41114CTLTTPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200601   NOX              -9  40.00 100 100 -9   -9     Y R 41114CTLTTPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200602   NOX              -9  40.00 100 100 -9   -9     Y R 41114CTLTTPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200604   NOX              -9  40.00 100 100 -9   -9     Y R 41114CTLTTPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 41114CTLTTPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 41114CTLTTPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 41114CTLTTPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 41114CTLTTPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 41114CTLTTPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 05OCT2006
21019 10200401   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-040                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200601   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-040                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200602   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-040                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200604   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-040                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200701   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-040                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600103   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-040                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600104   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-040                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600106   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-040                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R ES0603-040                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 05OCT2006
21019 10200401   NOX              -9  40.00 100 100 -9   -9     Y R T$5538                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200601   NOX              -9  40.00 100 100 -9   -9     Y R T$5538                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200602   NOX              -9  40.00 100 100 -9   -9     Y R T$5538                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200604   NOX              -9  40.00 100 100 -9   -9     Y R T$5538                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$5538                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600103   NOX              -9  40.00 100 100 -9   -9     Y R T$5538                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$5538                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$5538                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 31DEC2008
21019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$5538                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI32864, Plant=Marathon Ashland Petroleum LLC, Catlettsburg, KY, compliance date: 05OCT2006
21029 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21029 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2102900005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21041 0          10025737         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10025919         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10031137         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10034829         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10049055         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10060125         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10099748         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10101505         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10101538         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10101970         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10108642         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10124364         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10124433         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10294403         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10325947         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10377669         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          10588019         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          109              -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          11103869         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          12018018         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          12018198         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          12035722         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          12054487         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          12060003         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          12079651         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          125              -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          12626812         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          12640890         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          12710360         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1271289          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1303282          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1304569          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1306190          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1306236          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1307966          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1308061          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1308141          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1308389          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1309600          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1309644          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1313139          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13138459         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1313991          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1314063          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1314416          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1317346          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1317357          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1317368          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1317426          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1327339          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1327533          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1333820          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1335257          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1335326          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1336932          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1345046          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          1345160          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13462889         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13463393         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13510491         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13530659         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13530682         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13586828         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13597994         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          136              -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          136527           -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13765190         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13770893         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          13814965         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          139              -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          14018952         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          14220178         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          14307336         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          14307358         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          14336700         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          14977618         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          16065831         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          16842038         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          16925250         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          18454121         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          18540299         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          195              -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          198              -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          199              -9  82.25 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          200              -9  82.25 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          201              -9  82.25 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          202              -9  82.25 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          21679312         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          2223930          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          226              -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          22967926         -9  82.25 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          253              -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          27253287         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          301042           -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          3141126          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          3333673          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          373024           -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          50922297         -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          543908           -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          593748           -9  82.25 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          598630           -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          6018899          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          602              -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          603              -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          604              -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          61789513         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          61790145         -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          62384            -9  82.25 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7428480          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7439921          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7439965          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7439976          -9  82.25 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7440020          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7440360          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7440382          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7440417          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7440439          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7440473          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7440484          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7446084          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7446142          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7446277          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7446346          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7487947          -9  82.25 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7488564          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7542098          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7647010          -9  34.69 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7718549          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7722647          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7738945          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7758976          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7775113          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7778394          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7778509          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7782492          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7782505          -9  34.69 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7783008          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7783075          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7783166          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7783702          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7783791          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7784409          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7784421          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7785877          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7786814          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7787475          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7787497          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7788967          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7788989          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7789006          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7789062          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7789095          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7789120          -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7789426          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          7790809          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          78002            -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          8030704          -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          88               -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          92               -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          93               -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          EXH__16065831    -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          EXH__18540299    -9  93.98 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          EXH__7439965     -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          EXH__7440020     -9  89.03 100 100 -9   0801-1 Y R 359                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Atochem MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          PM10             -9  89.03 100 100 -9   0801-2 Y R 359                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ATOFINA(F/K/AELFATOCHEMNORTHAMERICA: NEI_UNIQUE_ID=NEI32865: cdate=2008
21041 0          PM2_5            -9  89.03 100 100 -9   0801-2 Y R 359                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ATOFINA(F/K/AELFATOCHEMNORTHAMERICA: NEI_UNIQUE_ID=NEI32865: cdate=2008
21059 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2105900039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21059 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5613                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2106700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2107300042                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500063                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2109500103                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2110700003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0041                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0062                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 0          106990           -9  28.00 100 100 -9   -9     Y R 0072                            ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          107028           -9  28.00 100 100 -9   -9     Y R 0072                            ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          50000            -9  28.00 100 100 -9   -9     Y R 0072                            ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          67561            -9  28.00 100 100 -9   -9     Y R 0072                            ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          71432            -9  28.00 100 100 -9   -9     Y R 0072                            ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          75070            -9  28.00 100 100 -9   -9     Y R 0072                            ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          91203            -9  28.00 100 100 -9   -9     Y R 0072                            ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          VOC              -9  28.00 100 100 -9   -9     Y R 0072                            ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          106990           -9  28.00 100 100 -9   -9     Y R 0073                            ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          107028           -9  28.00 100 100 -9   -9     Y R 0073                            ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          50000            -9  28.00 100 100 -9   -9     Y R 0073                            ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          67561            -9  28.00 100 100 -9   -9     Y R 0073                            ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          71432            -9  28.00 100 100 -9   -9     Y R 0073                            ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          75070            -9  28.00 100 100 -9   -9     Y R 0073                            ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          91203            -9  28.00 100 100 -9   -9     Y R 0073                            ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          VOC              -9  28.00 100 100 -9   -9     Y R 0073                            ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0109                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0189                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0459                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0870                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1259                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 0          106990           -9  28.00 100 100 -9   -9     Y R 40213FRDMTFERNV                 ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          107028           -9  28.00 100 100 -9   -9     Y R 40213FRDMTFERNV                 ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          50000            -9  28.00 100 100 -9   -9     Y R 40213FRDMTFERNV                 ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          67561            -9  28.00 100 100 -9   -9     Y R 40213FRDMTFERNV                 ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          71432            -9  28.00 100 100 -9   -9     Y R 40213FRDMTFERNV                 ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          75070            -9  28.00 100 100 -9   -9     Y R 40213FRDMTFERNV                 ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          91203            -9  28.00 100 100 -9   -9     Y R 40213FRDMTFERNV                 ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          VOC              -9  28.00 100 100 -9   -9     Y R 40213FRDMTFERNV                 ! MACT: Autos, plant: FORDMOTORCOLOUASSYPLT, VOC 28%: Auto_2002_projections.xls
21111 0          106990           -9  28.00 100 100 -9   -9     Y R 40222FRDMT3001C                 ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          107028           -9  28.00 100 100 -9   -9     Y R 40222FRDMT3001C                 ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          50000            -9  28.00 100 100 -9   -9     Y R 40222FRDMT3001C                 ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          67561            -9  28.00 100 100 -9   -9     Y R 40222FRDMT3001C                 ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          71432            -9  28.00 100 100 -9   -9     Y R 40222FRDMT3001C                 ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          75070            -9  28.00 100 100 -9   -9     Y R 40222FRDMT3001C                 ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          91203            -9  28.00 100 100 -9   -9     Y R 40222FRDMT3001C                 ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 0          VOC              -9  28.00 100 100 -9   -9     Y R 40222FRDMT3001C                 ! MACT: Autos, plant: FORDMOTORCOKYTRUCKPLT, VOC 28%: Auto_2002_projections.xls
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 40225GPPLNAPPLI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 0          10025737         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10025919         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10031137         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10034829         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10049055         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10060125         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10099748         -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10101505         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10101538         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10101970         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10108642         -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10124364         -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10124433         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10294403         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10325947         -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10377669         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          10588019         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          109              -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          11103869         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          12018018         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          12018198         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          12035722         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          12054487         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          12060003         -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          12079651         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          125              -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          12626812         -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          12640890         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          12710360         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1271289          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1303282          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1304569          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1306190          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1306236          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1307966          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1308061          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1308141          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1308389          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1309600          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1309644          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1313139          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13138459         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1313991          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1314063          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1314416          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1317346          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1317357          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1317368          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1317426          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1327339          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1327533          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1333820          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1335257          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1335326          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1336932          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1345046          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          1345160          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13462889         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13463393         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13510491         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13530659         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13530682         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13586828         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13597994         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          136              -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          136527           -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13765190         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13770893         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          13814965         -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          139              -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          14018952         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          14220178         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          14307336         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          14307358         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          14336700         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          14977618         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          16065831         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          16842038         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          16925250         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          18454121         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          18540299         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          195              -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          198              -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          199              -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          200              -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          201              -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          202              -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          21679312         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          2223930          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          226              -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          253              -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          27253287         -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          301042           -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          3141126          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          3333673          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          373024           -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          50922297         -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          543908           -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          593748           -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          598630           -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          6018899          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          602              -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          603              -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          604              -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          61789513         -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          61790145         -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          62384            -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7428480          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7439921          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7439965          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7440020          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7440360          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7440382          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7440417          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7440439          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7440473          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7440484          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7446084          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7446142          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7446277          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7446346          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7488564          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7542098          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7718549          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7722647          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7738945          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7758976          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7775113          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7778394          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7778509          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7782492          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7783008          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7783075          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7783166          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7783702          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7783791          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7784409          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7784421          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7785877          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7786814          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7787475          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7787497          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7788967          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7788989          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7789006          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7789062          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7789095          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7789120          -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7789426          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          7790809          -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          78002            -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          8030704          -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          88               -9  96.78 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          92               -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          93               -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          EXH__16065831    -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          EXH__18540299    -9  82.65 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          EXH__7439965     -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 0          EXH__7440020     -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO.  LOUISVILLE PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 0          PM10             -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROHM&HAASCOMPANYLOUISVILLEPLANT: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 741                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 0          PM2_5            -9  71.00 100 100 -9   0801-6 Y R 741                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROHM&HAASCOMPANYLOUISVILLEPLANT: NEI_UNIQUE_ID=NEI32966: cdate=2008
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5410                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5422                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5423                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5429                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5431                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5436                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21145 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2114500074                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115100038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15804                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 0          10025737         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10025919         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10031137         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10034829         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10049055         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10060125         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10099748         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10101505         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10101538         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10101970         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10108642         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10124364         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10124433         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10294403         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10325947         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10377669         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10588019         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          109              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          11103869         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12018018         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12018198         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12035722         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12054487         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12060003         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12079651         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          125              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12626812         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12640890         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12710360         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1271289          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1303282          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1304569          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1306190          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1306236          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1307966          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1308061          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1308141          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1308389          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1309600          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1309644          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1313139          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13138459         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1313991          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1314063          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1314416          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317346          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317357          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317368          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317426          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1327339          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1327533          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1333820          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1335257          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1335326          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1336932          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1345046          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1345160          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13462889         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13463393         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13510491         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13530659         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13530682         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13586828         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13597994         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          136              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          136527           -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13765190         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13770893         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13814965         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          139              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14018952         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14220178         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14307336         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14307358         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14336700         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14977618         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          16065831         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          16842038         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          16925250         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          18454121         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          18540299         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          195              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          198              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          199              -9  82.25 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          200              -9  82.25 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          201              -9  82.25 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          202              -9  82.25 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          21679312         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          2223930          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          226              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          22967926         -9  82.25 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          253              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          27253287         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          301042           -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          3141126          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          3333673          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          373024           -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          50922297         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          543908           -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          593748           -9  82.25 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          598630           -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          6018899          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          602              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          603              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          604              -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          61789513         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          61790145         -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          62384            -9  82.25 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7428480          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7439921          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7439965          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7439976          -9  82.25 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440020          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440360          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440382          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440417          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440439          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440473          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440484          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446084          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446142          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446277          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446346          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7487947          -9  82.25 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7488564          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7542098          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7647010          -9  63.03 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7718549          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7722647          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7738945          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7758976          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7775113          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7778394          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7778509          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7782492          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7782505          -9  63.03 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783008          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783075          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783166          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783702          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783791          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7784409          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7784421          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7785877          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7786814          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7787475          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7787497          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7788967          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7788989          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789006          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789062          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789095          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789120          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789426          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7790809          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          78002            -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          8030704          -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          88               -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          92               -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          93               -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__16065831    -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__18540299    -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__7439965     -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__7440020     -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          PM10             -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LWDInc: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          PM2_5            -9  65.59 100 100 -9   0801-1 Y R 210                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LWDInc: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10025737         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10025919         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10031137         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10034829         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10049055         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10060125         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10099748         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10101505         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10101538         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10101970         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10108642         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10124364         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10124433         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10294403         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10325947         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10377669         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10588019         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          109              -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          11103869         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12018018         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12018198         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12035722         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12054487         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12060003         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12079651         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          125              -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12626812         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12640890         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12710360         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1271289          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1303282          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1304569          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1306190          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1306236          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1307966          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1308061          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1308141          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1308389          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1309600          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1309644          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1313139          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13138459         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1313991          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1314063          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1314416          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317346          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317357          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317368          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317426          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1327339          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1327533          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1333820          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1335257          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1335326          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1336932          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1345046          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1345160          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13462889         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13463393         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13510491         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13530659         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13530682         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13586828         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13597994         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          136              -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          136527           -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13765190         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13770893         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13814965         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          139              -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14018952         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14220178         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14307336         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14307358         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14336700         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14977618         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          16065831         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          16842038         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          16925250         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          18454121         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          18540299         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          195              -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          198              -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          199              -9  77.45 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          200              -9  77.45 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          201              -9  77.45 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          202              -9  77.45 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          21679312         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          2223930          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          226              -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          22967926         -9  77.45 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          253              -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          27253287         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          301042           -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          3141126          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          3333673          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          373024           -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          50922297         -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          543908           -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          593748           -9  77.45 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          598630           -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          6018899          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          602              -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          603              -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          604              -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          61789513         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          61790145         -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          62384            -9  77.45 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7428480          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7439921          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7439965          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7439976          -9  77.45 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440020          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440360          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440382          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440417          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440439          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440473          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440484          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446084          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446142          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446277          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446346          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7487947          -9  77.45 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7488564          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7542098          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7647010          -9  46.92 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7718549          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7722647          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7738945          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7758976          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7775113          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7778394          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7778509          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7782492          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7782505          -9  46.92 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783008          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783075          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783166          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783702          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783791          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7784409          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7784421          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7785877          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7786814          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7787475          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7787497          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7788967          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7788989          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789006          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789062          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789095          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789120          -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789426          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7790809          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          78002            -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          8030704          -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          88               -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          92               -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          93               -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__16065831    -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__18540299    -9  85.36 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__7439965     -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__7440020     -9  66.06 100 100 -9   0801-1 Y R 211                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          PM10             -9  65.59 100 100 -9   0801-1 Y R 211                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LWDInc: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          PM2_5            -9  65.59 100 100 -9   0801-1 Y R 211                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LWDInc: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115700009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 0          10025737         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10025919         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10031137         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10034829         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10049055         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10060125         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10099748         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10101505         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10101538         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10101970         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10108642         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10124364         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10124433         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10294403         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10325947         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10377669         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          10588019         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          109              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          11103869         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12018018         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12018198         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12035722         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12054487         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12060003         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12079651         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          125              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12626812         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12640890         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          12710360         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1271289          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1303282          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1304569          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1306190          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1306236          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1307966          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1308061          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1308141          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1308389          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1309600          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1309644          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1313139          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13138459         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1313991          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1314063          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1314416          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317346          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317357          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317368          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1317426          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1327339          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1327533          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1333820          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1335257          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1335326          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1336932          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1345046          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          1345160          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13462889         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13463393         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13510491         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13530659         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13530682         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13586828         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13597994         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          136              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          136527           -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13765190         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13770893         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          13814965         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          139              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14018952         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14220178         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14307336         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14307358         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14336700         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          14977618         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          16065831         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          16842038         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          16925250         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          18454121         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          18540299         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          195              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          198              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          199              -9   0.00 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          200              -9   0.00 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          201              -9   0.00 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          202              -9   0.00 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          21679312         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          2223930          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          226              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          22967926         -9   0.00 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          253              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          27253287         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          301042           -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          3141126          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          3333673          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          373024           -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          50922297         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          543908           -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          593748           -9   0.00 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          598630           -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          6018899          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          602              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          603              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          604              -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          61789513         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          61790145         -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          62384            -9   0.00 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7428480          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7439921          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7439965          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7439976          -9   0.00 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440020          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440360          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440382          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440417          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440439          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440473          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7440484          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446084          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446142          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446277          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7446346          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7487947          -9   0.00 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7488564          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7542098          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7647010          -9  85.06 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7718549          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7722647          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7738945          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7758976          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7775113          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7778394          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7778509          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7782492          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7782505          -9  85.06 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783008          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783075          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783166          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783702          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7783791          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7784409          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7784421          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7785877          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7786814          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7787475          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7787497          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7788967          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7788989          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789006          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789062          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789095          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789120          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7789426          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          7790809          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          78002            -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          8030704          -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          88               -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          92               -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          93               -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__16065831    -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__18540299    -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__7439965     -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          EXH__7440020     -9  87.05 100 100 -9   0801-1 Y R 212                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LWD INC MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          PM10             -9  65.59 100 100 -9   0801-1 Y R 212                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LWDInc: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 0          PM2_5            -9  65.59 100 100 -9   0801-1 Y R 212                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LWDInc: NEI_UNIQUE_ID=NEI16360: cdate=2008
21157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5560                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21159 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2115900006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21161 0          PM10             -9  28.00 100 100 -9   -9     Y R 2116100010                      ! MACT: Lime Manufacturing: DRAVO LIME INC
21161 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 2116100010                      ! MACT: Lime Manufacturing: DRAVO LIME INC
21161 0          SO2              -9  20.00 100 100 -9   -9     Y R 2116100010                      ! MACT: Lime Manufacturing: DRAVO LIME INC
21161 0          PM10             -9  28.00 100 100 -9   -9     Y R T$5524                          ! MACT: Lime Manufacturing: DRAVO LIME INC
21161 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$5524                          ! MACT: Lime Manufacturing: DRAVO LIME INC
21161 0          SO2              -9  20.00 100 100 -9   -9     Y R T$5524                          ! MACT: Lime Manufacturing: DRAVO LIME INC
21175 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21175 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117500019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21177 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117700047                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00014                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00020                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2117900020                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 0          PM10             -9  28.00 100 100 -9   -9     Y R 2119100002                      ! MACT: Lime Manufacturing: DRAVO LIME COMPANY
21191 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 2119100002                      ! MACT: Lime Manufacturing: DRAVO LIME COMPANY
21191 0          SO2              -9  20.00 100 100 -9   -9     Y R 2119100002                      ! MACT: Lime Manufacturing: DRAVO LIME COMPANY
21191 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2119100007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21191 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15809                         ! MACT: Lime Manufacturing: DRAVO LIME COMPANY
21191 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15809                         ! MACT: Lime Manufacturing: DRAVO LIME COMPANY
21191 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15809                         ! MACT: Lime Manufacturing: DRAVO LIME COMPANY
21205 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21205 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120500005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21207 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120700017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2120900011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21209 0          106990           -9  28.00 100 100 -9   -9     Y R 2120900030                      ! MACT: Autos, plant: TOYOTAMOTORMFGUSAINC, VOC 28%: Auto_2002_projections.xls
21209 0          107028           -9  28.00 100 100 -9   -9     Y R 2120900030                      ! MACT: Autos, plant: TOYOTAMOTORMFGUSAINC, VOC 28%: Auto_2002_projections.xls
21209 0          50000            -9  28.00 100 100 -9   -9     Y R 2120900030                      ! MACT: Autos, plant: TOYOTAMOTORMFGUSAINC, VOC 28%: Auto_2002_projections.xls
21209 0          67561            -9  28.00 100 100 -9   -9     Y R 2120900030                      ! MACT: Autos, plant: TOYOTAMOTORMFGUSAINC, VOC 28%: Auto_2002_projections.xls
21209 0          71432            -9  28.00 100 100 -9   -9     Y R 2120900030                      ! MACT: Autos, plant: TOYOTAMOTORMFGUSAINC, VOC 28%: Auto_2002_projections.xls
21209 0          75070            -9  28.00 100 100 -9   -9     Y R 2120900030                      ! MACT: Autos, plant: TOYOTAMOTORMFGUSAINC, VOC 28%: Auto_2002_projections.xls
21209 0          91203            -9  28.00 100 100 -9   -9     Y R 2120900030                      ! MACT: Autos, plant: TOYOTAMOTORMFGUSAINC, VOC 28%: Auto_2002_projections.xls
21209 0          VOC              -9  28.00 100 100 -9   -9     Y R 2120900030                      ! MACT: Autos, plant: TOYOTAMOTORMFGUSAINC, VOC 28%: Auto_2002_projections.xls
21227 0          106990           -9  28.00 100 100 -9   -9     Y R 2122700005                      ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
21227 0          107028           -9  28.00 100 100 -9   -9     Y R 2122700005                      ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
21227 0          50000            -9  28.00 100 100 -9   -9     Y R 2122700005                      ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
21227 0          67561            -9  28.00 100 100 -9   -9     Y R 2122700005                      ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
21227 0          71432            -9  28.00 100 100 -9   -9     Y R 2122700005                      ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
21227 0          75070            -9  28.00 100 100 -9   -9     Y R 2122700005                      ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
21227 0          91203            -9  28.00 100 100 -9   -9     Y R 2122700005                      ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
21227 0          VOC              -9  28.00 100 100 -9   -9     Y R 2122700005                      ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
21227 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
21227 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2122700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22005 0          10025737         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10025919         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10031137         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10034829         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10049055         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10060125         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10099748         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10101505         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10101538         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10101970         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10108642         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10124364         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10124433         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10294403         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10325947         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10377669         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10588019         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          109              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          11103869         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          12018018         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          12018198         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          12035722         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          12054487         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          12060003         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          12079651         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          125              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          12626812         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          12640890         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          12710360         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1271289          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1303282          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1304569          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1306190          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1306236          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1307966          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1308061          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1308141          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1308389          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1309600          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1309644          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1313139          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13138459         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1313991          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1314063          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1314416          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1317346          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1317357          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1317368          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1317426          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1327339          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1327533          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1333820          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1335257          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1335326          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1336932          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1345046          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          1345160          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13462889         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13463393         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13510491         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13530659         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13530682         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13586828         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13597994         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          136              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          136527           -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13765190         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13770893         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          13814965         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          139              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          14018952         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          14220178         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          14307336         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          14307358         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          14336700         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          14977618         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          16065831         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          16842038         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          16925250         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          18454121         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          18540299         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          195              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          198              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          199              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          200              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          201              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          202              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          21679312         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          2223930          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          226              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          22967926         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          253              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          27253287         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          301042           -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          3141126          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          3333673          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          373024           -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          50922297         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          543908           -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          593748           -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          598630           -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          6018899          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          602              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          603              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          604              -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          61789513         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          61790145         -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          62384            -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7428480          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7439921          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7439965          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7439976          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7440020          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7440360          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7440382          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7440417          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7440439          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7440473          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7440484          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7446084          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7446142          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7446277          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7446346          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7487947          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7488564          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7542098          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7647010          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7718549          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7722647          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7738945          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7758976          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7775113          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7778394          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7778509          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7782492          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7782505          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7783008          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7783075          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7783166          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7783702          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7783791          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7784409          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7784421          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7785877          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7786814          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7787475          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7787497          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7788967          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7788989          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7789006          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7789062          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7789095          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7789120          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7789426          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          7790809          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          78002            -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          8030704          -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          88               -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          92               -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          93               -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          EXH__16065831    -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          EXH__18540299    -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          EXH__7439965     -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          EXH__7440020     -9   0.00 100 100 -9   0801-7 Y R 2005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VULCAN CHEMICALS MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6100: cdate=2008
22005 0          10025737         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10025919         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10031137         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10034829         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10049055         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10060125         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10099748         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101505         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101538         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101970         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10108642         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10124364         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10124433         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10294403         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10325947         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10377669         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10588019         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          109              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          11103869         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12018018         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12018198         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12035722         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12054487         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12060003         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12079651         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          125              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12626812         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12640890         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12710360         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1271289          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1303282          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1304569          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1306190          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1306236          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1307966          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308061          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308141          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308389          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1309600          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1309644          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1313139          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13138459         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1313991          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1314063          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1314416          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317346          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317357          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317368          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317426          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1327339          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1327533          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1333820          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1335257          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1335326          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1336932          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1345046          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1345160          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13462889         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13463393         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13510491         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13530659         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13530682         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13586828         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13597994         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          136              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          136527           -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13765190         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13770893         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13814965         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          139              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14018952         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14220178         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14307336         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14307358         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14336700         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14977618         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16065831         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16842038         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16925250         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          18454121         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          18540299         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          195              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          198              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          199              -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          200              -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          201              -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          202              -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          21679312         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          2223930          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          226              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          253              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          27253287         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          301042           -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          3141126          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          3333673          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          373024           -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          50922297         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          543908           -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          593748           -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          598630           -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          6018899          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          602              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          603              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          604              -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          61789513         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          61790145         -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          62384            -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7428480          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439921          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439965          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440020          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440360          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440382          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440417          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440439          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440473          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440484          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446084          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446142          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446277          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446346          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7488564          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7542098          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7718549          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7722647          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7738945          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7758976          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7775113          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7778394          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7778509          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7782492          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783008          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783075          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783166          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783702          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783791          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7784409          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7784421          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7785877          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7786814          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7787475          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7787497          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7788967          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7788989          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789006          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789062          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789095          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789120          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789426          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7790809          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          78002            -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          8030704          -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          88               -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          92               -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          93               -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__16065831    -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__18540299    -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__7439965     -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__7440020     -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          PM10             -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCORPORATION/GEISMARSITE: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          PM2_5            -9  12.12 100 100 -9   0801-2 Y R 604                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCORPORATION/GEISMARSITE: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10025737         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10025919         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10031137         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10034829         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10049055         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10060125         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10099748         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10101505         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10101538         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10101970         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10108642         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10124364         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10124433         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10294403         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10325947         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10377669         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10588019         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          109              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          11103869         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          12018018         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          12018198         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          12035722         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          12054487         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          12060003         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          12079651         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          125              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          12626812         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          12640890         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          12710360         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1271289          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1303282          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1304569          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1306190          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1306236          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1307966          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1308061          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1308141          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1308389          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1309600          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1309644          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1313139          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13138459         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1313991          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1314063          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1314416          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1317346          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1317357          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1317368          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1317426          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1327339          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1327533          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1333820          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1335257          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1335326          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1336932          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1345046          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          1345160          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13462889         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13463393         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13510491         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13530659         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13530682         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13586828         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13597994         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          136              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          136527           -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13765190         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13770893         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          13814965         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          139              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          14018952         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          14220178         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          14307336         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          14307358         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          14336700         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          14977618         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          16065831         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          16842038         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          16925250         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          18454121         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          18540299         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          195              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          198              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          199              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          200              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          201              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          202              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          21679312         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          2223930          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          226              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          22967926         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          253              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          27253287         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          301042           -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          3141126          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          3333673          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          373024           -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          50922297         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          543908           -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          593748           -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          598630           -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          6018899          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          602              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          603              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          604              -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          61789513         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          61790145         -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          62384            -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7428480          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7439921          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7439965          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7439976          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7440020          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7440360          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7440382          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7440417          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7440439          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7440473          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7440484          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7446084          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7446142          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7446277          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7446346          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7487947          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7488564          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7542098          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7647010          -9  65.21 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7718549          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7722647          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7738945          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7758976          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7775113          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7778394          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7778509          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7782492          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7782505          -9  65.21 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7783008          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7783075          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7783166          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7783702          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7783791          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7784409          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7784421          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7785877          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7786814          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7787475          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7787497          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7788967          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7788989          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7789006          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7789062          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7789095          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7789120          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7789426          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          7790809          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          78002            -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          8030704          -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          88               -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          92               -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          93               -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          EXH__16065831    -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          EXH__18540299    -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          EXH__7439965     -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          EXH__7440020     -9   0.00 100 100 -9   0801-7 Y R 785                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEISMAR VINYLS CO, LP MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5986: cdate=2008
22005 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          109              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          125              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          136              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          136527           -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          139              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          195              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          198              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          199              -9  57.02 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          200              -9  57.02 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          201              -9  57.02 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          202              -9  57.02 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          226              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          22967926         -9  57.02 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          253              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          301042           -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          373024           -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          543908           -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          593748           -9  57.02 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          598630           -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          602              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          603              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          604              -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          62384            -9  57.02 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439976          -9  57.02 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7487947          -9  57.02 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          78002            -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          88               -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          92               -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          93               -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 812                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          PM10             -9  67.29 100 100 -9   0801-6 Y R 812                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: RUBICON,LLC: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          PM2_5            -9  67.29 100 100 -9   0801-6 Y R 812                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: RUBICON,LLC: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10025737         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10025919         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10031137         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10034829         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10049055         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10060125         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10099748         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101505         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101538         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101970         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10108642         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10124364         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10124433         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10294403         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10325947         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10377669         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10588019         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          109              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          11103869         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12018018         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12018198         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12035722         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12054487         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12060003         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12079651         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          125              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12626812         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12640890         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12710360         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1271289          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1303282          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1304569          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1306190          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1306236          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1307966          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308061          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308141          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308389          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1309600          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1309644          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1313139          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13138459         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1313991          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1314063          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1314416          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317346          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317357          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317368          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317426          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1327339          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1327533          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1333820          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1335257          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1335326          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1336932          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1345046          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1345160          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13462889         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13463393         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13510491         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13530659         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13530682         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13586828         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13597994         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          136              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          136527           -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13765190         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13770893         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13814965         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          139              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14018952         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14220178         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14307336         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14307358         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14336700         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14977618         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16065831         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16842038         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16925250         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          18454121         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          18540299         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          195              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          198              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          199              -9  51.82 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          200              -9  51.82 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          201              -9  51.82 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          202              -9  51.82 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          21679312         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          2223930          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          226              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          22967926         -9  51.82 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          253              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          27253287         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          301042           -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          3141126          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          3333673          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          373024           -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          50922297         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          543908           -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          593748           -9  51.82 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          598630           -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          6018899          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          602              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          603              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          604              -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          61789513         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          61790145         -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          62384            -9  51.82 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7428480          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439921          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439965          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439976          -9  51.82 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440020          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440360          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440382          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440417          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440439          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440473          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440484          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446084          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446142          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446277          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446346          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7487947          -9  51.82 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7488564          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7542098          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7647010          -9  93.50 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7718549          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7722647          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7738945          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7758976          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7775113          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7778394          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7778509          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7782492          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7782505          -9  93.50 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783008          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783075          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783166          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783702          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783791          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7784409          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7784421          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7785877          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7786814          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7787475          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7787497          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7788967          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7788989          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789006          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789062          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789095          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789120          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789426          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7790809          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          78002            -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          8030704          -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          88               -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          92               -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          93               -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__16065831    -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__18540299    -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__7439965     -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__7440020     -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          PM10             -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: RUBICON,LLC: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          PM2_5            -9  67.29 100 100 -9   0801-6 Y R 813                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: RUBICON,LLC: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10025737         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10025919         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10031137         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10034829         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10049055         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10060125         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10099748         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101505         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101538         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101970         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10108642         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10124364         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10124433         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10294403         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10325947         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10377669         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10588019         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          109              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          11103869         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12018018         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12018198         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12035722         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12054487         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12060003         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12079651         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          125              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12626812         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12640890         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12710360         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1271289          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1303282          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1304569          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1306190          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1306236          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1307966          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308061          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308141          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308389          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1309600          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1309644          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1313139          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13138459         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1313991          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1314063          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1314416          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317346          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317357          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317368          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317426          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1327339          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1327533          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1333820          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1335257          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1335326          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1336932          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1345046          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1345160          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13462889         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13463393         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13510491         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13530659         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13530682         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13586828         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13597994         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          136              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          136527           -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13765190         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13770893         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13814965         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          139              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14018952         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14220178         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14307336         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14307358         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14336700         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14977618         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16065831         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16842038         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16925250         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          18454121         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          18540299         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          195              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          198              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          199              -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          200              -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          201              -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          202              -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          21679312         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          2223930          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          226              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          253              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          27253287         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          301042           -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          3141126          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          3333673          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          373024           -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          50922297         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          543908           -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          593748           -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          598630           -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          6018899          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          602              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          603              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          604              -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          61789513         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          61790145         -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          62384            -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7428480          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439921          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439965          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440020          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440360          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440382          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440417          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440439          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440473          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440484          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446084          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446142          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446277          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446346          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7488564          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7542098          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7718549          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7722647          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7738945          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7758976          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7775113          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7778394          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7778509          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7782492          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783008          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783075          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783166          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783702          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783791          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7784409          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7784421          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7785877          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7786814          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7787475          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7787497          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7788967          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7788989          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789006          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789062          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789095          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789120          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789426          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7790809          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          78002            -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          8030704          -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          88               -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          92               -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          93               -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__16065831    -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__18540299    -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__7439965     -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__7440020     -9  97.06 100 100 -9   0801-6 Y R 814                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          PM10             -9  67.29 100 100 -9   0801-6 Y R 814                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: RUBICON,LLC: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          PM2_5            -9  67.29 100 100 -9   0801-6 Y R 814                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: RUBICON,LLC: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10025737         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10025919         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10031137         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10034829         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10049055         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10060125         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10099748         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101505         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101538         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10101970         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10108642         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10124364         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10124433         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10294403         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10325947         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10377669         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10588019         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          109              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          11103869         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12018018         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12018198         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12035722         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12054487         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12060003         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12079651         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          125              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12626812         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12640890         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          12710360         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1271289          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1303282          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1304569          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1306190          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1306236          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1307966          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308061          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308141          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1308389          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1309600          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1309644          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1313139          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13138459         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1313991          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1314063          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1314416          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317346          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317357          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317368          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1317426          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1327339          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1327533          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1333820          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1335257          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1335326          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1336932          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1345046          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          1345160          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13462889         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13463393         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13510491         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13530659         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13530682         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13586828         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13597994         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          136              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          136527           -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13765190         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13770893         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          13814965         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          139              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14018952         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14220178         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14307336         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14307358         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14336700         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          14977618         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16065831         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16842038         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          16925250         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          18454121         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          18540299         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          195              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          198              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          199              -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          200              -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          201              -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          202              -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          21679312         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          2223930          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          226              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          253              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          27253287         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          301042           -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          3141126          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          3333673          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          373024           -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          50922297         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          543908           -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          593748           -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          598630           -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          6018899          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          602              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          603              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          604              -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          61789513         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          61790145         -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          62384            -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7428480          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439921          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439965          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440020          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440360          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440382          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440417          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440439          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440473          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7440484          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446084          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446142          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446277          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7446346          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7488564          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7542098          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7718549          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7722647          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7738945          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7758976          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7775113          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7778394          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7778509          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7782492          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783008          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783075          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783166          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783702          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7783791          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7784409          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7784421          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7785877          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7786814          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7787475          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7787497          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7788967          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7788989          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789006          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789062          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789095          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789120          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7789426          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          7790809          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          78002            -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          8030704          -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          88               -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          92               -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          93               -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__16065831    -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__18540299    -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__7439965     -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          EXH__7440020     -9   7.77 100 100 -9   0801-6 Y R 815                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: RUBICON, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          PM10             -9  67.29 100 100 -9   0801-6 Y R 815                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: RUBICON,LLC: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          PM2_5            -9  67.29 100 100 -9   0801-6 Y R 815                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: RUBICON,LLC: NEI_UNIQUE_ID=NEI6155: cdate=2008
22005 0          10025737         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10025919         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10031137         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10034829         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10049055         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10060125         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10099748         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101505         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101538         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101970         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10108642         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10124364         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10124433         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10294403         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10325947         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10377669         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10588019         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          109              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          11103869         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12018018         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12018198         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12035722         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12054487         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12060003         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12079651         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          125              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12626812         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12640890         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12710360         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1271289          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1303282          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1304569          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1306190          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1306236          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1307966          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308061          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308141          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308389          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1309600          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1309644          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1313139          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13138459         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1313991          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1314063          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1314416          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317346          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317357          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317368          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317426          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1327339          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1327533          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1333820          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1335257          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1335326          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1336932          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1345046          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1345160          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13462889         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13463393         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13510491         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13530659         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13530682         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13586828         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13597994         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          136              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          136527           -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13765190         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13770893         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13814965         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          139              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14018952         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14220178         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14307336         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14307358         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14336700         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14977618         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16065831         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16842038         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16925250         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          18454121         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          18540299         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          195              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          198              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          199              -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          200              -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          201              -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          202              -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          21679312         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          2223930          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          226              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          253              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          27253287         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          301042           -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          3141126          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          3333673          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          373024           -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          50922297         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          543908           -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          593748           -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          598630           -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          6018899          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          602              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          603              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          604              -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          61789513         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          61790145         -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          62384            -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7428480          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439921          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439965          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440020          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440360          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440382          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440417          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440439          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440473          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440484          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446084          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446142          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446277          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446346          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7488564          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7542098          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7718549          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7722647          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7738945          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7758976          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7775113          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7778394          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7778509          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7782492          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783008          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783075          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783166          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783702          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783791          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7784409          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7784421          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7785877          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7786814          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7787475          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7787497          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7788967          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7788989          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789006          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789062          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789095          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789120          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789426          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7790809          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          78002            -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          8030704          -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          88               -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          92               -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          93               -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__16065831    -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__18540299    -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__7439965     -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__7440020     -9  40.95 100 100 -9   0801-6 Y R 834                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          PM10             -9  12.12 100 100 -9   0801-6 Y R 834                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCORPORATION/GEISMARSITE: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          PM2_5            -9  12.12 100 100 -9   0801-6 Y R 834                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCORPORATION/GEISMARSITE: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          109              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          125              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          136              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          136527           -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          139              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          195              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          198              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          199              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          200              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          201              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          202              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          226              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          253              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          301042           -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          373024           -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          543908           -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          593748           -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          598630           -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          602              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          603              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          604              -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          62384            -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          78002            -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          88               -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          92               -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          93               -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 835                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          PM10             -9  12.12 100 100 -9   0801-6 Y R 835                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCORPORATION/GEISMARSITE: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          PM2_5            -9  12.12 100 100 -9   0801-6 Y R 835                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCORPORATION/GEISMARSITE: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          109              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          125              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          136              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          136527           -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          139              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          195              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          198              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          199              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          200              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          201              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          202              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          226              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          253              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          301042           -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          373024           -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          543908           -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          593748           -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          598630           -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          602              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          603              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          604              -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          62384            -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          78002            -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          88               -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          92               -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          93               -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 836                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF CORPORATION/GEISMAR SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          PM10             -9  12.12 100 100 -9   0801-6 Y R 836                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCORPORATION/GEISMARSITE: NEI_UNIQUE_ID=NEI6032: cdate=2008
22005 0          PM2_5            -9  12.12 100 100 -9   0801-6 Y R 836                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCORPORATION/GEISMARSITE: NEI_UNIQUE_ID=NEI6032: cdate=2008
22011 0          10025737         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10025919         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10031137         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10034829         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10049055         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10060125         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10099748         -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10101505         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10101538         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10101970         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10124433         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10294403         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10377669         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          10588019         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          109              -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          11103869         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          12018018         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          12018198         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          12035722         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          12054487         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          12060003         -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          12079651         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          125              -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          12626812         -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          12640890         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          12710360         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1271289          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1303282          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1304569          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1307966          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1308061          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1308141          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1308389          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1309600          -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1309644          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1313139          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13138459         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1313991          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1314063          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1314416          -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1317346          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1317357          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1317368          -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1317426          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1327339          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1327533          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1333820          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1335257          -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1335326          -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1336932          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1345046          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          1345160          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13462889         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13463393         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13510491         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13530659         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13530682         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13586828         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13597994         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          136              -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          136527           -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13765190         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13770893         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          13814965         -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          139              -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          14018952         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          14220178         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          14307336         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          14307358         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          14336700         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          14977618         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          16065831         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          16842038         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          16925250         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          18454121         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          18540299         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          195              -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          198              -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          199              -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          200              -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          201              -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          202              -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          21679312         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          226              -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          253              -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          27253287         -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          301042           -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          3141126          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          3333673          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          373024           -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          50922297         -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          543908           -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          593748           -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          598630           -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          6018899          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          602              -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          603              -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          604              -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          61789513         -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          61790145         -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          62384            -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7428480          -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7439921          -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7439965          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7440020          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7440360          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7440382          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7440417          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7440473          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7440484          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7446084          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7446142          -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7446277          -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7446346          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7488564          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7542098          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7718549          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7722647          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7738945          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7758976          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7775113          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7778394          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7778509          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7782492          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7783008          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7783075          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7783166          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7783702          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7783791          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7784409          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7784421          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7785877          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7786814          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7787475          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7787497          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7788967          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7788989          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7789006          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7789062          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7789095          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7789120          -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          78002            -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          8030704          -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          88               -9  91.06 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          92               -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          93               -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          EXH__16065831    -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          EXH__18540299    -9  66.85 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          EXH__7439965     -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          EXH__7440020     -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MEADWESTVACO CORPORATION/DERIDDER PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          PM10             -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MEADWESTVACOCORPORATION/DERIDDERPLANT: NEI_UNIQUE_ID=NEI6021: cdate=2008
22011 0          PM2_5            -9  63.60 100 100 -9   0801-6 Y R 818                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MEADWESTVACOCORPORATION/DERIDDERPLANT: NEI_UNIQUE_ID=NEI6021: cdate=2008
22017 0          106990           -9  28.00 100 100 -9   -9     Y R 0033                            ! MACT: Autos, plant: GENERALMOTORSCORP/SHREVEPORTASSEMBLY, VOC 28%: Auto_2002_projections.xls
22017 0          107028           -9  28.00 100 100 -9   -9     Y R 0033                            ! MACT: Autos, plant: GENERALMOTORSCORP/SHREVEPORTASSEMBLY, VOC 28%: Auto_2002_projections.xls
22017 0          50000            -9  28.00 100 100 -9   -9     Y R 0033                            ! MACT: Autos, plant: GENERALMOTORSCORP/SHREVEPORTASSEMBLY, VOC 28%: Auto_2002_projections.xls
22017 0          67561            -9  28.00 100 100 -9   -9     Y R 0033                            ! MACT: Autos, plant: GENERALMOTORSCORP/SHREVEPORTASSEMBLY, VOC 28%: Auto_2002_projections.xls
22017 0          71432            -9  28.00 100 100 -9   -9     Y R 0033                            ! MACT: Autos, plant: GENERALMOTORSCORP/SHREVEPORTASSEMBLY, VOC 28%: Auto_2002_projections.xls
22017 0          75070            -9  28.00 100 100 -9   -9     Y R 0033                            ! MACT: Autos, plant: GENERALMOTORSCORP/SHREVEPORTASSEMBLY, VOC 28%: Auto_2002_projections.xls
22017 0          91203            -9  28.00 100 100 -9   -9     Y R 0033                            ! MACT: Autos, plant: GENERALMOTORSCORP/SHREVEPORTASSEMBLY, VOC 28%: Auto_2002_projections.xls
22017 0          VOC              -9  28.00 100 100 -9   -9     Y R 0033                            ! MACT: Autos, plant: GENERALMOTORSCORP/SHREVEPORTASSEMBLY, VOC 28%: Auto_2002_projections.xls
22019 10200602   NOX              -9  40.00 100 100 -9   -9     Y R 0005                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 31JUL2009
22019 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 0005                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 31JUL2009
22019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 0005                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 01NOV2005
22019 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 0005                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 30JUN2005
22019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 0016                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31MAR2012
22019 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 0016                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31DEC2007
22019 10200602   NOX              -9  40.00 100 100 -9   -9     Y R 05200005                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 31JUL2009
22019 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 05200005                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 31JUL2009
22019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 05200005                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 01NOV2005
22019 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 05200005                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 30JUN2005
22019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 05200016                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31MAR2012
22019 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 05200016                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31DEC2007
22019 0          10025737         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10025919         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10031137         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10034829         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10049055         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10060125         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10099748         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10101505         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10101538         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10101970         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10108642         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10124364         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10124433         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10294403         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10325947         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10377669         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10588019         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          109              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          11103869         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12018018         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12018198         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12035722         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12054487         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12060003         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12079651         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          125              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12626812         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12640890         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12710360         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1271289          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1303282          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1304569          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1306190          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1306236          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1307966          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1308061          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1308141          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1308389          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1309600          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1309644          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1313139          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13138459         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1313991          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1314063          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1314416          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317346          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317357          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317368          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317426          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1327339          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1327533          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1333820          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1335257          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1335326          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1336932          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1345046          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1345160          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13462889         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13463393         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13510491         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13530659         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13530682         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13586828         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13597994         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          136              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          136527           -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13765190         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13770893         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13814965         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          139              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14018952         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14220178         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14307336         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14307358         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14336700         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14977618         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          16065831         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          16842038         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          16925250         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          18454121         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          18540299         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          195              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          198              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          199              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          200              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          201              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          202              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          21679312         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          2223930          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          226              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          22967926         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          253              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          27253287         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          301042           -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          3141126          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          3333673          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          373024           -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          50922297         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          543908           -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          593748           -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          598630           -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          6018899          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          602              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          603              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          604              -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          61789513         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          61790145         -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          62384            -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7428480          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7439921          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7439965          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7439976          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440020          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440360          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440382          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440417          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440439          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440473          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440484          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446084          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446142          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446277          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446346          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7487947          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7488564          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7542098          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7647010          -9   4.95 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7718549          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7722647          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7738945          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7758976          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7775113          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7778394          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7778509          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7782492          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7782505          -9   4.95 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783008          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783075          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783166          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783702          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783791          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7784409          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7784421          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7785877          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7786814          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7787475          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7787497          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7788967          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7788989          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789006          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789062          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789095          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789120          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789426          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7790809          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          78002            -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          8030704          -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          88               -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          92               -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          93               -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__16065831    -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__18540299    -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__7439965     -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__7440020     -9   0.00 100 100 -9   0801-7 Y R 2022                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          PM10             -9  89.10 100 100 -9   0801-7 Y R 2022                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: PPGINDUSTRIESINC/LAKECHARLESCOMPLEX: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          PM2_5            -9  89.10 100 100 -9   0801-7 Y R 2022                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: PPGINDUSTRIESINC/LAKECHARLESCOMPLEX: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10025737         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10025919         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10031137         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10034829         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10049055         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10060125         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10099748         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10101505         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10101538         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10101970         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10108642         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10124364         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10124433         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10294403         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10325947         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10377669         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10588019         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          109              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          11103869         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12018018         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12018198         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12035722         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12054487         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12060003         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12079651         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          125              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12626812         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12640890         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12710360         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1271289          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1303282          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1304569          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1306190          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1306236          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1307966          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1308061          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1308141          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1308389          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1309600          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1309644          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1313139          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13138459         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1313991          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1314063          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1314416          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317346          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317357          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317368          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317426          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1327339          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1327533          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1333820          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1335257          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1335326          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1336932          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1345046          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1345160          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13462889         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13463393         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13510491         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13530659         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13530682         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13586828         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13597994         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          136              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          136527           -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13765190         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13770893         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13814965         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          139              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14018952         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14220178         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14307336         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14307358         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14336700         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14977618         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          16065831         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          16842038         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          16925250         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          18454121         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          18540299         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          195              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          198              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          199              -9   0.00 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          200              -9   0.00 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          201              -9   0.00 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          202              -9   0.00 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          21679312         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          2223930          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          226              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          253              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          27253287         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          301042           -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          3141126          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          3333673          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          373024           -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          50922297         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          543908           -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          598630           -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          6018899          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          602              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          603              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          604              -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          61789513         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          61790145         -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7428480          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7439921          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7439965          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440020          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440360          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440382          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440417          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440439          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440473          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440484          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446084          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446142          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446277          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446346          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7488564          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7542098          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7647010          -9  18.79 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7718549          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7722647          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7738945          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7758976          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7775113          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7778394          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7778509          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7782492          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7782505          -9  18.79 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783008          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783075          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783166          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783702          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783791          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7784409          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7784421          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7785877          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7786814          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7787475          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7787497          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7788967          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7788989          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789006          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789062          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789095          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789120          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789426          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7790809          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          78002            -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          8030704          -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          88               -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          92               -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          93               -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__16065831    -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__18540299    -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__7439965     -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__7440020     -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          PM10             -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: PPGINDUSTRIESINC/LAKECHARLESCOMPLEX: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          PM2_5            -9  89.10 100 100 -9   0801-2 Y R 3001                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: PPGINDUSTRIESINC/LAKECHARLESCOMPLEX: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10025737         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10025919         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10031137         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10034829         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10049055         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10060125         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10099748         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10101505         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10101538         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10101970         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10108642         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10124364         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10124433         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10294403         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10325947         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10377669         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10588019         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          109              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          11103869         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12018018         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12018198         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12035722         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12054487         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12060003         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12079651         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          125              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12626812         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12640890         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          12710360         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1271289          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1303282          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1304569          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1306190          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1306236          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1307966          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1308061          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1308141          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1308389          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1309600          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1309644          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1313139          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13138459         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1313991          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1314063          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1314416          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317346          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317357          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317368          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1317426          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1327339          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1327533          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1333820          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1335257          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1335326          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1336932          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1345046          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          1345160          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13462889         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13463393         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13510491         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13530659         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13530682         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13586828         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13597994         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          136              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          136527           -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13765190         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13770893         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          13814965         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          139              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14018952         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14220178         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14307336         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14307358         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14336700         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          14977618         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          16065831         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          16842038         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          16925250         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          18454121         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          18540299         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          195              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          198              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          199              -9  57.39 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          200              -9  57.39 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          201              -9  57.39 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          202              -9  57.39 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          21679312         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          2223930          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          226              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          22967926         -9  57.39 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          253              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          27253287         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          301042           -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          3141126          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          3333673          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          373024           -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          50922297         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          543908           -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          593748           -9  57.39 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          598630           -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          6018899          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          602              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          603              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          604              -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          61789513         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          61790145         -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          62384            -9  57.39 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7428480          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7439921          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7439965          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7439976          -9  57.39 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440020          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440360          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440382          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440417          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440439          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440473          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7440484          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446084          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446142          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446277          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7446346          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7487947          -9  57.39 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7488564          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7542098          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7647010          -9  23.19 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7718549          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7722647          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7738945          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7758976          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7775113          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7778394          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7778509          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7782492          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7782505          -9  23.19 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783008          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783075          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783166          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783702          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7783791          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7784409          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7784421          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7785877          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7786814          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7787475          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7787497          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7788967          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7788989          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789006          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789062          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789095          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789120          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7789426          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          7790809          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          78002            -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          8030704          -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          88               -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          92               -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          93               -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__16065831    -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__18540299    -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__7439965     -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          EXH__7440020     -9  93.31 100 100 -9   0801-2 Y R 467                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG INDUSTRIES,INC. MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6076: cdate=2008
22019 0          10025737         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10025919         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10031137         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10034829         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10049055         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10060125         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10099748         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10101505         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10101538         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10101970         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10108642         -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10124364         -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10124433         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10294403         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10325947         -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10377669         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          10588019         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          109              -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          11103869         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          12018018         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          12018198         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          12035722         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          12054487         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          12060003         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          12079651         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          125              -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          12626812         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          12640890         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          12710360         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1271289          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1303282          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1304569          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1306190          -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1306236          -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1307966          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1308061          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1308141          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1308389          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1309600          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1309644          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1313139          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13138459         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1313991          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1314063          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1314416          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1317346          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1317357          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1317368          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1317426          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1327339          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1327533          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1333820          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1335257          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1335326          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1336932          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1345046          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          1345160          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13462889         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13463393         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13510491         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13530659         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13530682         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13586828         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13597994         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          136              -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          136527           -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13765190         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13770893         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          13814965         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          139              -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          14018952         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          14220178         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          14307336         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          14307358         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          14336700         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          14977618         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          16065831         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          16842038         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          16925250         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          18454121         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          18540299         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          195              -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          198              -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          199              -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          200              -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          201              -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          202              -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          21679312         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          2223930          -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          226              -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          253              -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          27253287         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          301042           -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          3141126          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          3333673          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          373024           -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          50922297         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          543908           -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          593748           -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          598630           -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          6018899          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          602              -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          603              -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          604              -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          61789513         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          61790145         -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          62384            -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7428480          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7439921          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7439965          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7440020          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7440360          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7440382          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7440417          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7440439          -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7440473          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7440484          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7446084          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7446142          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7446277          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7446346          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7488564          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7542098          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7647010          -9  95.68 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7718549          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7722647          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7738945          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7758976          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7775113          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7778394          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7778509          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7782492          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7782505          -9  95.68 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7783008          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7783075          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7783166          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7783702          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7783791          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7784409          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7784421          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7785877          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7786814          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7787475          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7787497          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7788967          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7788989          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7789006          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7789062          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7789095          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7789120          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7789426          -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          7790809          -9   0.00 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          78002            -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          8030704          -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          88               -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          92               -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          93               -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          EXH__16065831    -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          EXH__18540299    -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          EXH__7439965     -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 0          EXH__7440020     -9  50.29 100 100 -9   0801-2 Y R 714                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Olin Chemicals MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16361: cdate=2008
22019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R EGU0491                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31MAR2012
22019 30600201   SO2              -9  99.00 100 100 -9   -9     Y R EGU0491                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31DEC2007
22019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R ES0603-048                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31MAR2012
22019 30600201   SO2              -9  99.00 100 100 -9   -9     Y R ES0603-048                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31DEC2007
22019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R ES0603-049                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31MAR2012
22019 30600201   SO2              -9  99.00 100 100 -9   -9     Y R ES0603-049                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31DEC2007
22019 10200602   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-050                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 31JUL2009
22019 30600104   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-050                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 31JUL2009
22019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R ES0603-050                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 01NOV2005
22019 30600201   SO2              -9  50.00 100 100 -9   -9     Y R ES0603-050                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 30JUN2005
22019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$10578                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31MAR2012
22019 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$10578                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6166, Plant=Citgo Petroleum Corp., Lake Charles, LA, compliance date: 31DEC2007
22019 10200602   NOX              -9  40.00 100 100 -9   -9     Y R T$10598                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 31JUL2009
22019 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$10598                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 31JUL2009
22019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$10598                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 01NOV2005
22019 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$10598                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6062, Plant=Conoco Inc., Westlake, LA, compliance date: 30JUN2005
22033 10201402   NOX              -9  40.00 100 100 -9   -9     Y R 0015                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 31DEC2009
22033 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 0015                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 31DEC2009
22033 10201402   SO2              -9  99.00 100 100 -9   -9     Y R 0015                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 01JAN2006
22033 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 0015                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 01JAN2006
22033 10201402   NOX              -9  40.00 100 100 -9   -9     Y R 08400015                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 31DEC2009
22033 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 08400015                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 31DEC2009
22033 10201402   SO2              -9  99.00 100 100 -9   -9     Y R 08400015                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 01JAN2006
22033 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 08400015                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 01JAN2006
22033 10201402   NOX              -9  40.00 100 100 -9   -9     Y R 70805XXNBT4050S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 31DEC2009
22033 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 70805XXNBT4050S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 31DEC2009
22033 10201402   SO2              -9  99.00 100 100 -9   -9     Y R 70805XXNBT4050S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 01JAN2006
22033 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 70805XXNBT4050S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 01JAN2006
22033 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10099748         -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10108642         -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10124364         -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10325947         -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          109              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12060003         -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          125              -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12626812         -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1306190          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1306236          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1309600          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1314416          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1317368          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1335257          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1335326          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          136              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          136527           -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13814965         -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          139              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          195              -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          198              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          199              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          200              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          201              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          202              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          2223930          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          226              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          253              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          27253287         -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          301042           -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          373024           -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          543908           -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          593748           -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          598630           -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          602              -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          603              -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          604              -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          61790145         -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          62384            -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7428480          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7439921          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440439          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7446142          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7446277          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7789426          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7790809          -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          78002            -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          88               -9  70.56 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          92               -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          93               -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 822                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10099748         -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10108642         -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10124364         -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10325947         -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          109              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12060003         -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          125              -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12626812         -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1306190          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1306236          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1309600          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1314416          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1317368          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1335257          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1335326          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          136              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          136527           -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          13814965         -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          139              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          195              -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          198              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          199              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          200              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          201              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          202              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          2223930          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          226              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          253              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          27253287         -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          301042           -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          373024           -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          543908           -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          593748           -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          598630           -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          602              -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          603              -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          604              -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          61790145         -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          62384            -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7428480          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7439921          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440439          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7446142          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7446277          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7789426          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          7790809          -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          78002            -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          88               -9  70.66 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          92               -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          93               -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 822A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EXXONMOBIL CHEM CO/BR CHEM PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEILA13499: cdate=2008
22033 10201402   NOX              -9  40.00 100 100 -9   -9     Y R T$10659                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 31DEC2009
22033 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$10659                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 31DEC2009
22033 10201402   SO2              -9  99.00 100 100 -9   -9     Y R T$10659                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 01JAN2006
22033 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$10659                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6022, Plant=ExxonMobil Corp. (formerly Exxon), Baton Rouge, LA, compliance date: 01JAN2006
22047 50300504   PM10             -9  89.94 100 100 -9   -9     Y R 12800007                        ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SYNGENTACROPPROTECTIONINC/ST.GABRIEL: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 50300504   PM2_5            -9  89.94 100 100 -9   -9     Y R 12800007                        ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SYNGENTACROPPROTECTIONINC/ST.GABRIEL: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10025737         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10025919         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10031137         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10034829         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10049055         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10060125         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10099748         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10101505         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10101538         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10101970         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10108642         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10124364         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10124433         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10294403         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10325947         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10377669         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10588019         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          109              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          11103869         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12018018         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12018198         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12035722         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12054487         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12060003         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12079651         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          125              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12626812         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12640890         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12710360         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1271289          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1303282          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1304569          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1306190          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1306236          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1307966          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1308061          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1308141          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1308389          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1309600          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1309644          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1313139          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13138459         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1313991          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1314063          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1314416          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1317346          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1317357          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1317368          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1317426          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1327339          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1327533          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1333820          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1335257          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1335326          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1336932          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1345046          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1345160          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13462889         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13463393         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13510491         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13530659         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13530682         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13586828         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13597994         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          136              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          136527           -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13765190         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13770893         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13814965         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          139              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14018952         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14220178         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14307336         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14307358         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14336700         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14977618         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          16065831         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          16842038         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          16925250         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          18454121         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          18540299         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          195              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          198              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          199              -9  16.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          200              -9  16.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          201              -9  16.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          202              -9  16.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          21679312         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          2223930          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          226              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          22967926         -9  16.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          253              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          27253287         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          301042           -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          3141126          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          3333673          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          373024           -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          50922297         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          543908           -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          593748           -9  16.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          598630           -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          6018899          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          602              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          603              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          604              -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          61789513         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          61790145         -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          62384            -9  16.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7428480          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7439921          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7439965          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7439976          -9  16.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440020          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440360          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440382          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440417          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440439          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440473          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440484          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7446084          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7446142          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7446277          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7446346          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7487947          -9  16.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7488564          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7542098          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7718549          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7722647          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7738945          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7758976          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7775113          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7778394          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7778509          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7782492          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7783008          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7783075          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7783166          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7783702          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7783791          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7784409          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7784421          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7785877          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7786814          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7787475          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7787497          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7788967          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7788989          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7789006          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7789062          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7789095          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7789120          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7789426          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7790809          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          78002            -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          8030704          -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          88               -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          92               -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          93               -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          EXH__16065831    -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          EXH__18540299    -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          EXH__7439965     -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          EXH__7440020     -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          PM10             -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GEORGIAGULFCHEM&VINYLSLLC/PLAQUEMIN: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          PM2_5            -9  67.84 100 100 -9   0801-6 Y R 2000                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GEORGIAGULFCHEM&VINYLSLLC/PLAQUEMIN: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10025737         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025919         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10031137         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10034829         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10049055         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10060125         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10099748         -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101505         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101538         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101970         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10108642         -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124364         -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124433         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10294403         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10325947         -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10377669         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10588019         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          109              -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          11103869         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018018         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018198         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12035722         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12054487         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12060003         -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12079651         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          125              -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12626812         -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12640890         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12710360         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1271289          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1303282          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1304569          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306190          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306236          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1307966          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308061          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308141          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308389          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309600          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309644          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313139          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13138459         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313991          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314063          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314416          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317346          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317357          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317368          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317426          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327339          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327533          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1333820          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335257          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335326          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1336932          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345046          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345160          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13462889         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13463393         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13510491         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530659         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530682         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13586828         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13597994         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136              -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136527           -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13765190         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13770893         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13814965         -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          139              -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14018952         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14220178         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307336         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307358         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14336700         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14977618         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16065831         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16842038         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16925250         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18454121         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18540299         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          195              -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          198              -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          199              -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          200              -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          201              -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          202              -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          21679312         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          2223930          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          226              -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          253              -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          27253287         -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          301042           -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3141126          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3333673          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          373024           -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          50922297         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          543908           -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          598630           -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          6018899          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          602              -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          603              -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          604              -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61789513         -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61790145         -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7428480          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439921          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439965          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440020          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440360          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440382          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440417          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440439          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440473          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440484          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446084          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446142          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446277          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446346          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7488564          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7542098          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7718549          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7722647          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7738945          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7758976          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7775113          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778394          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778509          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782492          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783008          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783075          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783166          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783702          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783791          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784409          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784421          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7785877          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7786814          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787475          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787497          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788967          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788989          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789006          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789062          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789095          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789120          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789426          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7790809          -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          78002            -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          8030704          -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          88               -9  75.91 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          92               -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          93               -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__16065831    -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__18540299    -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7439965     -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7440020     -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM10             -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM2_5            -9  71.94 100 100 -9   0801-6 Y R 2001                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025737         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025919         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10031137         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10034829         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10049055         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10060125         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10099748         -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101505         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101538         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101970         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10108642         -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124364         -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124433         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10294403         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10325947         -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10377669         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10588019         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          109              -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          11103869         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018018         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018198         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12035722         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12054487         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12060003         -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12079651         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          125              -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12626812         -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12640890         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12710360         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1271289          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1303282          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1304569          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306190          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306236          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1307966          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308061          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308141          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308389          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309600          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309644          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313139          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13138459         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313991          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314063          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314416          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317346          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317357          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317368          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317426          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327339          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327533          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1333820          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335257          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335326          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1336932          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345046          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345160          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13462889         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13463393         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13510491         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530659         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530682         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13586828         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13597994         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136              -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136527           -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13765190         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13770893         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13814965         -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          139              -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14018952         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14220178         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307336         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307358         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14336700         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14977618         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16065831         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16842038         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16925250         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18454121         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18540299         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          195              -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          198              -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          199              -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          200              -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          201              -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          202              -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          21679312         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          2223930          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          226              -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          253              -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          27253287         -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          301042           -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3141126          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3333673          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          373024           -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          50922297         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          543908           -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          598630           -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          6018899          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          602              -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          603              -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          604              -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61789513         -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61790145         -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7428480          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439921          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439965          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440020          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440360          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440382          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440417          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440439          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440473          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440484          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446084          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446142          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446277          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446346          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7488564          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7542098          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7718549          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7722647          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7738945          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7758976          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7775113          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778394          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778509          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782492          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783008          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783075          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783166          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783702          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783791          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784409          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784421          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7785877          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7786814          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787475          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787497          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788967          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788989          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789006          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789062          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789095          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789120          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789426          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7790809          -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          78002            -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          8030704          -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          88               -9  76.27 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          92               -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          93               -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__16065831    -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__18540299    -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7439965     -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7440020     -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM10             -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM2_5            -9  71.94 100 100 -9   0801-6 Y R 2001A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10099748         -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10108642         -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124364         -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10325947         -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          109              -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12060003         -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          125              -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12626812         -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306190          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306236          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309600          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314416          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317368          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335257          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335326          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136              -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136527           -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13814965         -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          139              -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          195              -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          198              -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          199              -9   6.90 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          200              -9   6.90 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          201              -9   6.90 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          202              -9   6.90 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          2223930          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          226              -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          22967926         -9   6.90 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          253              -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          27253287         -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          301042           -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          373024           -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          543908           -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          593748           -9   6.90 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          598630           -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          602              -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          603              -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          604              -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61790145         -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          62384            -9   6.90 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7428480          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439921          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439976          -9   6.90 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440439          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446142          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446277          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7487947          -9   6.90 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789426          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7790809          -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          78002            -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          88               -9  77.04 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          92               -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          93               -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 2002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM10             -9  71.94 100 100 -9   0801-6 Y R 2002                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM2_5            -9  71.94 100 100 -9   0801-6 Y R 2002                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025737         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025919         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10031137         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10034829         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10049055         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10060125         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10099748         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101505         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101538         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101970         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10108642         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124364         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124433         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10294403         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10325947         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10377669         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10588019         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          109              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          11103869         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018018         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018198         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12035722         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12054487         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12060003         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12079651         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          125              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12626812         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12640890         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12710360         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1271289          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1303282          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1304569          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306190          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306236          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1307966          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308061          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308141          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308389          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309600          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309644          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313139          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13138459         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313991          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314063          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314416          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317346          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317357          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317368          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317426          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327339          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327533          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1333820          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335257          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335326          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1336932          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345046          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345160          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13462889         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13463393         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13510491         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530659         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530682         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13586828         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13597994         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136527           -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13765190         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13770893         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13814965         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          139              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14018952         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14220178         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307336         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307358         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14336700         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14977618         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16065831         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16842038         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16925250         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18454121         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18540299         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          195              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          198              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          199              -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          200              -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          201              -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          202              -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          21679312         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          2223930          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          226              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          253              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          27253287         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          301042           -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3141126          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3333673          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          373024           -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          50922297         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          543908           -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          598630           -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          6018899          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          602              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          603              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          604              -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61789513         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61790145         -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7428480          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439921          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439965          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440020          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440360          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440382          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440417          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440439          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440473          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440484          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446084          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446142          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446277          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446346          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7488564          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7542098          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7718549          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7722647          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7738945          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7758976          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7775113          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778394          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778509          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782492          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783008          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783075          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783166          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783702          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783791          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784409          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784421          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7785877          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7786814          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787475          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787497          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788967          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788989          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789006          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789062          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789095          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789120          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789426          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7790809          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          78002            -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          8030704          -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          88               -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          92               -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          93               -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__16065831    -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__18540299    -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7439965     -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7440020     -9  56.50 100 100 -9   0801-6 Y R 2003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM10             -9  71.94 100 100 -9   0801-6 Y R 2003                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM2_5            -9  71.94 100 100 -9   0801-6 Y R 2003                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025737         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025919         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10031137         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10034829         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10049055         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10060125         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10099748         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101505         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101538         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101970         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10108642         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124364         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124433         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10294403         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10325947         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10377669         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10588019         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          109              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          11103869         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018018         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018198         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12035722         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12054487         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12060003         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12079651         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          125              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12626812         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12640890         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12710360         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1271289          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1303282          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1304569          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306190          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306236          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1307966          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308061          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308141          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308389          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309600          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309644          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313139          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13138459         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313991          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314063          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314416          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317346          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317357          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317368          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317426          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327339          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327533          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1333820          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335257          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335326          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1336932          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345046          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345160          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13462889         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13463393         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13510491         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530659         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530682         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13586828         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13597994         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136527           -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13765190         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13770893         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13814965         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          139              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14018952         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14220178         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307336         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307358         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14336700         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14977618         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16065831         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16842038         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16925250         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18454121         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18540299         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          195              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          198              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          199              -9   0.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          200              -9   0.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          201              -9   0.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          202              -9   0.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          21679312         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          2223930          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          226              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          253              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          27253287         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          301042           -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3141126          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3333673          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          373024           -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          50922297         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          543908           -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          598630           -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          6018899          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          602              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          603              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          604              -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61789513         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61790145         -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7428480          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439921          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439965          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440020          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440360          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440382          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440417          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440439          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440473          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440484          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446084          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446142          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446277          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446346          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7488564          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7542098          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7647010          -9  79.24 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7718549          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7722647          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7738945          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7758976          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7775113          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778394          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778509          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782492          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782505          -9  79.24 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783008          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783075          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783166          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783702          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783791          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784409          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784421          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7785877          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7786814          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787475          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787497          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788967          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788989          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789006          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789062          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789095          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789120          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789426          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7790809          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          78002            -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          8030704          -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          88               -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          92               -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          93               -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__16065831    -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__18540299    -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7439965     -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7440020     -9  68.00 100 100 -9   0801-2 Y R 3002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM10             -9  71.94 100 100 -9   0801-2 Y R 3002                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM2_5            -9  71.94 100 100 -9   0801-2 Y R 3002                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025737         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10025919         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10031137         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10034829         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10049055         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10060125         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10099748         -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10101505         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10101538         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10101970         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10108642         -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10124364         -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10294403         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10325947         -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10377669         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10588019         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          109              -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          11103869         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12018018         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12018198         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12035722         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12054487         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12060003         -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12079651         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          125              -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12626812         -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12640890         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12710360         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1271289          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1303282          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1304569          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1306190          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1306236          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1308141          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1308389          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1309600          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1309644          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1313139          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13138459         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1313991          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1314063          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1314416          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1317346          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1317357          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1317368          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1327339          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1327533          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1333820          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1335257          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1335326          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1336932          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1345046          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13462889         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13463393         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13510491         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13530659         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13530682         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13597994         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          136              -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          136527           -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13765190         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13770893         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13814965         -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          139              -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14018952         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14220178         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14307336         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14307358         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14336700         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14977618         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          16065831         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          16925250         -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          18454121         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          18540299         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          195              -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          198              -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          199              -9  85.90 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          200              -9  85.90 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          201              -9  85.90 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          202              -9  85.90 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          21679312         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          2223930          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          226              -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          22967926         -9  85.90 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          253              -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          27253287         -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          301042           -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          3141126          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          3333673          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          373024           -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          50922297         -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          543908           -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          593748           -9  85.90 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          598630           -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          6018899          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          602              -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          603              -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          604              -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          61790145         -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          62384            -9  85.90 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7428480          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7439921          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7439965          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7439976          -9  85.90 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440020          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440360          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440382          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440417          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440439          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440473          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7446084          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7446142          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7446277          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7446346          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7487947          -9  85.90 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7488564          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7718549          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7722647          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7738945          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7758976          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7775113          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7778394          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7778509          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7782492          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7783008          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7783075          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7783166          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7783702          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7783791          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7784409          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7784421          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7785877          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7786814          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7787475          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7787497          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7788967          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7788989          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7789006          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7789062          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7789095          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7789120          -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7789426          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7790809          -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          78002            -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          8030704          -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          88               -9  99.11 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          92               -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          93               -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          EXH__16065831    -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          EXH__18540299    -9  98.98 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          EXH__7439965     -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          EXH__7440020     -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          PM10             -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SYNGENTACROPPROTECTIONINC/ST.GABRIEL: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          PM2_5            -9  89.94 100 100 -9   0801-2 Y R 480                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SYNGENTACROPPROTECTIONINC/ST.GABRIEL: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10025737         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10025919         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10031137         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10034829         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10049055         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10060125         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10099748         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10101505         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10101538         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10101970         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10108642         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10124364         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10124433         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10294403         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10325947         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10377669         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10588019         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          109              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          11103869         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12018018         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12018198         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12035722         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12054487         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12060003         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12079651         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          125              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12626812         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12640890         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          12710360         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1271289          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1303282          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1304569          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1306190          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1306236          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1307966          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1308061          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1308141          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1308389          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1309600          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1309644          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1313139          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13138459         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1313991          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1314063          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1314416          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1317346          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1317357          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1317368          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1317426          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1327339          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1327533          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1333820          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1335257          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1335326          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1336932          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1345046          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          1345160          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13462889         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13463393         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13510491         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13530659         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13530682         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13586828         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13597994         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          136              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          136527           -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13765190         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13770893         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          13814965         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          139              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14018952         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14220178         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14307336         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14307358         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14336700         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          14977618         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          16065831         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          16842038         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          16925250         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          18454121         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          18540299         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          195              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          198              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          199              -9  13.19 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          200              -9  13.19 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          201              -9  13.19 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          202              -9  13.19 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          21679312         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          2223930          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          226              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          22967926         -9  13.19 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          253              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          27253287         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          301042           -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          3141126          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          3333673          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          373024           -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          50922297         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          543908           -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          593748           -9  13.19 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          598630           -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          6018899          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          602              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          603              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          604              -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          61789513         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          61790145         -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          62384            -9  13.19 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7428480          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7439921          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7439965          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7439976          -9  13.19 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440020          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440360          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440382          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440417          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440439          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440473          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7440484          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7446084          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7446142          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7446277          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7446346          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7487947          -9  13.19 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7488564          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7542098          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7718549          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7722647          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7738945          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7758976          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7775113          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7778394          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7778509          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7782492          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7783008          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7783075          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7783166          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7783702          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7783791          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7784409          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7784421          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7785877          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7786814          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7787475          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7787497          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7788967          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7788989          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7789006          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7789062          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7789095          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7789120          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7789426          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          7790809          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          78002            -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          8030704          -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          88               -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          92               -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          93               -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          EXH__16065831    -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          EXH__18540299    -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          EXH__7439965     -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          EXH__7440020     -9  95.31 100 100 -9   0801-2 Y R 706                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CIBA-Geigy Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          PM10             -9  89.94 100 100 -9   0801-2 Y R 706                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SYNGENTACROPPROTECTIONINC/ST.GABRIEL: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          PM2_5            -9  89.94 100 100 -9   0801-2 Y R 706                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SYNGENTACROPPROTECTIONINC/ST.GABRIEL: NEI_UNIQUE_ID=NEI5992: cdate=2008
22047 0          10025737         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025919         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10031137         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10034829         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10049055         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10060125         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10099748         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101505         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101538         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10101970         -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10108642         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124364         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10124433         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10294403         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10325947         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10377669         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10588019         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          109              -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          11103869         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018018         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12018198         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12035722         -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12054487         -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12060003         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12079651         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          125              -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12626812         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12640890         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          12710360         -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1271289          -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1303282          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1304569          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306190          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1306236          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1307966          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308061          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308141          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1308389          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309600          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1309644          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313139          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13138459         -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1313991          -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314063          -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1314416          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317346          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317357          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317368          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1317426          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327339          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1327533          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1333820          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335257          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1335326          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1336932          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345046          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          1345160          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13462889         -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13463393         -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13510491         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530659         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13530682         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13586828         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13597994         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136              -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          136527           -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13765190         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13770893         -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          13814965         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          139              -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14018952         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14220178         -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307336         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14307358         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14336700         -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          14977618         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16065831         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16842038         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          16925250         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18454121         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          18540299         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          195              -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          198              -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          199              -9  41.68 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          200              -9  41.68 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          201              -9  41.68 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          202              -9  41.68 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          21679312         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          2223930          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          226              -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          22967926         -9  41.68 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          253              -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          27253287         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          301042           -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3141126          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          3333673          -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          373024           -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          50922297         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          543908           -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          593748           -9  41.68 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          598630           -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          6018899          -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          602              -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          603              -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          604              -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61789513         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          61790145         -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          62384            -9  41.68 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7428480          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439921          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439965          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7439976          -9  41.68 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440020          -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440360          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440382          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440417          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440439          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440473          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7440484          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446084          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446142          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446277          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7446346          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7487947          -9  41.68 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7488564          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7542098          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7718549          -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7722647          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7738945          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7758976          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7775113          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778394          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7778509          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782492          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783008          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783075          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783166          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783702          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7783791          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784409          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7784421          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7785877          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7786814          -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787475          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7787497          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788967          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7788989          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789006          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789062          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789095          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789120          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7789426          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          7790809          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          78002            -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          8030704          -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          88               -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          92               -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          93               -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__16065831    -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__18540299    -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7439965     -9  89.39 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          EXH__7440020     -9   0.00 100 100 -9   0801-2 Y R 808                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM10             -9  71.94 100 100 -9   0801-2 Y R 808                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          PM2_5            -9  71.94 100 100 -9   0801-2 Y R 808                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DowChemicalCo: NEI_UNIQUE_ID=NEI6016: cdate=2008
22047 0          10025737         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10025919         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10031137         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10034829         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10049055         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10060125         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10099748         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10101505         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10101538         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10101970         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10108642         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10124364         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10124433         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10294403         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10325947         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10377669         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          10588019         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          109              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          11103869         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12018018         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12018198         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12035722         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12054487         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12060003         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12079651         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          125              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12626812         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12640890         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          12710360         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1271289          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1303282          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1304569          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1306190          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1306236          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1307966          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1308061          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1308141          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1308389          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1309600          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1309644          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1313139          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13138459         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1313991          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1314063          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1314416          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1317346          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1317357          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1317368          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1317426          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1327339          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1327533          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1333820          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1335257          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1335326          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1336932          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1345046          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          1345160          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13462889         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13463393         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13510491         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13530659         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13530682         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13586828         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13597994         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          136              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          136527           -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13765190         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13770893         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          13814965         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          139              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14018952         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14220178         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14307336         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14307358         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14336700         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          14977618         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          16065831         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          16842038         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          16925250         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          18454121         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          18540299         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          195              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          198              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          199              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          200              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          201              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          202              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          21679312         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          2223930          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          226              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          22967926         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          253              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          27253287         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          301042           -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          3141126          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          3333673          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          373024           -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          50922297         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          543908           -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          593748           -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          598630           -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          6018899          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          602              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          603              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          604              -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          61789513         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          61790145         -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          62384            -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7428480          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7439921          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7439965          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7439976          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440020          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440360          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440382          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440417          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440439          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440473          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7440484          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7446084          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7446142          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7446277          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7446346          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7487947          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7488564          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7542098          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7647010          -9   0.11 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7718549          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7722647          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7738945          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7758976          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7775113          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7778394          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7778509          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7782492          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7782505          -9   0.11 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7783008          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7783075          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7783166          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7783702          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7783791          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7784409          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7784421          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7785877          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7786814          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7787475          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7787497          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7788967          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7788989          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7789006          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7789062          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7789095          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7789120          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7789426          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          7790809          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          78002            -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          8030704          -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          88               -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          92               -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          93               -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          EXH__16065831    -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          EXH__18540299    -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          EXH__7439965     -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          EXH__7440020     -9   0.00 100 100 -9   0801-7 Y R 855                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CHEM & VINYLS LLC/PLAQUEMIN MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          PM10             -9  67.84 100 100 -9   0801-7 Y R 855                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GEORGIAGULFCHEM&VINYLSLLC/PLAQUEMIN: NEI_UNIQUE_ID=NEI16362: cdate=2008
22047 0          PM2_5            -9  67.84 100 100 -9   0801-7 Y R 855                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GEORGIAGULFCHEM&VINYLSLLC/PLAQUEMIN: NEI_UNIQUE_ID=NEI16362: cdate=2008
22067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 19200001                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 71220NTRNT705CO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0505                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10695                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22073 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10099748         -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10108642         -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10124364         -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10325947         -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          109              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          12060003         -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          125              -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          12626812         -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1306190          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1306236          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1309600          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1314416          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1317368          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1335257          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1335326          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          136              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          136527           -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          13814965         -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          139              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          195              -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          198              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          199              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          200              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          201              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          202              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          2223930          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          226              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          253              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          27253287         -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          301042           -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          373024           -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          543908           -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          593748           -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          598630           -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          602              -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          603              -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          604              -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          61790145         -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          62384            -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7428480          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7439921          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7440439          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7446142          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7446277          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7789426          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          7790809          -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          78002            -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          88               -9  72.96 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          92               -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          93               -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22073 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 828                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ANGUS CHEM. CO/STERLINGTON PLNT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6086: cdate=2008
22087 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 0005                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 0005                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 25000005                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 25000005                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0520                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22087 20200202   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-067                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 30600104   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-067                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 20200202   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-068                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 30600104   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-068                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 20200202   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-069                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 30600104   NOX              -9  40.00 100 100 -9   -9     Y R ES0603-069                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 20200202   NOX              -9  40.00 100 100 -9   -9     Y R T$10532                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22087 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$10532                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6123, Plant=ExxonMobil Corp. (formerly Mobil), Chalmette, LA, compliance date: 31DEC2008
22089 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 0016                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2008
22089 10200603   SO2              -9  90.00 100 100 -9   -9     Y R 0016                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 0016                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 0016                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 0016                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 30JUN2005
22089 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 0016                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 0          10025737         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10025919         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10031137         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10034829         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10049055         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10060125         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10099748         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10101505         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10101538         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10101970         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10108642         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10124364         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10124433         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10294403         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10325947         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10377669         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10588019         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          109              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          11103869         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12018018         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12018198         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12035722         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12054487         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12060003         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12079651         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          125              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12626812         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12640890         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12710360         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1271289          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1303282          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1304569          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1306190          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1306236          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1307966          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1308061          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1308141          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1308389          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1309600          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1309644          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1313139          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13138459         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1313991          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1314063          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1314416          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1317346          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1317357          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1317368          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1317426          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1327339          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1327533          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1333820          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1335257          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1335326          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1336932          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1345046          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1345160          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13462889         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13463393         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13510491         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13530659         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13530682         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13586828         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13597994         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          136              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          136527           -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13765190         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13770893         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13814965         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          139              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14018952         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14220178         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14307336         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14307358         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14336700         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14977618         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          16065831         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          16842038         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          16925250         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          18454121         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          18540299         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          195              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          198              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          199              -9  96.92 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          200              -9  96.92 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          201              -9  96.92 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          202              -9  96.92 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          21679312         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          2223930          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          226              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          22967926         -9  96.92 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          253              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          27253287         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          301042           -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          3141126          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          3333673          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          373024           -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          50922297         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          543908           -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          593748           -9  96.92 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          598630           -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          6018899          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          602              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          603              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          604              -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          61789513         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          61790145         -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          62384            -9  96.92 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7428480          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7439921          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7439965          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7439976          -9  96.92 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440020          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440360          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440382          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440417          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440439          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440473          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440484          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7446084          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7446142          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7446277          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7446346          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7487947          -9  96.92 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7488564          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7542098          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7647010          -9  95.34 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7718549          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7722647          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7738945          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7758976          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7775113          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7778394          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7778509          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7782492          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7782505          -9  95.34 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7783008          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7783075          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7783166          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7783702          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7783791          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7784409          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7784421          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7785877          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7786814          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7787475          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7787497          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7788967          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7788989          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7789006          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7789062          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7789095          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7789120          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7789426          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7790809          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          78002            -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          8030704          -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          88               -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          92               -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          93               -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          EXH__16065831    -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          EXH__18540299    -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          EXH__7439965     -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          EXH__7440020     -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          PM10             -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SHELLNORCOCHEMICALPLANTWESTSITE: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          PM2_5            -9  60.81 100 100 -9   0801-2 Y R 610                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SHELLNORCOCHEMICALPLANTWESTSITE: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10025737         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10025919         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10031137         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10034829         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10049055         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10060125         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10099748         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10101505         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10101538         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10101970         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10108642         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10124364         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10124433         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10294403         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10325947         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10377669         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          10588019         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          109              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          11103869         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12018018         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12018198         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12035722         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12054487         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12060003         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12079651         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          125              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12626812         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12640890         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          12710360         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1271289          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1303282          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1304569          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1306190          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1306236          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1307966          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1308061          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1308141          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1308389          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1309600          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1309644          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1313139          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13138459         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1313991          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1314063          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1314416          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1317346          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1317357          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1317368          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1317426          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1327339          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1327533          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1333820          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1335257          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1335326          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1336932          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1345046          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          1345160          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13462889         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13463393         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13510491         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13530659         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13530682         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13586828         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13597994         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          136              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          136527           -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13765190         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13770893         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          13814965         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          139              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14018952         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14220178         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14307336         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14307358         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14336700         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          14977618         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          16065831         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          16842038         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          16925250         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          18454121         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          18540299         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          195              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          198              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          199              -9   7.41 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          200              -9   7.41 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          201              -9   7.41 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          202              -9   7.41 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          21679312         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          2223930          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          226              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          22967926         -9   7.41 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          253              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          27253287         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          301042           -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          3141126          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          3333673          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          373024           -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          50922297         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          543908           -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          593748           -9   7.41 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          598630           -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          6018899          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          602              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          603              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          604              -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          61789513         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          61790145         -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          62384            -9   7.41 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7428480          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7439921          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7439965          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7439976          -9   7.41 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440020          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440360          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440382          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440417          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440439          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440473          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7440484          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7446084          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7446142          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7446277          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7446346          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7487947          -9   7.41 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7488564          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7542098          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7718549          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7722647          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7738945          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7758976          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7775113          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7778394          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7778509          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7782492          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7783008          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7783075          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7783166          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7783702          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7783791          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7784409          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7784421          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7785877          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7786814          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7787475          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7787497          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7788967          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7788989          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7789006          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7789062          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7789095          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7789120          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7789426          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          7790809          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          78002            -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          8030704          -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          88               -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          92               -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          93               -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          EXH__16065831    -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          EXH__18540299    -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          EXH__7439965     -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          EXH__7440020     -9  67.66 100 100 -9   0801-2 Y R 611                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Oil Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          PM10             -9  60.81 100 100 -9   0801-2 Y R 611                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SHELLNORCOCHEMICALPLANTWESTSITE: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 0          PM2_5            -9  60.81 100 100 -9   0801-2 Y R 611                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SHELLNORCOCHEMICALPLANTWESTSITE: NEI_UNIQUE_ID=NEI16363: cdate=2008
22089 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 70047TRNSM14902                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2008
22089 10200603   SO2              -9  90.00 100 100 -9   -9     Y R 70047TRNSM14902                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 70047TRNSM14902                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 70047TRNSM14902                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 70047TRNSM14902                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 30JUN2005
22089 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 70047TRNSM14902                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600201   NOX              -9  45.00 100 100 -9   -9     Y R ES0603-074                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2008
22089 10200603   SO2              -9  90.00 100 100 -9   -9     Y R ES0603-074                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 10200701   SO2              -9  90.00 100 100 -9   -9     Y R ES0603-074                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600104   SO2              -9  90.00 100 100 -9   -9     Y R ES0603-074                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600201   SO2              -9  99.00 100 100 -9   -9     Y R ES0603-074                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 30JUN2005
22089 30600401   SO2              -9  90.00 100 100 -9   -9     Y R ES0603-074                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600201   NOX              -9  45.00 100 100 -9   -9     Y R ES0603-075                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2008
22089 10200603   SO2              -9  90.00 100 100 -9   -9     Y R ES0603-075                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 10200701   SO2              -9  90.00 100 100 -9   -9     Y R ES0603-075                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600104   SO2              -9  90.00 100 100 -9   -9     Y R ES0603-075                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600201   SO2              -9  99.00 100 100 -9   -9     Y R ES0603-075                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 30JUN2005
22089 30600401   SO2              -9  90.00 100 100 -9   -9     Y R ES0603-075                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$10484                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2008
22089 10200603   SO2              -9  90.00 100 100 -9   -9     Y R T$10484                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$10484                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$10484                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22089 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$10484                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 30JUN2005
22089 30600401   SO2              -9  90.00 100 100 -9   -9     Y R T$10484                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6095, Plant=Valero (formerly Orion Refining Corp, formerly Trans, Norco, LA, compliance date: 31DEC2007
22093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0015                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0021                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 25600021                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 70723CCDNTHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-082                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10613                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
22095 0          10025737         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10025919         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10031137         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10034829         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10049055         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10060125         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10099748         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10101505         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10101538         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10101970         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10108642         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10124364         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10124433         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10294403         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10325947         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10377669         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          10588019         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          109              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          11103869         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          12018018         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          12018198         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          12035722         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          12054487         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          12060003         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          12079651         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          125              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          12626812         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          12640890         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          12710360         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1271289          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1303282          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1304569          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1306190          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1306236          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1307966          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1308061          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1308141          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1308389          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1309600          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1309644          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1313139          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13138459         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1313991          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1314063          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1314416          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1317346          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1317357          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1317368          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1317426          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1327339          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1327533          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1333820          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1335257          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1335326          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1336932          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1345046          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          1345160          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13462889         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13463393         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13510491         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13530659         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13530682         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13586828         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13597994         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          136              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          136527           -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13765190         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13770893         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          13814965         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          139              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          14018952         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          14220178         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          14307336         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          14307358         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          14336700         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          14977618         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          16065831         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          16842038         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          16925250         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          18454121         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          18540299         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          195              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          198              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          199              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          200              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          201              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          202              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          21679312         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          2223930          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          226              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          22967926         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          253              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          27253287         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          301042           -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          3141126          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          3333673          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          373024           -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          50922297         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          543908           -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          593748           -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          598630           -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          6018899          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          602              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          603              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          604              -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          61789513         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          61790145         -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          62384            -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7428480          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7439921          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7439965          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7439976          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7440020          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7440360          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7440382          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7440417          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7440439          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7440473          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7440484          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7446084          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7446142          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7446277          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7446346          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7487947          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7488564          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7542098          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7647010          -9  90.11 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7718549          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7722647          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7738945          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7758976          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7775113          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7778394          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7778509          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7782492          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7782505          -9  90.11 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7783008          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7783075          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7783166          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7783702          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7783791          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7784409          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7784421          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7785877          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7786814          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7787475          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7787497          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7788967          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7788989          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7789006          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7789062          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7789095          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7789120          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7789426          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          7790809          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          78002            -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          8030704          -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          88               -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          92               -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          93               -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          EXH__16065831    -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          EXH__18540299    -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          EXH__7439965     -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 0          EXH__7440020     -9   0.00 100 100 -9   0801-7 Y R 853                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DUPONT DOW ELASTOMERS LLC MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI5983: cdate=2008
22095 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$10485                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6087, Plant=Marathon Ashland Petroleum LLC, Garyville, LA, compliance date: 31DEC2008
22095 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$10485                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6087, Plant=Marathon Ashland Petroleum LLC, Garyville, LA, compliance date: 31DEC2008
22095 30600105   NOX              -9  40.00 100 100 -9   -9     Y R T$10485                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6087, Plant=Marathon Ashland Petroleum LLC, Garyville, LA, compliance date: 31DEC2008
22095 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$10485                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6087, Plant=Marathon Ashland Petroleum LLC, Garyville, LA, compliance date: 01JUN2006
22097 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$10631                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6136, Plant=Valero (formerly Basis Petroleum, Inc.), Krotz Springs, LA, compliance date: 31DEC2006
22097 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$10631                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6136, Plant=Valero (formerly Basis Petroleum, Inc.), Krotz Springs, LA, compliance date: 31DEC2006
22121 0          10025737         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10031137         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10034829         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10049055         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10060125         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10099748         -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10101538         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10108642         -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10124364         -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10294403         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10325947         -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          10588019         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          109              -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          11103869         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          12018018         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          12018198         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          12060003         -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          125              -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          12626812         -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1303282          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1304569          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1306190          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1306236          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1308141          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1308389          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1309600          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1314416          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1317368          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1327533          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1333820          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1335257          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1335326          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13510491         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13530659         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13530682         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13597994         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          136              -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          136527           -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13765190         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          13814965         -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          139              -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          14018952         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          14307336         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          14307358         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          14977618         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          16065831         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          18454121         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          18540299         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          195              -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          198              -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          199              -9  25.66 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          200              -9  25.66 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          201              -9  25.66 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          202              -9  25.66 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          21679312         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          2223930          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          226              -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          22967926         -9  25.66 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          253              -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          27253287         -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          301042           -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          3141126          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          373024           -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          50922297         -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          543908           -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          593748           -9  25.66 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          598630           -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          602              -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          603              -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          604              -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          61790145         -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          62384            -9  25.66 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7428480          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7439921          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7439976          -9  25.66 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7440382          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7440417          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7440439          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7440473          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7446142          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7446277          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7487947          -9  25.66 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7738945          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7758976          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7775113          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7778394          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7778509          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7784409          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7784421          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7787475          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7787497          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7788967          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7788989          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7789006          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7789062          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7789095          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7789120          -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7789426          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          7790809          -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          78002            -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          88               -9  68.96 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          92               -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          93               -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          EXH__16065831    -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          EXH__18540299    -9   4.90 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
22121 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 756                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DSM COPOLYMER/ADDIS PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI33041: cdate=2008
23003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300017                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00300048                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300300048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14616                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$489                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00500138                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300500138                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0535                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$456                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00900004                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2300900004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0539                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 01700045                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2301700056                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0542                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0543                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
23017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14607                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 001-0011                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0556                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2328                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
24510 0          10025737         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10025919         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10031137         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10034829         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10049055         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10060125         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10099748         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10101505         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10101538         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10101970         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10108642         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10124364         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10124433         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10294403         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10325947         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10377669         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          10588019         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          109              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          11103869         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          12018018         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          12018198         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          12035722         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          12054487         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          12060003         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          12079651         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          125              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          12626812         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          12640890         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          12710360         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1271289          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1303282          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1304569          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1306190          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1306236          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1307966          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1308061          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1308141          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1308389          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1309600          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1309644          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1313139          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13138459         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1313991          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1314063          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1314416          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1317346          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1317357          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1317368          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1317426          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1327339          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1327533          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1333820          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1335257          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1335326          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1336932          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1345046          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          1345160          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13462889         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13463393         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13510491         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13530659         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13530682         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13586828         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13597994         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          136              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          136527           -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13765190         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13770893         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          13814965         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          139              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          14018952         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          14220178         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          14307336         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          14307358         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          14336700         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          14977618         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          16065831         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          16842038         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          16925250         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          18454121         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          18540299         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          195              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          198              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          199              -9   0.00 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          200              -9   0.00 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          201              -9   0.00 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          202              -9   0.00 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          21679312         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          2223930          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          226              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          253              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          27253287         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          301042           -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          3141126          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          3333673          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          373024           -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          50922297         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          543908           -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          593748           -9   0.00 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          598630           -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          6018899          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          602              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          603              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          604              -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          61789513         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          61790145         -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          62384            -9   0.00 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7428480          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7439921          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7439965          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7440020          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7440360          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7440382          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7440417          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7440439          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7440473          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7440484          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7446084          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7446142          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7446277          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7446346          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7488564          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7542098          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7647010          -9  69.80 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7718549          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7722647          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7738945          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7758976          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7775113          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7778394          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7778509          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7782492          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7782505          -9  69.80 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7783008          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7783075          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7783166          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7783702          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7783791          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7784409          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7784421          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7785877          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7786814          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7787475          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7787497          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7788967          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7788989          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7789006          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7789062          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7789095          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7789120          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7789426          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          7790809          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          78002            -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          8030704          -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          88               -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          92               -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          93               -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          EXH__16065831    -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          EXH__18540299    -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          EXH__7439965     -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          EXH__7440020     -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: FMC Agricultural Chemical Group MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          PM10             -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: FMCCORP: NEI_UNIQUE_ID=NEI16364: cdate=2008
24510 0          PM2_5            -9  93.64 100 100 -9   0801-2 Y R 454                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: FMCCORP: NEI_UNIQUE_ID=NEI16364: cdate=2008
25003 0          PM10             -9  28.00 100 100 -9   -9     Y R 01220PFZRN260CO                 ! MACT: Lime Manufacturing: SPECIALTY MINERALS
25003 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 01220PFZRN260CO                 ! MACT: Lime Manufacturing: SPECIALTY MINERALS
25003 0          SO2              -9  20.00 100 100 -9   -9     Y R 01220PFZRN260CO                 ! MACT: Lime Manufacturing: SPECIALTY MINERALS
25003 0          PM10             -9  28.00 100 100 -9   -9     Y R 1170012                         ! MACT: Lime Manufacturing: SOUTHDOWN INC
25003 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 1170012                         ! MACT: Lime Manufacturing: SOUTHDOWN INC
25003 0          SO2              -9  20.00 100 100 -9   -9     Y R 1170012                         ! MACT: Lime Manufacturing: SOUTHDOWN INC
25003 0          PM10             -9  28.00 100 100 -9   -9     Y R 1170042                         ! MACT: Lime Manufacturing: SPECIALTY MINERALS
25003 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 1170042                         ! MACT: Lime Manufacturing: SPECIALTY MINERALS
25003 0          SO2              -9  20.00 100 100 -9   -9     Y R 1170042                         ! MACT: Lime Manufacturing: SPECIALTY MINERALS
25003 0          PM10             -9  28.00 100 100 -9   -9     Y R T$14388                         ! MACT: Lime Manufacturing: SPECIALTY MINERALS
25003 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$14388                         ! MACT: Lime Manufacturing: SPECIALTY MINERALS
25003 0          SO2              -9  20.00 100 100 -9   -9     Y R T$14388                         ! MACT: Lime Manufacturing: SPECIALTY MINERALS
25009 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          109              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          125              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          136              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          136527           -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          139              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          195              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          198              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          199              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          200              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          201              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          202              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          226              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          253              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          301042           -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          373024           -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          543908           -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          593748           -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          598630           -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          602              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          603              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          604              -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          62384            -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          78002            -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          88               -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          92               -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          93               -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25009 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 3035                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BOSTIK FINDLEY INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIMAT$219: cdate=2008
25013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 01151MNSNT730WO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420086                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$116                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0420004                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192152                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1192191                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R BSCP91                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14488                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 01615NRTNC1NEWB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180115                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1180925                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
25027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$161                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B1470                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16517                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 49707BTBPR416FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B1476                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7900                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100101   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100102   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100201   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100202   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100203   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100204   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100205   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100211   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100212   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100215   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100217   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100218   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100221   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100222   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100223   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100224   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100225   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100226   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100235   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100237   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100238   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100300   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100301   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100302   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100303   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100304   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100306   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100316   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100317   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100318   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200101   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200104   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200107   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200117   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200201   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200202   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200203   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200204   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200205   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200206   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200210   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200212   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200213   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200217   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200218   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200219   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200221   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200222   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200223   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200224   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200225   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200226   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200229   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200300   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200301   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200302   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200303   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200304   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200306   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200307   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200802   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200804   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300101   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300102   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300103   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300200   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300203   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300205   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300206   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300207   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300208   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300209   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300211   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300214   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300216   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300217   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300218   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300221   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300222   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300223   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300224   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300225   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300226   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300300   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300305   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300306   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300307   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300309   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000100   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000189   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000199   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000200   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000201   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000203   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000288   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000289   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000299   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000389   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000399   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000801   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000889   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000899   PM10             -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26033 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R N2955                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R A0884                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7914                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B7192                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0605                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7924                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 48439CDLLC10800                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 0          106990           -9  28.00 100 100 -9   -9     Y R 48550BCFLN902EH                 ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          107028           -9  28.00 100 100 -9   -9     Y R 48550BCFLN902EH                 ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          50000            -9  28.00 100 100 -9   -9     Y R 48550BCFLN902EH                 ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          67561            -9  28.00 100 100 -9   -9     Y R 48550BCFLN902EH                 ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          71432            -9  28.00 100 100 -9   -9     Y R 48550BCFLN902EH                 ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          75070            -9  28.00 100 100 -9   -9     Y R 48550BCFLN902EH                 ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          91203            -9  28.00 100 100 -9   -9     Y R 48550BCFLN902EH                 ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          VOC              -9  28.00 100 100 -9   -9     Y R 48550BCFLN902EH                 ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          106990           -9  28.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          107028           -9  28.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          50000            -9  28.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          67561            -9  28.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          71432            -9  28.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          75070            -9  28.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          91203            -9  28.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 0          VOC              -9  28.00 100 100 -9   -9     Y R 48551GMCTRG3100                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          106990           -9  28.00 100 100 -9   -9     Y R A1178                           ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          107028           -9  28.00 100 100 -9   -9     Y R A1178                           ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          50000            -9  28.00 100 100 -9   -9     Y R A1178                           ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          67561            -9  28.00 100 100 -9   -9     Y R A1178                           ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          71432            -9  28.00 100 100 -9   -9     Y R A1178                           ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          75070            -9  28.00 100 100 -9   -9     Y R A1178                           ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          91203            -9  28.00 100 100 -9   -9     Y R A1178                           ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 0          VOC              -9  28.00 100 100 -9   -9     Y R A1178                           ! MACT: Autos, plant: GENERALMOTORSCORPPOWERTRAINFLINTNO, VOC 28%: Auto_2002_projections.xls
26049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B1604                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 0          106990           -9  28.00 100 100 -9   -9     Y R B1606                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          107028           -9  28.00 100 100 -9   -9     Y R B1606                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          50000            -9  28.00 100 100 -9   -9     Y R B1606                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          67561            -9  28.00 100 100 -9   -9     Y R B1606                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          71432            -9  28.00 100 100 -9   -9     Y R B1606                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          75070            -9  28.00 100 100 -9   -9     Y R B1606                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 0          91203            -9  28.00 100 100 -9   -9     Y R B1606                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B1606                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 0          VOC              -9  28.00 100 100 -9   -9     Y R B1606                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-VANSLYKEC, VOC 28%: Auto_2002_projections.xls
26049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B1610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7577                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B2873                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26063 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16430                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 0          106990           -9  28.00 100 100 -9   -9     Y R 48921BCLNS920TO                 ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          107028           -9  28.00 100 100 -9   -9     Y R 48921BCLNS920TO                 ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          50000            -9  28.00 100 100 -9   -9     Y R 48921BCLNS920TO                 ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          67561            -9  28.00 100 100 -9   -9     Y R 48921BCLNS920TO                 ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          71432            -9  28.00 100 100 -9   -9     Y R 48921BCLNS920TO                 ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          75070            -9  28.00 100 100 -9   -9     Y R 48921BCLNS920TO                 ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          91203            -9  28.00 100 100 -9   -9     Y R 48921BCLNS920TO                 ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          VOC              -9  28.00 100 100 -9   -9     Y R 48921BCLNS920TO                 ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          106990           -9  28.00 100 100 -9   -9     Y R 48921RTTCR2801W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          107028           -9  28.00 100 100 -9   -9     Y R 48921RTTCR2801W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          50000            -9  28.00 100 100 -9   -9     Y R 48921RTTCR2801W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          67561            -9  28.00 100 100 -9   -9     Y R 48921RTTCR2801W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          71432            -9  28.00 100 100 -9   -9     Y R 48921RTTCR2801W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          75070            -9  28.00 100 100 -9   -9     Y R 48921RTTCR2801W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          91203            -9  28.00 100 100 -9   -9     Y R 48921RTTCR2801W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          VOC              -9  28.00 100 100 -9   -9     Y R 48921RTTCR2801W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          106990           -9  28.00 100 100 -9   -9     Y R A1641                           ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          107028           -9  28.00 100 100 -9   -9     Y R A1641                           ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          50000            -9  28.00 100 100 -9   -9     Y R A1641                           ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          67561            -9  28.00 100 100 -9   -9     Y R A1641                           ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          71432            -9  28.00 100 100 -9   -9     Y R A1641                           ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          75070            -9  28.00 100 100 -9   -9     Y R A1641                           ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          91203            -9  28.00 100 100 -9   -9     Y R A1641                           ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          VOC              -9  28.00 100 100 -9   -9     Y R A1641                           ! MACT: Autos, plant: GENERALMOTORSLANSINGFACILITY-PLANT, VOC 28%: Auto_2002_projections.xls
26065 0          106990           -9  28.00 100 100 -9   -9     Y R B1639                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          107028           -9  28.00 100 100 -9   -9     Y R B1639                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          50000            -9  28.00 100 100 -9   -9     Y R B1639                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          67561            -9  28.00 100 100 -9   -9     Y R B1639                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          71432            -9  28.00 100 100 -9   -9     Y R B1639                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          75070            -9  28.00 100 100 -9   -9     Y R B1639                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          91203            -9  28.00 100 100 -9   -9     Y R B1639                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 0          VOC              -9  28.00 100 100 -9   -9     Y R B1639                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-LANSINGPLA, VOC 28%: Auto_2002_projections.xls
26065 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0611                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100101   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100102   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100201   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100202   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100203   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100204   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100205   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100211   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100212   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100215   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100217   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100218   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100221   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100222   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100223   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100224   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100225   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100226   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100235   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100237   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100238   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100300   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100301   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100302   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100303   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100304   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100306   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100316   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100317   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100318   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200101   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200104   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200107   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200117   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200201   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200202   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200203   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200204   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200205   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200206   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200210   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200212   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200213   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200217   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200218   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200219   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200221   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200222   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200223   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200224   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200225   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200226   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200229   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200300   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200301   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200302   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200303   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200304   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200306   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200307   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200802   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200804   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300101   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300102   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300103   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300200   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300203   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300205   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300206   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300207   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300208   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300209   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300211   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300214   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300216   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300217   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300218   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300221   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300222   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300223   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300224   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300225   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300226   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300300   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300305   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300306   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300307   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300309   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000100   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000189   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000199   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000200   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000201   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000203   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000288   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000289   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000299   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000389   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000399   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000801   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000889   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000899   PM10             -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26065 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R K3249                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R K2120                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 0          10025737         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10025919         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10031137         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10034829         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10049055         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10060125         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10099748         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10101505         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10101538         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10101970         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10108642         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10124364         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10124433         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10294403         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10325947         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10377669         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          10588019         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          109              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          11103869         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          12018018         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          12018198         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          12035722         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          12054487         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          12060003         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          12079651         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          125              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          12626812         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          12640890         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          12710360         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1271289          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1303282          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1304569          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1306190          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1306236          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1307966          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1308061          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1308141          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1308389          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1309600          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1309644          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1313139          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13138459         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1313991          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1314063          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1314416          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1317346          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1317357          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1317368          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1317426          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1327339          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1327533          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1333820          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1335257          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1335326          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1336932          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1345046          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          1345160          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13462889         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13463393         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13510491         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13530659         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13530682         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13586828         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13597994         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          136              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          136527           -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13765190         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13770893         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          13814965         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          139              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          14018952         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          14220178         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          14307336         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          14307358         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          14336700         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          14977618         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          16065831         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          16842038         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          16925250         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          18454121         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          18540299         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          195              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          198              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          199              -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          200              -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          201              -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          202              -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          21679312         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          2223930          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          226              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          253              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          27253287         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          301042           -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          3141126          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          3333673          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          373024           -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          50922297         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          543908           -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          593748           -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          598630           -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          6018899          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          602              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          603              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          604              -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          61789513         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          61790145         -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          62384            -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7428480          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7439921          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7439965          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7440020          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7440360          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7440382          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7440417          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7440439          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7440473          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7440484          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7446084          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7446142          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7446277          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7446346          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7488564          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7542098          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7718549          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7722647          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7738945          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7758976          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7775113          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7778394          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7778509          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7782492          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7783008          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7783075          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7783166          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7783702          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7783791          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7784409          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7784421          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7785877          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7786814          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7787475          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7787497          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7788967          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7788989          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7789006          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7789062          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7789095          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7789120          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7789426          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          7790809          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          78002            -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          8030704          -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          88               -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          92               -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          93               -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          EXH__16065831    -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          EXH__18540299    -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          EXH__7439965     -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          EXH__7440020     -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Upjohn Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          PM10             -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: PHARMACIA&UPJOHNCOLLCASUBSIDIARYO: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 0          PM2_5            -9  23.27 100 100 -9   0801-2 Y R 342                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: PHARMACIA&UPJOHNCOLLCASUBSIDIARYO: NEI_UNIQUE_ID=NEI33914: cdate=2008
26077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B3610                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26099 0          106990           -9  28.00 100 100 -9   -9     Y R 48077STRLN38111                 ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          107028           -9  28.00 100 100 -9   -9     Y R 48077STRLN38111                 ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          50000            -9  28.00 100 100 -9   -9     Y R 48077STRLN38111                 ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          67561            -9  28.00 100 100 -9   -9     Y R 48077STRLN38111                 ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          71432            -9  28.00 100 100 -9   -9     Y R 48077STRLN38111                 ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          75070            -9  28.00 100 100 -9   -9     Y R 48077STRLN38111                 ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          91203            -9  28.00 100 100 -9   -9     Y R 48077STRLN38111                 ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          VOC              -9  28.00 100 100 -9   -9     Y R 48077STRLN38111                 ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          106990           -9  28.00 100 100 -9   -9     Y R 48091WRRNT21500                 ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          107028           -9  28.00 100 100 -9   -9     Y R 48091WRRNT21500                 ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          50000            -9  28.00 100 100 -9   -9     Y R 48091WRRNT21500                 ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          67561            -9  28.00 100 100 -9   -9     Y R 48091WRRNT21500                 ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          71432            -9  28.00 100 100 -9   -9     Y R 48091WRRNT21500                 ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          75070            -9  28.00 100 100 -9   -9     Y R 48091WRRNT21500                 ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          91203            -9  28.00 100 100 -9   -9     Y R 48091WRRNT21500                 ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          VOC              -9  28.00 100 100 -9   -9     Y R 48091WRRNT21500                 ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          106990           -9  28.00 100 100 -9   -9     Y R B2767                           ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          107028           -9  28.00 100 100 -9   -9     Y R B2767                           ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          50000            -9  28.00 100 100 -9   -9     Y R B2767                           ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          67561            -9  28.00 100 100 -9   -9     Y R B2767                           ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          71432            -9  28.00 100 100 -9   -9     Y R B2767                           ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          75070            -9  28.00 100 100 -9   -9     Y R B2767                           ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          91203            -9  28.00 100 100 -9   -9     Y R B2767                           ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          VOC              -9  28.00 100 100 -9   -9     Y R B2767                           ! MACT: Autos, plant: DAIMLERCHRYSLERAGWARRENTRUCKASSEMBL, VOC 28%: Auto_2002_projections.xls
26099 0          106990           -9  28.00 100 100 -9   -9     Y R B7248                           ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          107028           -9  28.00 100 100 -9   -9     Y R B7248                           ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          50000            -9  28.00 100 100 -9   -9     Y R B7248                           ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          67561            -9  28.00 100 100 -9   -9     Y R B7248                           ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          71432            -9  28.00 100 100 -9   -9     Y R B7248                           ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          75070            -9  28.00 100 100 -9   -9     Y R B7248                           ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          91203            -9  28.00 100 100 -9   -9     Y R B7248                           ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26099 0          VOC              -9  28.00 100 100 -9   -9     Y R B7248                           ! MACT: Autos, plant: STERLINGHEIGHTSASSEMBLYPLANTDAIMLER, VOC 28%: Auto_2002_projections.xls
26101 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26101 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B1821                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26103 0          PM10             -9  62.00 100 100 -9   -9     Y R B1827                           ! MACT: Taconite Ore: EMPIRE IRON MINING PARTNERSHIP
26103 0          PM2_5            -9  62.00 100 100 -9   -9     Y R B1827                           ! MACT: Taconite Ore: EMPIRE IRON MINING PARTNERSHIP
26103 0          PM10             -9  62.00 100 100 -9   -9     Y R B4885                           ! MACT: Taconite Ore: TILDEN MINING COMPANY L.C.
26103 0          PM2_5            -9  62.00 100 100 -9   -9     Y R B4885                           ! MACT: Taconite Ore: TILDEN MINING COMPANY L.C.
26109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 49858MNMNP144FI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B1855                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16516                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26115 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B4320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R A4203                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0625                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7810                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 0          106990           -9  28.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          107028           -9  28.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          50000            -9  28.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          67561            -9  28.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          71432            -9  28.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          75070            -9  28.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          91203            -9  28.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 0          VOC              -9  28.00 100 100 -9   -9     Y R 48055GNRLM4555G                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          106990           -9  28.00 100 100 -9   -9     Y R 48058GMCTR820OP                 ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          107028           -9  28.00 100 100 -9   -9     Y R 48058GMCTR820OP                 ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          50000            -9  28.00 100 100 -9   -9     Y R 48058GMCTR820OP                 ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          67561            -9  28.00 100 100 -9   -9     Y R 48058GMCTR820OP                 ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          71432            -9  28.00 100 100 -9   -9     Y R 48058GMCTR820OP                 ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          75070            -9  28.00 100 100 -9   -9     Y R 48058GMCTR820OP                 ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          91203            -9  28.00 100 100 -9   -9     Y R 48058GMCTR820OP                 ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          VOC              -9  28.00 100 100 -9   -9     Y R 48058GMCTR820OP                 ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          106990           -9  28.00 100 100 -9   -9     Y R 48096FRDMT50000                 ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          107028           -9  28.00 100 100 -9   -9     Y R 48096FRDMT50000                 ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          50000            -9  28.00 100 100 -9   -9     Y R 48096FRDMT50000                 ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          67561            -9  28.00 100 100 -9   -9     Y R 48096FRDMT50000                 ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          71432            -9  28.00 100 100 -9   -9     Y R 48096FRDMT50000                 ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          75070            -9  28.00 100 100 -9   -9     Y R 48096FRDMT50000                 ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          91203            -9  28.00 100 100 -9   -9     Y R 48096FRDMT50000                 ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          VOC              -9  28.00 100 100 -9   -9     Y R 48096FRDMT50000                 ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          106990           -9  28.00 100 100 -9   -9     Y R A5260                           ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          107028           -9  28.00 100 100 -9   -9     Y R A5260                           ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          50000            -9  28.00 100 100 -9   -9     Y R A5260                           ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          67561            -9  28.00 100 100 -9   -9     Y R A5260                           ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          71432            -9  28.00 100 100 -9   -9     Y R A5260                           ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          75070            -9  28.00 100 100 -9   -9     Y R A5260                           ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          91203            -9  28.00 100 100 -9   -9     Y R A5260                           ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          VOC              -9  28.00 100 100 -9   -9     Y R A5260                           ! MACT: Autos, plant: FORDMOTORCOMPANYWIXOMASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
26125 0          106990           -9  28.00 100 100 -9   -9     Y R B4031                           ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          107028           -9  28.00 100 100 -9   -9     Y R B4031                           ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          50000            -9  28.00 100 100 -9   -9     Y R B4031                           ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          67561            -9  28.00 100 100 -9   -9     Y R B4031                           ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          71432            -9  28.00 100 100 -9   -9     Y R B4031                           ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          75070            -9  28.00 100 100 -9   -9     Y R B4031                           ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          91203            -9  28.00 100 100 -9   -9     Y R B4031                           ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 0          VOC              -9  28.00 100 100 -9   -9     Y R B4031                           ! MACT: Autos, plant: GENERALMOTORSCORPORATIONPONTIACASSY, VOC 28%: Auto_2002_projections.xls
26125 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B4032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 0          106990           -9  28.00 100 100 -9   -9     Y R B7227                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          107028           -9  28.00 100 100 -9   -9     Y R B7227                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          50000            -9  28.00 100 100 -9   -9     Y R B7227                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          67561            -9  28.00 100 100 -9   -9     Y R B7227                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          71432            -9  28.00 100 100 -9   -9     Y R B7227                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          75070            -9  28.00 100 100 -9   -9     Y R B7227                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 0          91203            -9  28.00 100 100 -9   -9     Y R B7227                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B7227                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 0          VOC              -9  28.00 100 100 -9   -9     Y R B7227                           ! MACT: Autos, plant: GENERALMOTORSCORPORATION-ORIONASSEM, VOC 28%: Auto_2002_projections.xls
26125 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0626                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7392                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26125 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R A5754                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B1966                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0627                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7927                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 48601GMCSG3900H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100101   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100102   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100201   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100202   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100203   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100204   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100205   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100211   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100212   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100215   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100217   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100218   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100221   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100222   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100223   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100224   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100225   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100226   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100235   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100237   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100238   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100300   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100301   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100302   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100303   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100304   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100306   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100316   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100317   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100318   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200101   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200104   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200107   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200117   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200201   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200202   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200203   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200204   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200205   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200206   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200210   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200212   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200213   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200217   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200218   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200219   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200221   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200222   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200223   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200224   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200225   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200226   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200229   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200300   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200301   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200302   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200303   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200304   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200306   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200307   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200802   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200804   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300101   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300102   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300103   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300200   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300203   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300205   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300206   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300207   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300208   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300209   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300211   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300214   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300216   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300217   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300218   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300221   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300222   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300223   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300224   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300225   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300226   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300300   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300305   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300306   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300307   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300309   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000100   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000189   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000199   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000200   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000201   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000203   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000288   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000289   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000299   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000389   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000399   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000801   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000889   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000899   PM10             -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R A6175                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B1993                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26145 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7599                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100101   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100102   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100201   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100202   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100203   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100204   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100205   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100211   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100212   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100215   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100217   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100218   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100221   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100222   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100223   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100224   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100225   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100226   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100235   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100237   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100238   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100300   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100301   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100302   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100303   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100304   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100306   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100316   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100317   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100318   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200101   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200104   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200107   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200117   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200201   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200202   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200203   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200204   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200205   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200206   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200210   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200212   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200213   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200217   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200218   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200219   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200221   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200222   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200223   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200224   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200225   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200226   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200229   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200300   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200301   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200302   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200303   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200304   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200306   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200307   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200802   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200804   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300101   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300102   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300103   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300200   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300203   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300205   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300206   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300207   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300208   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300209   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300211   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300214   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300216   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300217   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300218   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300221   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300222   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300223   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300224   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300225   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300226   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300300   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300305   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300306   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300307   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300309   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000100   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000189   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000199   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000200   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000201   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000203   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000288   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000289   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000299   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000389   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000399   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000801   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000889   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000899   PM10             -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R A6240                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B2032                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B6420                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7396                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26147 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100101   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100102   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100201   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100202   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100203   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100204   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100205   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100211   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100212   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100215   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100217   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100218   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100221   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100222   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100223   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100224   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100225   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100226   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100235   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100237   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100238   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100300   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100301   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100302   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100303   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100304   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100306   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100316   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100317   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100318   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200101   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200104   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200107   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200117   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200201   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200202   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200203   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200204   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200205   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200206   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200210   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200212   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200213   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200217   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200218   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200219   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200221   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200222   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200223   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200224   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200225   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200226   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200229   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200300   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200301   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200302   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200303   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200304   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200306   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200307   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200802   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200804   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300101   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300102   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300103   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300200   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300203   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300205   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300206   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300207   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300208   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300209   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300211   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300214   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300216   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300217   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300218   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300221   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300222   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300223   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300224   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300225   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300226   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300300   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300305   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300306   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300307   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300309   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000100   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000189   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000199   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000200   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000201   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000203   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000288   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000289   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000299   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000389   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000399   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000801   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000889   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000899   PM10             -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26149 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R A6380                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B2876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16415                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R A6475                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B2875                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16424                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 0          106990           -9  28.00 100 100 -9   -9     Y R 48121FRDM23001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R 48121FRDM23001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R 48121FRDM23001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R 48121FRDM23001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R 48121FRDM23001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R 48121FRDM23001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R 48121FRDM23001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R 48121FRDM23001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          106990           -9  28.00 100 100 -9   -9     Y R 48121FRDM33001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R 48121FRDM33001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R 48121FRDM33001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R 48121FRDM33001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R 48121FRDM33001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R 48121FRDM33001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R 48121FRDM33001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R 48121FRDM33001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          106990           -9  28.00 100 100 -9   -9     Y R 48121FRDM43001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R 48121FRDM43001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R 48121FRDM43001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R 48121FRDM43001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R 48121FRDM43001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R 48121FRDM43001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R 48121FRDM43001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R 48121FRDM43001M                 ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          106990           -9  28.00 100 100 -9   -9     Y R 48134MZDMT1MAZD                 ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R 48134MZDMT1MAZD                 ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R 48134MZDMT1MAZD                 ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R 48134MZDMT1MAZD                 ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R 48134MZDMT1MAZD                 ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R 48134MZDMT1MAZD                 ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R 48134MZDMT1MAZD                 ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R 48134MZDMT1MAZD                 ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          106990           -9  28.00 100 100 -9   -9     Y R 48184FRDMT37625                 ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R 48184FRDMT37625                 ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R 48184FRDMT37625                 ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R 48184FRDMT37625                 ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R 48184FRDMT37625                 ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R 48184FRDMT37625                 ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R 48184FRDMT37625                 ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R 48184FRDMT37625                 ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          106990           -9  28.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R 48211CDLLC2500E                 ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          106990           -9  28.00 100 100 -9   -9     Y R 48215CHRYL2101C                 ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R 48215CHRYL2101C                 ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R 48215CHRYL2101C                 ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R 48215CHRYL2101C                 ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R 48215CHRYL2101C                 ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R 48215CHRYL2101C                 ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R 48215CHRYL2101C                 ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R 48215CHRYL2101C                 ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 10200601   NOX              -9  45.00 100 100 -9   -9     Y R 48217MRTHN1300S                 ! Brenda Shine Refinery plant/SCC controls, NOX controls on large boilers based on analysis of consent decrees on Midwest RPO refinery - not in Brenda's original analysis she thinks it is applicable (
26163 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 48217MRTHN1300S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11885, Plant=Marathon Ashland Petrol. LLC, Detroit, MI, compliance date: 30JUN2006
26163 0          PM10             -9  28.00 100 100 -9   -9     Y R 48218DTRTL25MAR                 ! MACT: Lime Manufacturing: MARBLEHEAD LIME COMPANY - RIVER ROUG
26163 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 48218DTRTL25MAR                 ! MACT: Lime Manufacturing: MARBLEHEAD LIME COMPANY - RIVER ROUG
26163 0          SO2              -9  20.00 100 100 -9   -9     Y R 48218DTRTL25MAR                 ! MACT: Lime Manufacturing: MARBLEHEAD LIME COMPANY - RIVER ROUG
26163 0          106990           -9  28.00 100 100 -9   -9     Y R A8648                           ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R A8648                           ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R A8648                           ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R A8648                           ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R A8648                           ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R A8648                           ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R A8648                           ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R A8648                           ! MACT: Autos, plant: FORDMOTORCOROUGECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          106990           -9  28.00 100 100 -9   -9     Y R A8650                           ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R A8650                           ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R A8650                           ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R A8650                           ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R A8650                           ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R A8650                           ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R A8650                           ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R A8650                           ! MACT: Autos, plant: FORDMOTORCO/WAYNECOMPLEX, VOC 28%: Auto_2002_projections.xls
26163 10200601   NOX              -9  45.00 100 100 -9   -9     Y R A9831                           ! Brenda Shine Refinery plant/SCC controls, NOX controls on large boilers based on analysis of consent decrees on Midwest RPO refinery - not in Brenda's original analysis she thinks it is applicable (
26163 30600201   SO2              -9  50.00 100 100 -9   -9     Y R A9831                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11885, Plant=Marathon Ashland Petrol. LLC, Detroit, MI, compliance date: 30JUN2006
26163 0          PM10             -9  28.00 100 100 -9   -9     Y R B2169                           ! MACT: Lime Manufacturing: MARBLEHEAD LIME COMPANY - RIVER ROUG
26163 0          PM2_5            -9  28.00 100 100 -9   -9     Y R B2169                           ! MACT: Lime Manufacturing: MARBLEHEAD LIME COMPANY - RIVER ROUG
26163 0          SO2              -9  20.00 100 100 -9   -9     Y R B2169                           ! MACT: Lime Manufacturing: MARBLEHEAD LIME COMPANY - RIVER ROUG
26163 0          PM10             -9  28.00 100 100 -9   -9     Y R B3520                           ! MACT: Lime Manufacturing: DETROIT LIME, INC.
26163 0          PM2_5            -9  28.00 100 100 -9   -9     Y R B3520                           ! MACT: Lime Manufacturing: DETROIT LIME, INC.
26163 0          SO2              -9  20.00 100 100 -9   -9     Y R B3520                           ! MACT: Lime Manufacturing: DETROIT LIME, INC.
26163 0          106990           -9  28.00 100 100 -9   -9     Y R M4199                           ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R M4199                           ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R M4199                           ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R M4199                           ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R M4199                           ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R M4199                           ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R M4199                           ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R M4199                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R M4199                           ! MACT: Autos, plant: GENERALMOTORSHAMTRAMCK, VOC 28%: Auto_2002_projections.xls
26163 0          106990           -9  28.00 100 100 -9   -9     Y R N0929                           ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R N0929                           ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R N0929                           ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R N0929                           ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R N0929                           ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R N0929                           ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R N0929                           ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R N0929                           ! MACT: Autos, plant: AUTOALLIANCEINTL, VOC 28%: Auto_2002_projections.xls
26163 0          106990           -9  28.00 100 100 -9   -9     Y R N2155                           ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          107028           -9  28.00 100 100 -9   -9     Y R N2155                           ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          50000            -9  28.00 100 100 -9   -9     Y R N2155                           ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          67561            -9  28.00 100 100 -9   -9     Y R N2155                           ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          71432            -9  28.00 100 100 -9   -9     Y R N2155                           ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          75070            -9  28.00 100 100 -9   -9     Y R N2155                           ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          91203            -9  28.00 100 100 -9   -9     Y R N2155                           ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          VOC              -9  28.00 100 100 -9   -9     Y R N2155                           ! MACT: Autos, plant: DAIMLERCHRYSLERJEFFERSONNORTH, VOC 28%: Auto_2002_projections.xls
26163 0          PM10             -9  28.00 100 100 -9   -9     Y R T$16404                         ! MACT: Lime Manufacturing: MARBLEHEAD LIME COMPANY - RIVER ROUG
26163 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$16404                         ! MACT: Lime Manufacturing: MARBLEHEAD LIME COMPANY - RIVER ROUG
26163 0          SO2              -9  20.00 100 100 -9   -9     Y R T$16404                         ! MACT: Lime Manufacturing: MARBLEHEAD LIME COMPANY - RIVER ROUG
26163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$7525                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
26163 10200601   NOX              -9  45.00 100 100 -9   -9     Y R T$7537                          ! Brenda Shine Refinery plant/SCC controls, NOX controls on large boilers based on analysis of consent decrees on Midwest RPO refinery - not in Brenda's original analysis she thinks it is applicable (
26163 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$7537                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11885, Plant=Marathon Ashland Petrol. LLC, Detroit, MI, compliance date: 30JUN2006
27009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0644                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8934                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2701700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 55720PTLTCNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0647                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8874                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2702700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 56560MRCNC2500N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2703500002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 2703700011                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34022, Plant=Flint Hills Resourses (formerly Koch Refining Co.), Rosemount, MN, compliance date: 31DEC2006
27037 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$8775                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34022, Plant=Flint Hills Resourses (formerly Koch Refining Co.), Rosemount, MN, compliance date: 31DEC2006
27049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2704900007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8730                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27053 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2705301050                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2706100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 55744BLNDN115SW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0655                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27075 0          PM10             -9  62.00 100 100 -9   -9     Y R 2707500003                      ! MACT: Taconite Ore: Northshore Mining Co - Silver Bay
27075 0          PM2_5            -9  62.00 100 100 -9   -9     Y R 2707500003                      ! MACT: Taconite Ore: Northshore Mining Co - Silver Bay
27075 0          PM10             -9  62.00 100 100 -9   -9     Y R EGU0659                         ! MACT: Taconite Ore: Northshore Mining Co - Silver Bay
27075 0          PM2_5            -9  62.00 100 100 -9   -9     Y R EGU0659                         ! MACT: Taconite Ore: Northshore Mining Co - Silver Bay
27119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2711900016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 56716MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 56721MRCNCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16906                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27123 0          106990           -9  28.00 100 100 -9   -9     Y R 2712300039                      ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          107028           -9  28.00 100 100 -9   -9     Y R 2712300039                      ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          50000            -9  28.00 100 100 -9   -9     Y R 2712300039                      ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          67561            -9  28.00 100 100 -9   -9     Y R 2712300039                      ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          71432            -9  28.00 100 100 -9   -9     Y R 2712300039                      ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          75070            -9  28.00 100 100 -9   -9     Y R 2712300039                      ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          91203            -9  28.00 100 100 -9   -9     Y R 2712300039                      ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          VOC              -9  28.00 100 100 -9   -9     Y R 2712300039                      ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          106990           -9  28.00 100 100 -9   -9     Y R 55116FRDMT966SM                 ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          107028           -9  28.00 100 100 -9   -9     Y R 55116FRDMT966SM                 ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          50000            -9  28.00 100 100 -9   -9     Y R 55116FRDMT966SM                 ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          67561            -9  28.00 100 100 -9   -9     Y R 55116FRDMT966SM                 ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          71432            -9  28.00 100 100 -9   -9     Y R 55116FRDMT966SM                 ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          75070            -9  28.00 100 100 -9   -9     Y R 55116FRDMT966SM                 ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          91203            -9  28.00 100 100 -9   -9     Y R 55116FRDMT966SM                 ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27123 0          VOC              -9  28.00 100 100 -9   -9     Y R 55116FRDMT966SM                 ! MACT: Autos, plant: FordMotorCo-TwinCitiesAssemblyPlt, VOC 28%: Auto_2002_projections.xls
27129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2712900014                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16892                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 0          PM10             -9  62.00 100 100 -9   -9     Y R 2713700005                      ! MACT: Taconite Ore: US Steel Minn Ore Operations - Minnt
27137 0          PM2_5            -9  62.00 100 100 -9   -9     Y R 2713700005                      ! MACT: Taconite Ore: US Steel Minn Ore Operations - Minnt
27137 0          PM10             -9  62.00 100 100 -9   -9     Y R 2713700009                      ! MACT: Taconite Ore: LTV Steel Mining - Hoyt Lakes
27137 0          PM2_5            -9  62.00 100 100 -9   -9     Y R 2713700009                      ! MACT: Taconite Ore: LTV Steel Mining - Hoyt Lakes
27137 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700022                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 0          PM10             -9  62.00 100 100 -9   -9     Y R 2713700032                      ! MACT: Taconite Ore: Northshore Mining Co - Babbitt
27137 0          PM2_5            -9  62.00 100 100 -9   -9     Y R 2713700032                      ! MACT: Taconite Ore: Northshore Mining Co - Babbitt
27137 0          PM10             -9  62.00 100 100 -9   -9     Y R 2713700061                      ! MACT: Taconite Ore: Hibbing Taconite Co
27137 0          PM2_5            -9  62.00 100 100 -9   -9     Y R 2713700061                      ! MACT: Taconite Ore: Hibbing Taconite Co
27137 0          PM10             -9  62.00 100 100 -9   -9     Y R 2713700062                      ! MACT: Taconite Ore: Ispat Inland Mining Co
27137 0          PM2_5            -9  62.00 100 100 -9   -9     Y R 2713700062                      ! MACT: Taconite Ore: Ispat Inland Mining Co
27137 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700098                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700101                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700112                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 0          PM10             -9  62.00 100 100 -9   -9     Y R 2713700113                      ! MACT: Taconite Ore: EVTAC Mining - Plant
27137 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 0          PM2_5            -9  62.00 100 100 -9   -9     Y R 2713700113                      ! MACT: Taconite Ore: EVTAC Mining - Plant
27137 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700113                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700170                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700171                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27137 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2713700172                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27145 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2714500008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
27163 10200602   NOX              -9  40.00 100 100 -9   -9     Y R 2716300003                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 2716300003                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 20200301   NOX              -9  40.00 100 100 -9   -9     Y R 2716300003                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 2716300003                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 2716300003                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 2716300003                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 03APR2006
27163 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 2716300003                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 30JUN2006
27163 50300501   PM10             -9  65.34 100 100 -9   -9     Y R 2716300025                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: 3M-CottageGroveCorporateIncinerator: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 50300501   PM2_5            -9  65.34 100 100 -9   -9     Y R 2716300025                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: 3M-CottageGroveCorporateIncinerator: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10025737         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10025919         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10031137         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10034829         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10049055         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10060125         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10099748         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10101505         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10101538         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10101970         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10108642         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10124364         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10124433         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10294403         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10325947         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10377669         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          10588019         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          109              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          11103869         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          12018018         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          12018198         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          12035722         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          12054487         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          12060003         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          12079651         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          125              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          12626812         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          12640890         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          12710360         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1271289          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1303282          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1304569          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1306190          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1306236          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1307966          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1308061          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1308141          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1308389          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1309600          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1309644          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1313139          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13138459         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1313991          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1314063          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1314416          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1317346          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1317357          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1317368          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1317426          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1327339          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1327533          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1333820          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1335257          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1335326          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1336932          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1345046          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          1345160          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13462889         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13463393         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13510491         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13530659         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13530682         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13586828         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13597994         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          136              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          136527           -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13765190         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13770893         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          13814965         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          139              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          14018952         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          14220178         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          14307336         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          14307358         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          14336700         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          14977618         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          16065831         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          16842038         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          16925250         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          18454121         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          18540299         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          195              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          198              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          199              -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          200              -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          201              -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          202              -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          21679312         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          2223930          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          226              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          253              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          27253287         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          301042           -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          3141126          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          3333673          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          373024           -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          50922297         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          543908           -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          598630           -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          6018899          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          602              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          603              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          604              -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          61789513         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          61790145         -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7428480          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7439921          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7439965          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7440020          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7440360          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7440382          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7440417          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7440439          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7440473          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7440484          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7446084          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7446142          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7446277          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7446346          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7488564          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7542098          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7718549          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7722647          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7738945          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7758976          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7775113          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7778394          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7778509          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7782492          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7783008          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7783075          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7783166          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7783702          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7783791          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7784409          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7784421          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7785877          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7786814          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7787475          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7787497          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7788967          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7788989          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7789006          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7789062          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7789095          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7789120          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7789426          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          7790809          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          78002            -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          8030704          -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          88               -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          92               -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          93               -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          EXH__16065831    -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          EXH__18540299    -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          EXH__7439965     -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          EXH__7440020     -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3M - COTTAGE GROVE CORPORATE INCINERATOR MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          PM10             -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: 3M-COTTAGEGROVECORPORATEINCINERATOR: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 0          PM2_5            -9  65.34 100 100 -9   0801-2 Y R 3014                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: 3M-COTTAGEGROVECORPORATEINCINERATOR: NEI_UNIQUE_ID=NEIMN00025: cdate=2008
27163 10200602   NOX              -9  40.00 100 100 -9   -9     Y R 55071SHLND100WT                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 55071SHLND100WT                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 20200301   NOX              -9  40.00 100 100 -9   -9     Y R 55071SHLND100WT                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 55071SHLND100WT                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 55071SHLND100WT                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 55071SHLND100WT                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 03APR2006
27163 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 55071SHLND100WT                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 30JUN2006
27163 10200602   NOX              -9  40.00 100 100 -9   -9     Y R T$8734                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$8734                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 20200301   NOX              -9  40.00 100 100 -9   -9     Y R T$8734                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 30600103   NOX              -9  40.00 100 100 -9   -9     Y R T$8734                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$8734                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 31DEC2008
27163 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$8734                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 03APR2006
27163 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$8734                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34050, Plant=Marathon Ashland Petrol. LLC, St. Paul Park, MN, compliance date: 30JUN2006
28059 50300501   PM10             -9  87.50 100 100 -9   -9     Y R 2805900022                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: FIRSTCHEMICALCORPORATION: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 50300501   PM2_5            -9  87.50 100 100 -9   -9     Y R 2805900022                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: FIRSTCHEMICALCORPORATION: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30JUN2011
28059 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30JUN2011
28059 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30JUN2011
28059 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 31AUG2005
28059 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30SEP2007
28059 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30SEP2007
28059 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30SEP2007
28059 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 2805900058                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30JUN2011
28059 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30JUN2011
28059 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30JUN2011
28059 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 31AUG2005
28059 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30SEP2007
28059 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30SEP2007
28059 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30SEP2007
28059 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 39567CHVRNPOBOX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 0          10025737         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10025919         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10031137         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10034829         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10049055         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10060125         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10099748         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10101505         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10101538         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10101970         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10108642         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10124364         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10124433         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10294403         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10325947         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10377669         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          10588019         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          109              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          11103869         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          12018018         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          12018198         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          12035722         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          12054487         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          12060003         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          12079651         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          125              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          12626812         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          12640890         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          12710360         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1271289          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1303282          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1304569          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1306190          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1306236          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1307966          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1308061          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1308141          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1308389          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1309600          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1309644          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1313139          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13138459         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1313991          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1314063          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1314416          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1317346          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1317357          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1317368          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1317426          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1327339          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1327533          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1333820          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1335257          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1335326          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1336932          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1345046          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          1345160          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13462889         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13463393         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13510491         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13530659         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13530682         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13586828         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13597994         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          136              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          136527           -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13765190         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13770893         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          13814965         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          139              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          14018952         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          14220178         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          14307336         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          14307358         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          14336700         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          14977618         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          16065831         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          16842038         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          16925250         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          18454121         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          18540299         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          195              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          198              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          199              -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          200              -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          201              -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          202              -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          21679312         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          2223930          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          226              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          253              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          27253287         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          301042           -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          3141126          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          3333673          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          373024           -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          50922297         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          543908           -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          593748           -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          598630           -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          6018899          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          602              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          603              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          604              -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          61789513         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          61790145         -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          62384            -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7428480          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7439921          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7439965          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7440020          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7440360          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7440382          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7440417          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7440439          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7440473          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7440484          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7446084          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7446142          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7446277          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7446346          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7488564          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7542098          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7718549          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7722647          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7738945          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7758976          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7775113          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7778394          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7778509          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7782492          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7783008          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7783075          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7783166          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7783702          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7783791          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7784409          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7784421          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7785877          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7786814          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7787475          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7787497          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7788967          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7788989          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7789006          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7789062          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7789095          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7789120          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7789426          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          7790809          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          78002            -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          8030704          -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          88               -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          92               -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          93               -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          EXH__16065831    -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          EXH__18540299    -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          EXH__7439965     -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          EXH__7440020     -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: First Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          PM10             -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: FIRSTCHEMICALCORPORATION: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 0          PM2_5            -9  87.50 100 100 -9   0801-2 Y R 904                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: FIRSTCHEMICALCORPORATION: NEI_UNIQUE_ID=NEI34058: cdate=2008
28059 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30JUN2011
28059 30600105   NOX              -9  40.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30JUN2011
28059 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30JUN2011
28059 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 31AUG2005
28059 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30SEP2007
28059 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30SEP2007
28059 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28059 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 30SEP2007
28059 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$5334                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34057, Plant=Chevron USA Inc., Pascagoula, MS, compliance date: 27JUN2005
28087 0          10025737         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10025919         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10031137         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10034829         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10049055         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10060125         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10099748         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10101505         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10101538         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10101970         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10108642         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10124364         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10124433         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10294403         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10325947         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10377669         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          10588019         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          109              -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          11103869         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          12018018         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          12018198         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          12035722         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          12054487         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          12060003         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          12079651         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          125              -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          12626812         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          12640890         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          12710360         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1271289          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1303282          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1304569          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1306190          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1306236          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1307966          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1308061          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1308141          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1308389          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1309600          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1309644          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1313139          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13138459         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1313991          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1314063          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1314416          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1317346          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1317357          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1317368          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1317426          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1327339          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1327533          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1333820          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1335257          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1335326          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1336932          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1345046          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          1345160          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13462889         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13463393         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13510491         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13530659         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13530682         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13586828         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13597994         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          136              -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          136527           -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13765190         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13770893         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          13814965         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          139              -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          14018952         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          14220178         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          14307336         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          14307358         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          14336700         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          14977618         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          16065831         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          16842038         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          16925250         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          18454121         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          18540299         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          195              -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          198              -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          199              -9   0.04 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          200              -9   0.04 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          201              -9   0.04 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          202              -9   0.04 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          21679312         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          2223930          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          226              -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          22967926         -9   0.04 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          253              -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          27253287         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          301042           -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          3141126          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          3333673          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          373024           -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          50922297         -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          543908           -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          593748           -9   0.04 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          598630           -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          6018899          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          602              -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          603              -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          604              -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          61789513         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          61790145         -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          62384            -9   0.04 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7428480          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7439921          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7439965          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7439976          -9   0.04 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7440020          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7440360          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7440382          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7440417          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7440439          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7440473          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7440484          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7446084          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7446142          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7446277          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7446346          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7487947          -9   0.04 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7488564          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7542098          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7718549          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7722647          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7738945          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7758976          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7775113          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7778394          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7778509          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7782492          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7783008          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7783075          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7783166          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7783702          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7783791          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7784409          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7784421          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7785877          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7786814          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7787475          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7787497          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7788967          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7788989          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7789006          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7789062          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7789095          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7789120          -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7789426          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          7790809          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          78002            -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          8030704          -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          88               -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          92               -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          93               -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          EXH__16065831    -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          EXH__18540299    -9  69.17 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          EXH__7439965     -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          EXH__7440020     -9  39.76 100 100 -9   0801-3 Y R 203                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          PM10             -9  39.76 100 100 -9   0801-3 Y R 2808700025                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: HolnamInc: NEI_UNIQUE_ID=NEI11181: cdate=2008
28087 0          PM2_5            -9  39.76 100 100 -9   0801-3 Y R 2808700025                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: HolnamInc: NEI_UNIQUE_ID=NEI11181: cdate=2008
28131 0          106990           -9   0.00 100 100 -9   1624   Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   106990           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          107028           -9   0.00 100 100 -9   1624   Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   107028           -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          50000            -9   0.00 100 100 -9   1624   Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   50000            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          67561            -9   0.00 100 100 -9   1624   Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   67561            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          71432            -9   0.00 100 100 -9   1624   Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   71432            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          75070            -9   0.00 100 100 -9   1624   Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   75070            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          91203            -9   0.00 100 100 -9   1624   Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   91203            -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          VOC              -9   0.00 100 100 -9   1624   Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   VOC              -9   0.00 100 100 -9   -9     Y R 2813100003                      ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          106990           -9   0.00 100 100 -9   1624   Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   106990           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          107028           -9   0.00 100 100 -9   1624   Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   107028           -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          50000            -9   0.00 100 100 -9   1624   Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   50000            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          67561            -9   0.00 100 100 -9   1624   Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   67561            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          71432            -9   0.00 100 100 -9   1624   Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   71432            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          75070            -9   0.00 100 100 -9   1624   Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   75070            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          91203            -9   0.00 100 100 -9   1624   Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   91203            -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 0          VOC              -9   0.00 100 100 -9   1624   Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700602   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700604   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700606   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700607   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700608   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700610   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700611   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700621   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700625   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700626   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700628   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700629   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700630   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700631   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700632   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700635   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700640   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700651   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700655   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700661   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700664   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700665   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700701   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700702   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700703   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700704   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700705   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700706   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700707   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700708   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700709   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700710   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700711   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700712   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700713   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700714   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700715   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700716   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700717   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700718   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700720   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700725   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700727   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700730   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700734   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700735   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700736   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700737   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700740   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700744   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700746   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700747   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700750   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700752   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700753   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700756   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700757   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700760   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700762   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700763   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700766   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700767   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700769   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700770   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700771   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700780   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700781   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700783   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700785   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700788   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700789   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700790   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700791   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700792   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700793   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700798   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700799   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700801   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700802   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700895   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700921   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700923   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700925   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700927   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700931   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700932   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700933   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700934   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700935   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700936   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700939   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700940   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700950   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700960   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700971   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700980   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700981   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700982   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700983   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30700984   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701001   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701008   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701009   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701010   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701015   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701020   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701030   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701040   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701053   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701054   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701055   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701057   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701060   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701062   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701064   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701410   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701415   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701416   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701420   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701425   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701430   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701440   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701442   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701480   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701482   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701484   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701486   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701510   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701512   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701530   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701540   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701550   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701610   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701611   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701630   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701640   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701642   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701710   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701712   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701720   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701740   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30701742   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28131 30702021   VOC              -9   0.00 100 100 -9   -9     Y R 39577HDNDSOLDHW                 ! MACT: Plywood and Composite Wood Products: plant=Hood Industries, Incorporated, Wiggins, MS
28149 0          PM10             -9  28.00 100 100 -9   -9     Y R 2814900014                      ! MACT: Lime Manufacturing: FALCO LIME, INC
28149 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 2814900014                      ! MACT: Lime Manufacturing: FALCO LIME, INC
28149 0          SO2              -9  20.00 100 100 -9   -9     Y R 2814900014                      ! MACT: Lime Manufacturing: FALCO LIME, INC
29031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29031 0          PM10             -9  60.73 100 100 -9   0801-3 Y R 0021                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BUZZIUNICEMUSAINCCAPEGIRARDEAUPLAN: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          PM2_5            -9  60.73 100 100 -9   0801-3 Y R 0021                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BUZZIUNICEMUSAINCCAPEGIRARDEAUPLAN: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10025737         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10025919         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10031137         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10034829         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10049055         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10060125         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10099748         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10101505         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10101538         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10101970         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10108642         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10124364         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10124433         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10294403         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10325947         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10377669         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          10588019         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          109              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          11103869         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          12018018         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          12018198         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          12035722         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          12054487         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          12060003         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          12079651         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          125              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          12626812         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          12640890         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          12710360         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1271289          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1303282          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1304569          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1306190          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1306236          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1307966          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1308061          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1308141          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1308389          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1309600          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1309644          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1313139          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13138459         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1313991          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1314063          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1314416          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1317346          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1317357          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1317368          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1317426          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1327339          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1327533          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1333820          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1335257          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1335326          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1336932          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1345046          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          1345160          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13462889         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13463393         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13510491         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13530659         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13530682         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13586828         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13597994         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          136              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          136527           -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13765190         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13770893         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          13814965         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          139              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          14018952         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          14220178         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          14307336         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          14307358         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          14336700         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          14977618         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          16065831         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          16842038         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          16925250         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          18454121         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          18540299         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          195              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          198              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          199              -9  26.37 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          200              -9  26.37 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          201              -9  26.37 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          202              -9  26.37 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          21679312         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          2223930          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          226              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          22967926         -9  26.37 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          253              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          27253287         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          301042           -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          3141126          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          3333673          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          373024           -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          50922297         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          543908           -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          593748           -9  26.37 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          598630           -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          6018899          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          602              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          603              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          604              -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          61789513         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          61790145         -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          62384            -9  26.37 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7428480          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7439921          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7439965          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7439976          -9  26.37 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7440020          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7440360          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7440382          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7440417          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7440439          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7440473          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7440484          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7446084          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7446142          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7446277          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7446346          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7487947          -9  26.37 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7488564          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7542098          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7718549          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7722647          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7738945          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7758976          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7775113          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7778394          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7778509          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7782492          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7783008          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7783075          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7783166          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7783702          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7783791          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7784409          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7784421          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7785877          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7786814          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7787475          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7787497          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7788967          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7788989          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7789006          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7789062          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7789095          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7789120          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7789426          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          7790809          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          78002            -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          8030704          -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          88               -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          92               -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          93               -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          EXH__16065831    -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          EXH__18540299    -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          EXH__7439965     -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29031 0          EXH__7440020     -9  60.73 100 100 -9   0801-3 Y R 303                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lone Star Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16367: cdate=2008
29047 0          106990           -9  28.00 100 100 -9   -9     Y R 0019                            ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          107028           -9  28.00 100 100 -9   -9     Y R 0019                            ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          50000            -9  28.00 100 100 -9   -9     Y R 0019                            ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          67561            -9  28.00 100 100 -9   -9     Y R 0019                            ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          71432            -9  28.00 100 100 -9   -9     Y R 0019                            ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          75070            -9  28.00 100 100 -9   -9     Y R 0019                            ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          91203            -9  28.00 100 100 -9   -9     Y R 0019                            ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          VOC              -9  28.00 100 100 -9   -9     Y R 0019                            ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          106990           -9  28.00 100 100 -9   -9     Y R 64119FRDMTHWY69                 ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          107028           -9  28.00 100 100 -9   -9     Y R 64119FRDMTHWY69                 ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          50000            -9  28.00 100 100 -9   -9     Y R 64119FRDMTHWY69                 ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          67561            -9  28.00 100 100 -9   -9     Y R 64119FRDMTHWY69                 ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          71432            -9  28.00 100 100 -9   -9     Y R 64119FRDMTHWY69                 ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          75070            -9  28.00 100 100 -9   -9     Y R 64119FRDMTHWY69                 ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          91203            -9  28.00 100 100 -9   -9     Y R 64119FRDMTHWY69                 ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29047 0          VOC              -9  28.00 100 100 -9   -9     Y R 64119FRDMTHWY69                 ! MACT: Autos, plant: FORDMOTORCO-KANSASCITYASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
29077 0          PM10             -9  28.00 100 100 -9   -9     Y R 0001                            ! MACT: Lime Manufacturing: ASH GROVE CEMENT CO
29077 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0001                            ! MACT: Lime Manufacturing: ASH GROVE CEMENT CO
29077 0          SO2              -9  20.00 100 100 -9   -9     Y R 0001                            ! MACT: Lime Manufacturing: ASH GROVE CEMENT CO
29093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0009                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10008                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29095 0          10025737         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10025919         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10031137         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10034829         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10049055         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10060125         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10099748         -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10101505         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10101538         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10101970         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10108642         -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10124364         -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10124433         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10294403         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10325947         -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10377669         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10588019         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          109              -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          11103869         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          12018018         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          12018198         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          12035722         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          12054487         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          12060003         -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          12079651         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          125              -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          12626812         -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          12640890         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          12710360         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1271289          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1303282          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1304569          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1306190          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1306236          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1307966          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1308061          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1308141          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1308389          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1309600          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1309644          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1313139          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13138459         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1313991          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1314063          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1314416          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1317346          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1317357          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1317368          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1317426          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1327339          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1327533          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1333820          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1335257          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1335326          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1336932          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1345046          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          1345160          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13462889         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13463393         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13510491         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13530659         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13530682         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13586828         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13597994         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          136              -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          136527           -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13765190         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13770893         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          13814965         -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          139              -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          14018952         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          14220178         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          14307336         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          14307358         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          14336700         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          14977618         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          16065831         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          16842038         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          16925250         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          18454121         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          18540299         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          195              -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          198              -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          199              -9   0.00 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          200              -9   0.00 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          201              -9   0.00 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          202              -9   0.00 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          21679312         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          2223930          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          226              -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          253              -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          27253287         -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          301042           -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          3141126          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          3333673          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          373024           -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          50922297         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          543908           -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          593748           -9   0.00 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          598630           -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          6018899          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          602              -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          603              -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          604              -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          61789513         -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          61790145         -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          62384            -9   0.00 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7428480          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7439921          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7439965          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7440020          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7440360          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7440382          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7440417          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7440439          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7440473          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7440484          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7446084          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7446142          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7446277          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7446346          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7488564          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7542098          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7647010          -9  39.56 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7718549          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7722647          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7738945          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7758976          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7775113          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7778394          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7778509          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7782492          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7782505          -9  39.56 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7783008          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7783075          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7783166          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7783702          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7783791          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7784409          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7784421          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7785877          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7786814          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7787475          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7787497          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7788967          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7788989          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7789006          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7789062          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7789095          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7789120          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7789426          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          7790809          -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          78002            -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          8030704          -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          88               -9  99.03 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          92               -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          93               -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          EXH__16065831    -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          EXH__18540299    -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          EXH__7439965     -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          EXH__7440020     -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Miles (Mobay Chemical Corporation) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          PM10             -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: Miles(MobayChemicalCorporation): NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          PM2_5            -9  94.94 100 100 -9   0801-2 Y R 463                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: Miles(MobayChemicalCorporation): NEI_UNIQUE_ID=NEI34292: cdate=2008
29095 0          10025737         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10025919         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10031137         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10034829         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10049055         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10060125         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10099748         -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10101505         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10101538         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10101970         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10108642         -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10124364         -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10124433         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10294403         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10325947         -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10377669         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          10588019         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          109              -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          11103869         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          12018018         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          12018198         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          12035722         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          12054487         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          12060003         -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          12079651         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          125              -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          12626812         -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          12640890         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          12710360         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1271289          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1303282          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1304569          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1306190          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1306236          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1307966          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1308061          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1308141          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1308389          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1309600          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1309644          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1313139          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13138459         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1313991          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1314063          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1314416          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1317346          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1317357          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1317368          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1317426          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1327339          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1327533          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1333820          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1335257          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1335326          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1336932          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1345046          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          1345160          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13462889         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13463393         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13510491         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13530659         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13530682         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13586828         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13597994         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          136              -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          136527           -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13765190         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13770893         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          13814965         -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          139              -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          14018952         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          14220178         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          14307336         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          14307358         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          14336700         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          14977618         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          16065831         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          16842038         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          16925250         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          18454121         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          18540299         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          195              -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          198              -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          199              -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          200              -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          201              -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          202              -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          21679312         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          2223930          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          226              -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          253              -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          27253287         -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          301042           -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          3141126          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          3333673          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          373024           -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          50922297         -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          543908           -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          593748           -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          598630           -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          6018899          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          602              -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          603              -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          604              -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          61789513         -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          61790145         -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          62384            -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7428480          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7439921          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7439965          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7440020          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7440360          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7440382          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7440417          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7440439          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7440473          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7440484          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7446084          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7446142          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7446277          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7446346          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7488564          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7542098          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7718549          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7722647          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7738945          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7758976          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7775113          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7778394          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7778509          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7782492          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7783008          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7783075          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7783166          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7783702          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7783791          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7784409          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7784421          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7785877          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7786814          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7787475          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7787497          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7788967          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7788989          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7789006          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7789062          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7789095          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7789120          -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7789426          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          7790809          -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          78002            -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          8030704          -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          88               -9  81.45 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          92               -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          93               -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          EXH__16065831    -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          EXH__18540299    -9  58.77 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          EXH__7439965     -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          EXH__7440020     -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lake City Army Ammunition Plant MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          PM10             -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYLAKECITYARMYAMMUNITIONPLAN: NEI_UNIQUE_ID=NEI34327: cdate=2008
29095 0          PM2_5            -9   3.33 100 100 -9   0801-2 Y R 503                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYLAKECITYARMYAMMUNITIONPLAN: NEI_UNIQUE_ID=NEI34327: cdate=2008
29097 0          10025737         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10025919         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10031137         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10034829         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10049055         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10060125         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10099748         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10101505         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10101538         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10101970         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10108642         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10124364         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10124433         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10294403         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10325947         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10377669         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10588019         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          109              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          11103869         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12018018         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12018198         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12035722         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12054487         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12060003         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12079651         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          125              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12626812         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12640890         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12710360         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1271289          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1303282          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1304569          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1306190          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1306236          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1307966          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1308061          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1308141          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1308389          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1309600          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1309644          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1313139          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13138459         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1313991          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1314063          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1314416          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1317346          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1317357          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1317368          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1317426          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1327339          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1327533          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1333820          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1335257          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1335326          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1336932          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1345046          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1345160          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13462889         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13463393         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13510491         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13530659         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13530682         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13586828         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13597994         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          136              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          136527           -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13765190         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13770893         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13814965         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          139              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14018952         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14220178         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14307336         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14307358         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14336700         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14977618         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          16065831         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          16842038         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          16925250         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          18454121         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          18540299         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          195              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          198              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          199              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          200              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          201              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          202              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          21679312         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          2223930          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          226              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          22967926         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          253              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          27253287         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          301042           -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          3141126          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          3333673          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          373024           -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          50922297         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          543908           -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          593748           -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          598630           -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          6018899          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          602              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          603              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          604              -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          61789513         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          61790145         -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          62384            -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7428480          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7439921          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7439965          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7439976          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440020          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440360          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440382          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440417          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440439          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440473          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440484          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7446084          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7446142          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7446277          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7446346          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7487947          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7488564          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7542098          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7647010          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7718549          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7722647          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7738945          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7758976          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7775113          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7778394          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7778509          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7782492          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7782505          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7783008          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7783075          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7783166          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7783702          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7783791          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7784409          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7784421          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7785877          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7786814          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7787475          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7787497          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7788967          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7788989          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7789006          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7789062          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7789095          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7789120          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7789426          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7790809          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          78002            -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          8030704          -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          88               -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          92               -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          93               -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          EXH__16065831    -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          EXH__18540299    -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          EXH__7439965     -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          EXH__7440020     -9   0.00 100 100 -9   0801-1 Y R 3011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10025737         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10025919         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10031137         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10034829         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10049055         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10060125         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10099748         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10101505         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10101538         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10101970         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10108642         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10124364         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10124433         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10294403         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10325947         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10377669         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          10588019         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          109              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          11103869         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12018018         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12018198         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12035722         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12054487         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12060003         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12079651         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          125              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12626812         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12640890         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          12710360         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1271289          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1303282          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1304569          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1306190          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1306236          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1307966          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1308061          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1308141          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1308389          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1309600          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1309644          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1313139          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13138459         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1313991          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1314063          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1314416          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1317346          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1317357          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1317368          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1317426          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1327339          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1327533          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1333820          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1335257          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1335326          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1336932          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1345046          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          1345160          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13462889         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13463393         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13510491         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13530659         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13530682         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13586828         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13597994         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          136              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          136527           -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13765190         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13770893         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          13814965         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          139              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14018952         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14220178         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14307336         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14307358         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14336700         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          14977618         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          16065831         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          16842038         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          16925250         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          18454121         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          18540299         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          195              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          198              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          199              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          200              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          201              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          202              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          21679312         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          2223930          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          226              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          22967926         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          253              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          27253287         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          301042           -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          3141126          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          3333673          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          373024           -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          50922297         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          543908           -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          593748           -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          598630           -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          6018899          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          602              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          603              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          604              -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          61789513         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          61790145         -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          62384            -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7428480          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7439921          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7439965          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7439976          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440020          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440360          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440382          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440417          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440439          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440473          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7440484          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7446084          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7446142          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7446277          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7446346          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7487947          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7488564          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7542098          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7647010          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7718549          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7722647          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7738945          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7758976          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7775113          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7778394          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7778509          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7782492          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7782505          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7783008          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7783075          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7783166          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7783702          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7783791          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7784409          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7784421          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7785877          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7786814          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7787475          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7787497          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7788967          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7788989          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7789006          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7789062          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7789095          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7789120          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7789426          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          7790809          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          78002            -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          8030704          -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          88               -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          92               -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          93               -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          EXH__16065831    -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          EXH__18540299    -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          EXH__7439965     -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29097 0          EXH__7440020     -9   0.00 100 100 -9   0801-1 Y R 3015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ICI EXPLOSIVES ENVIRONMENTAL CO-JOPLIN MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI16371: cdate=2008
29099 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 63028RVRCMSELMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29099 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9873                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 0          10025737         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10025919         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10031137         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10034829         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10049055         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10060125         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10099748         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10101505         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10101538         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10101970         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10108642         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10124364         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10124433         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10294403         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10325947         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10377669         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10588019         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          109              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          11103869         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12018018         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12018198         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12035722         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12054487         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12060003         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12079651         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          125              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12626812         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12640890         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12710360         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1271289          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1303282          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1304569          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1306190          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1306236          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1307966          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1308061          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1308141          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1308389          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1309600          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1309644          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1313139          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13138459         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1313991          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1314063          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1314416          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317346          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317357          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317368          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317426          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1327339          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1327533          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1333820          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1335257          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1335326          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1336932          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1345046          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1345160          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13462889         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13463393         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13510491         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13530659         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13530682         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13586828         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13597994         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          136              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          136527           -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13765190         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13770893         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13814965         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          139              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14018952         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14220178         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14307336         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14307358         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14336700         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14977618         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          16065831         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          16842038         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          16925250         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          18454121         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          18540299         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          195              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          198              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          199              -9  87.54 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          200              -9  87.54 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          201              -9  87.54 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          202              -9  87.54 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          21679312         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          2223930          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          226              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          22967926         -9  87.54 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          253              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          27253287         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          301042           -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          3141126          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          3333673          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          373024           -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          50922297         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          543908           -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          593748           -9  87.54 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          598630           -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          6018899          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          602              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          603              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          604              -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          61789513         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          61790145         -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          62384            -9  87.54 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7428480          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7439921          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7439965          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7439976          -9  87.54 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440020          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440360          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440382          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440417          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440439          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440473          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440484          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446084          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446142          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446277          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446346          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7487947          -9  87.54 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7488564          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7542098          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7718549          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7722647          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7738945          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7758976          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7775113          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7778394          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7778509          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7782492          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783008          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783075          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783166          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783702          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783791          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7784409          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7784421          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7785877          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7786814          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7787475          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7787497          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7788967          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7788989          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789006          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789062          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789095          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789120          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789426          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7790809          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          78002            -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          8030704          -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          88               -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          92               -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          93               -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__16065831    -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__18540299    -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__7439965     -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__7440020     -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 0          PM10             -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AmericanCyanamid/BASFCORPHANNIBALPLA: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 477                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 0          PM2_5            -9  92.08 100 100 -9   0801-2 Y R 477                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AmericanCyanamid/BASFCORPHANNIBALPLA: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10025737         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10025919         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10031137         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10034829         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10049055         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10060125         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10099748         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10101505         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10101538         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10101970         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10108642         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10124364         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10124433         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10294403         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10325947         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10377669         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10588019         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          109              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          11103869         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12018018         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12018198         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12035722         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12054487         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12060003         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12079651         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          125              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12626812         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12640890         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12710360         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1271289          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1303282          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1304569          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1306190          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1306236          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1307966          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1308061          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1308141          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1308389          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1309600          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1309644          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1313139          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13138459         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1313991          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1314063          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1314416          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317346          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317357          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317368          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317426          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1327339          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1327533          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1333820          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1335257          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1335326          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1336932          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1345046          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1345160          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13462889         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13463393         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13510491         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13530659         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13530682         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13586828         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13597994         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          136              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          136527           -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13765190         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13770893         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13814965         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          139              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14018952         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14220178         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14307336         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14307358         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14336700         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14977618         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          16065831         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          16842038         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          16925250         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          18454121         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          18540299         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          195              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          198              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          199              -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          200              -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          201              -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          202              -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          21679312         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          2223930          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          226              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          253              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          27253287         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          301042           -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          3141126          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          3333673          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          373024           -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          50922297         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          543908           -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          593748           -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          598630           -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          6018899          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          602              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          603              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          604              -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          61789513         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          61790145         -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          62384            -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7428480          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7439921          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7439965          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440020          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440360          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440382          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440417          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440439          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440473          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440484          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446084          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446142          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446277          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446346          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7488564          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7542098          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7718549          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7722647          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7738945          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7758976          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7775113          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7778394          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7778509          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7782492          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783008          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783075          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783166          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783702          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783791          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7784409          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7784421          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7785877          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7786814          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7787475          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7787497          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7788967          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7788989          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789006          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789062          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789095          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789120          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789426          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7790809          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          78002            -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          8030704          -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          88               -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          92               -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          93               -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__16065831    -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__18540299    -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__7439965     -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__7440020     -9  93.31 100 100 -9   0801-2 Y R 478                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 0          PM10             -9  92.08 100 100 -9   0801-2 Y R 478                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AmericanCyanamid/BASFCORPHANNIBALPLA: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 478                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 0          PM2_5            -9  92.08 100 100 -9   0801-2 Y R 478                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AmericanCyanamid/BASFCORPHANNIBALPLA: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461-MRCNC-STA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 63461MRCNCSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 0          10025737         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10025919         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10031137         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10034829         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10049055         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10060125         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10099748         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10101505         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10101538         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10101970         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10108642         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10124364         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10124433         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10294403         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10325947         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10377669         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          10588019         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          109              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          11103869         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12018018         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12018198         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12035722         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12054487         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12060003         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12079651         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          125              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12626812         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12640890         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          12710360         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1271289          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1303282          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1304569          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1306190          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1306236          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1307966          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1308061          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1308141          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1308389          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1309600          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1309644          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1313139          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13138459         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1313991          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1314063          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1314416          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317346          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317357          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317368          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1317426          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1327339          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1327533          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1333820          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1335257          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1335326          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1336932          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1345046          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          1345160          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13462889         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13463393         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13510491         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13530659         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13530682         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13586828         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13597994         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          136              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          136527           -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13765190         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13770893         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          13814965         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          139              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14018952         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14220178         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14307336         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14307358         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14336700         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          14977618         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          16065831         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          16842038         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          16925250         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          18454121         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          18540299         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          195              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          198              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          199              -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          200              -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          201              -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          202              -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          21679312         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          2223930          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          226              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          253              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          27253287         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          301042           -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          3141126          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          3333673          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          373024           -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          50922297         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          543908           -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          593748           -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          598630           -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          6018899          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          602              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          603              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          604              -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          61789513         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          61790145         -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          62384            -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7428480          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7439921          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7439965          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440020          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440360          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440382          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440417          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440439          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440473          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7440484          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446084          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446142          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446277          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7446346          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7488564          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7542098          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7718549          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7722647          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7738945          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7758976          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7775113          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7778394          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7778509          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7782492          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783008          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783075          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783166          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783702          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7783791          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7784409          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7784421          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7785877          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7786814          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7787475          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7787497          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7788967          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7788989          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789006          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789062          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789095          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789120          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7789426          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          7790809          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          78002            -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          8030704          -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          88               -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          92               -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          93               -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__16065831    -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__18540299    -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__7439965     -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 0          EXH__7440020     -9  94.67 100 100 -9   0801-2 Y R 805                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: American Cyanamid MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 0          PM10             -9  92.08 100 100 -9   0801-2 Y R 805                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AmericanCyanamid/BASFCORPHANNIBALPLA: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 805                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 0          PM2_5            -9  92.08 100 100 -9   0801-2 Y R 805                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AmericanCyanamid/BASFCORPHANNIBALPLA: NEI_UNIQUE_ID=NEI34442: cdate=2008
29127 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29127 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9997                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29161 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0006                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29163 0          PM10             -9  58.68 100 100 -9   0801-3 Y R 0001                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: HOLCIM(US)INCCLARKSVILLEPLANT: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          PM2_5            -9  58.68 100 100 -9   0801-3 Y R 0001                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: HOLCIM(US)INCCLARKSVILLEPLANT: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10025737         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10025919         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10031137         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10034829         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10049055         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10060125         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10099748         -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10101505         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10101538         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10101970         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10108642         -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10124364         -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10124433         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10294403         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10325947         -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10377669         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          10588019         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          109              -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          11103869         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          12018018         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          12018198         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          12035722         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          12054487         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          12060003         -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          12079651         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          125              -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          12626812         -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          12640890         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          12710360         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1271289          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1303282          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1304569          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1306190          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1306236          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1307966          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1308061          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1308141          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1308389          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1309600          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1309644          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1313139          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13138459         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1313991          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1314063          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1314416          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1317346          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1317357          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1317368          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1317426          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1327339          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1327533          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1333820          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1335257          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1335326          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1336932          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1345046          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          1345160          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13462889         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13463393         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13510491         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13530659         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13530682         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13586828         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13597994         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          136              -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          136527           -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13765190         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13770893         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          13814965         -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          139              -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          14018952         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          14220178         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          14307336         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          14307358         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          14336700         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          14977618         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          16065831         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          16842038         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          16925250         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          18454121         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          18540299         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          195              -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          198              -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          199              -9  21.51 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          200              -9  21.51 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          201              -9  21.51 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          202              -9  21.51 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          21679312         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          2223930          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          226              -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          22967926         -9  21.51 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          253              -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          27253287         -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          301042           -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          3141126          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          3333673          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          373024           -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          50922297         -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          543908           -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          593748           -9  21.51 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          598630           -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          6018899          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          602              -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          603              -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          604              -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          61789513         -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          61790145         -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          62384            -9  21.51 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7428480          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7439921          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7439965          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7439976          -9  21.51 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7440020          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7440360          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7440382          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7440417          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7440439          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7440473          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7440484          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7446084          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7446142          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7446277          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7446346          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7487947          -9  21.51 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7488564          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7542098          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7718549          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7722647          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7738945          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7758976          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7775113          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7778394          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7778509          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7782492          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7783008          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7783075          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7783166          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7783702          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7783791          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7784409          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7784421          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7785877          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7786814          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7787475          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7787497          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7788967          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7788989          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7789006          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7789062          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7789095          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7789120          -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7789426          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          7790809          -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          78002            -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          8030704          -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          88               -9  72.06 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          92               -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          93               -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          EXH__16065831    -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          EXH__18540299    -9  74.17 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          EXH__7439965     -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29163 0          EXH__7440020     -9  58.68 100 100 -9   0801-3 Y R 204                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Holnam Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16369: cdate=2008
29173 0          PM10             -9  73.24 100 100 -9   0801-3 Y R 0001                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CONTINENTALCEMENTCOMPANYINC,ILASCOP: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          PM2_5            -9  73.24 100 100 -9   0801-3 Y R 0001                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CONTINENTALCEMENTCOMPANYINC,ILASCOP: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10025737         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10025919         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10031137         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10034829         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10049055         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10060125         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10099748         -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10101505         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10101538         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10101970         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10108642         -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10124364         -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10124433         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10294403         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10325947         -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10377669         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          10588019         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          109              -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          11103869         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          12018018         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          12018198         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          12035722         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          12054487         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          12060003         -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          12079651         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          125              -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          12626812         -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          12640890         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          12710360         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1271289          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1303282          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1304569          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1306190          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1306236          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1307966          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1308061          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1308141          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1308389          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1309600          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1309644          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1313139          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13138459         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1313991          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1314063          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1314416          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1317346          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1317357          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1317368          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1317426          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1327339          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1327533          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1333820          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1335257          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1335326          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1336932          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1345046          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          1345160          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13462889         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13463393         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13510491         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13530659         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13530682         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13586828         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13597994         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          136              -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          136527           -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13765190         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13770893         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          13814965         -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          139              -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          14018952         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          14220178         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          14307336         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          14307358         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          14336700         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          14977618         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          16065831         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          16842038         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          16925250         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          18454121         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          18540299         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          195              -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          198              -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          199              -9   6.33 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          200              -9   6.33 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          201              -9   6.33 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          202              -9   6.33 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          21679312         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          2223930          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          226              -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          22967926         -9   6.33 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          253              -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          27253287         -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          301042           -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          3141126          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          3333673          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          373024           -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          50922297         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          543908           -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          593748           -9   6.33 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          598630           -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          6018899          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          602              -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          603              -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          604              -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          61789513         -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          61790145         -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          62384            -9   6.33 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7428480          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7439921          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7439965          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7439976          -9   6.33 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7440020          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7440360          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7440382          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7440417          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7440439          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7440473          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7440484          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7446084          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7446142          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7446277          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7446346          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7487947          -9   6.33 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7488564          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7542098          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7718549          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7722647          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7738945          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7758976          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7775113          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7778394          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7778509          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7782492          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7783008          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7783075          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7783166          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7783702          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7783791          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7784409          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7784421          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7785877          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7786814          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7787475          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7787497          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7788967          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7788989          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7789006          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7789062          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7789095          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7789120          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7789426          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          7790809          -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          78002            -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          8030704          -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          88               -9  85.28 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          92               -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          93               -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          EXH__16065831    -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          EXH__18540299    -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          EXH__7439965     -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29173 0          EXH__7440020     -9  73.24 100 100 -9   0801-3 Y R 319                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Continental Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI34520: cdate=2008
29183 0          106990           -9  28.00 100 100 -9   -9     Y R 0076                            ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          107028           -9  28.00 100 100 -9   -9     Y R 0076                            ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          50000            -9  28.00 100 100 -9   -9     Y R 0076                            ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          67561            -9  28.00 100 100 -9   -9     Y R 0076                            ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          71432            -9  28.00 100 100 -9   -9     Y R 0076                            ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          75070            -9  28.00 100 100 -9   -9     Y R 0076                            ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          91203            -9  28.00 100 100 -9   -9     Y R 0076                            ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          VOC              -9  28.00 100 100 -9   -9     Y R 0076                            ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          106990           -9  28.00 100 100 -9   -9     Y R 63385BCGRP1500E                 ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          107028           -9  28.00 100 100 -9   -9     Y R 63385BCGRP1500E                 ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          50000            -9  28.00 100 100 -9   -9     Y R 63385BCGRP1500E                 ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          67561            -9  28.00 100 100 -9   -9     Y R 63385BCGRP1500E                 ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          71432            -9  28.00 100 100 -9   -9     Y R 63385BCGRP1500E                 ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          75070            -9  28.00 100 100 -9   -9     Y R 63385BCGRP1500E                 ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          91203            -9  28.00 100 100 -9   -9     Y R 63385BCGRP1500E                 ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29183 0          VOC              -9  28.00 100 100 -9   -9     Y R 63385BCGRP1500E                 ! MACT: Autos, plant: GENERALMOTORS-WENTZVILLECENTER, VOC 28%: Auto_2002_projections.xls
29186 0          PM10             -9  28.00 100 100 -9   -9     Y R 0001                            ! MACT: Lime Manufacturing: MISSISSIPPI LIME COMPANY
29186 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0001                            ! MACT: Lime Manufacturing: MISSISSIPPI LIME COMPANY
29186 0          SO2              -9  20.00 100 100 -9   -9     Y R 0001                            ! MACT: Lime Manufacturing: MISSISSIPPI LIME COMPANY
29186 0          PM10             -9  28.00 100 100 -9   -9     Y R 0035                            ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
29186 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0035                            ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
29186 0          SO2              -9  20.00 100 100 -9   -9     Y R 0035                            ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
29186 0          PM10             -9  28.00 100 100 -9   -9     Y R 63670CHMCL20947                 ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
29186 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 63670CHMCL20947                 ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
29186 0          SO2              -9  20.00 100 100 -9   -9     Y R 63670CHMCL20947                 ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
29186 0          PM10             -9  28.00 100 100 -9   -9     Y R 63670MSSSSHIGHW                 ! MACT: Lime Manufacturing: MISSISSIPPI LIME COMPANY
29186 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 63670MSSSSHIGHW                 ! MACT: Lime Manufacturing: MISSISSIPPI LIME COMPANY
29186 0          SO2              -9  20.00 100 100 -9   -9     Y R 63670MSSSSHIGHW                 ! MACT: Lime Manufacturing: MISSISSIPPI LIME COMPANY
29186 0          PM10             -9  28.00 100 100 -9   -9     Y R T$10009                         ! MACT: Lime Manufacturing: MISSISSIPPI LIME COMPANY
29186 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$10009                         ! MACT: Lime Manufacturing: MISSISSIPPI LIME COMPANY
29186 0          SO2              -9  20.00 100 100 -9   -9     Y R T$10009                         ! MACT: Lime Manufacturing: MISSISSIPPI LIME COMPANY
29186 0          PM10             -9  28.00 100 100 -9   -9     Y R T$17212                         ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
29186 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$17212                         ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
29186 0          SO2              -9  20.00 100 100 -9   -9     Y R T$17212                         ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY
29189 0          106990           -9  28.00 100 100 -9   -9     Y R 0002                            ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          107028           -9  28.00 100 100 -9   -9     Y R 0002                            ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          50000            -9  28.00 100 100 -9   -9     Y R 0002                            ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          67561            -9  28.00 100 100 -9   -9     Y R 0002                            ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          71432            -9  28.00 100 100 -9   -9     Y R 0002                            ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          75070            -9  28.00 100 100 -9   -9     Y R 0002                            ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          91203            -9  28.00 100 100 -9   -9     Y R 0002                            ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          VOC              -9  28.00 100 100 -9   -9     Y R 0002                            ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0230                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 0          106990           -9  28.00 100 100 -9   -9     Y R 0231                            ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          107028           -9  28.00 100 100 -9   -9     Y R 0231                            ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          50000            -9  28.00 100 100 -9   -9     Y R 0231                            ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          67561            -9  28.00 100 100 -9   -9     Y R 0231                            ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          71432            -9  28.00 100 100 -9   -9     Y R 0231                            ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          75070            -9  28.00 100 100 -9   -9     Y R 0231                            ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          91203            -9  28.00 100 100 -9   -9     Y R 0231                            ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          VOC              -9  28.00 100 100 -9   -9     Y R 0231                            ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          106990           -9  28.00 100 100 -9   -9     Y R 63026CHRYS1001N                 ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          107028           -9  28.00 100 100 -9   -9     Y R 63026CHRYS1001N                 ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          50000            -9  28.00 100 100 -9   -9     Y R 63026CHRYS1001N                 ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          67561            -9  28.00 100 100 -9   -9     Y R 63026CHRYS1001N                 ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          71432            -9  28.00 100 100 -9   -9     Y R 63026CHRYS1001N                 ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          75070            -9  28.00 100 100 -9   -9     Y R 63026CHRYS1001N                 ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          91203            -9  28.00 100 100 -9   -9     Y R 63026CHRYS1001N                 ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          VOC              -9  28.00 100 100 -9   -9     Y R 63026CHRYS1001N                 ! MACT: Autos, plant: CHRYSLERASSEMBLYPLANT1-FENTON, VOC 28%: Auto_2002_projections.xls
29189 0          106990           -9  28.00 100 100 -9   -9     Y R 63026STLSS1050D                 ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          107028           -9  28.00 100 100 -9   -9     Y R 63026STLSS1050D                 ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          50000            -9  28.00 100 100 -9   -9     Y R 63026STLSS1050D                 ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          67561            -9  28.00 100 100 -9   -9     Y R 63026STLSS1050D                 ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          71432            -9  28.00 100 100 -9   -9     Y R 63026STLSS1050D                 ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          75070            -9  28.00 100 100 -9   -9     Y R 63026STLSS1050D                 ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          91203            -9  28.00 100 100 -9   -9     Y R 63026STLSS1050D                 ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          VOC              -9  28.00 100 100 -9   -9     Y R 63026STLSS1050D                 ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 63145MCDNNLINDB                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 0          106990           -9  28.00 100 100 -9   -9     Y R MDI1523                         ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          107028           -9  28.00 100 100 -9   -9     Y R MDI1523                         ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          50000            -9  28.00 100 100 -9   -9     Y R MDI1523                         ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          67561            -9  28.00 100 100 -9   -9     Y R MDI1523                         ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          71432            -9  28.00 100 100 -9   -9     Y R MDI1523                         ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          75070            -9  28.00 100 100 -9   -9     Y R MDI1523                         ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          91203            -9  28.00 100 100 -9   -9     Y R MDI1523                         ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 0          VOC              -9  28.00 100 100 -9   -9     Y R MDI1523                         ! MACT: Autos, plant: CHRYSLERCORP-NORTHPLANT, VOC 28%: Auto_2002_projections.xls
29189 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29189 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9965                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0017                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0040                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118-NHSRB-ONE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 63118NHSRBONEBU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147-MLLNC-360                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 63147MLLNC3600N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0724                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9938                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
29510 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9968                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30007 0          PM10             -9  28.00 100 100 -9   -9     Y R 007-0002                        ! MACT: Lime Manufacturing: CONTINENTAL LIME
30007 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 007-0002                        ! MACT: Lime Manufacturing: CONTINENTAL LIME
30007 0          SO2              -9  20.00 100 100 -9   -9     Y R 007-0002                        ! MACT: Lime Manufacturing: CONTINENTAL LIME
30007 0          PM10             -9  28.00 100 100 -9   -9     Y R T$16933                         ! MACT: Lime Manufacturing: CONTINENTAL LIME
30007 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$16933                         ! MACT: Lime Manufacturing: CONTINENTAL LIME
30007 0          SO2              -9  20.00 100 100 -9   -9     Y R T$16933                         ! MACT: Lime Manufacturing: CONTINENTAL LIME
30013 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 013-0004                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 013-0004                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 013-0004                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 013-0004                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 31DEC2006
30013 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 013-0004                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 31DEC2006
30013 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 013-0004                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 013-0004                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 31DEC2006
30013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 013-0016                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30013 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 59414MNTNR19001                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 59414MNTNR19001                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 59414MNTNR19001                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 59414MNTNR19001                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 31DEC2006
30013 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 59414MNTNR19001                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 31DEC2006
30013 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 59414MNTNR19001                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 59414MNTNR19001                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 31DEC2006
30013 30600105   NOX              -9  40.00 100 100 -9   -9     Y R T$9035                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$9035                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$9035                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$9035                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 31DEC2006
30013 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$9035                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 31DEC2006
30013 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$9035                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 30JUN2005
30013 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$9035                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12464, Plant=Montana Refining Co., Great Falls, MT, compliance date: 31DEC2006
30029 0          106990           -9   0.00 100 100 -9   1624   Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   106990           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          107028           -9   0.00 100 100 -9   1624   Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   107028           -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          50000            -9   0.00 100 100 -9   1624   Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   50000            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          67561            -9   0.00 100 100 -9   1624   Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   67561            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          71432            -9   0.00 100 100 -9   1624   Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   71432            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          75070            -9   0.00 100 100 -9   1624   Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   75070            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          91203            -9   0.00 100 100 -9   1624   Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   91203            -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          VOC              -9   0.00 100 100 -9   1624   Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   VOC              -9   0.00 100 100 -9   -9     Y R 029-0008                        ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          106990           -9   0.00 100 100 -9   1624   Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   106990           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          107028           -9   0.00 100 100 -9   1624   Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   107028           -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          50000            -9   0.00 100 100 -9   1624   Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   50000            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          67561            -9   0.00 100 100 -9   1624   Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   67561            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          71432            -9   0.00 100 100 -9   1624   Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   71432            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          75070            -9   0.00 100 100 -9   1624   Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   75070            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          91203            -9   0.00 100 100 -9   1624   Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   91203            -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 0          VOC              -9   0.00 100 100 -9   1624   Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700602   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700604   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700606   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700607   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700608   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700610   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700611   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700621   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700625   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700626   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700628   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700629   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700630   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700631   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700632   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700635   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700640   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700651   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700655   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700661   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700664   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700665   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700701   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700702   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700703   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700704   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700705   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700706   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700707   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700708   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700709   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700710   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700711   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700712   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700713   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700714   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700715   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700716   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700717   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700718   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700720   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700725   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700727   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700730   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700734   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700735   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700736   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700737   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700740   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700744   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700746   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700747   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700750   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700752   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700753   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700756   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700757   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700760   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700762   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700763   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700766   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700767   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700769   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700770   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700771   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700780   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700781   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700783   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700785   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700788   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700789   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700790   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700791   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700792   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700793   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700798   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700799   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700801   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700802   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700895   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700921   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700923   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700925   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700927   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700931   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700932   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700933   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700934   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700935   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700936   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700939   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700940   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700950   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700960   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700971   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700980   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700981   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700982   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700983   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30700984   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701001   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701008   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701009   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701010   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701015   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701020   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701030   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701040   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701053   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701054   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701055   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701057   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701060   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701062   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701064   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701410   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701415   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701416   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701420   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701425   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701430   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701440   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701442   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701480   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701482   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701484   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701486   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701510   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701512   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701530   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701540   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701550   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701610   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701611   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701630   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701640   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701642   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701710   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701712   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701720   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701740   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30701742   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30029 30702021   VOC              -9   0.00 100 100 -9   -9     Y R 59912PLMCRPOBOX                 ! MACT: Plywood and Composite Wood Products: plant=Plum Creek Manufacturing, LP, Kalispell, MT
30031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 031-0005                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 59752HLNMN4070T                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16934                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 083-0002                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 59270HLLYSEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 111-0007                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 111-0011                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 111-0011                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 111-0011                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 111-0011                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 111-0011                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 111-0011                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 30JUN2007
30111 10100601   NOX              -9  40.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10201401   NOX              -9  40.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10201402   NOX              -9  40.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 20200201   NOX              -9  40.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31OCT2005
30111 10201401   PM10             -9  90.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201402   PM10             -9  90.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201402   PM2_5            -9  90.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201401   SO2              -9  99.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201402   SO2              -9  99.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 30SEP2005
30111 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 111-0012                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10200601   NOX              -9  40.00 100 100 -9   -9     Y R 111-0013                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 111-0013                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 20100201   NOX              -9  40.00 100 100 -9   -9     Y R 111-0013                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 111-0013                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 111-0013                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 111-0013                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 10201404   SO2              -9  50.00 100 100 -9   -9     Y R 111-0013                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 15JAN2010
30111 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 111-0013                        ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 15JAN2010
30111 10100601   NOX              -9  40.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10201401   NOX              -9  40.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10201402   NOX              -9  40.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 20200201   NOX              -9  40.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31OCT2005
30111 10201401   PM10             -9  90.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201402   PM10             -9  90.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201402   PM2_5            -9  90.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201401   SO2              -9  99.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201402   SO2              -9  99.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 30SEP2005
30111 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 59044CNXRF803HI                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 59101CNCBL401SO                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 59101CNCBL401SO                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 59101CNCBL401SO                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 59101CNCBL401SO                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 59101CNCBL401SO                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 59101CNCBL401SO                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 30JUN2007
30111 10200601   NOX              -9  40.00 100 100 -9   -9     Y R 59101XXNBL700EX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 59101XXNBL700EX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 20100201   NOX              -9  40.00 100 100 -9   -9     Y R 59101XXNBL700EX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 59101XXNBL700EX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 59101XXNBL700EX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 59101XXNBL700EX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 10201404   SO2              -9  50.00 100 100 -9   -9     Y R 59101XXNBL700EX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 15JAN2010
30111 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 59101XXNBL700EX                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 15JAN2010
30111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 59107WSTRN3020S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16930                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
30111 10100601   NOX              -9  40.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10200401   NOX              -9  40.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10201401   NOX              -9  40.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 10201402   NOX              -9  40.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 20200201   NOX              -9  40.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 20200202   NOX              -9  40.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600103   NOX              -9  40.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2011
30111 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31OCT2005
30111 10201401   PM10             -9  90.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201402   PM10             -9  90.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201402   PM2_5            -9  90.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201401   SO2              -9  99.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10201402   SO2              -9  99.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 30103204   SO2              -9   0.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 30SEP2005
30111 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$9024                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12458, Plant=Cenex Harvest States, Laurel, MT, compliance date: 31DEC2009
30111 10200401   NOX              -9  40.00 100 100 -9   -9     Y R T$9026                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$9026                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$9026                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600105   NOX              -9  40.00 100 100 -9   -9     Y R T$9026                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$9026                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 31JUL2009
30111 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$9026                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12459, Plant=Conoco Inc., Billings, MT, compliance date: 30JUN2007
30111 10200601   NOX              -9  40.00 100 100 -9   -9     Y R T$9028                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$9028                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 20100201   NOX              -9  40.00 100 100 -9   -9     Y R T$9028                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$9028                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 30600105   NOX              -9  40.00 100 100 -9   -9     Y R T$9028                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$9028                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 31DEC2008
30111 10201404   SO2              -9  50.00 100 100 -9   -9     Y R T$9028                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 15JAN2010
30111 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$9028                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12460, Plant=ExxonMobil Corp. (formerly Exxon), Billings, MT, compliance date: 15JAN2010
31001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00044                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 68901CHFTHEASTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10466                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
31105 50300502   PM10             -9  30.95 100 100 -9   -9     Y R 00009                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CLEANHARBORSENVIRONMENTALSERVICESINC: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 50300502   PM2_5            -9  30.95 100 100 -9   -9     Y R 00009                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CLEANHARBORSENVIRONMENTALSERVICESINC: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10025737         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10025919         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10031137         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10034829         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10049055         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10060125         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10099748         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10101505         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10101538         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10101970         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10108642         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10124364         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10124433         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10294403         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10325947         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10377669         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          10588019         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          109              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          11103869         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          12018018         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          12018198         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          12035722         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          12054487         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          12060003         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          12079651         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          125              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          12626812         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          12640890         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          12710360         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1271289          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1303282          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1304569          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1306190          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1306236          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1307966          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1308061          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1308141          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1308389          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1309600          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1309644          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1313139          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13138459         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1313991          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1314063          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1314416          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1317346          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1317357          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1317368          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1317426          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1327339          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1327533          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1333820          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1335257          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1335326          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1336932          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1345046          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          1345160          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13462889         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13463393         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13510491         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13530659         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13530682         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13586828         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13597994         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          136              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          136527           -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13765190         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13770893         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          13814965         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          139              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          14018952         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          14220178         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          14307336         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          14307358         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          14336700         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          14977618         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          16065831         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          16842038         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          16925250         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          18454121         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          18540299         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          195              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          198              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          199              -9  99.78 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          200              -9  99.78 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          201              -9  99.78 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          202              -9  99.78 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          21679312         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          2223930          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          226              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          22967926         -9  99.78 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          253              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          27253287         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          301042           -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          3141126          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          3333673          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          373024           -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          50922297         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          543908           -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          593748           -9  99.78 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          598630           -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          6018899          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          602              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          603              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          604              -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          61789513         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          61790145         -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          62384            -9  99.78 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7428480          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7439921          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7439965          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7439976          -9  99.78 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7440020          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7440360          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7440382          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7440417          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7440439          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7440473          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7440484          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7446084          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7446142          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7446277          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7446346          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7487947          -9  99.78 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7488564          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7542098          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7647010          -9  66.47 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7718549          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7722647          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7738945          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7758976          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7775113          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7778394          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7778509          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7782492          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7782505          -9  66.47 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7783008          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7783075          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7783166          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7783702          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7783791          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7784409          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7784421          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7785877          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7786814          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7787475          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7787497          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7788967          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7788989          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7789006          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7789062          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7789095          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7789120          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7789426          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          7790809          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          78002            -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          8030704          -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          88               -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          92               -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          93               -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          EXH__16065831    -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          EXH__18540299    -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          EXH__7439965     -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          EXH__7440020     -9  30.95 100 100 -9   0801-2 Y R 3010                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ecova Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          PM10             -9  30.95 100 100 -9   0801-1 Y R 3010                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CLEANHARBORSENVIRONMENTALSERVICESINC: NEI_UNIQUE_ID=NEINE00009: cdate=2008
31105 0          PM2_5            -9  30.95 100 100 -9   0801-1 Y R 3010                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CLEANHARBORSENVIRONMENTALSERVICESINC: NEI_UNIQUE_ID=NEINE00009: cdate=2008
34001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 70497                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00122                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00263                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 02101                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 02102                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 02876                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI00122                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 08057GRSPCBORTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45077                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45835                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI45239                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14786                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 08110GRGPC175DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 50519                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 51607                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI50519                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14781                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14794                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14795                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 75478                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 75499                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34011 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI75043                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 07349                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 08027MDGNS480DE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 216                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 55057                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 55779                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 55781                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34862, Plant=Sunoco (formerly Coastal Eagle Point Oil Co.), Westville, NJ, compliance date: 30APR2008
34015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 55796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 0          10025737         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10025919         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10031137         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10034829         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10049055         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10060125         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10099748         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10101505         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10101538         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10101970         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10108642         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10124364         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10294403         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10325947         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10377669         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          10588019         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          109              -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          11103869         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          12018018         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          12018198         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          12035722         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          12054487         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          12060003         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          12079651         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          125              -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          12626812         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          12640890         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          12710360         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1271289          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1303282          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1304569          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1306190          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1306236          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1308141          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1308389          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1309600          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1309644          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1313139          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13138459         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1313991          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1314063          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1314416          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1317346          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1317357          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1317368          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1327339          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1327533          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1333820          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1335257          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1335326          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1336932          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1345046          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13462889         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13463393         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13510491         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13530659         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13530682         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13597994         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          136              -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          136527           -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13765190         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13770893         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          13814965         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          139              -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          14018952         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          14220178         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          14307336         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          14307358         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          14336700         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          14977618         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          16065831         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          16925250         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          18454121         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          18540299         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          195              -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          198              -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          199              -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          200              -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          201              -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          202              -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          21679312         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          2223930          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          226              -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          253              -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          27253287         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          301042           -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          3141126          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          3333673          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          373024           -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          50922297         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          543908           -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          593748           -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          598630           -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          6018899          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          602              -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          603              -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          604              -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          61790145         -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          62384            -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7428480          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7439921          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7439965          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7440020          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7440360          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7440382          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7440417          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7440439          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7440473          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7446084          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7446142          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7446277          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7446346          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7488564          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7718549          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7722647          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7738945          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7758976          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7775113          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7778394          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7778509          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7782492          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7783008          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7783075          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7783166          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7783702          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7783791          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7784409          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7784421          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7785877          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7786814          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7787475          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7787497          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7788967          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7788989          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7789006          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7789062          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7789095          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7789120          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7789426          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          7790809          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          78002            -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          8030704          -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          88               -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          92               -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          93               -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          EXH__16065831    -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          EXH__18540299    -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          EXH__7439965     -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          EXH__7440020     -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Pennwalt Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          PM10             -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AUSIMONTUSAINCORPORATED: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 0          PM2_5            -9  84.57 100 100 -9   0801-2 Y R 824                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AUSIMONTUSAINCORPORATED: NEI_UNIQUE_ID=NEI45000: cdate=2008
34015 30600201   NOX              -9  45.00 100 100 -9   -9     Y R EGU0773                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34862, Plant=Sunoco (formerly Coastal Eagle Point Oil Co.), Westville, NJ, compliance date: 30APR2008
34015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55035                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI55057                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$880                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$891                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEINJT$891, Plant=Valero Energy Corp. (formerly Mobil Oil), Paulsboro, NJ, compliance date: 31DEC2008
34015 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$891                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEINJT$891, Plant=Valero Energy Corp. (formerly Mobil Oil), Paulsboro, NJ, compliance date: 31DEC2006
34015 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$891                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEINJT$891, Plant=Valero Energy Corp. (formerly Mobil Oil), Paulsboro, NJ, compliance date: 31DEC2006
34015 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$891                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEINJT$891, Plant=Valero Energy Corp. (formerly Mobil Oil), Paulsboro, NJ, compliance date: 31DEC2005
34015 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$891                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEINJT$891, Plant=Valero Energy Corp. (formerly Mobil Oil), Paulsboro, NJ, compliance date: 31DEC2006
34015 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$891                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEINJT$891, Plant=Valero Energy Corp. (formerly Mobil Oil), Paulsboro, NJ, compliance date: 31DEC2005
34015 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$911                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34862, Plant=Sunoco (formerly Coastal Eagle Point Oil Co.), Westville, NJ, compliance date: 30APR2008
34015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$921                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 10320                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 10759                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 12099                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 12195                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 0          10025737         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10025919         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10031137         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10034829         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10049055         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10060125         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10099748         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10101505         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10101538         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10101970         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10108642         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10124364         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10124433         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10294403         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10325947         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10377669         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          10588019         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          109              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          11103869         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          12018018         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          12018198         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          12035722         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          12054487         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          12060003         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          12079651         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          125              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          12626812         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          12640890         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          12710360         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1271289          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1303282          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1304569          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1306190          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1306236          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1307966          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1308061          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1308141          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1308389          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1309600          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1309644          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1313139          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13138459         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1313991          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1314063          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1314416          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1317346          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1317357          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1317368          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1317426          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1327339          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1327533          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1333820          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1335257          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1335326          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1336932          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1345046          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          1345160          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13462889         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13463393         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13510491         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13530659         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13530682         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13586828         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13597994         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          136              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          136527           -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13765190         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13770893         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          13814965         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          139              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          14018952         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          14220178         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          14307336         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          14307358         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          14336700         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          14977618         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          16065831         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          16842038         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          16925250         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          18454121         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          18540299         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          195              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          198              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          199              -9   0.00 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          200              -9   0.00 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          201              -9   0.00 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          202              -9   0.00 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          21679312         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          2223930          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          226              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          253              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          27253287         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          301042           -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          3141126          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          3333673          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          373024           -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          50922297         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          543908           -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          593748           -9   0.00 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          598630           -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          6018899          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          602              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          603              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          604              -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          61789513         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          61790145         -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          62384            -9   0.00 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7428480          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7439921          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7439965          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7440020          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7440360          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7440382          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7440417          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7440439          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7440473          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7440484          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7446084          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7446142          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7446277          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7446346          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7488564          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7542098          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7647010          -9  87.86 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7718549          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7722647          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7738945          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7758976          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7775113          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7778394          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7778509          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7782492          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7782505          -9  87.86 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7783008          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7783075          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7783166          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7783702          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7783791          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7784409          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7784421          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7785877          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7786814          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7787475          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7787497          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7788967          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7788989          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7789006          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7789062          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7789095          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7789120          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7789426          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          7790809          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          78002            -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          8030704          -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          88               -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          92               -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          93               -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          EXH__16065831    -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          EXH__18540299    -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          EXH__7439965     -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          EXH__7440020     -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ZENECA MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          PM10             -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ZENECA: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 0          PM2_5            -9  86.53 100 100 -9   0801-2 Y R 725                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ZENECA: NEI_UNIQUE_ID=NEINJ725: cdate=2008
34017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI10759                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI12195                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 80062                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 80368                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 08543BRSTLRTE20                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 61051                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 61052                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 61053                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14803                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 07008BLLGLONEMI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 15621                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 16313                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 17913                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 17994                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 18064                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 18070                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI16631                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI18064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14718                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$969                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 21140                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 26233                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 30345                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 31544                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 31669                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R PI30345                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34033 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 65482                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 40543                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 41682                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 41724                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 41735                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 41808                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 41811                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 41813                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
34039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$721                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
35015 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 350150010                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 21DEC2009
35015 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 350150010                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 21DEC2009
35015 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 350150010                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 21DEC2009
35015 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 350150010                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31MAR2006
35015 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 350150010                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31DEC2006
35015 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 350150010                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31DEC2006
35015 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 350150010                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31DEC2006
35015 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 88210NVJRF501EA                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 21DEC2009
35015 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 88210NVJRF501EA                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 21DEC2009
35015 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 88210NVJRF501EA                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 21DEC2009
35015 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 88210NVJRF501EA                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31MAR2006
35015 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 88210NVJRF501EA                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31DEC2006
35015 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 88210NVJRF501EA                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31DEC2006
35015 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 88210NVJRF501EA                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31DEC2006
35015 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$12476                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 21DEC2009
35015 20200202   NOX              -9  40.00 100 100 -9   -9     Y R T$12476                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 21DEC2009
35015 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$12476                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 21DEC2009
35015 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$12476                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31MAR2006
35015 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$12476                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31DEC2006
35015 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$12476                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31DEC2006
35015 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$12476                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI34898, Plant=Navajo Refining Co., Artesia, NM, compliance date: 31DEC2006
36001 0          10025737         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10025919         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10031137         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10034829         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10049055         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10060125         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10099748         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10101505         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10101538         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10101970         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10108642         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10124364         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10124433         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10294403         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10325947         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10377669         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10588019         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          109              -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          11103869         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12018018         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12018198         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12035722         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12054487         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12060003         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12079651         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          125              -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12626812         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12640890         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12710360         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1271289          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1303282          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1304569          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1306190          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1306236          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1307966          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1308061          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1308141          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1308389          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1309600          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1309644          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1313139          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13138459         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1313991          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1314063          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1314416          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1317346          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1317357          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1317368          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1317426          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1327339          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1327533          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1333820          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1335257          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1335326          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1336932          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1345046          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1345160          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13462889         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13463393         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13510491         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13530659         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13530682         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13586828         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13597994         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          136              -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          136527           -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13765190         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13770893         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13814965         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          139              -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14018952         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14220178         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14307336         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14307358         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14336700         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14977618         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          16065831         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          16842038         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          16925250         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          18454121         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          18540299         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          195              -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          198              -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          199              -9  94.80 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          200              -9  94.80 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          201              -9  94.80 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          202              -9  94.80 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          21679312         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          2223930          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          226              -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          22967926         -9  94.80 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          253              -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          27253287         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          301042           -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          3141126          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          3333673          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          373024           -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          50922297         -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          543908           -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          593748           -9  94.80 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          598630           -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          6018899          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          602              -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          603              -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          604              -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          61789513         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          61790145         -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          62384            -9  94.80 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7428480          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7439921          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7439965          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7439976          -9  94.80 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440020          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440360          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440382          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440417          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440439          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440473          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440484          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7446084          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7446142          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7446277          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7446346          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7487947          -9  94.80 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7488564          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7542098          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7647010          -9   0.00 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7718549          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7722647          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7738945          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7758976          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7775113          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7778394          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7778509          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7782492          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7782505          -9   0.00 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7783008          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7783075          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7783166          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7783702          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7783791          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7784409          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7784421          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7785877          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7786814          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7787475          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7787497          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7788967          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7788989          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7789006          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7789062          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7789095          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7789120          -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7789426          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7790809          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          78002            -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          8030704          -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          88               -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          92               -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          93               -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          EXH__16065831    -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          EXH__18540299    -9  22.37 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          EXH__7439965     -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          EXH__7440020     -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          PM10             -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: Thermalkem(Norlite): NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          PM2_5            -9   3.79 100 100 -9   0801-4 Y R 307                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: Thermalkem(Norlite): NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10025737         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10025919         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10031137         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10034829         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10049055         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10060125         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10099748         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10101505         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10101538         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10101970         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10108642         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10124364         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10124433         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10294403         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10325947         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10377669         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10588019         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          109              -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          11103869         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12018018         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12018198         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12035722         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12054487         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12060003         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12079651         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          125              -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12626812         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12640890         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          12710360         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1271289          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1303282          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1304569          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1306190          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1306236          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1307966          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1308061          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1308141          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1308389          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1309600          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1309644          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1313139          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13138459         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1313991          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1314063          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1314416          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1317346          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1317357          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1317368          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1317426          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1327339          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1327533          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1333820          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1335257          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1335326          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1336932          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1345046          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          1345160          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13462889         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13463393         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13510491         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13530659         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13530682         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13586828         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13597994         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          136              -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          136527           -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13765190         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13770893         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          13814965         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          139              -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14018952         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14220178         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14307336         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14307358         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14336700         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          14977618         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          16065831         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          16842038         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          16925250         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          18454121         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          18540299         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          195              -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          198              -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          199              -9  94.80 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          200              -9  94.80 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          201              -9  94.80 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          202              -9  94.80 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          21679312         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          2223930          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          226              -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          22967926         -9  94.80 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          253              -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          27253287         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          301042           -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          3141126          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          3333673          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          373024           -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          50922297         -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          543908           -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          593748           -9  94.80 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          598630           -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          6018899          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          602              -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          603              -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          604              -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          61789513         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          61790145         -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          62384            -9  94.80 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7428480          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7439921          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7439965          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7439976          -9  94.80 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440020          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440360          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440382          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440417          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440439          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440473          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7440484          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7446084          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7446142          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7446277          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7446346          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7487947          -9  94.80 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7488564          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7542098          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7647010          -9   0.00 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7718549          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7722647          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7738945          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7758976          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7775113          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7778394          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7778509          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7782492          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7782505          -9   0.00 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7783008          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7783075          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7783166          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7783702          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7783791          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7784409          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7784421          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7785877          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7786814          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7787475          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7787497          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7788967          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7788989          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7789006          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7789062          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7789095          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7789120          -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7789426          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          7790809          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          78002            -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          8030704          -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          88               -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          92               -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          93               -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          EXH__16065831    -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          EXH__18540299    -9  22.37 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          EXH__7439965     -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          EXH__7440020     -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Thermalkem (Norlite) MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          PM10             -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: Thermalkem(Norlite): NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          PM2_5            -9   3.79 100 100 -9   0801-4 Y R 479                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: Thermalkem(Norlite): NEI_UNIQUE_ID=NEI16605: cdate=2008
36001 0          10025737         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10025919         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10031137         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10034829         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10049055         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10060125         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10099748         -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10101505         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10101538         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10101970         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10108642         -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10124364         -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10124433         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10294403         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10325947         -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10377669         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          10588019         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          109              -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          11103869         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          12018018         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          12018198         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          12035722         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          12054487         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          12060003         -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          12079651         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          125              -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          12626812         -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          12640890         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          12710360         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1271289          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1303282          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1304569          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1306190          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1306236          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1307966          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1308061          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1308141          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1308389          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1309600          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1309644          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1313139          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13138459         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1313991          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1314063          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1314416          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1317346          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1317357          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1317368          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1317426          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1327339          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1327533          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1333820          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1335257          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1335326          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1336932          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1345046          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          1345160          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13462889         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13463393         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13510491         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13530659         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13530682         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13586828         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13597994         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          136              -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          136527           -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13765190         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13770893         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          13814965         -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          139              -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          14018952         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          14220178         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          14307336         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          14307358         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          14336700         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          14977618         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          16065831         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          16842038         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          16925250         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          18454121         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          18540299         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          195              -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          198              -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          199              -9   0.00 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          200              -9   0.00 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          201              -9   0.00 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          202              -9   0.00 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          21679312         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          2223930          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          226              -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          253              -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          27253287         -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          301042           -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          3141126          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          3333673          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          373024           -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          50922297         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          543908           -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          593748           -9   0.00 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          598630           -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          6018899          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          602              -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          603              -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          604              -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          61789513         -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          61790145         -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          62384            -9   0.00 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7428480          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7439921          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7439965          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7440020          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7440360          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7440382          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7440417          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7440439          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7440473          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7440484          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7446084          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7446142          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7446277          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7446346          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7488564          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7542098          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7647010          -9  39.97 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7718549          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7722647          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7738945          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7758976          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7775113          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7778394          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7778509          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7782492          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7782505          -9  39.97 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7783008          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7783075          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7783166          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7783702          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7783791          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7784409          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7784421          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7785877          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7786814          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7787475          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7787497          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7788967          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7788989          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7789006          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7789062          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7789095          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7789120          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7789426          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          7790809          -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          78002            -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          8030704          -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          88               -9  74.56 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          92               -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          93               -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          EXH__16065831    -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          EXH__18540299    -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          EXH__7439965     -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          EXH__7440020     -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GENERAL ELECTRIC SELKIRK PLASTICS PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          PM10             -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GENERALELECTRICSELKIRKPLASTICSPLT: NEI_UNIQUE_ID=NEI43300: cdate=2008
36001 0          PM2_5            -9  17.92 100 100 -9   0801-6 Y R 766                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GENERALELECTRICSELKIRKPLASTICSPLT: NEI_UNIQUE_ID=NEI43300: cdate=2008
36007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 7034800027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4123000019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1243                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 9140200465                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100101   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100102   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100201   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100202   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100203   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100204   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100205   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100211   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100212   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100215   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100217   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100218   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100221   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100222   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100223   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100224   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100225   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100226   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100235   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100237   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100238   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100300   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100301   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100302   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100303   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100304   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100306   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100316   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100317   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100318   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200101   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200104   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200107   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200117   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200201   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200202   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200203   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200204   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200205   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200206   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200210   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200212   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200213   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200217   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200218   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200219   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200221   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200222   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200223   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200224   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200225   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200226   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200229   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200300   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200301   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200302   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200303   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200304   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200306   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200307   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200802   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200804   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300101   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300102   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300103   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300200   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300203   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300205   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300206   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300207   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300208   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300209   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300211   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300214   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300216   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300217   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300218   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300221   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300222   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300223   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300224   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300225   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300226   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300300   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300305   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300306   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300307   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300309   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000100   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000189   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000199   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000200   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000201   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000203   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000288   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000289   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000299   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000389   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000399   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000801   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000889   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000899   PM10             -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36029 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-8                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4192200015                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14870                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 6226000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 14652STMNK1669L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 0          10025737         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10025919         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10031137         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10034829         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10049055         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10060125         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10099748         -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10101505         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10101538         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10101970         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10108642         -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10124364         -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10124433         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10294403         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10325947         -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10377669         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10588019         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          109              -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          11103869         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12018018         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12018198         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12035722         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12054487         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12060003         -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12079651         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          125              -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12626812         -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12640890         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12710360         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1271289          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1303282          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1304569          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1306190          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1306236          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1307966          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1308061          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1308141          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1308389          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1309600          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1309644          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1313139          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13138459         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1313991          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1314063          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1314416          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1317346          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1317357          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1317368          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1317426          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1327339          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1327533          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1333820          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1335257          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1335326          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1336932          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1345046          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1345160          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13462889         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13463393         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13510491         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13530659         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13530682         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13586828         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13597994         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          136              -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          136527           -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13765190         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13770893         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13814965         -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          139              -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14018952         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14220178         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14307336         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14307358         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14336700         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14977618         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          16065831         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          16842038         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          16925250         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          18454121         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          18540299         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          195              -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          198              -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          199              -9  41.68 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          200              -9  41.68 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          201              -9  41.68 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          202              -9  41.68 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          21679312         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          2223930          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          226              -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          22967926         -9  41.68 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          253              -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          27253287         -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          301042           -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          3141126          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          3333673          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          373024           -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          50922297         -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          543908           -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          593748           -9  41.68 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          598630           -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          6018899          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          602              -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          603              -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          604              -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          61789513         -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          61790145         -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          62384            -9  41.68 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7428480          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7439921          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7439965          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7439976          -9  41.68 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440020          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440360          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440382          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440417          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440439          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440473          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440484          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7446084          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7446142          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7446277          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7446346          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7487947          -9  41.68 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7488564          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7542098          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7718549          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7722647          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7738945          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7758976          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7775113          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7778394          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7778509          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7782492          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7783008          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7783075          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7783166          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7783702          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7783791          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7784409          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7784421          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7785877          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7786814          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7787475          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7787497          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7788967          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7788989          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7789006          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7789062          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7789095          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7789120          -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7789426          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7790809          -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          78002            -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          8030704          -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          88               -9  70.46 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          92               -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          93               -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          EXH__16065831    -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          EXH__18540299    -9  49.87 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          EXH__7439965     -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          EXH__7440020     -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 0          PM10             -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANKODAKCOKODAKPARK: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3016                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 0          PM2_5            -9  25.00 100 100 -9   0801-2 Y R 3016                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANKODAKCOKODAKPARK: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 0          PM10             -9  25.00 100 100 -9   0801-2 Y R 8261400205                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANKODAKCOKODAKPARK: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 50300506   PM10             -9  25.00 100 100 -9   -9     Y R 8261400205                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANKODAKCOKODAKPARK: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 8261400205                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 0          PM2_5            -9  25.00 100 100 -9   0801-2 Y R 8261400205                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANKODAKCOKODAKPARK: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 50300506   PM2_5            -9  25.00 100 100 -9   -9     Y R 8261400205                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANKODAKCOKODAKPARK: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10025737         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10025919         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10031137         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10034829         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10049055         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10060125         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10099748         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10101505         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10101538         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10101970         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10108642         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10124364         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10124433         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10294403         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10325947         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10377669         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          10588019         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          109              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          11103869         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12018018         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12018198         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12035722         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12054487         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12060003         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12079651         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          125              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12626812         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12640890         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          12710360         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1271289          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1303282          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1304569          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1306190          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1306236          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1307966          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1308061          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1308141          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1308389          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1309600          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1309644          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1313139          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13138459         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1313991          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1314063          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1314416          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1317346          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1317357          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1317368          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1317426          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1327339          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1327533          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1333820          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1335257          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1335326          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1336932          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1345046          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          1345160          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13462889         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13463393         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13510491         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13530659         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13530682         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13586828         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13597994         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          136              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          136527           -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13765190         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13770893         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          13814965         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          139              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14018952         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14220178         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14307336         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14307358         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14336700         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          14977618         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          16065831         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          16842038         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          16925250         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          18454121         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          18540299         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          195              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          198              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          199              -9   0.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          200              -9   0.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          201              -9   0.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          202              -9   0.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          21679312         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          2223930          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          226              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          253              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          27253287         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          301042           -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          3141126          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          3333673          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          373024           -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          50922297         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          543908           -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          593748           -9   0.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          598630           -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          6018899          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          602              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          603              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          604              -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          61789513         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          61790145         -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          62384            -9   0.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7428480          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7439921          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7439965          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440020          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440360          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440382          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440417          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440439          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440473          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7440484          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7446084          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7446142          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7446277          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7446346          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7488564          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7542098          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7647010          -9  23.19 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7718549          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7722647          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7738945          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7758976          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7775113          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7778394          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7778509          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7782492          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7782505          -9  23.19 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7783008          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7783075          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7783166          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7783702          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7783791          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7784409          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7784421          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7785877          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7786814          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7787475          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7787497          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7788967          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7788989          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7789006          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7789062          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7789095          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7789120          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7789426          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          7790809          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          78002            -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          8030704          -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          88               -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          92               -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          93               -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          EXH__16065831    -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          EXH__18540299    -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          EXH__7439965     -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 0          EXH__7440020     -9  96.20 100 100 -9   0801-2 Y R 915                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eastman Kodak MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 0          PM10             -9  25.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANKODAKCOKODAKPARK: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 915                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 0          PM2_5            -9  25.00 100 100 -9   0801-2 Y R 915                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANKODAKCOKODAKPARK: NEI_UNIQUE_ID=NEI37022: cdate=2008
36055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0812                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R Magtape99-05                    ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1380                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36063 0          10025737         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10025919         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10031137         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10034829         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10049055         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10060125         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10099748         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10101505         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10101538         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10101970         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10108642         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10124364         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10124433         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10294403         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10325947         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10377669         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          10588019         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          109              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          11103869         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          12018018         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          12018198         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          12035722         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          12054487         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          12060003         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          12079651         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          125              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          12626812         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          12640890         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          12710360         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1271289          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1303282          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1304569          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1306190          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1306236          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1307966          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1308061          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1308141          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1308389          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1309600          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1309644          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1313139          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13138459         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1313991          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1314063          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1314416          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1317346          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1317357          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1317368          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1317426          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1327339          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1327533          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1333820          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1335257          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1335326          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1336932          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1345046          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          1345160          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13462889         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13463393         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13510491         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13530659         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13530682         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13586828         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13597994         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          136              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          136527           -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13765190         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13770893         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          13814965         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          139              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          14018952         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          14220178         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          14307336         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          14307358         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          14336700         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          14977618         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          16065831         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          16842038         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          16925250         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          18454121         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          18540299         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          195              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          198              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          199              -9  57.39 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          200              -9  57.39 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          201              -9  57.39 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          202              -9  57.39 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          21679312         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          2223930          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          226              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          22967926         -9  57.39 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          253              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          27253287         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          301042           -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          3141126          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          3333673          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          373024           -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          50922297         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          543908           -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          593748           -9  57.39 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          598630           -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          6018899          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          602              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          603              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          604              -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          61789513         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          61790145         -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          62384            -9  57.39 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7428480          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7439921          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7439965          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7439976          -9  57.39 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7440020          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7440360          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7440382          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7440417          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7440439          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7440473          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7440484          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7446084          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7446142          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7446277          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7446346          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7487947          -9  57.39 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7488564          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7542098          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7647010          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7718549          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7722647          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7738945          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7758976          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7775113          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7778394          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7778509          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7782492          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7782505          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7783008          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7783075          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7783166          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7783702          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7783791          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7784409          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7784421          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7785877          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7786814          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7787475          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7787497          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7788967          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7788989          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7789006          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7789062          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7789095          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7789120          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7789426          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          7790809          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          78002            -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          8030704          -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          88               -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          92               -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          93               -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          EXH__16065831    -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          EXH__18540299    -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          EXH__7439965     -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36063 0          EXH__7440020     -9   0.00 100 100 -9   0801-2 Y R A43                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIRNYT$1332: cdate=2008
36071 0          10025737         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10025919         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10031137         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10034829         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10049055         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10060125         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10099748         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10101505         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10101538         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10101970         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10108642         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10124364         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10124433         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10294403         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10325947         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10377669         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          10588019         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          109              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          11103869         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          12018018         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          12018198         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          12035722         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          12054487         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          12060003         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          12079651         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          125              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          12626812         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          12640890         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          12710360         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1271289          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1303282          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1304569          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1306190          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1306236          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1307966          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1308061          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1308141          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1308389          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1309600          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1309644          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1313139          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13138459         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1313991          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1314063          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1314416          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1317346          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1317357          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1317368          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1317426          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1327339          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1327533          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1333820          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1335257          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1335326          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1336932          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1345046          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          1345160          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13462889         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13463393         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13510491         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13530659         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13530682         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13586828         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13597994         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          136              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          136527           -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13765190         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13770893         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          13814965         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          139              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          14018952         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          14220178         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          14307336         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          14307358         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          14336700         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          14977618         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          16065831         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          16842038         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          16925250         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          18454121         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          18540299         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          195              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          198              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          199              -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          200              -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          201              -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          202              -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          21679312         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          2223930          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          226              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          253              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          27253287         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          301042           -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          3141126          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          3333673          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          373024           -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          50922297         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          543908           -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          593748           -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          598630           -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          6018899          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          602              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          603              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          604              -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          61789513         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          61790145         -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          62384            -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7428480          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7439921          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7439965          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7440020          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7440360          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7440382          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7440417          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7440439          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7440473          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7440484          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7446084          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7446142          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7446277          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7446346          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7488564          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7542098          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7718549          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7722647          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7738945          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7758976          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7775113          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7778394          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7778509          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7782492          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7783008          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7783075          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7783166          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7783702          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7783791          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7784409          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7784421          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7785877          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7786814          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7787475          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7787497          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7788967          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7788989          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7789006          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7789062          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7789095          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7789120          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7789426          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          7790809          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          78002            -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          8030704          -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          88               -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          92               -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          93               -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          EXH__16065831    -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          EXH__18540299    -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          EXH__7439965     -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          EXH__7440020     -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Nepera MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          PM10             -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: RUTHERFORDCHEMICALSLLCNEPERADIV: NEI_UNIQUE_ID=NEI38382: cdate=2008
36071 0          PM2_5            -9  88.93 100 100 -9   0801-2 Y R 712                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: RUTHERFORDCHEMICALSLLCNEPERADIV: NEI_UNIQUE_ID=NEI38382: cdate=2008
36091 0          10025737         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10025919         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10031137         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10034829         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10049055         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10060125         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10099748         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10101505         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10101538         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10101970         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10108642         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10124364         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10124433         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10294403         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10325947         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10377669         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10588019         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          109              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          11103869         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12018018         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12018198         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12035722         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12054487         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12060003         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12079651         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          125              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12626812         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12640890         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12710360         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1271289          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1303282          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1304569          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1306190          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1306236          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1307966          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1308061          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1308141          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1308389          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1309600          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1309644          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1313139          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13138459         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1313991          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1314063          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1314416          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1317346          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1317357          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1317368          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1317426          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1327339          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1327533          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1333820          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1335257          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1335326          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1336932          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1345046          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1345160          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13462889         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13463393         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13510491         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13530659         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13530682         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13586828         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13597994         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          136              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          136527           -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13765190         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13770893         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13814965         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          139              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14018952         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14220178         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14307336         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14307358         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14336700         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14977618         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          16065831         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          16842038         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          16925250         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          18454121         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          18540299         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          195              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          198              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          199              -9   0.00 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          200              -9   0.00 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          201              -9   0.00 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          202              -9   0.00 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          21679312         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          2223930          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          226              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          253              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          27253287         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          301042           -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          3141126          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          3333673          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          373024           -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          50922297         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          543908           -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          598630           -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          6018899          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          602              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          603              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          604              -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          61789513         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          61790145         -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7428480          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7439921          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7439965          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440020          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440360          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440382          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440417          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440439          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440473          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440484          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7446084          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7446142          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7446277          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7446346          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7488564          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7542098          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7647010          -9   4.75 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7718549          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7722647          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7738945          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7758976          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7775113          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7778394          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7778509          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7782492          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7782505          -9   4.75 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7783008          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7783075          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7783166          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7783702          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7783791          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7784409          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7784421          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7785877          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7786814          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7787475          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7787497          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7788967          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7788989          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7789006          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7789062          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7789095          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7789120          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7789426          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7790809          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          78002            -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          8030704          -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          88               -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          92               -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          93               -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          EXH__16065831    -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          EXH__18540299    -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          EXH__7439965     -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          EXH__7440020     -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          PM10             -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MOMENTIVEPERFORMANCEMATERIALS/GESILIC: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          PM2_5            -9  84.82 100 100 -9   0801-2 Y R 3020                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MOMENTIVEPERFORMANCEMATERIALS/GESILIC: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10025737         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10025919         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10031137         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10034829         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10049055         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10060125         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10099748         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10101505         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10101538         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10101970         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10108642         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10124364         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10124433         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10294403         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10325947         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10377669         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          10588019         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          109              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          11103869         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12018018         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12018198         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12035722         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12054487         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12060003         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12079651         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          125              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12626812         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12640890         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          12710360         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1271289          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1303282          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1304569          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1306190          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1306236          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1307966          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1308061          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1308141          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1308389          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1309600          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1309644          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1313139          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13138459         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1313991          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1314063          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1314416          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1317346          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1317357          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1317368          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1317426          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1327339          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1327533          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1333820          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1335257          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1335326          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1336932          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1345046          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          1345160          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13462889         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13463393         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13510491         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13530659         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13530682         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13586828         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13597994         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          136              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          136527           -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13765190         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13770893         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          13814965         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          139              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14018952         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14220178         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14307336         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14307358         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14336700         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          14977618         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          16065831         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          16842038         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          16925250         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          18454121         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          18540299         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          195              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          198              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          199              -9   0.00 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          200              -9   0.00 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          201              -9   0.00 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          202              -9   0.00 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          21679312         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          2223930          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          226              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          253              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          27253287         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          301042           -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          3141126          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          3333673          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          373024           -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          50922297         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          543908           -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          593748           -9   0.00 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          598630           -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          6018899          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          602              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          603              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          604              -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          61789513         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          61790145         -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          62384            -9   0.00 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7428480          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7439921          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7439965          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440020          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440360          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440382          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440417          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440439          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440473          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7440484          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7446084          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7446142          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7446277          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7446346          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7488564          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7542098          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7647010          -9  69.15 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7718549          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7722647          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7738945          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7758976          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7775113          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7778394          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7778509          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7782492          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7782505          -9  69.15 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7783008          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7783075          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7783166          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7783702          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7783791          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7784409          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7784421          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7785877          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7786814          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7787475          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7787497          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7788967          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7788989          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7789006          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7789062          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7789095          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7789120          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7789426          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          7790809          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          78002            -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          8030704          -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          88               -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          92               -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          93               -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          EXH__16065831    -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          EXH__18540299    -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          EXH__7439965     -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          EXH__7440020     -9  55.84 100 100 -9   0801-2 Y R 825                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: General Electric Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          PM10             -9  84.82 100 100 -9   0801-2 Y R 825                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MOMENTIVEPERFORMANCEMATERIALS/GESILIC: NEI_UNIQUE_ID=NEI6676: cdate=2008
36091 0          PM2_5            -9  84.82 100 100 -9   0801-2 Y R 825                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MOMENTIVEPERFORMANCEMATERIALS/GESILIC: NEI_UNIQUE_ID=NEI6676: cdate=2008
36097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 14891CRGLL518EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 8442400001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1416                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 7500700030                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3514800084                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 9563200007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
36121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14977                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700300005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3700900053                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0724                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28728BSFLF1451S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14153                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14154                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702300060                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645BRNHRPLAN3                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28645THMSV315EL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700008                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3702700027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14139                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3223                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3197                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704100051                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3704900019                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28302CRGLLRIVER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705100016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3110                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVEMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 27360THMSVWMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700147                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700149                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3705700150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R MDI1603                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2876                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2877                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2878                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2879                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37063 0          10025737         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10025919         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10031137         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10034829         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10049055         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10060125         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10099748         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10101505         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10101538         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10101970         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10108642         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10124364         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10294403         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10325947         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10377669         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          10588019         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          109              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          11103869         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          12018018         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          12018198         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          12035722         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          12054487         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          12060003         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          12079651         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          125              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          12626812         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          12640890         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          12710360         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1271289          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1303282          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1304569          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1306190          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1306236          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1308141          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1308389          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1309600          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1309644          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1313139          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13138459         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1313991          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1314063          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1314416          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1317346          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1317357          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1317368          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1327339          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1327533          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1333820          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1335257          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1335326          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1336932          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1345046          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13462889         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13463393         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13510491         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13530659         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13530682         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13597994         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          136              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          136527           -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13765190         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13770893         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          13814965         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          139              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          14018952         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          14220178         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          14307336         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          14307358         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          14336700         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          14977618         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          16065831         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          16925250         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          18454121         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          18540299         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          195              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          198              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          199              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          200              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          201              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          202              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          21679312         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          2223930          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          226              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          253              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          27253287         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          301042           -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          3141126          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          3333673          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          373024           -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          50922297         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          543908           -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          593748           -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          598630           -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          6018899          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          602              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          603              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          604              -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          61790145         -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          62384            -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7428480          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7439921          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7439965          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7440020          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7440360          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7440382          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7440417          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7440439          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7440473          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7446084          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7446142          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7446277          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7446346          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7488564          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7647010          -9  86.96 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7718549          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7722647          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7738945          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7758976          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7775113          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7778394          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7778509          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7782492          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7782505          -9  86.96 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7783008          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7783075          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7783166          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7783702          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7783791          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7784409          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7784421          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7785877          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7786814          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7787475          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7787497          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7788967          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7788989          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7789006          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7789062          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7789095          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7789120          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7789426          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          7790809          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          78002            -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          8030704          -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          88               -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          92               -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          93               -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          EXH__16065831    -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          EXH__18540299    -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          EXH__7439965     -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37063 0          EXH__7440020     -9   0.00 100 100 -9   0801-2 Y R 341                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GLAXOSMITHKLINE MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43980: cdate=2008
37067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2782                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3707100078                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2994                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100824                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100863                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708100910                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2857                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 27870CHMPNNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3708300007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0873                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28376BRLNGPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709300001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28634HLLYFSHEFF                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3709700093                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14136                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3710700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0877                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3170                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711100001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3267                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3711700069                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0878                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37117 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2989                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0069                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28210FRTLY2911N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14082                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14088                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713300011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37133 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3175                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3713500043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37135 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0881                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37147 0          10025737         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10025919         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10031137         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10034829         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10049055         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10060125         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10099748         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10101505         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10101538         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10101970         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10108642         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10124364         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10124433         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10294403         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10325947         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10377669         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10588019         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          109              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          11103869         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12018018         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12018198         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12035722         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12054487         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12060003         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12079651         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          125              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12626812         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12640890         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12710360         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1271289          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1303282          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1304569          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1306190          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1306236          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1307966          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1308061          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1308141          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1308389          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1309600          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1309644          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1313139          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13138459         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1313991          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1314063          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1314416          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317346          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317357          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317368          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317426          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1327339          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1327533          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1333820          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1335257          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1335326          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1336932          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1345046          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1345160          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13462889         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13463393         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13510491         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13530659         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13530682         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13586828         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13597994         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          136              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          136527           -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13765190         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13770893         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13814965         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          139              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14018952         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14220178         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14307336         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14307358         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14336700         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14977618         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          16065831         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          16842038         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          16925250         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          18454121         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          18540299         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          195              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          198              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          199              -9   0.00 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          200              -9   0.00 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          201              -9   0.00 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          202              -9   0.00 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          21679312         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          2223930          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          226              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          253              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          27253287         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          301042           -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          3141126          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          3333673          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          373024           -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          50922297         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          543908           -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          598630           -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          6018899          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          602              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          603              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          604              -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          61789513         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          61790145         -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7428480          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7439921          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7439965          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440020          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440360          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440382          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440417          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440439          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440473          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440484          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446084          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446142          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446277          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446346          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7488564          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7542098          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7647010          -9  97.78 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7718549          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7722647          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7738945          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7758976          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7775113          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7778394          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7778509          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7782492          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783008          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783075          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783166          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783702          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783791          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7784409          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7784421          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7785877          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7786814          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7787475          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7787497          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7788967          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7788989          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789006          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789062          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789095          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789120          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789426          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7790809          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          78002            -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          8030704          -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          88               -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          92               -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          93               -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__16065831    -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__18540299    -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__7439965     -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__7440020     -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          PM10             -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DSMPharmaceuticals,Inc./BurroughsWell: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          PM2_5            -9  93.27 100 100 -9   0801-2 Y R 3036                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DSMPharmaceuticals,Inc./BurroughsWell: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10025737         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10025919         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10031137         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10034829         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10049055         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10060125         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10099748         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10101505         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10101538         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10101970         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10108642         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10124364         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10124433         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10294403         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10325947         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10377669         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10588019         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          109              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          11103869         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12018018         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12018198         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12035722         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12054487         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12060003         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12079651         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          125              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12626812         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12640890         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12710360         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1271289          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1303282          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1304569          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1306190          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1306236          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1307966          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1308061          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1308141          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1308389          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1309600          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1309644          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1313139          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13138459         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1313991          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1314063          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1314416          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317346          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317357          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317368          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317426          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1327339          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1327533          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1333820          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1335257          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1335326          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1336932          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1345046          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1345160          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13462889         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13463393         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13510491         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13530659         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13530682         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13586828         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13597994         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          136              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          136527           -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13765190         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13770893         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13814965         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          139              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14018952         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14220178         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14307336         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14307358         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14336700         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14977618         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          16065831         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          16842038         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          16925250         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          18454121         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          18540299         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          195              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          198              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          199              -9   0.00 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          200              -9   0.00 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          201              -9   0.00 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          202              -9   0.00 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          21679312         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          2223930          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          226              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          253              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          27253287         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          301042           -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          3141126          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          3333673          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          373024           -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          50922297         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          543908           -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          598630           -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          6018899          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          602              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          603              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          604              -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          61789513         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          61790145         -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7428480          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7439921          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7439965          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440020          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440360          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440382          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440417          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440439          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440473          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440484          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446084          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446142          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446277          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446346          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7488564          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7542098          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7647010          -9  97.82 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7718549          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7722647          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7738945          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7758976          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7775113          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7778394          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7778509          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7782492          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783008          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783075          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783166          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783702          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783791          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7784409          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7784421          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7785877          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7786814          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7787475          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7787497          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7788967          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7788989          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789006          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789062          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789095          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789120          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789426          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7790809          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          78002            -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          8030704          -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          88               -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          92               -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          93               -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__16065831    -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__18540299    -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__7439965     -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__7440020     -9  95.47 100 100 -9   0801-2 Y R 3037                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          PM10             -9  93.27 100 100 -9   0801-2 Y R 3037                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DSMPharmaceuticals,Inc./BurroughsWell: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          PM2_5            -9  93.27 100 100 -9   0801-2 Y R 3037                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DSMPharmaceuticals,Inc./BurroughsWell: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10025737         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10025919         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10031137         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10034829         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10049055         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10060125         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10099748         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10101505         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10101538         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10101970         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10108642         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10124364         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10294403         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10325947         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10377669         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          10588019         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          109              -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          11103869         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12018018         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12018198         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12035722         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12054487         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12060003         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12079651         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          125              -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12626812         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12640890         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          12710360         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1271289          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1303282          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1304569          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1306190          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1306236          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1308141          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1308389          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1309600          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1309644          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1313139          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13138459         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1313991          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1314063          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1314416          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317346          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317357          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317368          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1327339          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1327533          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1333820          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1335257          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1335326          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1336932          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1345046          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13462889         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13463393         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13510491         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13530659         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13530682         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13597994         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          136              -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          136527           -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13765190         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13770893         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          13814965         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          139              -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14018952         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14220178         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14307336         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14307358         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14336700         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          14977618         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          16065831         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          16925250         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          18454121         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          18540299         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          195              -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          198              -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          199              -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          200              -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          201              -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          202              -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          21679312         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          2223930          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          226              -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          253              -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          27253287         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          301042           -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          3141126          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          3333673          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          373024           -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          50922297         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          543908           -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          593748           -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          598630           -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          6018899          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          602              -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          603              -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          604              -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          61790145         -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          62384            -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7428480          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7439921          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7439965          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440020          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440360          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440382          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440417          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440439          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440473          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446084          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446142          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446277          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7446346          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7488564          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7718549          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7722647          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7738945          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7758976          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7775113          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7778394          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7778509          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7782492          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783008          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783075          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783166          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783702          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7783791          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7784409          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7784421          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7785877          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7786814          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7787475          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7787497          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7788967          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7788989          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789006          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789062          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789095          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789120          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7789426          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          7790809          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          78002            -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          8030704          -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          88               -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          92               -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          93               -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__16065831    -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__18540299    -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__7439965     -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          EXH__7440020     -9  94.85 100 100 -9   0801-2 Y R 708                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Burroughs Wellcome MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          PM10             -9  93.27 100 100 -9   0801-2 Y R 708                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DSMPharmaceuticals,Inc./BurroughsWell: NEI_UNIQUE_ID=NEI56479: cdate=2008
37147 0          PM2_5            -9  93.27 100 100 -9   0801-2 Y R 708                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DSMPharmaceuticals,Inc./BurroughsWell: NEI_UNIQUE_ID=NEI56479: cdate=2008
37153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715300044                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 27288MLLRB863EA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715700090                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2839                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37159 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3715900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37165 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716500048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 225                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28001CLLNS313BE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3716700016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3049                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621CHTHMPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28621VGHNBRT268                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3717100077                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2775                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37171 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37183 0          10025737         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10025919         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10034829         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10049055         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10060125         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10099748         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10101505         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10101538         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10101970         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10108642         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10124364         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10124433         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10294403         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10325947         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10377669         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10588019         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          109              -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          11103869         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12018018         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12018198         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12035722         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12054487         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12060003         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12079651         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          125              -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12626812         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12640890         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12710360         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1271289          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1306190          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1306236          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1307966          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1308061          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1308141          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1308389          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1309600          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1309644          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1313139          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13138459         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1313991          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1314063          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1314416          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1317346          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1317357          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1317368          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1317426          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1327339          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1333820          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1335257          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1335326          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1336932          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1345046          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1345160          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13462889         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13463393         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13530659         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13530682         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13586828         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          136              -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          136527           -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13765190         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13770893         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13814965         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          139              -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14018952         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14220178         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14307336         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14307358         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14336700         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14977618         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          16065831         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          16842038         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          16925250         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          18454121         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          18540299         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          195              -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          198              -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          199              -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          200              -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          201              -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          202              -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          21679312         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          2223930          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          226              -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          253              -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          27253287         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          301042           -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          3333673          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          373024           -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          50922297         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          543908           -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          593748           -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          598630           -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          6018899          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          602              -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          603              -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          604              -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          61789513         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          61790145         -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          62384            -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7428480          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7439921          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7439965          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440020          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440360          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440439          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440473          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440484          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7446084          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7446142          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7446277          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7446346          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7488564          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7542098          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7718549          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7722647          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7738945          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7758976          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7775113          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7778509          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7782492          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7783008          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7783075          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7783166          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7783702          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7783791          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7785877          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7786814          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7788967          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7788989          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7789006          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7789062          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7789095          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7789120          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7789426          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7790809          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          78002            -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          8030704          -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          88               -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          92               -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          93               -9   0.00 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          EXH__16065831    -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          EXH__18540299    -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          EXH__7439965     -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          EXH__7440020     -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          PM10             -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MALLINCKRODTINC: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          PM2_5            -9  84.80 100 100 -9   0801-6 Y R 1000                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MALLINCKRODTINC: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10025737         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10025919         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10034829         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10049055         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10060125         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10099748         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10101505         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10101538         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10101970         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10108642         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10124364         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10124433         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10294403         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10325947         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10377669         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          10588019         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          109              -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          11103869         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12018018         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12018198         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12035722         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12054487         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12060003         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12079651         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          125              -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12626812         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12640890         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          12710360         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1271289          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1306190          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1306236          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1307966          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1308061          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1308141          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1308389          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1309600          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1309644          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1313139          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13138459         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1313991          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1314063          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1314416          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1317346          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1317357          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1317368          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1317426          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1327339          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1333820          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1335257          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1335326          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1336932          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1345046          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          1345160          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13462889         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13463393         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13530659         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13530682         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13586828         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          136              -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          136527           -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13765190         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13770893         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          13814965         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          139              -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14018952         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14220178         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14307336         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14307358         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14336700         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          14977618         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          16065831         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          16842038         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          16925250         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          18454121         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          18540299         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          195              -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          198              -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          199              -9  26.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          200              -9  26.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          201              -9  26.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          202              -9  26.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          21679312         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          2223930          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          226              -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          22967926         -9  26.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          253              -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          27253287         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          301042           -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          3333673          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          373024           -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          50922297         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          543908           -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          593748           -9  26.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          598630           -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          6018899          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          602              -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          603              -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          604              -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          61789513         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          61790145         -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          62384            -9  26.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7428480          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7439921          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7439965          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7439976          -9  26.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440020          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440360          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440439          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440473          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7440484          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7446084          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7446142          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7446277          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7446346          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7487947          -9  26.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7488564          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7542098          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7718549          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7722647          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7738945          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7758976          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7775113          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7778509          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7782492          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7783008          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7783075          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7783166          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7783702          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7783791          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7785877          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7786814          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7788967          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7788989          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7789006          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7789062          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7789095          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7789120          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7789426          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          7790809          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          78002            -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          8030704          -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          88               -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          92               -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          93               -9   0.00 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          EXH__16065831    -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          EXH__18540299    -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          EXH__7439965     -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          EXH__7440020     -9  84.32 100 100 -9   0801-6 Y R 778                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MALLINCKRODT INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          PM10             -9  84.80 100 100 -9   0801-6 Y R 778                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MALLINCKRODTINC: NEI_UNIQUE_ID=NEI54183: cdate=2008
37183 0          PM2_5            -9  84.80 100 100 -9   0801-6 Y R 778                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MALLINCKRODTINC: NEI_UNIQUE_ID=NEI54183: cdate=2008
37195 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3719500040                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
37195 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19099                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$9005                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16921                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0900                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
38097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16919                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0204010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 44004SCMCH2426M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0605010016                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409000353                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409010043                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409040212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1409090081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45013CHMPN601NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45067MLLRB2525W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0907                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6403                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6438                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1413000187                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6442                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39029 0          10025737         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10025919         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10031137         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10034829         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10049055         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10060125         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10099748         -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10101505         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10101538         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10101970         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10108642         -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10124364         -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10124433         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10294403         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10325947         -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10377669         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          10588019         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          109              -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          11103869         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          12018018         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          12018198         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          12035722         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          12054487         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          12060003         -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          12079651         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          125              -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          12626812         -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          12640890         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          12710360         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1271289          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1303282          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1304569          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1306190          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1306236          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1307966          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1308061          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1308141          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1308389          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1309600          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1309644          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1313139          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13138459         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1313991          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1314063          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1314416          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1317346          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1317357          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1317368          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1317426          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1327339          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1327533          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1333820          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1335257          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1335326          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1336932          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1345046          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          1345160          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13462889         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13463393         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13510491         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13530659         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13530682         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13586828         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13597994         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          136              -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          136527           -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13765190         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13770893         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          13814965         -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          139              -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          14018952         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          14220178         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          14307336         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          14307358         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          14336700         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          14977618         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          16065831         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          16842038         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          16925250         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          18454121         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          18540299         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          195              -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          198              -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          199              -9  82.25 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          200              -9  82.25 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          201              -9  82.25 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          202              -9  82.25 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          21679312         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          2223930          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          226              -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          22967926         -9  82.25 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          253              -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          27253287         -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          301042           -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          3141126          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          3333673          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          373024           -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          50922297         -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          543908           -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          593748           -9  82.25 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          598630           -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          6018899          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          602              -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          603              -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          604              -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          61789513         -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          61790145         -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          62384            -9  82.25 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7428480          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7439921          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7439965          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7439976          -9  82.25 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7440020          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7440360          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7440382          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7440417          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7440439          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7440473          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7440484          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7446084          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7446142          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7446277          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7446346          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7487947          -9  82.25 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7488564          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7542098          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7647010          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7718549          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7722647          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7738945          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7758976          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7775113          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7778394          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7778509          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7782492          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7782505          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7783008          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7783075          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7783166          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7783702          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7783791          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7784409          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7784421          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7785877          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7786814          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7787475          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7787497          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7788967          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7788989          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7789006          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7789062          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7789095          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7789120          -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7789426          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          7790809          -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          78002            -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          8030704          -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          88               -9  73.98 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          92               -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          93               -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          EXH__16065831    -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          EXH__18540299    -9  60.60 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          EXH__7439965     -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39029 0          EXH__7440020     -9   0.00 100 100 -9   0801-1 Y R 222                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: VONROLL AMERICA INC/ WTI MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIOHT$5915: cdate=2008
39035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318000246                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318003059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1318120180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 44142FRDMT5600H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6118                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 0          PM10             -9  28.00 100 100 -9   -9     Y R 0322010062                      ! MACT: Lime Manufacturing: HURON LIME COMPANY
39043 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0322010062                      ! MACT: Lime Manufacturing: HURON LIME COMPANY
39043 0          SO2              -9  20.00 100 100 -9   -9     Y R 0322010062                      ! MACT: Lime Manufacturing: HURON LIME COMPANY
39043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0322020045                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 44870NWDPR2509H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6373                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0123010150                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125040057                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0125042608                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 43228GNRLM200GE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15893                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0829700441                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431010054                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070035                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070076                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070849                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431070952                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390137                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431390903                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1431490901                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45209RCKTN3347M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45217PMCSP501MU                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45232HNKLC4900E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45237HLTND2235L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 0          10025737         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10025919         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10031137         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10034829         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10049055         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10060125         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10099748         -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10101505         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10101538         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10101970         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10108642         -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10124364         -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10124433         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10294403         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10325947         -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10377669         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          10588019         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          109              -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          11103869         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          12018018         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          12018198         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          12035722         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          12054487         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          12060003         -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          12079651         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          125              -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          12626812         -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          12640890         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          12710360         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1271289          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1303282          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1304569          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1306190          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1306236          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1307966          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1308061          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1308141          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1308389          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1309600          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1309644          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1313139          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13138459         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1313991          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1314063          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1314416          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1317346          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1317357          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1317368          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1317426          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1327339          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1327533          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1333820          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1335257          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1335326          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1336932          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1345046          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          1345160          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13462889         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13463393         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13510491         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13530659         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13530682         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13586828         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13597994         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          136              -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          136527           -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13765190         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13770893         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          13814965         -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          139              -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          14018952         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          14220178         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          14307336         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          14307358         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          14336700         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          14977618         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          16065831         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          16842038         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          16925250         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          18454121         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          18540299         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          195              -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          198              -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          199              -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          200              -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          201              -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          202              -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          21679312         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          2223930          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          226              -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          253              -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          27253287         -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          301042           -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          3141126          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          3333673          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          373024           -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          50922297         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          543908           -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          593748           -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          598630           -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          6018899          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          602              -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          603              -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          604              -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          61789513         -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          61790145         -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          62384            -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7428480          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7439921          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7439965          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7440020          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7440360          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7440382          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7440417          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7440439          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7440473          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7440484          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7446084          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7446142          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7446277          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7446346          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7488564          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7542098          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7718549          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7722647          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7738945          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7758976          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7775113          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7778394          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7778509          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7782492          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7783008          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7783075          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7783166          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7783702          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7783791          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7784409          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7784421          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7785877          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7786814          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7787475          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7787497          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7788967          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7788989          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7789006          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7789062          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7789095          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7789120          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7789426          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          7790809          -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          78002            -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          8030704          -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          88               -9  91.24 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          92               -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          93               -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          EXH__16065831    -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          EXH__18540299    -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          EXH__7439965     -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 0          EXH__7440020     -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER POLYMERS LLC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 0          PM10             -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LANXESSCORPADDYSTONFACILITY: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 840                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 0          PM2_5            -9  81.21 100 100 -9   0801-6 Y R 840                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LANXESSCORPADDYSTONFACILITY: NEI_UNIQUE_ID=NEI43304: cdate=2008
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0917                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16089                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6394                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6472                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6483                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6484                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6497                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0335010105                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 43545CMPBLEASTM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39069 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15920                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39085 0          PM10             -9  28.00 100 100 -9   -9     Y R 0243030257                      ! MACT: Lime Manufacturing: LTV LIME PLANT
39085 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0243030257                      ! MACT: Lime Manufacturing: LTV LIME PLANT
39085 0          SO2              -9  20.00 100 100 -9   -9     Y R 0243030257                      ! MACT: Lime Manufacturing: LTV LIME PLANT
39085 0          PM10             -9  28.00 100 100 -9   -9     Y R 44045LTVST15WIL                 ! MACT: Lime Manufacturing: LTV LIME PLANT
39085 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 44045LTVST15WIL                 ! MACT: Lime Manufacturing: LTV LIME PLANT
39085 0          SO2              -9  20.00 100 100 -9   -9     Y R 44045LTVST15WIL                 ! MACT: Lime Manufacturing: LTV LIME PLANT
39087 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10099748         -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10108642         -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10124364         -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10325947         -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          109              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12060003         -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          125              -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12626812         -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1306190          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1306236          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1309600          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1314416          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1317368          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1335257          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1335326          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          136              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          136527           -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13814965         -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          139              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          195              -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          198              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          199              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          200              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          201              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          202              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          2223930          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          226              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          253              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          27253287         -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          301042           -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          373024           -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          543908           -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          593748           -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          598630           -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          602              -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          603              -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          604              -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          61790145         -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          62384            -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7428480          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7439921          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440439          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7446142          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7446277          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7789426          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7790809          -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          78002            -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          88               -9  47.18 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          92               -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          93               -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 730                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10099748         -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10108642         -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10124364         -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10325947         -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          109              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12060003         -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          125              -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12626812         -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1306190          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1306236          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1309600          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1314416          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1317368          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1335257          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1335326          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          136              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          136527           -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          13814965         -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          139              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          195              -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          198              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          199              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          200              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          201              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          202              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          2223930          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          226              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          253              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          27253287         -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          301042           -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          373024           -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          543908           -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          593748           -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          598630           -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          602              -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          603              -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          604              -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          61790145         -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          62384            -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7428480          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7439921          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440439          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7446142          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7446277          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7789426          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          7790809          -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          78002            -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          88               -9  47.18 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          92               -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          93               -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39087 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 730A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DOW CHEMICAL USA HANGING ROCK PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11652: cdate=2008
39089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0145000018                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 0          106990           -9  28.00 100 100 -9   -9     Y R 0247030471                      ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          107028           -9  28.00 100 100 -9   -9     Y R 0247030471                      ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          50000            -9  28.00 100 100 -9   -9     Y R 0247030471                      ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          67561            -9  28.00 100 100 -9   -9     Y R 0247030471                      ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          71432            -9  28.00 100 100 -9   -9     Y R 0247030471                      ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          75070            -9  28.00 100 100 -9   -9     Y R 0247030471                      ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          91203            -9  28.00 100 100 -9   -9     Y R 0247030471                      ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          VOC              -9  28.00 100 100 -9   -9     Y R 0247030471                      ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 50300501   PM10             -9  59.15 100 100 -9   -9     Y R 0247050278                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROSSINCINERATIONSERVICES,INC.: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 50300501   PM2_5            -9  59.15 100 100 -9   -9     Y R 0247050278                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROSSINCINERATIONSERVICES,INC.: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0247100408                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39093 0          10025737         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10025919         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10031137         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10034829         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10049055         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10060125         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10099748         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10101505         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10101538         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10101970         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10108642         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10124364         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10294403         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10325947         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10377669         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10588019         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          109              -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          11103869         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          12018018         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          12018198         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          12035722         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          12054487         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          12060003         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          12079651         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          125              -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          12626812         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          12640890         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          12710360         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1271289          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1303282          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1304569          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1306190          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1306236          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1308141          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1308389          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1309600          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1309644          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1313139          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13138459         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1313991          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1314063          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1314416          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1317346          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1317357          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1317368          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1327339          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1327533          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1333820          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1335257          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1335326          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1336932          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1345046          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13462889         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13463393         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13510491         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13530659         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13530682         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13597994         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          136              -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          136527           -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13765190         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13770893         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          13814965         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          139              -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          14018952         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          14220178         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          14307336         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          14307358         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          14336700         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          14977618         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          16065831         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          16925250         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          18454121         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          18540299         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          195              -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          198              -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          199              -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          200              -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          201              -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          202              -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          21679312         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          2223930          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          226              -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          253              -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          27253287         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          301042           -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          3141126          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          3333673          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          373024           -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          50922297         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          543908           -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          598630           -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          6018899          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          602              -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          603              -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          604              -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          61790145         -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7428480          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7439921          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7439965          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7440020          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7440360          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7440382          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7440417          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7440439          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7440473          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7446084          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7446142          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7446277          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7446346          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7488564          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7718549          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7722647          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7738945          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7758976          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7775113          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7778394          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7778509          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7782492          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7783008          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7783075          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7783166          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7783702          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7783791          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7784409          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7784421          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7785877          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7786814          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7787475          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7787497          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7788967          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7788989          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7789006          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7789062          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7789095          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7789120          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7789426          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          7790809          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          78002            -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          8030704          -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          88               -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          92               -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          93               -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          EXH__16065831    -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          EXH__18540299    -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          EXH__7439965     -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          EXH__7440020     -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Aztec Peroxides Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          PM10             -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AztecPeroxidesInc: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          PM2_5            -9  68.57 100 100 -9   0801-2 Y R 3013                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AztecPeroxidesInc: NEI_UNIQUE_ID=NEI40460: cdate=2008
39093 0          10025737         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10025919         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10031137         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10034829         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10049055         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10060125         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10099748         -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10101505         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10101538         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10101970         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10108642         -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10124364         -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10124433         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10294403         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10325947         -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10377669         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          10588019         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          109              -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          11103869         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          12018018         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          12018198         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          12035722         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          12054487         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          12060003         -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          12079651         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          125              -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          12626812         -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          12640890         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          12710360         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1271289          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1303282          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1304569          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1306190          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1306236          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1307966          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1308061          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1308141          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1308389          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1309600          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1309644          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1313139          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13138459         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1313991          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1314063          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1314416          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1317346          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1317357          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1317368          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1317426          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1327339          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1327533          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1333820          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1335257          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1335326          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1336932          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1345046          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          1345160          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13462889         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13463393         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13510491         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13530659         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13530682         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13586828         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13597994         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          136              -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          136527           -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13765190         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13770893         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          13814965         -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          139              -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          14018952         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          14220178         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          14307336         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          14307358         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          14336700         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          14977618         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          16065831         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          16842038         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          16925250         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          18454121         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          18540299         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          195              -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          198              -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          199              -9  58.06 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          200              -9  58.06 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          201              -9  58.06 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          202              -9  58.06 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          21679312         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          2223930          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          226              -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          22967926         -9  58.06 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          253              -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          27253287         -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          301042           -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          3141126          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          3333673          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          373024           -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          50922297         -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          543908           -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          593748           -9  58.06 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          598630           -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          6018899          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          602              -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          603              -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          604              -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          61789513         -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          61790145         -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          62384            -9  58.06 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7428480          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7439921          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7439965          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7439976          -9  58.06 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7440020          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7440360          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7440382          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7440417          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7440439          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7440473          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7440484          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7446084          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7446142          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7446277          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7446346          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7487947          -9  58.06 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7488564          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7542098          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7647010          -9   0.00 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7718549          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7722647          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7738945          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7758976          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7775113          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7778394          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7778509          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7782492          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7782505          -9   0.00 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7783008          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7783075          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7783166          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7783702          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7783791          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7784409          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7784421          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7785877          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7786814          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7787475          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7787497          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7788967          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7788989          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7789006          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7789062          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7789095          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7789120          -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7789426          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          7790809          -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          78002            -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          8030704          -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          88               -9  99.32 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          92               -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          93               -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          EXH__16065831    -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          EXH__18540299    -9  94.57 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          EXH__7439965     -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          EXH__7440020     -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Ross Incineration Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          PM10             -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROSSINCINERATIONSERVICES,INC.: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          PM2_5            -9  59.15 100 100 -9   0801-1 Y R 331                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROSSINCINERATIONSERVICES,INC.: NEI_UNIQUE_ID=NEI40462: cdate=2008
39093 0          106990           -9  28.00 100 100 -9   -9     Y R 44012FRDMT650MI                 ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          107028           -9  28.00 100 100 -9   -9     Y R 44012FRDMT650MI                 ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          50000            -9  28.00 100 100 -9   -9     Y R 44012FRDMT650MI                 ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          67561            -9  28.00 100 100 -9   -9     Y R 44012FRDMT650MI                 ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          71432            -9  28.00 100 100 -9   -9     Y R 44012FRDMT650MI                 ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          75070            -9  28.00 100 100 -9   -9     Y R 44012FRDMT650MI                 ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          91203            -9  28.00 100 100 -9   -9     Y R 44012FRDMT650MI                 ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39093 0          VOC              -9  28.00 100 100 -9   -9     Y R 44012FRDMT650MI                 ! MACT: Autos, plant: FORDMOTORCOMPANY-OHIOASSEMBLYPLANT, VOC 28%: Auto_2002_projections.xls
39095 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 0448010246                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30103202   SO2              -9  98.00 100 100 -9   -9     Y R 0448010246                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 0448010246                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 0448010246                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 0448010246                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010247                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0448010413                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30103202   SO2              -9  98.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 0448011640                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 43612CHRYS1000J                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30103202   SO2              -9  98.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 43616SNRFN1819W                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 0          106990           -9  28.00 100 100 -9   -9     Y R 448010413                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          107028           -9  28.00 100 100 -9   -9     Y R 448010413                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          50000            -9  28.00 100 100 -9   -9     Y R 448010413                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          67561            -9  28.00 100 100 -9   -9     Y R 448010413                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          71432            -9  28.00 100 100 -9   -9     Y R 448010413                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          75070            -9  28.00 100 100 -9   -9     Y R 448010413                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          91203            -9  28.00 100 100 -9   -9     Y R 448010413                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          VOC              -9  28.00 100 100 -9   -9     Y R 448010413                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          106990           -9  28.00 100 100 -9   -9     Y R 448010414                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          107028           -9  28.00 100 100 -9   -9     Y R 448010414                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          50000            -9  28.00 100 100 -9   -9     Y R 448010414                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          67561            -9  28.00 100 100 -9   -9     Y R 448010414                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          71432            -9  28.00 100 100 -9   -9     Y R 448010414                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          75070            -9  28.00 100 100 -9   -9     Y R 448010414                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          91203            -9  28.00 100 100 -9   -9     Y R 448010414                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 0          VOC              -9  28.00 100 100 -9   -9     Y R 448010414                       ! MACT: Autos, plant: DAIMLERCHRYSLERCORP, VOC 28%: Auto_2002_projections.xls
39095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5862                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39095 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 20200202   NOX              -9  40.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   NOX              -9  90.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30103202   SO2              -9  98.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39095 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$5878                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11450, Plant=Sunoco, Inc., Toledo, OH, compliance date: 31DEC2009
39099 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39099 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0250110024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040017                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857040931                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857041124                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857080148                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 0          106990           -9  28.00 100 100 -9   -9     Y R 0857101349                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          107028           -9  28.00 100 100 -9   -9     Y R 0857101349                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          50000            -9  28.00 100 100 -9   -9     Y R 0857101349                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          67561            -9  28.00 100 100 -9   -9     Y R 0857101349                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          71432            -9  28.00 100 100 -9   -9     Y R 0857101349                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          75070            -9  28.00 100 100 -9   -9     Y R 0857101349                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          91203            -9  28.00 100 100 -9   -9     Y R 0857101349                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          VOC              -9  28.00 100 100 -9   -9     Y R 0857101349                      ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0857190134                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45414CRGLL3201N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45417NLNDD2701H                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45420DLCPR2000F                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 0          106990           -9  28.00 100 100 -9   -9     Y R 45439GNRLM2601W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          107028           -9  28.00 100 100 -9   -9     Y R 45439GNRLM2601W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          50000            -9  28.00 100 100 -9   -9     Y R 45439GNRLM2601W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          67561            -9  28.00 100 100 -9   -9     Y R 45439GNRLM2601W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          71432            -9  28.00 100 100 -9   -9     Y R 45439GNRLM2601W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          75070            -9  28.00 100 100 -9   -9     Y R 45439GNRLM2601W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          91203            -9  28.00 100 100 -9   -9     Y R 45439GNRLM2601W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 0          VOC              -9  28.00 100 100 -9   -9     Y R 45439GNRLM2601W                 ! MACT: Autos, plant: GENERALMOTORSCORPORATION-MORAINEASS, VOC 28%: Auto_2002_projections.xls
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45449PPLTN1030W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6565                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6585                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6588                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39113 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0660010006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 43701RMCDV1724L                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39119 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5885                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39123 0          PM10             -9  28.00 100 100 -9   -9     Y R 0362000079                      ! MACT: Lime Manufacturing: GENLIME GROUP, L.P.
39123 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0362000079                      ! MACT: Lime Manufacturing: GENLIME GROUP, L.P.
39123 0          SO2              -9  20.00 100 100 -9   -9     Y R 0362000079                      ! MACT: Lime Manufacturing: GENLIME GROUP, L.P.
39123 0          PM10             -9  28.00 100 100 -9   -9     Y R 43430GRYMN21880                 ! MACT: Lime Manufacturing: GENLIME GROUP, L.P.
39123 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 43430GRYMN21880                 ! MACT: Lime Manufacturing: GENLIME GROUP, L.P.
39123 0          SO2              -9  20.00 100 100 -9   -9     Y R 43430GRYMN21880                 ! MACT: Lime Manufacturing: GENLIME GROUP, L.P.
39123 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15908                         ! MACT: Lime Manufacturing: GENLIME GROUP, L.P.
39123 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15908                         ! MACT: Lime Manufacturing: GENLIME GROUP, L.P.
39123 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15908                         ! MACT: Lime Manufacturing: GENLIME GROUP, L.P.
39125 0          10025737         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10031137         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10034829         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10049055         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10060125         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10099748         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10101538         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10108642         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10124364         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10294403         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10325947         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10588019         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          109              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          11103869         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12018018         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12018198         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12060003         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          125              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12626812         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1303282          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1304569          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1306190          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1306236          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1308141          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1308389          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1309600          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1314416          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1317368          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1327533          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1333820          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1335257          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1335326          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13510491         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13530659         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13530682         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13597994         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          136              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          136527           -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13765190         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13814965         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          139              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14018952         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14307336         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14307358         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14977618         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          16065831         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          18454121         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          18540299         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          195              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          198              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          199              -9   3.10 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          200              -9   3.10 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          201              -9   3.10 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          202              -9   3.10 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          21679312         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          2223930          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          226              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          22967926         -9   3.10 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          253              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          27253287         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          301042           -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          3141126          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          373024           -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          50922297         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          543908           -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          593748           -9   3.10 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          598630           -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          602              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          603              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          604              -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          61790145         -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          62384            -9   3.10 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7428480          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7439921          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7439976          -9   3.10 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440382          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440417          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440439          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440473          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7446142          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7446277          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7487947          -9   3.10 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7738945          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7758976          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7775113          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7778394          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7778509          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7784409          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7784421          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7787475          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7787497          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7788967          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7788989          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7789006          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7789062          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7789095          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7789120          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7789426          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7790809          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          78002            -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          88               -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          92               -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          93               -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          EXH__16065831    -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          EXH__18540299    -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 302                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10025737         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10031137         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10034829         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10049055         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10060125         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10099748         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10101538         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10108642         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10124364         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10294403         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10325947         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          10588019         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          109              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          11103869         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12018018         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12018198         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12060003         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          125              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12626812         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1303282          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1304569          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1306190          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1306236          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1308141          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1308389          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1309600          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1314416          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1317368          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1327533          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1333820          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1335257          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1335326          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13510491         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13530659         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13530682         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13597994         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          136              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          136527           -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13765190         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          13814965         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          139              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14018952         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14307336         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14307358         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          14977618         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          16065831         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          18454121         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          18540299         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          195              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          198              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          199              -9   3.10 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          200              -9   3.10 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          201              -9   3.10 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          202              -9   3.10 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          21679312         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          2223930          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          226              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          22967926         -9   3.10 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          253              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          27253287         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          301042           -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          3141126          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          373024           -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          50922297         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          543908           -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          593748           -9   3.10 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          598630           -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          602              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          603              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          604              -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          61790145         -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          62384            -9   3.10 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7428480          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7439921          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7439976          -9   3.10 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440382          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440417          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440439          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440473          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7446142          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7446277          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7487947          -9   3.10 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7738945          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7758976          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7775113          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7778394          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7778509          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7784409          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7784421          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7787475          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7787497          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7788967          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7788989          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7789006          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7789062          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7789095          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7789120          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7789426          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          7790809          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          78002            -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          88               -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          92               -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          93               -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          EXH__16065831    -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          EXH__18540299    -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39125 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 302A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lafarge MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI11681: cdate=2008
39129 50300501   PM10             -9  11.22 100 100 -9   -9     Y R 0165000007                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: PPGINDUSTRIESOHIOINCCIRCLEVILLE: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 50300501   PM2_5            -9  11.22 100 100 -9   -9     Y R 0165000007                      ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: PPGINDUSTRIESOHIOINCCIRCLEVILLE: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10025737         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10025919         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10031137         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10034829         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10049055         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10060125         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10099748         -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10101505         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10101538         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10101970         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10108642         -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10124364         -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10124433         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10294403         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10325947         -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10377669         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          10588019         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          109              -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          11103869         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          12018018         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          12018198         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          12035722         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          12054487         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          12060003         -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          12079651         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          125              -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          12626812         -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          12640890         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          12710360         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1271289          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1303282          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1304569          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1306190          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1306236          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1307966          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1308061          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1308141          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1308389          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1309600          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1309644          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1313139          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13138459         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1313991          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1314063          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1314416          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1317346          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1317357          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1317368          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1317426          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1327339          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1327533          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1333820          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1335257          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1335326          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1336932          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1345046          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          1345160          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13462889         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13463393         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13510491         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13530659         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13530682         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13586828         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13597994         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          136              -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          136527           -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13765190         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13770893         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          13814965         -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          139              -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          14018952         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          14220178         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          14307336         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          14307358         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          14336700         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          14977618         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          16065831         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          16842038         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          16925250         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          18454121         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          18540299         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          195              -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          198              -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          199              -9  99.82 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          200              -9  99.82 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          201              -9  99.82 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          202              -9  99.82 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          21679312         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          2223930          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          226              -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          22967926         -9  99.82 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          253              -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          27253287         -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          301042           -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          3141126          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          3333673          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          373024           -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          50922297         -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          543908           -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          593748           -9  99.82 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          598630           -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          6018899          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          602              -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          603              -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          604              -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          61789513         -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          61790145         -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          62384            -9  99.82 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7428480          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7439921          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7439965          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7439976          -9  99.82 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7440020          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7440360          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7440382          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7440417          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7440439          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7440473          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7440484          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7446084          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7446142          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7446277          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7446346          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7487947          -9  99.82 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7488564          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7542098          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7718549          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7722647          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7738945          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7758976          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7775113          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7778394          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7778509          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7782492          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7783008          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7783075          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7783166          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7783702          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7783791          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7784409          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7784421          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7785877          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7786814          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7787475          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7787497          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7788967          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7788989          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7789006          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7789062          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7789095          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7789120          -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7789426          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          7790809          -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          78002            -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          8030704          -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          88               -9  44.64 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          92               -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          93               -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          EXH__16065831    -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          EXH__18540299    -9  14.55 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          EXH__7439965     -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          EXH__7440020     -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PPG Industries  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          PM10             -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: PPGINDUSTRIESOHIOINCCIRCLEVILLE: NEI_UNIQUE_ID=NEI11399: cdate=2008
39129 0          PM2_5            -9  11.22 100 100 -9   0801-2 Y R 495                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: PPGINDUSTRIESOHIOINCCIRCLEVILLE: NEI_UNIQUE_ID=NEI11399: cdate=2008
39131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0666000000                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45661NTDST3930U                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39131 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6626                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010028                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0671010104                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45601MDCRP401SP                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0929                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6614                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39143 0          PM10             -9  28.00 100 100 -9   -9     Y R 0372000081                      ! MACT: Lime Manufacturing: REDLAND OHIO - MILLERSVILLE
39143 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0372000081                      ! MACT: Lime Manufacturing: REDLAND OHIO - MILLERSVILLE
39143 0          SO2              -9  20.00 100 100 -9   -9     Y R 0372000081                      ! MACT: Lime Manufacturing: REDLAND OHIO - MILLERSVILLE
39143 0          PM10             -9  28.00 100 100 -9   -9     Y R 0372000127                      ! MACT: Lime Manufacturing: MARTIN MARIETTA MAGNESIA SPECIALTIES
39143 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0372000127                      ! MACT: Lime Manufacturing: MARTIN MARIETTA MAGNESIA SPECIALTIES
39143 0          SO2              -9  20.00 100 100 -9   -9     Y R 0372000127                      ! MACT: Lime Manufacturing: MARTIN MARIETTA MAGNESIA SPECIALTIES
39143 0          PM10             -9  28.00 100 100 -9   -9     Y R 43435MLLRS3964C                 ! MACT: Lime Manufacturing: REDLAND OHIO - MILLERSVILLE
39143 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 43435MLLRS3964C                 ! MACT: Lime Manufacturing: REDLAND OHIO - MILLERSVILLE
39143 0          SO2              -9  20.00 100 100 -9   -9     Y R 43435MLLRS3964C                 ! MACT: Lime Manufacturing: REDLAND OHIO - MILLERSVILLE
39143 0          PM10             -9  28.00 100 100 -9   -9     Y R 43469MRTNM755LI                 ! MACT: Lime Manufacturing: MARTIN MARIETTA MAGNESIA SPECIALTIES
39143 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 43469MRTNM755LI                 ! MACT: Lime Manufacturing: MARTIN MARIETTA MAGNESIA SPECIALTIES
39143 0          SO2              -9  20.00 100 100 -9   -9     Y R 43469MRTNM755LI                 ! MACT: Lime Manufacturing: MARTIN MARIETTA MAGNESIA SPECIALTIES
39143 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15909                         ! MACT: Lime Manufacturing: REDLAND OHIO - MILLERSVILLE
39143 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15909                         ! MACT: Lime Manufacturing: REDLAND OHIO - MILLERSVILLE
39143 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15909                         ! MACT: Lime Manufacturing: REDLAND OHIO - MILLERSVILLE
39143 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15912                         ! MACT: Lime Manufacturing: MARTIN MARIETTA MAGNESIA SPECIALTIES
39143 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15912                         ! MACT: Lime Manufacturing: MARTIN MARIETTA MAGNESIA SPECIALTIES
39143 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15912                         ! MACT: Lime Manufacturing: MARTIN MARIETTA MAGNESIA SPECIALTIES
39145 0          10025737         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10025919         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10031137         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10034829         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10049055         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10060125         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10099748         -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101505         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101538         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101970         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10108642         -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10124364         -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10124433         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10294403         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10325947         -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10377669         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10588019         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          109              -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          11103869         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12018018         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12018198         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12035722         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12054487         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12060003         -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12079651         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          125              -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12626812         -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12640890         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12710360         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1271289          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1303282          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1304569          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1306190          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1306236          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1307966          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308061          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308141          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308389          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1309600          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1309644          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1313139          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13138459         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1313991          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1314063          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1314416          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317346          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317357          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317368          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317426          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1327339          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1327533          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1333820          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1335257          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1335326          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1336932          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1345046          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1345160          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13462889         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13463393         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13510491         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13530659         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13530682         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13586828         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13597994         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          136              -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          136527           -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13765190         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13770893         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13814965         -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          139              -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14018952         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14220178         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14307336         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14307358         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14336700         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14977618         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16065831         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16842038         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16925250         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          18454121         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          18540299         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          195              -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          198              -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          199              -9  35.38 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          200              -9  35.38 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          201              -9  35.38 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          202              -9  35.38 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          21679312         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          2223930          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          226              -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          22967926         -9  35.38 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          253              -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          27253287         -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          301042           -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          3141126          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          3333673          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          373024           -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          50922297         -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          543908           -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          593748           -9  35.38 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          598630           -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          6018899          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          602              -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          603              -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          604              -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          61789513         -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          61790145         -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          62384            -9  35.38 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7428480          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439921          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439965          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439976          -9  35.38 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440020          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440360          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440382          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440417          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440439          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440473          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440484          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446084          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446142          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446277          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446346          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7487947          -9  35.38 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7488564          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7542098          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7718549          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7722647          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7738945          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7758976          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7775113          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7778394          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7778509          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7782492          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783008          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783075          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783166          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783702          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783791          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7784409          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7784421          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7785877          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7786814          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7787475          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7787497          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7788967          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7788989          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789006          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789062          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789095          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789120          -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789426          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7790809          -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          78002            -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          8030704          -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          88               -9  81.55 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          92               -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          93               -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__16065831    -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__18540299    -9  93.16 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__7439965     -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__7440020     -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          PM10             -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SUNOCOINC(R&M): NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          PM2_5            -9  64.63 100 100 -9   0801-6 Y R 911                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SUNOCOINC(R&M): NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10025737         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10025919         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10031137         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10034829         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10049055         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10060125         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10099748         -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101505         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101538         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101970         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10108642         -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10124364         -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10124433         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10294403         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10325947         -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10377669         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10588019         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          109              -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          11103869         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12018018         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12018198         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12035722         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12054487         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12060003         -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12079651         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          125              -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12626812         -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12640890         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12710360         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1271289          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1303282          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1304569          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1306190          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1306236          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1307966          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308061          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308141          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308389          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1309600          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1309644          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1313139          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13138459         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1313991          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1314063          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1314416          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317346          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317357          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317368          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317426          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1327339          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1327533          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1333820          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1335257          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1335326          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1336932          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1345046          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1345160          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13462889         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13463393         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13510491         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13530659         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13530682         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13586828         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13597994         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          136              -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          136527           -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13765190         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13770893         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13814965         -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          139              -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14018952         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14220178         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14307336         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14307358         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14336700         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14977618         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16065831         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16842038         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16925250         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          18454121         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          18540299         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          195              -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          198              -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          199              -9  35.38 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          200              -9  35.38 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          201              -9  35.38 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          202              -9  35.38 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          21679312         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          2223930          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          226              -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          22967926         -9  35.38 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          253              -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          27253287         -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          301042           -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          3141126          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          3333673          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          373024           -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          50922297         -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          543908           -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          593748           -9  35.38 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          598630           -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          6018899          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          602              -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          603              -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          604              -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          61789513         -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          61790145         -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          62384            -9  35.38 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7428480          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439921          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439965          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439976          -9  35.38 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440020          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440360          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440382          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440417          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440439          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440473          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440484          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446084          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446142          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446277          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446346          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7487947          -9  35.38 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7488564          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7542098          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7718549          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7722647          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7738945          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7758976          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7775113          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7778394          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7778509          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7782492          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783008          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783075          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783166          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783702          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783791          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7784409          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7784421          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7785877          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7786814          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7787475          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7787497          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7788967          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7788989          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789006          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789062          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789095          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789120          -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789426          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7790809          -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          78002            -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          8030704          -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          88               -9  81.86 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          92               -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          93               -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__16065831    -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__18540299    -9  93.16 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__7439965     -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__7440020     -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          PM10             -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SUNOCOINC(R&M): NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          PM2_5            -9  64.63 100 100 -9   0801-6 Y R 911A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SUNOCOINC(R&M): NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10025737         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10025919         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10031137         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10034829         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10049055         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10060125         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10099748         -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101505         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101538         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101970         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10108642         -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10124364         -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10124433         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10294403         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10325947         -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10377669         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10588019         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          109              -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          11103869         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12018018         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12018198         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12035722         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12054487         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12060003         -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12079651         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          125              -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12626812         -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12640890         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12710360         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1271289          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1303282          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1304569          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1306190          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1306236          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1307966          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308061          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308141          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308389          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1309600          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1309644          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1313139          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13138459         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1313991          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1314063          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1314416          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317346          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317357          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317368          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317426          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1327339          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1327533          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1333820          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1335257          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1335326          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1336932          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1345046          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1345160          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13462889         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13463393         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13510491         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13530659         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13530682         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13586828         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13597994         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          136              -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          136527           -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13765190         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13770893         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13814965         -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          139              -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14018952         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14220178         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14307336         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14307358         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14336700         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14977618         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16065831         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16842038         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16925250         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          18454121         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          18540299         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          195              -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          198              -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          199              -9  35.38 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          200              -9  35.38 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          201              -9  35.38 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          202              -9  35.38 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          21679312         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          2223930          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          226              -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          22967926         -9  35.38 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          253              -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          27253287         -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          301042           -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          3141126          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          3333673          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          373024           -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          50922297         -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          543908           -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          593748           -9  35.38 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          598630           -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          6018899          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          602              -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          603              -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          604              -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          61789513         -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          61790145         -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          62384            -9  35.38 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7428480          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439921          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439965          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439976          -9  35.38 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440020          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440360          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440382          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440417          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440439          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440473          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440484          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446084          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446142          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446277          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446346          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7487947          -9  35.38 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7488564          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7542098          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7718549          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7722647          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7738945          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7758976          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7775113          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7778394          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7778509          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7782492          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783008          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783075          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783166          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783702          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783791          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7784409          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7784421          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7785877          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7786814          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7787475          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7787497          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7788967          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7788989          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789006          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789062          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789095          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789120          -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789426          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7790809          -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          78002            -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          8030704          -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          88               -9  81.86 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          92               -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          93               -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__16065831    -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__18540299    -9  93.16 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__7439965     -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__7440020     -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          PM10             -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SUNOCOINC(R&M): NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          PM2_5            -9  64.63 100 100 -9   0801-6 Y R 911B                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SUNOCOINC(R&M): NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10099748         -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10108642         -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10124364         -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10325947         -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          109              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12060003         -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          125              -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12626812         -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1306190          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1306236          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1309600          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1314416          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317368          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1335257          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1335326          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          136              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          136527           -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          13814965         -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          139              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          195              -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          198              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          199              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          200              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          201              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          202              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          2223930          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          226              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          253              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          27253287         -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          301042           -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          373024           -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          543908           -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          593748           -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          598630           -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          602              -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          603              -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          604              -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          61790145         -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          62384            -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7428480          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439921          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440439          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446142          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446277          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7789426          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          7790809          -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          78002            -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          88               -9  72.71 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          92               -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          93               -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 912                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          PM10             -9  64.63 100 100 -9   0801-6 Y R 912                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SUNOCOINC(R&M): NEI_UNIQUE_ID=NEI11651: cdate=2008
39145 0          PM2_5            -9  64.63 100 100 -9   0801-6 Y R 912                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SUNOCOINC(R&M): NEI_UNIQUE_ID=NEI11651: cdate=2008
39149 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0575010160                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45365CRGLL2400I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39149 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6541                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 1576000301                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11574, Plant=Marathon Ashland Petrol. LLC, Canton, OH, compliance date: 28APR2006
39151 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 1576000301                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11574, Plant=Marathon Ashland Petrol. LLC, Canton, OH, compliance date: 15SEP2005
39151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1576050614                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 44711SHLND2408G                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11574, Plant=Marathon Ashland Petrol. LLC, Canton, OH, compliance date: 28APR2006
39151 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 44711SHLND2408G                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11574, Plant=Marathon Ashland Petrol. LLC, Canton, OH, compliance date: 15SEP2005
39151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6319                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6326                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$6336                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11574, Plant=Marathon Ashland Petrol. LLC, Canton, OH, compliance date: 28APR2006
39151 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$6336                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11574, Plant=Marathon Ashland Petrol. LLC, Canton, OH, compliance date: 15SEP2005
39151 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39151 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6338                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010027                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010029                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010193                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1677010757                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 44301BFGDR240WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 44314KZSLT2065M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6184                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6196                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39153 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6206                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000013                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 0          106990           -9  28.00 100 100 -9   -9     Y R 0278000199                      ! MACT: Autos, plant: GMNAO/SCGLORDSTOWNASSEMBLY, VOC 28%: Auto_2002_projections.xls
39155 0          107028           -9  28.00 100 100 -9   -9     Y R 0278000199                      ! MACT: Autos, plant: GMNAO/SCGLORDSTOWNASSEMBLY, VOC 28%: Auto_2002_projections.xls
39155 0          50000            -9  28.00 100 100 -9   -9     Y R 0278000199                      ! MACT: Autos, plant: GMNAO/SCGLORDSTOWNASSEMBLY, VOC 28%: Auto_2002_projections.xls
39155 0          67561            -9  28.00 100 100 -9   -9     Y R 0278000199                      ! MACT: Autos, plant: GMNAO/SCGLORDSTOWNASSEMBLY, VOC 28%: Auto_2002_projections.xls
39155 0          71432            -9  28.00 100 100 -9   -9     Y R 0278000199                      ! MACT: Autos, plant: GMNAO/SCGLORDSTOWNASSEMBLY, VOC 28%: Auto_2002_projections.xls
39155 0          75070            -9  28.00 100 100 -9   -9     Y R 0278000199                      ! MACT: Autos, plant: GMNAO/SCGLORDSTOWNASSEMBLY, VOC 28%: Auto_2002_projections.xls
39155 0          91203            -9  28.00 100 100 -9   -9     Y R 0278000199                      ! MACT: Autos, plant: GMNAO/SCGLORDSTOWNASSEMBLY, VOC 28%: Auto_2002_projections.xls
39155 0          VOC              -9  28.00 100 100 -9   -9     Y R 0278000199                      ! MACT: Autos, plant: GMNAO/SCGLORDSTOWNASSEMBLY, VOC 28%: Auto_2002_projections.xls
39155 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0278000463                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 44430DNMNT400DI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 44481WRRNW1040P                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0932                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6218                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39155 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6233                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39161 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6672                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0684010011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 45714SHLLC2982W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39167 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$6637                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285020059                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0285030180                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 44270MRTNS151SI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39169 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16013                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
39175 0          PM10             -9  28.00 100 100 -9   -9     Y R 0388000043                      ! MACT: Lime Manufacturing: NATIONAL LIME AND STONE COMPANY - CA
39175 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0388000043                      ! MACT: Lime Manufacturing: NATIONAL LIME AND STONE COMPANY - CA
39175 0          SO2              -9  20.00 100 100 -9   -9     Y R 0388000043                      ! MACT: Lime Manufacturing: NATIONAL LIME AND STONE COMPANY - CA
40019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 1535                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40528, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2013
40019 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 1535                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40528, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 30JUN2006
40019 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 1535                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40528, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 30JUN2006
40019 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 1535                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40528, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 1535                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40528, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 1535                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40528, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 1535                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40528, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 1535                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40528, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 30JUN2006
40019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 73401TTLPTHIGHW                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2013
40019 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 73401TTLPTHIGHW                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 30JUN2006
40019 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 73401TTLPTHIGHW                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 30JUN2006
40019 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 73401TTLPTHIGHW                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 73401TTLPTHIGHW                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 73401TTLPTHIGHW                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 73401TTLPTHIGHW                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 73401TTLPTHIGHW                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 30JUN2006
40019 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$11009                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2013
40019 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$11009                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 30JUN2006
40019 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11009                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 30JUN2006
40019 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$11009                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$11009                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$11009                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$11009                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 31DEC2005
40019 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$11009                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEIOKT$11009, Plant=Valero (formerly Ultramar/Diamond Shamrock, formerly, Ardmore, OK, compliance date: 30JUN2006
40031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 662                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 73505GDYRT1GOOD                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40071 10100601   NOX              -9  40.00 100 100 -9   -9     Y R 314                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 20100201   NOX              -9  40.00 100 100 -9   -9     Y R 314                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 314                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 314                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 10100601   NOX              -9  40.00 100 100 -9   -9     Y R 74603CNCPN1000S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 20100201   NOX              -9  40.00 100 100 -9   -9     Y R 74603CNCPN1000S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 74603CNCPN1000S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 74603CNCPN1000S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 10100601   NOX              -9  40.00 100 100 -9   -9     Y R EGU0945                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 20100201   NOX              -9  40.00 100 100 -9   -9     Y R EGU0945                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 30600104   NOX              -9  40.00 100 100 -9   -9     Y R EGU0945                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 30600106   NOX              -9  40.00 100 100 -9   -9     Y R EGU0945                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 10100601   NOX              -9  40.00 100 100 -9   -9     Y R EGU0947                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 20100201   NOX              -9  40.00 100 100 -9   -9     Y R EGU0947                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 30600104   NOX              -9  40.00 100 100 -9   -9     Y R EGU0947                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 30600106   NOX              -9  40.00 100 100 -9   -9     Y R EGU0947                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 10100601   NOX              -9  40.00 100 100 -9   -9     Y R T$11123                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 20100201   NOX              -9  40.00 100 100 -9   -9     Y R T$11123                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$11123                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40071 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$11123                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12988, Plant=Conoco Inc., Ponca City, OK, compliance date: 31JUL2009
40101 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 643                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 74403FRTHW5600E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0952                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40101 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11110                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 0          106990           -9  28.00 100 100 -9   -9     Y R 650                             ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          107028           -9  28.00 100 100 -9   -9     Y R 650                             ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          50000            -9  28.00 100 100 -9   -9     Y R 650                             ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          67561            -9  28.00 100 100 -9   -9     Y R 650                             ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          71432            -9  28.00 100 100 -9   -9     Y R 650                             ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          75070            -9  28.00 100 100 -9   -9     Y R 650                             ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          91203            -9  28.00 100 100 -9   -9     Y R 650                             ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 650                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 0          VOC              -9  28.00 100 100 -9   -9     Y R 650                             ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          106990           -9  28.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          107028           -9  28.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          50000            -9  28.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          67561            -9  28.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          71432            -9  28.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          75070            -9  28.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 0          91203            -9  28.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 0          VOC              -9  28.00 100 100 -9   -9     Y R 73134GNRLM7447S                 ! MACT: Autos, plant: GENERALMOTORSCORPCPCGROUP, VOC 28%: Auto_2002_projections.xls
40109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$10999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
40121 0          10025737         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10025919         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10031137         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10034829         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10049055         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10060125         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10099748         -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10101505         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10101538         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10101970         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10108642         -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10124364         -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10124433         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10294403         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10325947         -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10377669         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          10588019         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          109              -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          11103869         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          12018018         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          12018198         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          12035722         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          12054487         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          12060003         -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          12079651         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          125              -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          12626812         -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          12640890         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          12710360         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1271289          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1303282          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1304569          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1306190          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1306236          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1307966          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1308061          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1308141          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1308389          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1309600          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1309644          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1313139          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13138459         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1313991          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1314063          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1314416          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1317346          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1317357          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1317368          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1317426          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1327339          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1327533          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1333820          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1335257          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1335326          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1336932          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1345046          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          1345160          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13462889         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13463393         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13510491         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13530659         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13530682         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13586828         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13597994         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          136              -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          136527           -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13765190         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13770893         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          13814965         -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          139              -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          14018952         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          14220178         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          14307336         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          14307358         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          14336700         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          14977618         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          16065831         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          16842038         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          16925250         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          18454121         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          18540299         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          195              -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          198              -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          199              -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          200              -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          201              -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          202              -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          21679312         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          2223930          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          226              -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          22967926         -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          253              -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          27253287         -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          301042           -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          3141126          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          3333673          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          373024           -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          50922297         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          543908           -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          593748           -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          598630           -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          6018899          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          602              -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          603              -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          604              -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          61789513         -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          61790145         -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          62384            -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7428480          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7439921          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7439965          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7439976          -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7440020          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7440360          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7440382          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7440417          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7440439          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7440473          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7440484          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7446084          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7446142          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7446277          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7446346          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7487947          -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7488564          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7542098          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7647010          -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7718549          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7722647          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7738945          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7758976          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7775113          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7778394          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7778509          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7782492          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7782505          -9   0.00 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7783008          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7783075          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7783166          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7783702          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7783791          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7784409          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7784421          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7785877          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7786814          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7787475          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7787497          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7788967          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7788989          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7789006          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7789062          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7789095          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7789120          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7789426          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          7790809          -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          78002            -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          8030704          -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          88               -9  92.03 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          92               -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          93               -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          EXH__16065831    -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          EXH__18540299    -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          EXH__7439965     -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40121 0          EXH__7440020     -9  37.41 100 100 -9   0801-2 Y R HWI3032                         ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MCALESTER ARMY AMMUNITION PLT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12985: cdate=2008
40135 0          PM10             -9  28.00 100 100 -9   -9     Y R 655                             ! MACT: Lime Manufacturing: GLOBAL STONE ST. CLAIR INC.
40135 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 655                             ! MACT: Lime Manufacturing: GLOBAL STONE ST. CLAIR INC.
40135 0          SO2              -9  20.00 100 100 -9   -9     Y R 655                             ! MACT: Lime Manufacturing: GLOBAL STONE ST. CLAIR INC.
40135 0          PM10             -9  28.00 100 100 -9   -9     Y R 74945GLBLSHWY17                 ! MACT: Lime Manufacturing: GLOBAL STONE ST. CLAIR INC.
40135 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 74945GLBLSHWY17                 ! MACT: Lime Manufacturing: GLOBAL STONE ST. CLAIR INC.
40135 0          SO2              -9  20.00 100 100 -9   -9     Y R 74945GLBLSHWY17                 ! MACT: Lime Manufacturing: GLOBAL STONE ST. CLAIR INC.
40135 0          PM10             -9  28.00 100 100 -9   -9     Y R T$17629                         ! MACT: Lime Manufacturing: GLOBAL STONE ST. CLAIR INC.
40135 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$17629                         ! MACT: Lime Manufacturing: GLOBAL STONE ST. CLAIR INC.
40135 0          SO2              -9  20.00 100 100 -9   -9     Y R T$17629                         ! MACT: Lime Manufacturing: GLOBAL STONE ST. CLAIR INC.
40143 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 1477                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2005
40143 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 1477                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2005
40143 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 1477                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2005
40143 10200601   NOX              -9  40.00 100 100 -9   -9     Y R 74107SNRFN1700S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2013
40143 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 74107SNRFN1700S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2013
40143 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 74107SNRFN1700S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2013
40143 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 74107SNRFN1700S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2013
40143 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 74107SNRFN1700S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2005
40143 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 74107SNRFN1700S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2005
40143 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 74107SNRFN1700S                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2005
40143 10200601   NOX              -9  40.00 100 100 -9   -9     Y R T$11066                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2013
40143 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$11066                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2013
40143 30600105   NOX              -9  40.00 100 100 -9   -9     Y R T$11066                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2013
40143 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$11066                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2013
40143 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$11066                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2005
40143 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$11066                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2005
40143 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$11066                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12969, Plant=Sunoco, Inc., Tulsa, OK, compliance date: 31DEC2005
41043 0          106990           -9   0.00 100 100 -9   1624   Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700602   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700604   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700606   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700607   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700608   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700610   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700611   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700621   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700625   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700626   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700628   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700629   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700630   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700631   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700632   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700635   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700640   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700651   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700655   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700661   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700664   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700665   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700701   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700702   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700703   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700704   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700705   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700706   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700707   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700708   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700709   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700710   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700711   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700712   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700713   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700714   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700715   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700716   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700717   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700718   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700720   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700725   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700727   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700730   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700734   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700735   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700736   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700737   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700740   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700744   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700746   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700747   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700750   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700752   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700753   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700756   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700757   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700760   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700762   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700763   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700766   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700767   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700769   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700770   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700771   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700780   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700781   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700783   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700785   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700788   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700789   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700790   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700791   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700792   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700793   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700798   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700799   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700801   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700802   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700895   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700921   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700923   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700925   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700927   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700931   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700932   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700933   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700934   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700935   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700936   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700939   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700940   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700950   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700960   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700971   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700980   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700981   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700982   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700983   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700984   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701001   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701008   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701009   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701010   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701015   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701020   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701030   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701040   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701053   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701054   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701055   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701057   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701060   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701062   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701064   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701410   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701415   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701416   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701420   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701425   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701430   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701440   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701442   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701480   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701482   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701484   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701486   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701510   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701512   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701530   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701540   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701550   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701610   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701611   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701630   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701640   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701642   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701710   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701712   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701720   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701740   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701742   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30702021   106990           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 0          107028           -9   0.00 100 100 -9   1624   Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700602   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700604   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700606   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700607   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700608   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700610   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700611   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700621   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700625   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700626   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700628   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700629   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700630   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700631   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700632   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700635   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700640   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700651   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700655   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700661   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700664   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700665   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700701   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700702   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700703   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700704   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700705   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700706   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700707   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700708   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700709   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700710   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700711   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700712   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700713   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700714   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700715   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700716   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700717   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700718   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700720   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700725   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700727   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700730   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700734   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700735   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700736   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700737   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700740   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700744   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700746   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700747   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700750   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700752   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700753   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700756   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700757   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700760   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700762   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700763   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700766   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700767   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700769   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700770   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700771   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700780   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700781   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700783   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700785   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700788   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700789   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700790   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700791   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700792   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700793   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700798   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700799   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700801   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700802   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700895   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700921   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700923   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700925   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700927   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700931   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700932   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700933   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700934   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700935   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700936   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700939   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700940   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700950   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700960   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700971   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700980   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700981   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700982   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700983   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700984   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701001   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701008   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701009   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701010   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701015   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701020   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701030   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701040   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701053   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701054   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701055   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701057   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701060   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701062   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701064   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701410   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701415   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701416   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701420   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701425   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701430   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701440   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701442   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701480   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701482   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701484   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701486   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701510   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701512   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701530   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701540   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701550   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701610   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701611   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701630   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701640   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701642   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701710   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701712   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701720   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701740   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701742   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30702021   107028           -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 0          50000            -9   0.00 100 100 -9   1624   Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700602   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700604   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700606   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700607   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700608   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700610   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700611   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700621   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700625   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700626   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700628   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700629   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700630   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700631   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700632   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700635   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700640   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700651   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700655   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700661   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700664   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700665   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700701   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700702   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700703   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700704   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700705   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700706   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700707   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700708   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700709   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700710   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700711   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700712   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700713   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700714   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700715   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700716   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700717   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700718   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700720   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700725   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700727   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700730   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700734   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700735   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700736   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700737   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700740   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700744   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700746   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700747   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700750   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700752   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700753   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700756   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700757   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700760   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700762   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700763   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700766   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700767   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700769   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700770   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700771   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700780   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700781   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700783   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700785   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700788   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700789   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700790   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700791   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700792   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700793   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700798   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700799   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700801   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700802   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700895   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700921   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700923   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700925   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700927   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700931   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700932   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700933   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700934   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700935   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700936   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700939   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700940   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700950   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700960   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700971   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700980   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700981   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700982   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700983   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700984   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701001   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701008   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701009   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701010   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701015   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701020   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701030   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701040   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701053   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701054   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701055   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701057   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701060   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701062   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701064   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701410   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701415   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701416   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701420   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701425   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701430   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701440   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701442   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701480   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701482   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701484   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701486   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701510   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701512   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701530   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701540   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701550   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701610   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701611   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701630   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701640   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701642   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701710   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701712   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701720   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701740   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701742   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30702021   50000            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 0          67561            -9   0.00 100 100 -9   1624   Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700602   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700604   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700606   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700607   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700608   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700610   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700611   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700621   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700625   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700626   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700628   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700629   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700630   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700631   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700632   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700635   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700640   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700651   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700655   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700661   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700664   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700665   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700701   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700702   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700703   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700704   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700705   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700706   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700707   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700708   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700709   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700710   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700711   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700712   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700713   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700714   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700715   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700716   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700717   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700718   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700720   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700725   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700727   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700730   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700734   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700735   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700736   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700737   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700740   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700744   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700746   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700747   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700750   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700752   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700753   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700756   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700757   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700760   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700762   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700763   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700766   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700767   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700769   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700770   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700771   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700780   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700781   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700783   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700785   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700788   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700789   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700790   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700791   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700792   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700793   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700798   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700799   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700801   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700802   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700895   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700921   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700923   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700925   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700927   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700931   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700932   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700933   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700934   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700935   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700936   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700939   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700940   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700950   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700960   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700971   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700980   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700981   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700982   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700983   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700984   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701001   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701008   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701009   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701010   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701015   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701020   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701030   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701040   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701053   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701054   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701055   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701057   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701060   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701062   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701064   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701410   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701415   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701416   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701420   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701425   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701430   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701440   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701442   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701480   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701482   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701484   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701486   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701510   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701512   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701530   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701540   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701550   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701610   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701611   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701630   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701640   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701642   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701710   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701712   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701720   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701740   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701742   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30702021   67561            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 0          71432            -9   0.00 100 100 -9   1624   Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700602   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700604   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700606   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700607   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700608   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700610   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700611   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700621   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700625   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700626   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700628   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700629   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700630   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700631   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700632   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700635   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700640   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700651   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700655   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700661   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700664   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700665   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700701   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700702   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700703   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700704   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700705   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700706   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700707   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700708   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700709   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700710   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700711   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700712   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700713   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700714   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700715   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700716   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700717   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700718   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700720   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700725   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700727   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700730   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700734   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700735   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700736   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700737   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700740   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700744   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700746   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700747   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700750   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700752   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700753   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700756   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700757   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700760   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700762   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700763   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700766   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700767   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700769   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700770   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700771   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700780   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700781   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700783   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700785   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700788   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700789   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700790   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700791   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700792   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700793   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700798   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700799   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700801   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700802   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700895   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700921   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700923   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700925   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700927   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700931   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700932   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700933   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700934   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700935   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700936   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700939   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700940   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700950   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700960   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700971   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700980   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700981   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700982   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700983   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700984   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701001   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701008   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701009   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701010   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701015   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701020   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701030   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701040   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701053   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701054   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701055   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701057   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701060   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701062   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701064   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701410   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701415   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701416   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701420   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701425   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701430   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701440   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701442   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701480   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701482   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701484   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701486   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701510   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701512   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701530   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701540   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701550   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701610   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701611   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701630   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701640   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701642   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701710   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701712   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701720   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701740   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701742   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30702021   71432            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 0          75070            -9   0.00 100 100 -9   1624   Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700602   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700604   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700606   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700607   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700608   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700610   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700611   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700621   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700625   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700626   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700628   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700629   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700630   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700631   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700632   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700635   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700640   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700651   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700655   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700661   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700664   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700665   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700701   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700702   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700703   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700704   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700705   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700706   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700707   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700708   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700709   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700710   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700711   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700712   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700713   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700714   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700715   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700716   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700717   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700718   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700720   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700725   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700727   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700730   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700734   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700735   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700736   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700737   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700740   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700744   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700746   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700747   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700750   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700752   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700753   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700756   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700757   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700760   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700762   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700763   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700766   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700767   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700769   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700770   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700771   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700780   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700781   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700783   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700785   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700788   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700789   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700790   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700791   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700792   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700793   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700798   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700799   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700801   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700802   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700895   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700921   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700923   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700925   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700927   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700931   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700932   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700933   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700934   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700935   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700936   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700939   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700940   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700950   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700960   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700971   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700980   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700981   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700982   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700983   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700984   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701001   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701008   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701009   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701010   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701015   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701020   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701030   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701040   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701053   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701054   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701055   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701057   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701060   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701062   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701064   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701410   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701415   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701416   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701420   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701425   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701430   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701440   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701442   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701480   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701482   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701484   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701486   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701510   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701512   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701530   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701540   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701550   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701610   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701611   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701630   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701640   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701642   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701710   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701712   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701720   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701740   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701742   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30702021   75070            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 0          91203            -9   0.00 100 100 -9   1624   Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700602   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700604   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700606   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700607   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700608   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700610   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700611   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700621   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700625   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700626   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700628   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700629   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700630   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700631   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700632   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700635   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700640   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700651   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700655   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700661   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700664   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700665   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700701   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700702   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700703   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700704   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700705   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700706   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700707   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700708   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700709   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700710   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700711   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700712   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700713   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700714   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700715   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700716   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700717   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700718   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700720   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700725   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700727   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700730   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700734   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700735   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700736   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700737   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700740   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700744   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700746   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700747   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700750   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700752   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700753   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700756   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700757   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700760   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700762   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700763   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700766   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700767   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700769   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700770   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700771   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700780   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700781   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700783   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700785   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700788   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700789   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700790   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700791   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700792   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700793   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700798   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700799   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700801   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700802   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700895   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700921   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700923   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700925   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700927   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700931   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700932   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700933   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700934   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700935   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700936   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700939   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700940   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700950   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700960   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700971   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700980   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700981   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700982   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700983   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700984   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701001   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701008   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701009   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701010   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701015   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701020   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701030   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701040   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701053   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701054   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701055   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701057   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701060   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701062   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701064   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701410   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701415   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701416   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701420   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701425   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701430   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701440   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701442   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701480   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701482   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701484   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701486   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701510   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701512   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701530   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701540   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701550   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701610   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701611   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701630   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701640   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701642   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701710   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701712   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701720   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701740   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701742   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30702021   91203            -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 0          VOC              -9   0.00 100 100 -9   1624   Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700602   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700604   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700606   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700607   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700608   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700610   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700611   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700621   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700625   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700626   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700628   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700629   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700630   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700631   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700632   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700635   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700640   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700651   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700655   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700661   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700664   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700665   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700701   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700702   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700703   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700704   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700705   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700706   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700707   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700708   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700709   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700710   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700711   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700712   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700713   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700714   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700715   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700716   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700717   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700718   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700720   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700725   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700727   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700730   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700734   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700735   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700736   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700737   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700740   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700744   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700746   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700747   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700750   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700752   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700753   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700756   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700757   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700760   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700762   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700763   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700766   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700767   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700769   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700770   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700771   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700780   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700781   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700783   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700785   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700788   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700789   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700790   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700791   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700792   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700793   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700798   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700799   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700801   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700802   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700895   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700921   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700923   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700925   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700927   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700931   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700932   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700933   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700934   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700935   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700936   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700939   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700940   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700950   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700960   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700971   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700980   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700981   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700982   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700983   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30700984   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701001   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701008   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701009   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701010   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701015   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701020   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701030   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701040   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701053   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701054   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701055   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701057   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701060   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701062   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701064   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701410   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701415   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701416   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701420   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701425   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701430   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701440   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701442   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701480   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701482   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701484   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701486   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701510   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701512   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701530   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701540   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701550   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701610   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701611   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701630   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701640   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701642   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701710   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701712   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701720   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701740   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30701742   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41043 30702021   VOC              -9   0.00 100 100 -9   -9     Y R 05195                           ! MACT: Plywood and Composite Wood Products: plant=Oregon Panel Products, Lebanon, OR
41045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0969                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
41045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18716                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300009                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300024                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300144                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300183                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300196                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4200300311                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15015                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 15061ZNCCR300FR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420070032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0982                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110431                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42011 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420110471                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420130010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42013 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1732                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42017 0          10025737         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10025919         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10031137         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10034829         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10049055         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10060125         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10099748         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10101505         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10101538         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10101970         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10108642         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10124364         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10124433         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10294403         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10325947         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10377669         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10588019         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          109              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          11103869         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12018018         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12018198         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12035722         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12054487         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12060003         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12079651         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          125              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12626812         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12640890         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12710360         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1271289          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1303282          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1304569          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1306190          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1306236          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1307966          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1308061          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1308141          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1308389          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1309600          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1309644          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1313139          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13138459         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1313991          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1314063          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1314416          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317346          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317357          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317368          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317426          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1327339          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1327533          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1333820          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1335257          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1335326          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1336932          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1345046          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1345160          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13462889         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13463393         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13510491         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13530659         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13530682         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13586828         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13597994         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          136              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          136527           -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13765190         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13770893         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13814965         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          139              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14018952         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14220178         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14307336         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14307358         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14336700         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14977618         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          16065831         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          16842038         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          16925250         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          18454121         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          18540299         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          195              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          198              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          199              -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          200              -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          201              -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          202              -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          21679312         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          2223930          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          226              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          253              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          27253287         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          301042           -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          3141126          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          3333673          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          373024           -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          50922297         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          543908           -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          593748           -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          598630           -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          6018899          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          602              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          603              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          604              -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          61789513         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          61790145         -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          62384            -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7428480          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7439921          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7439965          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440020          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440360          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440382          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440417          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440439          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440473          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440484          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446084          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446142          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446277          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446346          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7488564          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7542098          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7718549          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7722647          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7738945          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7758976          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7775113          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7778394          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7778509          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7782492          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783008          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783075          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783166          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783702          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783791          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7784409          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7784421          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7785877          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7786814          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7787475          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7787497          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7788967          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7788989          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789006          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789062          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789095          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789120          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789426          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7790809          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          78002            -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          8030704          -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          88               -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          92               -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          93               -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__16065831    -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__18540299    -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__7439965     -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__7440020     -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          PM10             -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROHM&HAASCO/BRISTOL: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          PM2_5            -9  68.59 100 100 -9   0801-6 Y R 739                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROHM&HAASCO/BRISTOL: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10025737         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10025919         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10031137         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10034829         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10049055         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10060125         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10099748         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10101505         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10101538         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10101970         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10108642         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10124364         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10124433         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10294403         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10325947         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10377669         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10588019         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          109              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          11103869         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12018018         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12018198         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12035722         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12054487         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12060003         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12079651         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          125              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12626812         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12640890         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12710360         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1271289          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1303282          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1304569          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1306190          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1306236          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1307966          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1308061          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1308141          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1308389          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1309600          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1309644          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1313139          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13138459         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1313991          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1314063          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1314416          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317346          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317357          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317368          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317426          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1327339          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1327533          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1333820          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1335257          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1335326          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1336932          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1345046          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1345160          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13462889         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13463393         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13510491         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13530659         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13530682         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13586828         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13597994         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          136              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          136527           -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13765190         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13770893         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13814965         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          139              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14018952         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14220178         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14307336         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14307358         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14336700         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14977618         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          16065831         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          16842038         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          16925250         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          18454121         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          18540299         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          195              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          198              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          199              -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          200              -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          201              -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          202              -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          21679312         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          2223930          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          226              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          253              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          27253287         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          301042           -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          3141126          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          3333673          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          373024           -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          50922297         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          543908           -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          593748           -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          598630           -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          6018899          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          602              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          603              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          604              -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          61789513         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          61790145         -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          62384            -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7428480          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7439921          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7439965          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440020          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440360          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440382          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440417          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440439          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440473          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440484          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446084          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446142          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446277          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446346          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7488564          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7542098          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7718549          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7722647          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7738945          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7758976          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7775113          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7778394          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7778509          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7782492          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783008          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783075          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783166          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783702          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783791          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7784409          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7784421          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7785877          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7786814          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7787475          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7787497          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7788967          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7788989          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789006          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789062          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789095          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789120          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789426          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7790809          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          78002            -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          8030704          -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          88               -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          92               -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          93               -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__16065831    -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__18540299    -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__7439965     -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__7440020     -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          PM10             -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROHM&HAASCO/BRISTOL: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          PM2_5            -9  68.59 100 100 -9   0801-6 Y R 739A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROHM&HAASCO/BRISTOL: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10025737         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10025919         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10031137         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10034829         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10049055         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10060125         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10099748         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10101505         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10101538         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10101970         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10108642         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10124364         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10124433         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10294403         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10325947         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10377669         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          10588019         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          109              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          11103869         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12018018         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12018198         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12035722         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12054487         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12060003         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12079651         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          125              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12626812         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12640890         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          12710360         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1271289          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1303282          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1304569          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1306190          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1306236          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1307966          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1308061          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1308141          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1308389          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1309600          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1309644          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1313139          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13138459         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1313991          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1314063          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1314416          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317346          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317357          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317368          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1317426          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1327339          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1327533          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1333820          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1335257          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1335326          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1336932          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1345046          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          1345160          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13462889         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13463393         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13510491         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13530659         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13530682         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13586828         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13597994         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          136              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          136527           -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13765190         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13770893         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          13814965         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          139              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14018952         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14220178         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14307336         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14307358         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14336700         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          14977618         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          16065831         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          16842038         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          16925250         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          18454121         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          18540299         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          195              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          198              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          199              -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          200              -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          201              -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          202              -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          21679312         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          2223930          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          226              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          253              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          27253287         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          301042           -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          3141126          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          3333673          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          373024           -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          50922297         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          543908           -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          593748           -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          598630           -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          6018899          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          602              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          603              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          604              -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          61789513         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          61790145         -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          62384            -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7428480          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7439921          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7439965          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440020          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440360          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440382          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440417          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440439          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440473          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7440484          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446084          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446142          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446277          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7446346          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7488564          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7542098          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7718549          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7722647          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7738945          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7758976          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7775113          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7778394          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7778509          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7782492          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783008          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783075          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783166          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783702          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7783791          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7784409          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7784421          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7785877          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7786814          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7787475          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7787497          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7788967          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7788989          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789006          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789062          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789095          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789120          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7789426          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          7790809          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          78002            -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          8030704          -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          88               -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          92               -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          93               -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__16065831    -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__18540299    -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__7439965     -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          EXH__7440020     -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS CO/BRISTOL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          PM10             -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROHM&HAASCO/BRISTOL: NEI_UNIQUE_ID=NEI7318: cdate=2008
42017 0          PM2_5            -9  68.59 100 100 -9   0801-6 Y R 739B                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROHM&HAASCO/BRISTOL: NEI_UNIQUE_ID=NEI7318: cdate=2008
42019 0          PM10             -9  28.00 100 100 -9   -9     Y R 16057MRCRL560BR                 ! MACT: Lime Manufacturing: MERCER LIME & STONE /BRANCHTON
42019 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 16057MRCRL560BR                 ! MACT: Lime Manufacturing: MERCER LIME & STONE /BRANCHTON
42019 0          SO2              -9  20.00 100 100 -9   -9     Y R 16057MRCRL560BR                 ! MACT: Lime Manufacturing: MERCER LIME & STONE /BRANCHTON
42019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 0          PM10             -9  28.00 100 100 -9   -9     Y R 420190009                       ! MACT: Lime Manufacturing: ALLEGHENY MINERALS C/HARRISVILLE
42019 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 420190009                       ! MACT: Lime Manufacturing: ALLEGHENY MINERALS C/HARRISVILLE
42019 0          SO2              -9  20.00 100 100 -9   -9     Y R 420190009                       ! MACT: Lime Manufacturing: ALLEGHENY MINERALS C/HARRISVILLE
42019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420190015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 0          PM10             -9  28.00 100 100 -9   -9     Y R 420190021                       ! MACT: Lime Manufacturing: MERCER LIME & STONE /BRANCHTON
42019 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 420190021                       ! MACT: Lime Manufacturing: MERCER LIME & STONE /BRANCHTON
42019 0          SO2              -9  20.00 100 100 -9   -9     Y R 420190021                       ! MACT: Lime Manufacturing: MERCER LIME & STONE /BRANCHTON
42019 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15051                         ! MACT: Lime Manufacturing: MERCER LIME & STONE /BRANCHTON
42019 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15051                         ! MACT: Lime Manufacturing: MERCER LIME & STONE /BRANCHTON
42019 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15051                         ! MACT: Lime Manufacturing: MERCER LIME & STONE /BRANCHTON
42019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420210027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 0          PM10             -9  28.00 100 100 -9   -9     Y R 16823BLLFNNTHOM                 ! MACT: Lime Manufacturing: GRAYMONT PA INC/BELLEFONTE PLANT N T
42027 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 16823BLLFNNTHOM                 ! MACT: Lime Manufacturing: GRAYMONT PA INC/BELLEFONTE PLANT N T
42027 0          SO2              -9  20.00 100 100 -9   -9     Y R 16823BLLFNNTHOM                 ! MACT: Lime Manufacturing: GRAYMONT PA INC/BELLEFONTE PLANT N T
42027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 0          PM10             -9  28.00 100 100 -9   -9     Y R 420270003                       ! MACT: Lime Manufacturing: GRAYMONT PA INC/BELLEFONTE PLANT N T
42027 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 420270003                       ! MACT: Lime Manufacturing: GRAYMONT PA INC/BELLEFONTE PLANT N T
42027 0          SO2              -9  20.00 100 100 -9   -9     Y R 420270003                       ! MACT: Lime Manufacturing: GRAYMONT PA INC/BELLEFONTE PLANT N T
42027 0          PM10             -9  28.00 100 100 -9   -9     Y R 420270013                       ! MACT: Lime Manufacturing: CON LIME INC/BELLEFONTE
42027 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 420270013                       ! MACT: Lime Manufacturing: CON LIME INC/BELLEFONTE
42027 0          SO2              -9  20.00 100 100 -9   -9     Y R 420270013                       ! MACT: Lime Manufacturing: CON LIME INC/BELLEFONTE
42027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420270017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42027 0          PM10             -9  28.00 100 100 -9   -9     Y R 420270018                       ! MACT: Lime Manufacturing: GRAYMONT PA INC/PLEASANT GAP PLT
42027 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 420270018                       ! MACT: Lime Manufacturing: GRAYMONT PA INC/PLEASANT GAP PLT
42027 0          SO2              -9  20.00 100 100 -9   -9     Y R 420270018                       ! MACT: Lime Manufacturing: GRAYMONT PA INC/PLEASANT GAP PLT
42027 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15086                         ! MACT: Lime Manufacturing: GRAYMONT PA INC/BELLEFONTE PLANT N T
42027 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15086                         ! MACT: Lime Manufacturing: GRAYMONT PA INC/BELLEFONTE PLANT N T
42027 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15086                         ! MACT: Lime Manufacturing: GRAYMONT PA INC/BELLEFONTE PLANT N T
42027 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15087                         ! MACT: Lime Manufacturing: CON LIME INC/BELLEFONTE
42027 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15087                         ! MACT: Lime Manufacturing: CON LIME INC/BELLEFONTE
42027 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15087                         ! MACT: Lime Manufacturing: CON LIME INC/BELLEFONTE
42029 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42029 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420290011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420310100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1663                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0994                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1897                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420370007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420410028                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 19061BPLCMPOSTR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31MAY2009
42045 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 19061BPLCMPOSTR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 19061BPLCMPOSTR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 10200401   SO2              -9  90.00 100 100 -9   -9     Y R 19061BPLCMPOSTR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 19061BPLCMPOSTR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 30JUN2006
42045 30600103   SO2              -9  90.00 100 100 -9   -9     Y R 19061BPLCMPOSTR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 19061BPLCMPOSTR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 19061BPLCMPOSTR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 19061BPLCMPOSTR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 19061BPLCMPOSTR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 20200203   NOX              -9  40.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 15JUN2013
42045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200401   SO2              -9  90.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 19061SNRFNGREEN                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 20200203   NOX              -9  40.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 15JUN2013
42045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450025                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200401   SO2              -9  90.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 420450025                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 420450030                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 420450030                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 10200401   SO2              -9  90.00 100 100 -9   -9     Y R 420450030                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 420450030                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 30JUN2006
42045 30600103   SO2              -9  90.00 100 100 -9   -9     Y R 420450030                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 420450030                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 420450030                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 420450030                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 420450030                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 20200203   NOX              -9  40.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600105   NOX              -9  40.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 15JUN2013
42045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420450220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200401   SO2              -9  90.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 420450220                       ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600201   NOX              -9  60.00 100 100 -9   -9     Y R T$2072                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31MAY2009
42045 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$2072                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$2072                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 10200401   SO2              -9  90.00 100 100 -9   -9     Y R T$2072                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30103204   SO2              -9   0.00 100 100 -9   -9     Y R T$2072                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 30JUN2006
42045 30600103   SO2              -9  90.00 100 100 -9   -9     Y R T$2072                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$2072                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$2072                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$2072                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$2072                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI113, Plant=ConocoPhillips (formerlyTosco Refining Co., formerly, Trainer (Marcus Hook), PA, compliance date: 31DEC2006
42045 10200401   NOX              -9  40.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 20200203   NOX              -9  40.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600105   NOX              -9  40.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 30600201   NOX              -9  90.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 15JUN2013
42045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2075                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42045 10200401   SO2              -9  90.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 31DEC2005
42045 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$2075                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI109, Plant=Sunoco, Inc., Marcus Hook, PA, compliance date: 13JUN2013
42047 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 15845PNNTC100CE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420470005                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU0999                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42047 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1576                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 16501RCKFN15THC                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 16512RCKCRFOOTO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 16531GNRLL2901E                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490009                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420490031                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COB                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COC                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EC-E-COP                        ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1001                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1718                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1725                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42061 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420610015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42069 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420690205                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 17604RMSTRLIBER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710035                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710037                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420710074                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1886                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420770011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420790027                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 16701KNDLL77NKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 16749QKRSTINTER                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420830042                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1737                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1742                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42083 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420910008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42091 0          10025737         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10025919         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10031137         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10034829         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10049055         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10060125         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10099748         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10101505         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10101538         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10101970         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10108642         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10124364         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10124433         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10294403         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10325947         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10377669         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          10588019         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          109              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          11103869         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          12018018         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          12018198         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          12035722         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          12054487         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          12060003         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          12079651         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          125              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          12626812         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          12640890         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          12710360         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1271289          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1303282          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1304569          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1306190          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1306236          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1307966          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1308061          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1308141          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1308389          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1309600          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1309644          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1313139          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13138459         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1313991          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1314063          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1314416          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1317346          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1317357          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1317368          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1317426          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1327339          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1327533          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1333820          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1335257          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1335326          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1336932          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1345046          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          1345160          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13462889         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13463393         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13510491         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13530659         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13530682         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13586828         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13597994         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          136              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          136527           -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13765190         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13770893         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          13814965         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          139              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          14018952         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          14220178         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          14307336         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          14307358         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          14336700         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          14977618         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          16065831         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          16842038         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          16925250         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          18454121         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          18540299         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          195              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          198              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          199              -9   0.00 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          200              -9   0.00 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          201              -9   0.00 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          202              -9   0.00 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          21679312         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          2223930          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          226              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          253              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          27253287         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          301042           -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          3141126          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          3333673          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          373024           -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          50922297         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          543908           -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          593748           -9   0.00 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          598630           -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          6018899          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          602              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          603              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          604              -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          61789513         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          61790145         -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          62384            -9   0.00 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7428480          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7439921          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7439965          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7440020          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7440360          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7440382          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7440417          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7440439          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7440473          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7440484          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7446084          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7446142          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7446277          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7446346          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7488564          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7542098          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7647010          -9   9.72 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7718549          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7722647          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7738945          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7758976          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7775113          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7778394          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7778509          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7782492          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7782505          -9   9.72 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7783008          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7783075          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7783166          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7783702          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7783791          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7784409          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7784421          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7785877          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7786814          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7787475          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7787497          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7788967          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7788989          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7789006          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7789062          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7789095          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7789120          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7789426          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          7790809          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          78002            -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          8030704          -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          88               -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          92               -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          93               -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          EXH__16065831    -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          EXH__18540299    -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          EXH__7439965     -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          EXH__7440020     -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Lonza Chemicals-Riveriside (Smithkline) MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          PM10             -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LONZAINC: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42091 0          PM2_5            -9  92.42 100 100 -9   0801-2 Y R 468                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LONZAINC: NEI_UNIQUE_ID=NEIPA13-5665: cdate=2008
42093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420930004                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 0          10025737         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10025919         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10031137         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10034829         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10049055         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10060125         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10099748         -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10101505         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10101538         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10101970         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10108642         -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10124364         -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10124433         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10294403         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10325947         -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10377669         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10588019         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          109              -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          11103869         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12018018         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12018198         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12035722         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12054487         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12060003         -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12079651         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          125              -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12626812         -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12640890         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12710360         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1271289          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1303282          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1304569          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1306190          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1306236          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1307966          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1308061          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1308141          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1308389          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1309600          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1309644          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1313139          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13138459         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1313991          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1314063          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1314416          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1317346          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1317357          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1317368          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1317426          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1327339          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1327533          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1333820          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1335257          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1335326          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1336932          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1345046          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1345160          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13462889         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13463393         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13510491         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13530659         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13530682         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13586828         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13597994         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          136              -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          136527           -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13765190         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13770893         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13814965         -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          139              -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14018952         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14220178         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14307336         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14307358         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14336700         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14977618         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          16065831         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          16842038         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          16925250         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          18454121         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          18540299         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          195              -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          198              -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          199              -9   3.47 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          200              -9   3.47 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          201              -9   3.47 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          202              -9   3.47 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          21679312         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          2223930          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          226              -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          22967926         -9   3.47 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          253              -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          27253287         -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          301042           -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          3141126          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          3333673          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          373024           -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          50922297         -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          543908           -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          593748           -9   3.47 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          598630           -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          6018899          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          602              -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          603              -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          604              -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          61789513         -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          61790145         -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          62384            -9   3.47 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7428480          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7439921          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7439965          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7439976          -9   3.47 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440020          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440360          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440382          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440417          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440439          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440473          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440484          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7446084          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7446142          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7446277          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7446346          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7487947          -9   3.47 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7488564          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7542098          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7718549          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7722647          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7738945          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7758976          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7775113          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7778394          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7778509          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7782492          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7783008          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7783075          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7783166          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7783702          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7783791          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7784409          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7784421          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7785877          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7786814          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7787475          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7787497          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7788967          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7788989          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7789006          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7789062          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7789095          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7789120          -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7789426          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7790809          -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          78002            -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          8030704          -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          88               -9  74.97 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          92               -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          93               -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          EXH__16065831    -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          EXH__18540299    -9  75.70 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          EXH__7439965     -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          EXH__7440020     -9  66.41 100 100 -9   0801-3 Y R 207                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10025737         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10025919         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10031137         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10034829         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10049055         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10060125         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10099748         -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10101505         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10101538         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10101970         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10108642         -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10124364         -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10124433         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10294403         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10325947         -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10377669         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          10588019         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          109              -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          11103869         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12018018         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12018198         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12035722         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12054487         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12060003         -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12079651         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          125              -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12626812         -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12640890         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          12710360         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1271289          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1303282          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1304569          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1306190          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1306236          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1307966          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1308061          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1308141          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1308389          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1309600          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1309644          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1313139          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13138459         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1313991          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1314063          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1314416          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1317346          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1317357          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1317368          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1317426          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1327339          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1327533          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1333820          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1335257          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1335326          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1336932          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1345046          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          1345160          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13462889         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13463393         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13510491         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13530659         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13530682         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13586828         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13597994         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          136              -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          136527           -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13765190         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13770893         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          13814965         -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          139              -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14018952         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14220178         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14307336         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14307358         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14336700         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          14977618         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          16065831         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          16842038         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          16925250         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          18454121         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          18540299         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          195              -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          198              -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          199              -9   3.47 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          200              -9   3.47 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          201              -9   3.47 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          202              -9   3.47 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          21679312         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          2223930          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          226              -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          22967926         -9   3.47 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          253              -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          27253287         -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          301042           -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          3141126          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          3333673          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          373024           -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          50922297         -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          543908           -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          593748           -9   3.47 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          598630           -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          6018899          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          602              -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          603              -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          604              -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          61789513         -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          61790145         -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          62384            -9   3.47 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7428480          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7439921          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7439965          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7439976          -9   3.47 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440020          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440360          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440382          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440417          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440439          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440473          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7440484          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7446084          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7446142          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7446277          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7446346          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7487947          -9   3.47 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7488564          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7542098          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7718549          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7722647          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7738945          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7758976          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7775113          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7778394          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7778509          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7782492          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7783008          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7783075          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7783166          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7783702          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7783791          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7784409          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7784421          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7785877          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7786814          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7787475          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7787497          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7788967          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7788989          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7789006          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7789062          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7789095          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7789120          -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7789426          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          7790809          -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          78002            -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          8030704          -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          88               -9  70.58 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          92               -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          93               -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          EXH__16065831    -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          EXH__18540299    -9  81.99 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          EXH__7439965     -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          EXH__7440020     -9  51.14 100 100 -9   0801-3 Y R 208                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Keystone Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          PM10             -9  66.41 100 100 -9   0801-3 Y R 420950012                       ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: KeystoneCementCompany: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 0          PM2_5            -9  66.41 100 100 -9   0801-3 Y R 420950012                       ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: KeystoneCementCompany: NEI_UNIQUE_ID=NEI16665: cdate=2008
42095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 420950047                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42095 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42101 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 10200401   SO2              -9  90.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600103   SO2              -9  90.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 30600805   SO2              -9 100.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 19145TLNTC3144P                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 0          10025737         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10025919         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10034829         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10049055         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10060125         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10099748         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10101505         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10101538         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10101970         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10108642         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10124364         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10124433         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10294403         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10325947         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10377669         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10588019         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          109              -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          11103869         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12018018         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12018198         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12035722         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12054487         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12060003         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12079651         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          125              -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12626812         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12640890         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12710360         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1271289          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1306190          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1306236          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1307966          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1308061          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1308141          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1308389          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1309600          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1309644          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1313139          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13138459         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1313991          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1314063          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1314416          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1317346          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1317357          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1317368          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1317426          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1327339          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1333820          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1335257          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1335326          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1336932          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1345046          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1345160          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13462889         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13463393         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13530659         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13530682         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13586828         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          136              -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          136527           -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13765190         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13770893         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13814965         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          139              -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14018952         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14220178         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14307336         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14307358         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14336700         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14977618         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          16065831         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          16842038         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          16925250         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          18454121         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          18540299         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          195              -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          198              -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          199              -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          200              -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          201              -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          202              -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          21679312         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          2223930          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          226              -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          253              -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          27253287         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          301042           -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          3333673          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          373024           -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          50922297         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          543908           -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          598630           -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          6018899          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          602              -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          603              -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          604              -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          61789513         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          61790145         -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7428480          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7439921          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7439965          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440020          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440360          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440439          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440473          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440484          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7446084          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7446142          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7446277          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7446346          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7488564          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7542098          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7718549          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7722647          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7738945          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7758976          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7775113          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7778509          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7782492          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7783008          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7783075          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7783166          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7783702          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7783791          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7785877          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7786814          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7788967          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7788989          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7789006          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7789062          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7789095          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7789120          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7789426          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7790809          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          78002            -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          8030704          -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          88               -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          92               -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          93               -9   0.00 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          EXH__16065831    -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          EXH__18540299    -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          EXH__7439965     -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          EXH__7440020     -9  34.83 100 100 -9   0801-6 Y R 2008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10025737         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10025919         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10034829         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10049055         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10060125         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10099748         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10101505         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10101538         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10101970         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10108642         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10124364         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10124433         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10294403         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10325947         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10377669         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          10588019         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          109              -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          11103869         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12018018         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12018198         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12035722         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12054487         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12060003         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12079651         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          125              -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12626812         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12640890         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          12710360         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1271289          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1306190          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1306236          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1307966          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1308061          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1308141          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1308389          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1309600          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1309644          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1313139          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13138459         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1313991          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1314063          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1314416          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1317346          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1317357          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1317368          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1317426          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1327339          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1333820          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1335257          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1335326          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1336932          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1345046          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          1345160          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13462889         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13463393         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13530659         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13530682         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13586828         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          136              -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          136527           -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13765190         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13770893         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          13814965         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          139              -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14018952         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14220178         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14307336         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14307358         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14336700         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          14977618         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          16065831         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          16842038         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          16925250         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          18454121         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          18540299         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          195              -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          198              -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          199              -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          200              -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          201              -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          202              -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          21679312         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          2223930          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          226              -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          253              -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          27253287         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          301042           -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          3333673          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          373024           -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          50922297         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          543908           -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          598630           -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          6018899          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          602              -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          603              -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          604              -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          61789513         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          61790145         -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7428480          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7439921          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7439965          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440020          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440360          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440439          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440473          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7440484          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7446084          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7446142          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7446277          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7446346          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7488564          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7542098          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7718549          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7722647          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7738945          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7758976          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7775113          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7778509          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7782492          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7783008          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7783075          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7783166          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7783702          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7783791          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7785877          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7786814          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7788967          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7788989          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7789006          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7789062          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7789095          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7789120          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7789426          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          7790809          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          78002            -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          8030704          -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          88               -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          92               -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          93               -9   0.00 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          EXH__16065831    -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          EXH__18540299    -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          EXH__7439965     -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 0          EXH__7440020     -9  34.83 100 100 -9   0801-6 Y R 2008A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chevron Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI40723: cdate=2008
42101 10200401   SO2              -9  90.00 100 100 -9   -9     Y R 4210101501                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 4210101501                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 4210101501                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600103   SO2              -9  90.00 100 100 -9   -9     Y R 4210101501                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 4210101501                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 4210101501                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 30600805   SO2              -9 100.00 100 100 -9   -9     Y R 4210101501                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 4210101501                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 10200401   SO2              -9  90.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600103   SO2              -9  90.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 30600805   SO2              -9 100.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 4210101517                      ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 10200401   NOX              -9  40.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600103   NOX              -9  40.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600201   NOX              -9  90.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 10200401   SO2              -9  90.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600103   SO2              -9  90.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 30600805   SO2              -9 100.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 504                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 10200401   NOX              -9  40.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 10200701   NOX              -9  40.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600103   NOX              -9  40.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600106   NOX              -9  40.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600201   NOX              -9  90.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 10200401   SO2              -9  90.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 10200701   SO2              -9  90.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30103204   SO2              -9   0.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600103   SO2              -9  90.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600106   SO2              -9  90.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600201   SO2              -9  99.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 30600805   SO2              -9 100.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600904   SO2              -9  90.00 100 100 -9   -9     Y R EGU1020                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 10200401   NOX              -9  40.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600103   NOX              -9  40.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 15JUN2010
42101 30600201   NOX              -9  90.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 10200401   SO2              -9  90.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30103204   SO2              -9   0.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600103   SO2              -9  90.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42101 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 30JUN2008
42101 30600805   SO2              -9 100.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2005
42101 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$2106                          ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI40723, Plant=Sunoco (combined Sun & Chevron), Phil. (Girard Pt & Pt Breeze), PA, compliance date: 31DEC2010
42107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 421070023                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1024                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1937                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 421090008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 421110003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 421210006                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42127 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 421270773                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 15656LLGHNPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 421290044                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42129 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1555                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 421330016                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1034                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
42133 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$1822                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0001                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0080-0041                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 602                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14264                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0011                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0200-0032                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0300-0014                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45011 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14262                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0560-0244                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1049                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0600-0007                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14252                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0820-0012                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 29550SNCPRNORTH                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3479                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0900-0017                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 0          10025737         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10031137         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10034829         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10049055         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10060125         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10099748         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101538         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10108642         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10124364         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10294403         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10325947         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10588019         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          109              -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          11103869         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12018018         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12018198         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12060003         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          125              -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12626812         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1303282          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1304569          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1306190          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1306236          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308141          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308389          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1309600          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1314416          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317368          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1327533          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1333820          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1335257          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1335326          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13510491         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13530659         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13530682         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13597994         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          136              -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          136527           -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13765190         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13814965         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          139              -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14018952         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14307336         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14307358         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14977618         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16065831         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          18454121         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          18540299         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          195              -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          198              -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          199              -9  63.20 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          200              -9  63.20 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          201              -9  63.20 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          202              -9  63.20 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          21679312         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          2223930          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          226              -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          22967926         -9  63.20 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          253              -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          27253287         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          301042           -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          3141126          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          373024           -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          50922297         -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          543908           -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          593748           -9  63.20 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          598630           -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          602              -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          603              -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          604              -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          61790145         -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          62384            -9  63.20 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7428480          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439921          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439976          -9  63.20 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440382          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440417          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440439          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440473          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446142          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446277          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7487947          -9  63.20 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7738945          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7758976          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7775113          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7778394          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7778509          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7784409          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7784421          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7787475          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7787497          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7788967          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7788989          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789006          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789062          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789095          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789120          -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789426          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7790809          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          78002            -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          88               -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          92               -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          93               -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__16065831    -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__18540299    -9   8.24 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 200                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10025737         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10031137         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10034829         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10049055         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10060125         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10099748         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101538         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10108642         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10124364         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10294403         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10325947         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10588019         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          109              -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          11103869         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12018018         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12018198         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12060003         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          125              -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12626812         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1303282          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1304569          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1306190          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1306236          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308141          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308389          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1309600          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1314416          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317368          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1327533          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1333820          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1335257          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1335326          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13510491         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13530659         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13530682         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13597994         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          136              -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          136527           -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13765190         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13814965         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          139              -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14018952         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14307336         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14307358         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14977618         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16065831         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          18454121         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          18540299         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          195              -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          198              -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          199              -9  63.20 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          200              -9  63.20 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          201              -9  63.20 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          202              -9  63.20 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          21679312         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          2223930          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          226              -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          22967926         -9  63.20 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          253              -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          27253287         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          301042           -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          3141126          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          373024           -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          50922297         -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          543908           -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          593748           -9  63.20 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          598630           -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          602              -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          603              -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          604              -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          61790145         -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          62384            -9  63.20 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7428480          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439921          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439976          -9  63.20 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440382          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440417          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440439          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440473          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446142          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446277          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7487947          -9  63.20 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7738945          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7758976          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7775113          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7778394          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7778509          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7784409          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7784421          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7787475          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7787497          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7788967          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7788989          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789006          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789062          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789095          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789120          -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789426          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7790809          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          78002            -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          88               -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          92               -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          93               -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__16065831    -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__18540299    -9  25.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 201                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10025737         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10031137         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10034829         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10049055         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10060125         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10099748         -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101538         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10108642         -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10124364         -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10294403         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10325947         -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10588019         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          109              -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          11103869         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12018018         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12018198         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12060003         -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          125              -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12626812         -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1303282          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1304569          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1306190          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1306236          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308141          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308389          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1309600          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1314416          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317368          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1327533          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1333820          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1335257          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1335326          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13510491         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13530659         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13530682         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13597994         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          136              -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          136527           -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13765190         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13814965         -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          139              -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14018952         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14307336         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14307358         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14977618         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16065831         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          18454121         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          18540299         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          195              -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          198              -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          199              -9  63.20 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          200              -9  63.20 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          201              -9  63.20 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          202              -9  63.20 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          21679312         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          2223930          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          226              -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          22967926         -9  63.20 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          253              -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          27253287         -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          301042           -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          3141126          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          373024           -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          50922297         -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          543908           -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          593748           -9  63.20 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          598630           -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          602              -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          603              -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          604              -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          61790145         -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          62384            -9  63.20 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7428480          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439921          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439976          -9  63.20 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440382          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440417          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440439          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440473          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446142          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446277          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7487947          -9  63.20 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7738945          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7758976          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7775113          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7778394          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7778509          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7784409          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7784421          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7787475          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7787497          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7788967          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7788989          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789006          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789062          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789095          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789120          -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789426          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7790809          -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          78002            -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          88               -9  49.85 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          92               -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          93               -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__16065831    -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__18540299    -9   8.24 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 680                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10025737         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10031137         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10034829         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10049055         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10060125         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10099748         -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101538         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10108642         -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10124364         -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10294403         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10325947         -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          10588019         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          109              -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          11103869         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12018018         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12018198         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12060003         -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          125              -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12626812         -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1303282          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1304569          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1306190          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1306236          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308141          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1308389          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1309600          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1314416          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317368          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1327533          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1333820          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1335257          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1335326          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13510491         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13530659         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13530682         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13597994         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          136              -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          136527           -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13765190         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          13814965         -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          139              -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14018952         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14307336         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14307358         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          14977618         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16065831         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          18454121         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          18540299         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          195              -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          198              -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          199              -9  63.20 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          200              -9  63.20 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          201              -9  63.20 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          202              -9  63.20 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          21679312         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          2223930          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          226              -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          22967926         -9  63.20 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          253              -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          27253287         -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          301042           -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          3141126          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          373024           -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          50922297         -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          543908           -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          593748           -9  63.20 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          598630           -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          602              -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          603              -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          604              -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          61790145         -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          62384            -9  63.20 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7428480          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439921          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7439976          -9  63.20 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440382          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440417          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440439          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440473          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446142          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446277          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7487947          -9  63.20 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7738945          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7758976          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7775113          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7778394          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7778509          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7784409          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7784421          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7787475          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7787497          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7788967          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7788989          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789006          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789062          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789095          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789120          -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7789426          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          7790809          -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          78002            -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          88               -9  82.56 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          92               -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          93               -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__16065831    -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__18540299    -9   8.24 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 681                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Giant Cement Company MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI16783: cdate=2008
45035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$14206                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1040-0015                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1052                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3451                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3456                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1140-0002                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 0          10025737         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10025919         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10031137         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10034829         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10049055         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10060125         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10099748         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10101505         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10101538         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10101970         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10108642         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10124364         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10124433         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10294403         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10325947         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10377669         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          10588019         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          109              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          11103869         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          12018018         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          12018198         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          12035722         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          12054487         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          12060003         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          12079651         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          125              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          12626812         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          12640890         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          12710360         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1271289          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1303282          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1304569          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1306190          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1306236          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1307966          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1308061          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1308141          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1308389          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1309600          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1309644          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1313139          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13138459         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1313991          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1314063          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1314416          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1317346          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1317357          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1317368          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1317426          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1327339          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1327533          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1333820          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1335257          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1335326          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1336932          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1345046          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          1345160          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13462889         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13463393         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13510491         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13530659         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13530682         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13586828         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13597994         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          136              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          136527           -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13765190         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13770893         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          13814965         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          139              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          14018952         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          14220178         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          14307336         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          14307358         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          14336700         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          14977618         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          16065831         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          16842038         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          16925250         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          18454121         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          18540299         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          195              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          198              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          199              -9   0.00 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          200              -9   0.00 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          201              -9   0.00 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          202              -9   0.00 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          21679312         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          2223930          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          226              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          253              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          27253287         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          301042           -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          3141126          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          3333673          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          373024           -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          50922297         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          543908           -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          598630           -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          6018899          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          602              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          603              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          604              -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          61789513         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          61790145         -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7428480          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7439921          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7439965          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7440020          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7440360          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7440382          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7440417          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7440439          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7440473          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7440484          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7446084          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7446142          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7446277          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7446346          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7488564          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7542098          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7647010          -9  71.56 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7718549          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7722647          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7738945          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7758976          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7775113          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7778394          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7778509          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7782492          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7782505          -9  71.56 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7783008          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7783075          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7783166          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7783702          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7783791          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7784409          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7784421          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7785877          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7786814          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7787475          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7787497          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7788967          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7788989          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7789006          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7789062          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7789095          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7789120          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7789426          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          7790809          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          78002            -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          8030704          -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          88               -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          92               -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          93               -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          EXH__16065831    -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          EXH__18540299    -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          EXH__7439965     -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 0          EXH__7440020     -9   6.76 100 100 -9   0801-6 Y R 2006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: 3V INC MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41316: cdate=2008
45043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1053                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1200-0029                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3547                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1380-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1056                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45055 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3287                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1460-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 29720SPRNGGRACE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3586                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1560-0008                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45063 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3354                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45075 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10099748         -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10108642         -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10124364         -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10325947         -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          109              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          12060003         -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          125              -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          12626812         -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1306190          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1306236          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1309600          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1314416          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1317368          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1335257          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1335326          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          136              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          136527           -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          13814965         -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          139              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          195              -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          198              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          199              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          200              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          201              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          202              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          2223930          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          226              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          253              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          27253287         -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          301042           -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          373024           -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          543908           -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          593748           -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          598630           -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          602              -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          603              -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          604              -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          61790145         -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          62384            -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7428480          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7439921          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7440439          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7446142          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7446277          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7647010          -9  98.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7782505          -9  98.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7789426          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          7790809          -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          78002            -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          88               -9  97.75 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          92               -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          93               -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45075 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 763                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALBEMARLE CORP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI41424: cdate=2008
45077 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45077 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1880-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0033                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1900-0046                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 29044NNCMPROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 29205NCHRC2000S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1060                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3293                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3357                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45083 0          106990           -9  28.00 100 100 -9   -9     Y R 2060-0230                       ! MACT: Autos, plant: BMWMANUFACTURINGCORP, VOC 28%: Auto_2002_projections.xls
45083 0          107028           -9  28.00 100 100 -9   -9     Y R 2060-0230                       ! MACT: Autos, plant: BMWMANUFACTURINGCORP, VOC 28%: Auto_2002_projections.xls
45083 0          50000            -9  28.00 100 100 -9   -9     Y R 2060-0230                       ! MACT: Autos, plant: BMWMANUFACTURINGCORP, VOC 28%: Auto_2002_projections.xls
45083 0          67561            -9  28.00 100 100 -9   -9     Y R 2060-0230                       ! MACT: Autos, plant: BMWMANUFACTURINGCORP, VOC 28%: Auto_2002_projections.xls
45083 0          71432            -9  28.00 100 100 -9   -9     Y R 2060-0230                       ! MACT: Autos, plant: BMWMANUFACTURINGCORP, VOC 28%: Auto_2002_projections.xls
45083 0          75070            -9  28.00 100 100 -9   -9     Y R 2060-0230                       ! MACT: Autos, plant: BMWMANUFACTURINGCORP, VOC 28%: Auto_2002_projections.xls
45083 0          91203            -9  28.00 100 100 -9   -9     Y R 2060-0230                       ! MACT: Autos, plant: BMWMANUFACTURINGCORP, VOC 28%: Auto_2002_projections.xls
45083 0          VOC              -9  28.00 100 100 -9   -9     Y R 2060-0230                       ! MACT: Autos, plant: BMWMANUFACTURINGCORP, VOC 28%: Auto_2002_projections.xls
45087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2180-0003                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2440-0010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
45091 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$3591                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46011 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 28.2201-06M                     ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
46103 0          PM10             -9  28.00 100 100 -9   -9     Y R 28.1143-02                      ! MACT: Lime Manufacturing: PETE LIEN AND SONS, INC.
46103 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 28.1143-02                      ! MACT: Lime Manufacturing: PETE LIEN AND SONS, INC.
46103 0          SO2              -9  20.00 100 100 -9   -9     Y R 28.1143-02                      ! MACT: Lime Manufacturing: PETE LIEN AND SONS, INC.
46103 0          PM10             -9  28.00 100 100 -9   -9     Y R 57702PTLNS3401U                 ! MACT: Lime Manufacturing: PETE LIEN AND SONS, INC.
46103 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 57702PTLNS3401U                 ! MACT: Lime Manufacturing: PETE LIEN AND SONS, INC.
46103 0          SO2              -9  20.00 100 100 -9   -9     Y R 57702PTLNS3401U                 ! MACT: Lime Manufacturing: PETE LIEN AND SONS, INC.
46103 0          PM10             -9  28.00 100 100 -9   -9     Y R T$16917                         ! MACT: Lime Manufacturing: PETE LIEN AND SONS, INC.
46103 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$16917                         ! MACT: Lime Manufacturing: PETE LIEN AND SONS, INC.
46103 0          SO2              -9  20.00 100 100 -9   -9     Y R T$16917                         ! MACT: Lime Manufacturing: PETE LIEN AND SONS, INC.
47001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0020                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4993                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 37138DPNTL1002I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700038                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700039                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700081                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 4703700212                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1064                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4807                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 38358MLNRMSTATE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47053 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15668                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0197                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 37778LNZNGTENNE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1065                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47063 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4972                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2730                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415DPNTC4501A                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 37415NVSTS451NA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 6048                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47065 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4911                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47069 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0051                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0028                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 37660HLSTNWESTS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$15615                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0081                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 37774STLYMROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47105 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4969                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 37309BWTRSROUTE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1069                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4843                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47119 0          106990           -9  28.00 100 100 -9   -9     Y R 0132                            ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          107028           -9  28.00 100 100 -9   -9     Y R 0132                            ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          50000            -9  28.00 100 100 -9   -9     Y R 0132                            ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          67561            -9  28.00 100 100 -9   -9     Y R 0132                            ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          71432            -9  28.00 100 100 -9   -9     Y R 0132                            ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          75070            -9  28.00 100 100 -9   -9     Y R 0132                            ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          91203            -9  28.00 100 100 -9   -9     Y R 0132                            ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          VOC              -9  28.00 100 100 -9   -9     Y R 0132                            ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          106990           -9  28.00 100 100 -9   -9     Y R 37174STRNC100SA                 ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          107028           -9  28.00 100 100 -9   -9     Y R 37174STRNC100SA                 ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          50000            -9  28.00 100 100 -9   -9     Y R 37174STRNC100SA                 ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          67561            -9  28.00 100 100 -9   -9     Y R 37174STRNC100SA                 ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          71432            -9  28.00 100 100 -9   -9     Y R 37174STRNC100SA                 ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          75070            -9  28.00 100 100 -9   -9     Y R 37174STRNC100SA                 ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          91203            -9  28.00 100 100 -9   -9     Y R 37174STRNC100SA                 ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47119 0          VOC              -9  28.00 100 100 -9   -9     Y R 37174STRNC100SA                 ! MACT: Autos, plant: SATURNCORPORATION, VOC 28%: Auto_2002_projections.xls
47125 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0050                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47125 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$19174                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47127 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47145 0          10025737         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10025919         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10031137         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10034829         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10049055         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10060125         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10099748         -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10101505         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10101538         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10101970         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10108642         -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10124364         -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10124433         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10294403         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10325947         -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10377669         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10588019         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          109              -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          11103869         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          12018018         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          12018198         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          12035722         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          12054487         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          12060003         -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          12079651         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          125              -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          12626812         -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          12640890         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          12710360         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1271289          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1303282          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1304569          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1306190          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1306236          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1307966          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1308061          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1308141          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1308389          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1309600          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1309644          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1313139          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13138459         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1313991          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1314063          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1314416          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1317346          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1317357          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1317368          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1317426          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1327339          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1327533          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1333820          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1335257          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1335326          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1336932          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1345046          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          1345160          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13462889         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13463393         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13510491         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13530659         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13530682         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13586828         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13597994         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          136              -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          136527           -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13765190         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13770893         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          13814965         -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          139              -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          14018952         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          14220178         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          14307336         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          14307358         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          14336700         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          14977618         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          16065831         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          16842038         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          16925250         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          18454121         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          18540299         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          195              -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          198              -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          199              -9  44.10 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          200              -9  44.10 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          201              -9  44.10 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          202              -9  44.10 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          21679312         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          2223930          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          226              -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          22967926         -9  44.10 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          253              -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          27253287         -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          301042           -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          3141126          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          3333673          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          373024           -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          50922297         -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          543908           -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          593748           -9  44.10 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          598630           -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          6018899          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          602              -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          603              -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          604              -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          61789513         -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          61790145         -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          62384            -9  44.10 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7428480          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7439921          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7439965          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7439976          -9  44.10 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7440020          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7440360          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7440382          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7440417          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7440439          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7440473          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7440484          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7446084          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7446142          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7446277          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7446346          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7487947          -9  44.10 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7488564          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7542098          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7718549          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7722647          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7738945          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7758976          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7775113          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7778394          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7778509          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7782492          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7783008          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7783075          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7783166          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7783702          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7783791          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7784409          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7784421          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7785877          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7786814          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7787475          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7787497          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7788967          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7788989          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7789006          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7789062          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7789095          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7789120          -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7789426          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          7790809          -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          78002            -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          8030704          -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          88               -9  98.77 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          92               -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          93               -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          EXH__16065831    -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          EXH__18540299    -9  97.88 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          EXH__7439965     -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          EXH__7440020     -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of Energy MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          PM10             -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.DOEEASTTENNESSEETECHNOLOGYPARK: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          PM2_5            -9  95.45 100 100 -9   0801-2 Y R 357                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.DOEEASTTENNESSEETECHNOLOGYPARK: NEI_UNIQUE_ID=NEITNT$4995: cdate=2008
47145 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          109              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          125              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          136              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          136527           -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          139              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          195              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          198              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          199              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          200              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          201              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          202              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          226              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          253              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          301042           -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          373024           -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          543908           -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          593748           -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          598630           -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          602              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          603              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          604              -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          62384            -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          78002            -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          88               -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          92               -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          93               -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47145 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 901                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DIVERSIFIED SCIENTIFIC SERVICE S INC. (D MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITNT$4963: cdate=2008
47149 0          106990           -9  28.00 100 100 -9   -9     Y R 0155                            ! MACT: Autos, plant: NISSANNORTHAMERICAINC, VOC 28%: Auto_2002_projections.xls
47149 0          107028           -9  28.00 100 100 -9   -9     Y R 0155                            ! MACT: Autos, plant: NISSANNORTHAMERICAINC, VOC 28%: Auto_2002_projections.xls
47149 0          50000            -9  28.00 100 100 -9   -9     Y R 0155                            ! MACT: Autos, plant: NISSANNORTHAMERICAINC, VOC 28%: Auto_2002_projections.xls
47149 0          67561            -9  28.00 100 100 -9   -9     Y R 0155                            ! MACT: Autos, plant: NISSANNORTHAMERICAINC, VOC 28%: Auto_2002_projections.xls
47149 0          71432            -9  28.00 100 100 -9   -9     Y R 0155                            ! MACT: Autos, plant: NISSANNORTHAMERICAINC, VOC 28%: Auto_2002_projections.xls
47149 0          75070            -9  28.00 100 100 -9   -9     Y R 0155                            ! MACT: Autos, plant: NISSANNORTHAMERICAINC, VOC 28%: Auto_2002_projections.xls
47149 0          91203            -9  28.00 100 100 -9   -9     Y R 0155                            ! MACT: Autos, plant: NISSANNORTHAMERICAINC, VOC 28%: Auto_2002_projections.xls
47149 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0155                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 0          VOC              -9  28.00 100 100 -9   -9     Y R 0155                            ! MACT: Autos, plant: NISSANNORTHAMERICAINC, VOC 28%: Auto_2002_projections.xls
47149 10100101   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100102   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100201   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100202   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100203   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100204   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100205   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100211   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100212   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100215   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100217   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100218   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100221   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100222   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100223   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100224   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100225   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100226   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100235   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100237   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100238   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100300   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100301   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100302   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100303   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100304   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100306   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100316   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100317   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100318   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200101   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200104   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200107   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200117   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200201   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200202   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200203   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200204   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200205   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200206   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200210   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200212   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200213   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200217   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200218   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200219   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200221   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200222   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200223   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200224   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200225   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200226   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200229   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200300   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200301   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200302   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200303   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200304   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200306   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200307   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200802   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200804   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300101   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300102   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300103   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300200   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300203   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300205   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300206   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300207   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300208   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300209   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300211   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300214   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300216   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300217   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300218   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300221   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300222   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300223   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300224   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300225   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300226   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300300   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300305   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300306   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300307   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300309   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000100   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000189   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000199   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000200   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000201   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000203   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000288   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000289   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000299   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000389   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000399   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000801   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000889   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000899   PM10             -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R B33                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47149 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4812                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00045                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 0          10025737         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10025919         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10031137         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10034829         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10049055         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10060125         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10099748         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10101505         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10101538         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10101970         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10108642         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10124364         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10124433         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10294403         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10325947         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10377669         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          10588019         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          109              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          11103869         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          12018018         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          12018198         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          12035722         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          12054487         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          12060003         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          12079651         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          125              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          12626812         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          12640890         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          12710360         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1271289          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1303282          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1304569          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1306190          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1306236          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1307966          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1308061          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1308141          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1308389          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1309600          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1309644          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1313139          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13138459         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1313991          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1314063          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1314416          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1317346          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1317357          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1317368          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1317426          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1327339          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1327533          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1333820          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1335257          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1335326          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1336932          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1345046          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          1345160          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13462889         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13463393         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13510491         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13530659         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13530682         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13586828         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13597994         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          136              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          136527           -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13765190         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13770893         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          13814965         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          139              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          14018952         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          14220178         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          14307336         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          14307358         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          14336700         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          14977618         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          16065831         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          16842038         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          16925250         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          18454121         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          18540299         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          195              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          198              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          199              -9  81.50 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          200              -9  81.50 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          201              -9  81.50 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          202              -9  81.50 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          21679312         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          2223930          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          226              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          22967926         -9  81.50 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          253              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          27253287         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          301042           -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          3141126          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          3333673          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          373024           -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          50922297         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          543908           -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          593748           -9  81.50 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          598630           -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          6018899          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          602              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          603              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          604              -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          61789513         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          61790145         -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          62384            -9  81.50 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7428480          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7439921          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7439965          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7439976          -9  81.50 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7440020          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7440360          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7440382          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7440417          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7440439          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7440473          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7440484          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7446084          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7446142          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7446277          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7446346          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7487947          -9  81.50 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7488564          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7542098          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7718549          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7722647          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7738945          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7758976          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7775113          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7778394          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7778509          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7782492          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7783008          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7783075          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7783166          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7783702          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7783791          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7784409          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7784421          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7785877          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7786814          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7787475          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7787497          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7788967          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7788989          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7789006          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7789062          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7789095          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7789120          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7789426          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          7790809          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          78002            -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          8030704          -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          88               -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          92               -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          93               -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          EXH__16065831    -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          EXH__18540299    -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          EXH__7439965     -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          EXH__7440020     -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Velsicol Chemical Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          PM10             -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: VELSICOLCHEMICALCORP: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 0          PM2_5            -9  93.34 100 100 -9   0801-2 Y R 905                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: VELSICOLCHEMICALCORP: NEI_UNIQUE_ID=NEI41592: cdate=2008
47157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1071                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47157 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$5082                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0018                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0022                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0055                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          10025737         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025919         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10031137         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10034829         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10049055         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10060125         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10099748         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101505         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101538         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101970         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10108642         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124364         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124433         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10294403         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10325947         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10377669         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10588019         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          109              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          11103869         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018018         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018198         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12035722         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12054487         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12060003         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12079651         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          125              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12626812         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12640890         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12710360         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1271289          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1303282          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1304569          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306190          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306236          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1307966          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308061          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308141          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308389          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309600          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309644          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313139          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13138459         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313991          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314063          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314416          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317346          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317357          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317368          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317426          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327339          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327533          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1333820          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335257          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335326          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1336932          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345046          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345160          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13462889         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13463393         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13510491         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530659         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530682         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13586828         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13597994         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136527           -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13765190         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13770893         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13814965         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          139              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14018952         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14220178         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307336         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307358         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14336700         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14977618         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16065831         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16842038         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16925250         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18454121         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18540299         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          195              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          198              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          199              -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          200              -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          201              -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          202              -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          21679312         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          2223930          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          226              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          22967926         -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          253              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          27253287         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          301042           -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3141126          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3333673          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          373024           -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          50922297         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          543908           -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          593748           -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          598630           -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          6018899          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          602              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          603              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          604              -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61789513         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61790145         -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          62384            -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7428480          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439921          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439965          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439976          -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440020          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440360          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440382          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440417          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440439          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440473          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440484          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446084          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446142          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446277          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446346          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7487947          -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7488564          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7542098          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7647010          -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7718549          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7722647          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7738945          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7758976          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7775113          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778394          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778509          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782492          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782505          -9   0.00 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783008          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783075          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783166          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783702          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783791          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784409          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784421          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7785877          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7786814          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787475          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787497          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788967          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788989          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789006          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789062          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789095          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789120          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789426          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7790809          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          78002            -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          8030704          -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          88               -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          92               -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          93               -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__16065831    -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__18540299    -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7439965     -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7440020     -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM10             -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM2_5            -9  57.65 100 100 -9   0801-5 Y R 1011                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025737         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025919         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10031137         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10034829         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10049055         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10060125         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10099748         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101505         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101538         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101970         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10108642         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124364         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124433         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10294403         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10325947         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10377669         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10588019         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          109              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          11103869         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018018         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018198         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12035722         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12054487         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12060003         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12079651         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          125              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12626812         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12640890         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12710360         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1271289          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1303282          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1304569          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306190          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306236          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1307966          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308061          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308141          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308389          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309600          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309644          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313139          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13138459         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313991          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314063          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314416          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317346          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317357          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317368          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317426          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327339          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327533          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1333820          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335257          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335326          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1336932          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345046          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345160          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13462889         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13463393         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13510491         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530659         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530682         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13586828         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13597994         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136527           -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13765190         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13770893         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13814965         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          139              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14018952         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14220178         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307336         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307358         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14336700         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14977618         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16065831         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16842038         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16925250         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18454121         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18540299         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          195              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          198              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          199              -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          200              -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          201              -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          202              -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          21679312         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          2223930          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          226              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          22967926         -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          253              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          27253287         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          301042           -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3141126          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3333673          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          373024           -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          50922297         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          543908           -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          593748           -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          598630           -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          6018899          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          602              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          603              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          604              -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61789513         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61790145         -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          62384            -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7428480          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439921          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439965          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439976          -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440020          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440360          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440382          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440417          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440439          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440473          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440484          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446084          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446142          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446277          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446346          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7487947          -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7488564          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7542098          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7647010          -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7718549          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7722647          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7738945          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7758976          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7775113          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778394          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778509          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782492          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782505          -9   0.00 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783008          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783075          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783166          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783702          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783791          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784409          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784421          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7785877          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7786814          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787475          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787497          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788967          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788989          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789006          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789062          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789095          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789120          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789426          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7790809          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          78002            -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          8030704          -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          88               -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          92               -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          93               -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__16065831    -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__18540299    -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7439965     -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7440020     -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM10             -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM2_5            -9  57.65 100 100 -9   0801-5 Y R 1011A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025737         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025919         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10031137         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10034829         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10049055         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10060125         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10099748         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101505         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101538         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101970         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10108642         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124364         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124433         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10294403         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10325947         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10377669         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10588019         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          109              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          11103869         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018018         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018198         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12035722         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12054487         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12060003         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12079651         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          125              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12626812         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12640890         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12710360         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1271289          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1303282          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1304569          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306190          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306236          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1307966          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308061          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308141          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308389          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309600          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309644          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313139          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13138459         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313991          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314063          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314416          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317346          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317357          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317368          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317426          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327339          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327533          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1333820          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335257          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335326          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1336932          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345046          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345160          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13462889         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13463393         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13510491         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530659         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530682         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13586828         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13597994         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136527           -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13765190         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13770893         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13814965         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          139              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14018952         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14220178         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307336         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307358         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14336700         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14977618         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16065831         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16842038         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16925250         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18454121         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18540299         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          195              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          198              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          199              -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          200              -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          201              -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          202              -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          21679312         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          2223930          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          226              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          22967926         -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          253              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          27253287         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          301042           -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3141126          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3333673          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          373024           -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          50922297         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          543908           -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          593748           -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          598630           -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          6018899          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          602              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          603              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          604              -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61789513         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61790145         -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          62384            -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7428480          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439921          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439965          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439976          -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440020          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440360          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440382          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440417          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440439          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440473          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440484          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446084          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446142          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446277          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446346          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7487947          -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7488564          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7542098          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7647010          -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7718549          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7722647          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7738945          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7758976          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7775113          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778394          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778509          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782492          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782505          -9   0.00 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783008          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783075          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783166          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783702          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783791          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784409          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784421          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7785877          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7786814          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787475          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787497          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788967          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788989          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789006          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789062          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789095          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789120          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789426          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7790809          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          78002            -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          8030704          -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          88               -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          92               -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          93               -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__16065831    -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__18540299    -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7439965     -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7440020     -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM10             -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1011B                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM2_5            -9  57.65 100 100 -9   0801-5 Y R 1011B                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025737         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025919         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10031137         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10034829         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10049055         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10060125         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10099748         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101505         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101538         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101970         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10108642         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124364         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124433         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10294403         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10325947         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10377669         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10588019         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          109              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          11103869         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018018         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018198         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12035722         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12054487         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12060003         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12079651         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          125              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12626812         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12640890         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12710360         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1271289          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1303282          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1304569          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306190          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306236          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1307966          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308061          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308141          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308389          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309600          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309644          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313139          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13138459         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313991          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314063          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314416          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317346          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317357          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317368          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317426          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327339          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327533          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1333820          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335257          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335326          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1336932          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345046          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345160          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13462889         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13463393         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13510491         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530659         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530682         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13586828         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13597994         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136527           -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13765190         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13770893         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13814965         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          139              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14018952         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14220178         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307336         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307358         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14336700         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14977618         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16065831         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16842038         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16925250         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18454121         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18540299         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          195              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          198              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          199              -9  15.56 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          200              -9  15.56 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          201              -9  15.56 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          202              -9  15.56 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          21679312         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          2223930          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          226              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          22967926         -9  15.56 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          253              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          27253287         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          301042           -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3141126          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3333673          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          373024           -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          50922297         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          543908           -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          593748           -9  15.56 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          598630           -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          6018899          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          602              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          603              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          604              -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61789513         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61790145         -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          62384            -9  15.56 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7428480          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439921          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439965          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439976          -9  15.56 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440020          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440360          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440382          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440417          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440439          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440473          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440484          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446084          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446142          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446277          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446346          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7487947          -9  15.56 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7488564          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7542098          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7647010          -9   0.00 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7718549          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7722647          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7738945          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7758976          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7775113          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778394          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778509          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782492          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782505          -9   0.00 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783008          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783075          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783166          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783702          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783791          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784409          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784421          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7785877          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7786814          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787475          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787497          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788967          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788989          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789006          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789062          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789095          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789120          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789426          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7790809          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          78002            -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          8030704          -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          88               -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          92               -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          93               -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__16065831    -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__18540299    -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7439965     -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7440020     -9  55.26 100 100 -9   0801-5 Y R 1012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM10             -9  57.65 100 100 -9   0801-5 Y R 1012                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM2_5            -9  57.65 100 100 -9   0801-5 Y R 1012                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025737         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025919         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10031137         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10034829         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10049055         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10060125         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10099748         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101505         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101538         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101970         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10108642         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124364         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124433         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10294403         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10325947         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10377669         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10588019         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          109              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          11103869         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018018         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018198         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12035722         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12054487         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12060003         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12079651         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          125              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12626812         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12640890         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12710360         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1271289          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1303282          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1304569          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306190          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306236          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1307966          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308061          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308141          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308389          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309600          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309644          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313139          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13138459         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313991          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314063          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314416          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317346          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317357          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317368          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317426          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327339          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327533          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1333820          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335257          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335326          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1336932          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345046          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345160          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13462889         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13463393         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13510491         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530659         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530682         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13586828         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13597994         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136527           -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13765190         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13770893         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13814965         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          139              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14018952         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14220178         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307336         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307358         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14336700         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14977618         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16065831         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16842038         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16925250         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18454121         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18540299         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          195              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          198              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          199              -9  15.56 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          200              -9  15.56 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          201              -9  15.56 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          202              -9  15.56 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          21679312         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          2223930          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          226              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          22967926         -9  15.56 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          253              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          27253287         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          301042           -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3141126          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3333673          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          373024           -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          50922297         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          543908           -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          593748           -9  15.56 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          598630           -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          6018899          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          602              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          603              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          604              -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61789513         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61790145         -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          62384            -9  15.56 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7428480          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439921          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439965          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439976          -9  15.56 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440020          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440360          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440382          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440417          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440439          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440473          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440484          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446084          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446142          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446277          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446346          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7487947          -9  15.56 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7488564          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7542098          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7647010          -9   0.00 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7718549          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7722647          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7738945          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7758976          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7775113          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778394          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778509          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782492          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782505          -9   0.00 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783008          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783075          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783166          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783702          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783791          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784409          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784421          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7785877          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7786814          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787475          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787497          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788967          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788989          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789006          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789062          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789095          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789120          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789426          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7790809          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          78002            -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          8030704          -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          88               -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          92               -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          93               -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__16065831    -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__18540299    -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7439965     -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7440020     -9  55.26 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM10             -9  57.65 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1012A                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM2_5            -9  57.65 100 100 -9   0801-5 Y R 1012A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 37662MDPPRPOBOX                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          10025737         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025919         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10031137         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10034829         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10049055         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10060125         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10099748         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101505         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101538         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101970         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10108642         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124364         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124433         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10294403         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10325947         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10377669         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10588019         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          109              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          11103869         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018018         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018198         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12035722         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12054487         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12060003         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12079651         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          125              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12626812         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12640890         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12710360         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1271289          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1303282          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1304569          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306190          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306236          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1307966          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308061          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308141          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308389          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309600          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309644          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313139          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13138459         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313991          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314063          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314416          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317346          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317357          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317368          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317426          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327339          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327533          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1333820          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335257          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335326          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1336932          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345046          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345160          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13462889         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13463393         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13510491         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530659         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530682         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13586828         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13597994         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136527           -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13765190         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13770893         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13814965         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          139              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14018952         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14220178         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307336         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307358         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14336700         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14977618         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16065831         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16842038         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16925250         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18454121         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18540299         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          195              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          198              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          199              -9  28.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          200              -9  28.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          201              -9  28.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          202              -9  28.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          21679312         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          2223930          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          226              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          22967926         -9  28.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          253              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          27253287         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          301042           -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3141126          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3333673          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          373024           -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          50922297         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          543908           -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          593748           -9  28.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          598630           -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          6018899          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          602              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          603              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          604              -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61789513         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61790145         -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          62384            -9  28.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7428480          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439921          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439965          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439976          -9  28.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440020          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440360          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440382          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440417          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440439          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440473          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440484          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446084          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446142          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446277          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446346          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7487947          -9  28.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7488564          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7542098          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7647010          -9   0.00 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7718549          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7722647          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7738945          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7758976          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7775113          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778394          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778509          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782492          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782505          -9   0.00 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783008          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783075          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783166          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783702          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783791          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784409          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784421          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7785877          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7786814          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787475          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787497          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788967          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788989          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789006          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789062          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789095          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789120          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789426          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7790809          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          78002            -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          8030704          -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          88               -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          92               -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          93               -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__16065831    -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__18540299    -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7439965     -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7440020     -9  59.50 100 100 -9   0801-5 Y R 719                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM10             -9  57.65 100 100 -9   0801-5 Y R 719                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 719                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM2_5            -9  57.65 100 100 -9   0801-5 Y R 719                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025737         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025919         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10031137         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10034829         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10049055         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10060125         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10099748         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101505         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101538         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101970         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10108642         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124364         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124433         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10294403         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10325947         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10377669         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10588019         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          109              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          11103869         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018018         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018198         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12035722         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12054487         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12060003         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12079651         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          125              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12626812         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12640890         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12710360         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1271289          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1303282          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1304569          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306190          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306236          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1307966          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308061          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308141          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308389          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309600          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309644          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313139          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13138459         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313991          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314063          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314416          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317346          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317357          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317368          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317426          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327339          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327533          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1333820          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335257          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335326          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1336932          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345046          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345160          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13462889         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13463393         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13510491         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530659         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530682         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13586828         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13597994         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136527           -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13765190         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13770893         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13814965         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          139              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14018952         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14220178         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307336         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307358         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14336700         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14977618         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16065831         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16842038         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16925250         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18454121         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18540299         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          195              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          198              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          199              -9  28.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          200              -9  28.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          201              -9  28.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          202              -9  28.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          21679312         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          2223930          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          226              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          22967926         -9  28.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          253              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          27253287         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          301042           -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3141126          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3333673          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          373024           -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          50922297         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          543908           -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          593748           -9  28.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          598630           -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          6018899          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          602              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          603              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          604              -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61789513         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61790145         -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          62384            -9  28.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7428480          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439921          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439965          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439976          -9  28.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440020          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440360          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440382          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440417          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440439          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440473          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440484          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446084          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446142          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446277          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446346          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7487947          -9  28.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7488564          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7542098          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7647010          -9   0.00 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7718549          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7722647          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7738945          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7758976          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7775113          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778394          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778509          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782492          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782505          -9   0.00 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783008          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783075          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783166          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783702          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783791          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784409          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784421          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7785877          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7786814          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787475          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787497          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788967          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788989          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789006          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789062          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789095          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789120          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789426          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7790809          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          78002            -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          8030704          -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          88               -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          92               -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          93               -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__16065831    -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__18540299    -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7439965     -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7440020     -9  59.50 100 100 -9   0801-5 Y R 719A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM10             -9  57.65 100 100 -9   0801-5 Y R 719A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 719A                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM2_5            -9  57.65 100 100 -9   0801-5 Y R 719A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025737         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025919         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10031137         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10034829         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10049055         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10060125         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10099748         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101505         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101538         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101970         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10108642         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124364         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10294403         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10325947         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10377669         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10588019         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          109              -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          11103869         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018018         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018198         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12035722         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12054487         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12060003         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12079651         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          125              -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12626812         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12640890         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12710360         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1271289          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1303282          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1304569          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306190          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306236          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308141          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308389          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309600          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309644          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313139          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13138459         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313991          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314063          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314416          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317346          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317357          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317368          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327339          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327533          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1333820          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335257          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335326          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1336932          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345046          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13462889         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13463393         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13510491         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530659         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530682         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13597994         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136              -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136527           -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13765190         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13770893         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13814965         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          139              -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14018952         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14220178         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307336         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307358         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14336700         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14977618         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16065831         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16925250         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18454121         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18540299         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          195              -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          198              -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          199              -9  57.39 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          200              -9  57.39 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          201              -9  57.39 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          202              -9  57.39 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          21679312         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          2223930          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          226              -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          22967926         -9  57.39 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          253              -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          27253287         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          301042           -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3141126          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3333673          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          373024           -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          50922297         -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          543908           -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          593748           -9  57.39 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          598630           -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          6018899          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          602              -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          603              -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          604              -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61790145         -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          62384            -9  57.39 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7428480          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439921          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439965          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439976          -9  57.39 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440020          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440360          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440382          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440417          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440439          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440473          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446084          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446142          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446277          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446346          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7487947          -9  57.39 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7488564          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7718549          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7722647          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7738945          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7758976          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7775113          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778394          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778509          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782492          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783008          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783075          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783166          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783702          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783791          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784409          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784421          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7785877          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7786814          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787475          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787497          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788967          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788989          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789006          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789062          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789095          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789120          -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789426          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7790809          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          78002            -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          8030704          -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          88               -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          92               -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          93               -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__16065831    -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__18540299    -9  85.08 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7439965     -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7440020     -9   0.00 100 100 -9   0801-2 Y R 809                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM10             -9  57.65 100 100 -9   0801-2 Y R 809                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 809                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM2_5            -9  57.65 100 100 -9   0801-2 Y R 809                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025737         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10025919         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10031137         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10034829         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10049055         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10060125         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10099748         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101505         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101538         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10101970         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10108642         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124364         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10294403         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10325947         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10377669         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          10588019         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          109              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          11103869         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018018         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12018198         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12035722         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12054487         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12060003         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12079651         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          125              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12626812         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12640890         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          12710360         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1271289          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1303282          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1304569          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306190          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1306236          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308141          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1308389          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309600          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1309644          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313139          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13138459         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1313991          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314063          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1314416          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317346          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317357          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317368          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327339          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1327533          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1333820          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335257          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1335326          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1336932          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345046          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13462889         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13463393         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13510491         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530659         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13530682         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13597994         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          136527           -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13765190         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13770893         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          13814965         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          139              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14018952         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14220178         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307336         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14307358         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14336700         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          14977618         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16065831         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          16925250         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18454121         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          18540299         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          195              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          198              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          199              -9  87.54 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          200              -9  87.54 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          201              -9  87.54 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          202              -9  87.54 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          21679312         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          2223930          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          226              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          22967926         -9  87.54 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          253              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          27253287         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          301042           -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3141126          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          3333673          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          373024           -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          50922297         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          543908           -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          593748           -9  87.54 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          598630           -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          6018899          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          602              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          603              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          604              -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          61790145         -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          62384            -9  87.54 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7428480          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439921          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439965          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7439976          -9  87.54 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440020          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440360          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440382          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440417          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440439          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440473          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446084          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446142          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446277          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7446346          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7487947          -9  87.54 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7488564          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7718549          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7722647          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7738945          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7758976          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7775113          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778394          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7778509          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782492          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783008          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783075          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783166          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783702          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7783791          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784409          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7784421          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7785877          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7786814          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787475          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7787497          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788967          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7788989          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789006          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789062          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789095          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789120          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7789426          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          7790809          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          78002            -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          8030704          -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          88               -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          92               -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          93               -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__16065831    -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__18540299    -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7439965     -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 0          EXH__7440020     -9   0.00 100 100 -9   0801-2 Y R 810                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EASTMAN CHEMICAL COMPANY MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM10             -9  57.65 100 100 -9   0801-2 Y R 810                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 810                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 0          PM2_5            -9  57.65 100 100 -9   0801-2 Y R 810                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTENNESSEEOPERATIONS: NEI_UNIQUE_ID=NEI16788: cdate=2008
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1074                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1075                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4941                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$4942                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47173 0          PM10             -9  28.00 100 100 -9   -9     Y R 0023                            ! MACT: Lime Manufacturing: GLOBAL STONE TENN LUTTRELL COMPANY
47173 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0023                            ! MACT: Lime Manufacturing: GLOBAL STONE TENN LUTTRELL COMPANY
47173 0          SO2              -9  20.00 100 100 -9   -9     Y R 0023                            ! MACT: Lime Manufacturing: GLOBAL STONE TENN LUTTRELL COMPANY
47173 0          PM10             -9  28.00 100 100 -9   -9     Y R 0028                            ! MACT: Lime Manufacturing: Global Stone Tenn Luttrell Company
47173 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0028                            ! MACT: Lime Manufacturing: Global Stone Tenn Luttrell Company
47173 0          SO2              -9  20.00 100 100 -9   -9     Y R 0028                            ! MACT: Lime Manufacturing: Global Stone Tenn Luttrell Company
47173 0          PM10             -9  28.00 100 100 -9   -9     Y R T$15620                         ! MACT: Lime Manufacturing: Global Stone Tenn Luttrell Company
47173 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$15620                         ! MACT: Lime Manufacturing: Global Stone Tenn Luttrell Company
47173 0          SO2              -9  20.00 100 100 -9   -9     Y R T$15620                         ! MACT: Lime Manufacturing: Global Stone Tenn Luttrell Company
47179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0029                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
47183 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0014                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48029 0          PM10             -9  28.00 100 100 -9   -9     Y R T$17899                         ! MACT: Lime Manufacturing: SAN ANTONIOLIME INC
48029 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$17899                         ! MACT: Lime Manufacturing: SAN ANTONIOLIME INC
48029 0          SO2              -9  20.00 100 100 -9   -9     Y R T$17899                         ! MACT: Lime Manufacturing: SAN ANTONIOLIME INC
48035 0          PM10             -9  28.00 100 100 -9   -9     Y R 1                               ! MACT: Lime Manufacturing: CHEMICAL LIME LTD
48035 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 1                               ! MACT: Lime Manufacturing: CHEMICAL LIME LTD
48035 0          SO2              -9  20.00 100 100 -9   -9     Y R 1                               ! MACT: Lime Manufacturing: CHEMICAL LIME LTD
48035 0          PM10             -9  28.00 100 100 -9   -9     Y R 76634CHMCL2861F                 ! MACT: Lime Manufacturing: CHEMICAL LIME LTD
48035 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 76634CHMCL2861F                 ! MACT: Lime Manufacturing: CHEMICAL LIME LTD
48035 0          SO2              -9  20.00 100 100 -9   -9     Y R 76634CHMCL2861F                 ! MACT: Lime Manufacturing: CHEMICAL LIME LTD
48035 0          PM10             -9  28.00 100 100 -9   -9     Y R T$17779                         ! MACT: Lime Manufacturing: CHEMICAL LIME LTD
48035 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$17779                         ! MACT: Lime Manufacturing: CHEMICAL LIME LTD
48035 0          SO2              -9  20.00 100 100 -9   -9     Y R T$17779                         ! MACT: Lime Manufacturing: CHEMICAL LIME LTD
48037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 6                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11287                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48039 0          10025737         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025919         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10031137         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10034829         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10049055         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10060125         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10099748         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101505         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101538         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101970         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10108642         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124364         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124433         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10294403         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10325947         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10377669         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10588019         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          109              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          11103869         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018018         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018198         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12035722         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12054487         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12060003         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12079651         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          125              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12626812         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12640890         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12710360         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1271289          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1303282          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1304569          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306190          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306236          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1307966          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308061          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308141          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308389          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309600          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309644          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313139          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13138459         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313991          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314063          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314416          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317346          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317357          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317368          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317426          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327339          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327533          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1333820          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335257          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335326          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1336932          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345046          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345160          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13462889         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13463393         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13510491         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530659         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530682         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13586828         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13597994         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136527           -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13765190         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13770893         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13814965         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          139              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14018952         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14220178         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307336         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307358         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14336700         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14977618         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16065831         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16842038         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16925250         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18454121         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18540299         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          195              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          198              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          199              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          200              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          201              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          202              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          21679312         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          2223930          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          226              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          22967926         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          253              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          27253287         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          301042           -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3141126          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3333673          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          373024           -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          50922297         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          543908           -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          593748           -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          598630           -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          6018899          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          602              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          603              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          604              -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61789513         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61790145         -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          62384            -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7428480          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439921          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439965          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439976          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440020          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440360          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440382          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440417          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440439          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440473          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440484          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446084          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446142          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446277          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446346          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7487947          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7488564          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7542098          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7647010          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7718549          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7722647          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7738945          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7758976          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7775113          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778394          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778509          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782492          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782505          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783008          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783075          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783166          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783702          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783791          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784409          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784421          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7785877          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7786814          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787475          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787497          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788967          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788989          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789006          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789062          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789095          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789120          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789426          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7790809          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          78002            -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          8030704          -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          88               -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          92               -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          93               -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__16065831    -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__18540299    -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7439965     -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7440020     -9   0.00 100 100 -9   0801-7 Y R 2018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM10             -9   3.33 100 100 -9   0801-7 Y R 2018                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM2_5            -9   3.33 100 100 -9   0801-7 Y R 2018                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM10             -9   3.33 100 100 -9   0801-6 Y R 2020                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM2_5            -9   3.33 100 100 -9   0801-6 Y R 2020                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025737         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10031137         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10034829         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10049055         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10060125         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10101538         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10294403         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10588019         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          109              -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          11103869         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12018018         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12018198         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          125              -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1303282          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1304569          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1308141          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1308389          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1327533          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1333820          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13510491         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13530659         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13530682         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13597994         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          136              -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          136527           -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13765190         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          139              -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14018952         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14307336         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14307358         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14977618         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          16065831         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          18454121         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          18540299         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          195              -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          198              -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          199              -9  58.42 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          200              -9  58.42 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          201              -9  58.42 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          202              -9  58.42 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          21679312         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          226              -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          22967926         -9  58.42 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          253              -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          301042           -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          3141126          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          373024           -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          50922297         -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          543908           -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          593748           -9  58.42 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          598630           -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          602              -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          603              -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          604              -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          62384            -9  58.42 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7439976          -9  58.42 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440382          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440417          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440473          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7487947          -9  58.42 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7738945          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7758976          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7775113          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7778394          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7778509          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7784409          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7784421          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7787475          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7787497          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7788967          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7788989          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7789006          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7789062          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7789095          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7789120          -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          78002            -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          88               -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          92               -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          93               -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          EXH__16065831    -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          EXH__18540299    -9  32.52 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 232                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10025737         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10031137         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10034829         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10049055         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10060125         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10101538         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10294403         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10588019         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          109              -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          11103869         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12018018         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12018198         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          125              -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1303282          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1304569          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1308141          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1308389          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1327533          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1333820          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13510491         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13530659         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13530682         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13597994         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          136              -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          136527           -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13765190         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          139              -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14018952         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14307336         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14307358         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          14977618         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          16065831         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          18454121         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          18540299         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          195              -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          198              -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          199              -9  58.82 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          200              -9  58.82 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          201              -9  58.82 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          202              -9  58.82 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          21679312         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          226              -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          22967926         -9  58.82 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          253              -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          301042           -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          3141126          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          373024           -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          50922297         -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          543908           -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          593748           -9  58.82 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          598630           -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          602              -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          603              -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          604              -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          62384            -9  58.82 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7439976          -9  58.82 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440382          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440417          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440473          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7487947          -9  58.82 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7738945          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7758976          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7775113          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7778394          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7778509          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7784409          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7784421          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7787475          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7787497          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7788967          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7788989          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7789006          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7789062          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7789095          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7789120          -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          78002            -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          88               -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          92               -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          93               -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          EXH__16065831    -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          EXH__18540299    -9  32.52 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 232A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SOLUTIA CHOCOLATE BAYOU P MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13280: cdate=2008
48039 0          10025737         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10025919         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10031137         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10034829         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10049055         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10060125         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10099748         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10101505         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10101538         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10101970         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10108642         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10124364         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10124433         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10294403         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10325947         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10377669         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10588019         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          109              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          11103869         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12018018         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12018198         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12035722         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12054487         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12060003         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12079651         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          125              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12626812         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12640890         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12710360         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1271289          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1303282          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1304569          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1306190          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1306236          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1307966          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1308061          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1308141          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1308389          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1309600          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1309644          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1313139          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13138459         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1313991          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1314063          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1314416          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1317346          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1317357          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1317368          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1317426          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1327339          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1327533          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1333820          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1335257          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1335326          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1336932          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1345046          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1345160          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13462889         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13463393         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13510491         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13530659         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13530682         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13586828         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13597994         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          136              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          136527           -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13765190         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13770893         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13814965         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          139              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14018952         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14220178         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14307336         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14307358         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14336700         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14977618         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          16065831         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          16842038         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          16925250         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          18454121         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          18540299         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          195              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          198              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          199              -9   0.00 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          200              -9   0.00 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          201              -9   0.00 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          202              -9   0.00 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          21679312         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          2223930          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          226              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          253              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          27253287         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          301042           -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          3141126          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          3333673          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          373024           -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          50922297         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          543908           -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          593748           -9   0.00 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          598630           -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          6018899          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          602              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          603              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          604              -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          61789513         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          61790145         -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          62384            -9   0.00 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7428480          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7439921          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7439965          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440020          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440360          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440382          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440417          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440439          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440473          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440484          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7446084          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7446142          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7446277          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7446346          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7488564          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7542098          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7647010          -9  87.32 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7718549          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7722647          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7738945          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7758976          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7775113          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7778394          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7778509          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7782492          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7782505          -9  87.32 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7783008          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7783075          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7783166          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7783702          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7783791          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7784409          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7784421          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7785877          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7786814          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7787475          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7787497          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7788967          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7788989          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7789006          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7789062          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7789095          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7789120          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7789426          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7790809          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          78002            -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          8030704          -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          88               -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          92               -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          93               -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          EXH__16065831    -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          EXH__18540299    -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          EXH__7439965     -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          EXH__7440020     -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          PM10             -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCorporation: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          PM2_5            -9  56.78 100 100 -9   0801-2 Y R 506                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCorporation: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10025737         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025919         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10031137         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10034829         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10049055         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10060125         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10099748         -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101505         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101538         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101970         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10108642         -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124364         -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124433         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10294403         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10325947         -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10377669         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10588019         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          109              -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          11103869         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018018         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018198         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12035722         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12054487         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12060003         -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12079651         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          125              -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12626812         -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12640890         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12710360         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1271289          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1303282          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1304569          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306190          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306236          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1307966          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308061          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308141          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308389          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309600          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309644          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313139          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13138459         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313991          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314063          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314416          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317346          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317357          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317368          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317426          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327339          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327533          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1333820          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335257          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335326          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1336932          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345046          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345160          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13462889         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13463393         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13510491         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530659         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530682         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13586828         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13597994         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136              -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136527           -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13765190         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13770893         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13814965         -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          139              -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14018952         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14220178         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307336         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307358         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14336700         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14977618         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16065831         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16842038         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16925250         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18454121         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18540299         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          195              -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          198              -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          199              -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          200              -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          201              -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          202              -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          21679312         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          2223930          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          226              -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          253              -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          27253287         -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          301042           -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3141126          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3333673          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          373024           -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          50922297         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          543908           -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          593748           -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          598630           -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          6018899          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          602              -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          603              -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          604              -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61789513         -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61790145         -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          62384            -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7428480          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439921          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439965          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440020          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440360          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440382          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440417          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440439          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440473          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440484          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446084          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446142          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446277          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446346          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7488564          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7542098          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7718549          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7722647          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7738945          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7758976          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7775113          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778394          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778509          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782492          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783008          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783075          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783166          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783702          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783791          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784409          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784421          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7785877          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7786814          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787475          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787497          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788967          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788989          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789006          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789062          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789095          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789120          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789426          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7790809          -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          78002            -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          8030704          -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          88               -9  10.25 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          92               -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          93               -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__16065831    -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__18540299    -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7439965     -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7440020     -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM10             -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM2_5            -9   3.33 100 100 -9   0801-2 Y R 600                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          109              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          125              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          136              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          136527           -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          139              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          195              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          198              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          199              -9  44.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          200              -9  44.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          201              -9  44.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          202              -9  44.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          226              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          22967926         -9  44.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          253              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          301042           -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          373024           -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          543908           -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          593748           -9  44.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          598630           -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          602              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          603              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          604              -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          62384            -9  44.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7439976          -9  44.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7487947          -9  44.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          78002            -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          88               -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          92               -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          93               -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 743                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SCHENECTADY INTERNATIONAL MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8308: cdate=2008
48039 0          10025737         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025919         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10031137         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10034829         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10049055         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10060125         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10099748         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101505         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101538         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101970         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10108642         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124364         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124433         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10294403         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10325947         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10377669         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10588019         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          109              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          11103869         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018018         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018198         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12035722         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12054487         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12060003         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12079651         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          125              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12626812         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12640890         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12710360         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1271289          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1303282          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1304569          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306190          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306236          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1307966          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308061          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308141          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308389          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309600          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309644          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313139          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13138459         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313991          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314063          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314416          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317346          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317357          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317368          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317426          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327339          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327533          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1333820          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335257          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335326          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1336932          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345046          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345160          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13462889         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13463393         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13510491         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530659         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530682         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13586828         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13597994         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136527           -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13765190         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13770893         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13814965         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          139              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14018952         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14220178         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307336         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307358         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14336700         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14977618         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16065831         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16842038         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16925250         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18454121         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18540299         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          195              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          198              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          199              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          200              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          201              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          202              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          21679312         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          2223930          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          226              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          22967926         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          253              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          27253287         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          301042           -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3141126          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3333673          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          373024           -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          50922297         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          543908           -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          593748           -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          598630           -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          6018899          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          602              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          603              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          604              -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61789513         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61790145         -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          62384            -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7428480          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439921          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439965          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439976          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440020          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440360          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440382          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440417          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440439          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440473          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440484          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446084          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446142          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446277          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446346          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7487947          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7488564          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7542098          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7647010          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7718549          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7722647          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7738945          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7758976          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7775113          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778394          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778509          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782492          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782505          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783008          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783075          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783166          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783702          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783791          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784409          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784421          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7785877          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7786814          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787475          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787497          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788967          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788989          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789006          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789062          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789095          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789120          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789426          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7790809          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          78002            -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          8030704          -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          88               -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          92               -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          93               -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__16065831    -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__18540299    -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7439965     -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7440020     -9   0.00 100 100 -9   0801-7 Y R 788                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM10             -9   3.33 100 100 -9   0801-7 Y R 788                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM2_5            -9   3.33 100 100 -9   0801-7 Y R 788                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025737         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10025919         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10031137         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10034829         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10049055         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10060125         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10099748         -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10101505         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10101538         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10101970         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10108642         -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10124364         -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10124433         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10294403         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10325947         -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10377669         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10588019         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          109              -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          11103869         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12018018         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12018198         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12035722         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12054487         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12060003         -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12079651         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          125              -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12626812         -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12640890         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          12710360         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1271289          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1303282          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1304569          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1306190          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1306236          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1307966          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1308061          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1308141          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1308389          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1309600          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1309644          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1313139          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13138459         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1313991          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1314063          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1314416          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1317346          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1317357          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1317368          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1317426          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1327339          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1327533          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1333820          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1335257          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1335326          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1336932          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1345046          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          1345160          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13462889         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13463393         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13510491         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13530659         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13530682         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13586828         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13597994         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          136              -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          136527           -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13765190         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13770893         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          13814965         -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          139              -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14018952         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14220178         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14307336         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14307358         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14336700         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          14977618         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          16065831         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          16842038         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          16925250         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          18454121         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          18540299         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          195              -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          198              -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          199              -9  25.03 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          200              -9  25.03 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          201              -9  25.03 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          202              -9  25.03 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          21679312         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          2223930          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          226              -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          22967926         -9  25.03 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          253              -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          27253287         -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          301042           -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          3141126          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          3333673          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          373024           -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          50922297         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          543908           -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          593748           -9  25.03 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          598630           -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          6018899          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          602              -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          603              -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          604              -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          61789513         -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          61790145         -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          62384            -9  25.03 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7428480          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7439921          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7439965          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7439976          -9  25.03 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440020          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440360          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440382          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440417          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440439          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440473          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7440484          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7446084          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7446142          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7446277          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7446346          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7487947          -9  25.03 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7488564          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7542098          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7647010          -9  39.97 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7718549          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7722647          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7738945          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7758976          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7775113          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7778394          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7778509          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7782492          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7782505          -9  39.97 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7783008          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7783075          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7783166          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7783702          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7783791          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7784409          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7784421          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7785877          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7786814          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7787475          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7787497          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7788967          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7788989          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7789006          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7789062          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7789095          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7789120          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7789426          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          7790809          -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          78002            -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          8030704          -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          88               -9  54.83 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          92               -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          93               -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          EXH__16065831    -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          EXH__18540299    -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          EXH__7439965     -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          EXH__7440020     -9  49.90 100 100 -9   0801-6 Y R 833                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BASF Corporation MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          PM10             -9  56.78 100 100 -9   0801-6 Y R 833                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCorporation: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          PM2_5            -9  56.78 100 100 -9   0801-6 Y R 833                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BASFCorporation: NEI_UNIQUE_ID=NEI7139: cdate=2008
48039 0          10025737         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025919         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10031137         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10034829         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10049055         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10060125         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10099748         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101505         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101538         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101970         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10108642         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124364         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124433         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10294403         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10325947         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10377669         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10588019         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          109              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          11103869         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018018         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018198         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12035722         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12054487         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12060003         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12079651         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          125              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12626812         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12640890         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12710360         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1271289          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1303282          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1304569          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306190          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306236          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1307966          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308061          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308141          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308389          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309600          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309644          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313139          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13138459         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313991          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314063          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314416          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317346          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317357          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317368          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317426          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327339          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327533          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1333820          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335257          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335326          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1336932          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345046          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345160          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13462889         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13463393         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13510491         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530659         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530682         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13586828         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13597994         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136527           -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13765190         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13770893         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13814965         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          139              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14018952         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14220178         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307336         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307358         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14336700         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14977618         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16065831         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16842038         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16925250         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18454121         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18540299         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          195              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          198              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          199              -9  51.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          200              -9  51.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          201              -9  51.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          202              -9  51.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          21679312         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          2223930          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          226              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          22967926         -9  51.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          253              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          27253287         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          301042           -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3141126          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3333673          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          373024           -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          50922297         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          543908           -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          593748           -9  51.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          598630           -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          6018899          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          602              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          603              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          604              -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61789513         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61790145         -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          62384            -9  51.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7428480          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439921          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439965          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439976          -9  51.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440020          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440360          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440382          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440417          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440439          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440473          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440484          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446084          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446142          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446277          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446346          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7487947          -9  51.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7488564          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7542098          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7647010          -9  40.22 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7718549          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7722647          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7738945          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7758976          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7775113          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778394          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778509          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782492          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782505          -9  40.22 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783008          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783075          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783166          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783702          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783791          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784409          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784421          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7785877          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7786814          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787475          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787497          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788967          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788989          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789006          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789062          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789095          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789120          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789426          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7790809          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          78002            -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          8030704          -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          88               -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          92               -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          93               -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__16065831    -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__18540299    -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7439965     -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7440020     -9  48.82 100 100 -9   0801-6 Y R 843                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM10             -9   3.33 100 100 -9   0801-6 Y R 843                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM2_5            -9   3.33 100 100 -9   0801-6 Y R 843                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025737         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025919         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10031137         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10034829         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10049055         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10060125         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10099748         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101505         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101538         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101970         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10108642         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124364         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124433         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10294403         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10325947         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10377669         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10588019         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          109              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          11103869         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018018         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018198         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12035722         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12054487         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12060003         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12079651         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          125              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12626812         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12640890         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12710360         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1271289          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1303282          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1304569          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306190          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306236          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1307966          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308061          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308141          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308389          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309600          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309644          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313139          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13138459         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313991          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314063          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314416          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317346          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317357          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317368          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317426          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327339          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327533          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1333820          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335257          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335326          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1336932          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345046          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345160          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13462889         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13463393         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13510491         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530659         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530682         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13586828         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13597994         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136527           -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13765190         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13770893         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13814965         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          139              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14018952         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14220178         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307336         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307358         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14336700         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14977618         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16065831         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16842038         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16925250         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18454121         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18540299         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          195              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          198              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          199              -9  51.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          200              -9  51.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          201              -9  51.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          202              -9  51.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          21679312         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          2223930          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          226              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          22967926         -9  51.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          253              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          27253287         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          301042           -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3141126          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3333673          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          373024           -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          50922297         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          543908           -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          593748           -9  51.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          598630           -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          6018899          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          602              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          603              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          604              -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61789513         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61790145         -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          62384            -9  51.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7428480          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439921          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439965          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439976          -9  51.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440020          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440360          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440382          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440417          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440439          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440473          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440484          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446084          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446142          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446277          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446346          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7487947          -9  51.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7488564          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7542098          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7647010          -9  40.22 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7718549          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7722647          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7738945          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7758976          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7775113          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778394          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778509          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782492          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782505          -9  40.22 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783008          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783075          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783166          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783702          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783791          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784409          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784421          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7785877          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7786814          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787475          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787497          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788967          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788989          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789006          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789062          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789095          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789120          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789426          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7790809          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          78002            -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          8030704          -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          88               -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          92               -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          93               -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__16065831    -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__18540299    -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7439965     -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7440020     -9  48.82 100 100 -9   0801-6 Y R 843A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM10             -9   3.33 100 100 -9   0801-6 Y R 843A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM2_5            -9   3.33 100 100 -9   0801-6 Y R 843A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025737         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025919         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10031137         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10034829         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10049055         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10060125         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10099748         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101505         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101538         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101970         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10108642         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124364         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124433         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10294403         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10325947         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10377669         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10588019         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          109              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          11103869         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018018         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018198         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12035722         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12054487         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12060003         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12079651         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          125              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12626812         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12640890         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12710360         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1271289          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1303282          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1304569          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306190          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306236          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1307966          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308061          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308141          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308389          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309600          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309644          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313139          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13138459         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313991          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314063          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314416          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317346          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317357          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317368          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317426          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327339          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327533          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1333820          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335257          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335326          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1336932          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345046          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345160          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13462889         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13463393         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13510491         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530659         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530682         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13586828         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13597994         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136527           -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13765190         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13770893         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13814965         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          139              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14018952         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14220178         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307336         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307358         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14336700         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14977618         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16065831         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16842038         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16925250         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18454121         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18540299         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          195              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          198              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          199              -9  51.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          200              -9  51.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          201              -9  51.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          202              -9  51.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          21679312         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          2223930          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          226              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          22967926         -9  51.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          253              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          27253287         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          301042           -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3141126          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3333673          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          373024           -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          50922297         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          543908           -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          593748           -9  51.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          598630           -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          6018899          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          602              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          603              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          604              -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61789513         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61790145         -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          62384            -9  51.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7428480          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439921          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439965          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439976          -9  51.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440020          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440360          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440382          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440417          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440439          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440473          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440484          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446084          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446142          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446277          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446346          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7487947          -9  51.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7488564          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7542098          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7647010          -9  40.22 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7718549          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7722647          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7738945          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7758976          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7775113          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778394          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778509          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782492          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782505          -9  40.22 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783008          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783075          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783166          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783702          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783791          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784409          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784421          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7785877          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7786814          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787475          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787497          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788967          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788989          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789006          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789062          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789095          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789120          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789426          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7790809          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          78002            -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          8030704          -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          88               -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          92               -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          93               -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__16065831    -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__18540299    -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7439965     -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7440020     -9  48.82 100 100 -9   0801-6 Y R 843B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM10             -9   3.33 100 100 -9   0801-6 Y R 843B                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM2_5            -9   3.33 100 100 -9   0801-6 Y R 843B                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025737         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10025919         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10031137         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10034829         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10049055         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10060125         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10099748         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101505         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101538         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10101970         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10108642         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124364         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10124433         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10294403         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10325947         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10377669         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          10588019         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          109              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          109              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          11103869         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018018         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12018198         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12035722         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12054487         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12060003         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12079651         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          125              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          125              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12626812         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12640890         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          12710360         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1271289          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1303282          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1304569          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306190          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1306236          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1307966          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308061          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308141          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1308389          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309600          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1309644          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313139          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13138459         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1313991          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314063          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1314416          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317346          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317357          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317368          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1317426          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327339          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1327533          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1333820          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335257          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1335326          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1336932          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345046          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          1345160          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13462889         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13463393         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13510491         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530659         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13530682         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13586828         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13597994         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136527           -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          136527           -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13765190         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13770893         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          13814965         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          139              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          139              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14018952         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14220178         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307336         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14307358         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14336700         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          14977618         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16065831         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16842038         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          16925250         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18454121         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          18540299         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          195              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          195              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          198              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          198              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          199              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          199              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          200              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          200              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          201              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          201              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          202              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          202              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          21679312         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          2223930          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          226              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          226              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          22967926         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          253              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          253              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          27253287         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          301042           -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          301042           -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3141126          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          3333673          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          373024           -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          373024           -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          50922297         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          543908           -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          543908           -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          593748           -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          593748           -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          598630           -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          598630           -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          6018899          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          602              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          602              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          603              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          603              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          604              -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          604              -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61789513         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          61790145         -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          62384            -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          62384            -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7428480          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439921          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439965          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7439976          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440020          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440360          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440382          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440417          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440439          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440473          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7440484          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446084          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446142          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446277          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7446346          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7487947          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7488564          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7542098          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7647010          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7718549          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7722647          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7738945          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7758976          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7775113          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778394          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7778509          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782492          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7782505          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783008          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783075          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783166          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783702          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7783791          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784409          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7784421          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7785877          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7786814          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787475          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7787497          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788967          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7788989          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789006          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789062          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789095          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789120          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7789426          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          7790809          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          78002            -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          78002            -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          8030704          -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          88               -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          88               -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          92               -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          92               -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          93               -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          93               -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__16065831    -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__18540299    -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7439965     -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          EXH__7440020     -9   0.00 100 100 -9   0801-7 Y R 845                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dow Chemical Co MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM10             -9   3.33 100 100 -9   0801-7 Y R 845                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48039 0          PM2_5            -9   3.33 100 100 -9   0801-7 Y R 845                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DOWCHEMICALCOFREEPORTFACILITY: NEI_UNIQUE_ID=NEI11295: cdate=2008
48091 0          PM10             -9  28.00 100 100 -9   -9     Y R 2                               ! MACT: Lime Manufacturing: APG LIME CORP
48091 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 2                               ! MACT: Lime Manufacturing: APG LIME CORP
48091 0          SO2              -9  20.00 100 100 -9   -9     Y R 2                               ! MACT: Lime Manufacturing: APG LIME CORP
48091 0          PM10             -9  28.00 100 100 -9   -9     Y R 78132CHMCL350AP                 ! MACT: Lime Manufacturing: APG LIME CORP
48091 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 78132CHMCL350AP                 ! MACT: Lime Manufacturing: APG LIME CORP
48091 0          SO2              -9  20.00 100 100 -9   -9     Y R 78132CHMCL350AP                 ! MACT: Lime Manufacturing: APG LIME CORP
48135 0          10025737         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10025919         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10031137         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10034829         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10049055         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10060125         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10099748         -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10101505         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10101538         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10101970         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10108642         -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10124364         -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10124433         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10294403         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10325947         -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10377669         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          10588019         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          109              -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          11103869         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          12018018         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          12018198         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          12035722         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          12054487         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          12060003         -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          12079651         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          125              -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          12626812         -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          12640890         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          12710360         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1271289          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1303282          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1304569          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1306190          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1306236          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1307966          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1308061          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1308141          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1308389          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1309600          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1309644          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1313139          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13138459         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1313991          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1314063          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1314416          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1317346          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1317357          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1317368          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1317426          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1327339          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1327533          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1333820          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1335257          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1335326          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1336932          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1345046          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          1345160          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13462889         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13463393         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13510491         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13530659         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13530682         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13586828         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13597994         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          136              -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          136527           -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13765190         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13770893         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          13814965         -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          139              -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          14018952         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          14220178         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          14307336         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          14307358         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          14336700         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          14977618         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          16065831         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          16842038         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          16925250         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          18454121         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          18540299         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          195              -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          198              -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          199              -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          200              -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          201              -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          202              -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          21679312         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          2223930          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          226              -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          253              -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          27253287         -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          301042           -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          3141126          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          3333673          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          373024           -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          50922297         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          543908           -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          593748           -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          598630           -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          6018899          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          602              -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          603              -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          604              -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          61789513         -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          61790145         -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          62384            -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7428480          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7439921          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7439965          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7440020          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7440360          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7440382          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7440417          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7440439          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7440473          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7440484          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7446084          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7446142          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7446277          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7446346          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7488564          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7542098          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7718549          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7722647          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7738945          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7758976          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7775113          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7778394          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7778509          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7782492          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7783008          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7783075          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7783166          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7783702          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7783791          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7784409          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7784421          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7785877          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7786814          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7787475          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7787497          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7788967          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7788989          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7789006          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7789062          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7789095          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7789120          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7789426          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          7790809          -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          78002            -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          8030704          -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          88               -9  94.91 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          92               -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          93               -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          EXH__16065831    -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          EXH__18540299    -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          EXH__7439965     -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48135 0          EXH__7440020     -9  76.78 100 100 -9   0801-6 Y R 1007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ODESSA PETROCHEMICAL PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6743: cdate=2008
48139 0          10025737         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10031137         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10034829         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10049055         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10060125         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10099748         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101538         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10108642         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10124364         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10294403         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10325947         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10588019         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          109              -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          11103869         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12018018         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12018198         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12060003         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          125              -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12626812         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1303282          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1304569          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1306190          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1306236          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308141          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308389          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1309600          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1314416          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317368          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1327533          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1333820          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1335257          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1335326          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13510491         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13530659         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13530682         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13597994         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          136              -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          136527           -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13765190         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13814965         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          139              -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14018952         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14307336         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14307358         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14977618         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16065831         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          18454121         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          18540299         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          195              -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          198              -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          199              -9   0.25 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          200              -9   0.25 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          201              -9   0.25 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          202              -9   0.25 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          21679312         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          2223930          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          226              -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          22967926         -9   0.25 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          253              -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          27253287         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          301042           -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          3141126          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          373024           -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          50922297         -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          543908           -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          593748           -9   0.25 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          598630           -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          602              -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          603              -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          604              -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          61790145         -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          62384            -9   0.25 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7428480          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439921          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439976          -9   0.25 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440382          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440417          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440439          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440473          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446142          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446277          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7487947          -9   0.25 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7738945          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7758976          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7775113          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7778394          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7778509          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7784409          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7784421          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7787475          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7787497          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7788967          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7788989          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789006          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789062          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789095          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789120          -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789426          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7790809          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          78002            -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          88               -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          92               -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          93               -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__16065831    -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__18540299    -9  28.04 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 3030                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10025737         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10031137         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10034829         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10049055         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10060125         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10099748         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101538         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10108642         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10124364         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10294403         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10325947         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10588019         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          109              -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          11103869         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12018018         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12018198         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12060003         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          125              -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12626812         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1303282          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1304569          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1306190          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1306236          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308141          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308389          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1309600          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1314416          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317368          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1327533          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1333820          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1335257          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1335326          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13510491         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13530659         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13530682         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13597994         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          136              -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          136527           -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13765190         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13814965         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          139              -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14018952         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14307336         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14307358         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14977618         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16065831         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          18454121         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          18540299         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          195              -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          198              -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          199              -9   0.25 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          200              -9   0.25 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          201              -9   0.25 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          202              -9   0.25 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          21679312         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          2223930          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          226              -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          22967926         -9   0.25 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          253              -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          27253287         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          301042           -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          3141126          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          373024           -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          50922297         -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          543908           -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          593748           -9   0.25 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          598630           -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          602              -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          603              -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          604              -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          61790145         -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          62384            -9   0.25 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7428480          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439921          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439976          -9   0.25 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440382          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440417          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440439          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440473          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446142          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446277          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7487947          -9   0.25 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7738945          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7758976          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7775113          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7778394          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7778509          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7784409          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7784421          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7787475          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7787497          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7788967          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7788989          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789006          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789062          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789095          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789120          -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789426          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7790809          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          78002            -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          88               -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          92               -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          93               -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__16065831    -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__18540299    -9  28.04 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 318                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10025737         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10031137         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10034829         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10049055         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10060125         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10099748         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101538         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10108642         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10124364         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10294403         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10325947         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10588019         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          109              -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          11103869         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12018018         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12018198         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12060003         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          125              -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12626812         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1303282          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1304569          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1306190          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1306236          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308141          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308389          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1309600          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1314416          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317368          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1327533          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1333820          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1335257          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1335326          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13510491         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13530659         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13530682         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13597994         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          136              -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          136527           -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13765190         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13814965         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          139              -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14018952         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14307336         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14307358         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14977618         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16065831         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          18454121         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          18540299         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          195              -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          198              -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          199              -9   0.25 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          200              -9   0.25 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          201              -9   0.25 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          202              -9   0.25 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          21679312         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          2223930          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          226              -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          22967926         -9   0.25 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          253              -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          27253287         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          301042           -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          3141126          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          373024           -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          50922297         -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          543908           -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          593748           -9   0.25 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          598630           -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          602              -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          603              -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          604              -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          61790145         -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          62384            -9   0.25 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7428480          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439921          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439976          -9   0.25 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440382          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440417          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440439          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440473          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446142          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446277          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7487947          -9   0.25 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7738945          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7758976          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7775113          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7778394          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7778509          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7784409          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7784421          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7787475          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7787497          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7788967          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7788989          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789006          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789062          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789095          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789120          -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789426          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7790809          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          78002            -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          88               -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          92               -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          93               -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__16065831    -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__18540299    -9  28.04 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 318A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10025737         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10025919         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10031137         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10034829         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10049055         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10060125         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10099748         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101505         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101538         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10101970         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10108642         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10124364         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10124433         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10294403         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10325947         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10377669         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          10588019         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          109              -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          11103869         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12018018         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12018198         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12035722         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12054487         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12060003         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12079651         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          125              -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12626812         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12640890         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          12710360         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1271289          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1303282          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1304569          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1306190          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1306236          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1307966          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308061          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308141          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1308389          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1309600          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1309644          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1313139          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13138459         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1313991          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1314063          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1314416          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317346          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317357          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317368          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1317426          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1327339          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1327533          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1333820          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1335257          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1335326          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1336932          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1345046          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          1345160          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13462889         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13463393         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13510491         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13530659         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13530682         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13586828         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13597994         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          136              -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          136527           -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13765190         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13770893         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          13814965         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          139              -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14018952         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14220178         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14307336         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14307358         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14336700         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          14977618         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16065831         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16842038         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          16925250         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          18454121         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          18540299         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          195              -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          198              -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          199              -9   0.25 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          200              -9   0.25 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          201              -9   0.25 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          202              -9   0.25 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          21679312         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          2223930          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          226              -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          22967926         -9   0.25 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          253              -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          27253287         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          301042           -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          3141126          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          3333673          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          373024           -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          50922297         -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          543908           -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          593748           -9   0.25 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          598630           -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          6018899          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          602              -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          603              -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          604              -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          61789513         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          61790145         -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          62384            -9   0.25 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7428480          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439921          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439965          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7439976          -9   0.25 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440020          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440360          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440382          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440417          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440439          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440473          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7440484          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446084          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446142          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446277          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7446346          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7487947          -9   0.25 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7488564          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7542098          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7647010          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7718549          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7722647          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7738945          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7758976          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7775113          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7778394          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7778509          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7782492          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7782505          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783008          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783075          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783166          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783702          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7783791          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7784409          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7784421          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7785877          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7786814          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7787475          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7787497          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7788967          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7788989          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789006          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789062          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789095          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789120          -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7789426          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          7790809          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          78002            -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          8030704          -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          88               -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          92               -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          93               -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__16065831    -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__18540299    -9  28.04 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__7439965     -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48139 0          EXH__7440020     -9   0.00 100 100 -9   0801-3 Y R 473                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Industries  Inc MACT=Hazardous Waste Incineration: Cement Kilns: NEI_UNIQUE_ID=NEI13258: cdate=2008
48141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 1                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48167 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 1                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6436, Plant=BP (formerly Amoco Oil Co.), Texas City, TX, compliance date: 31DEC2006
48167 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 1                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6436, Plant=BP (formerly Amoco Oil Co.), Texas City, TX, compliance date: 31DEC2006
48167 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 1                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6436, Plant=BP (formerly Amoco Oil Co.), Texas City, TX, compliance date: 31DEC2006
48167 10200602   NOX              -9  40.00 100 100 -9   -9     Y R 161                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2008
48167 20200254   NOX              -9  40.00 100 100 -9   -9     Y R 161                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2008
48167 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 161                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2008
48167 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 161                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2007
48167 0          10025737         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10025919         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10034829         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10049055         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10060125         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10099748         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10101505         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10101538         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10101970         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10108642         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10124364         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10124433         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10294403         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10325947         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10377669         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10588019         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          109              -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          11103869         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12018018         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12018198         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12035722         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12054487         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12060003         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12079651         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          125              -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12626812         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12640890         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12710360         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1271289          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1306190          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1306236          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1307966          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1308061          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1308141          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1308389          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1309600          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1309644          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1313139          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13138459         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1313991          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1314063          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1314416          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1317346          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1317357          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1317368          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1317426          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1327339          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1333820          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1335257          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1335326          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1336932          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1345046          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1345160          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13462889         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13463393         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13530659         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13530682         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13586828         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          136              -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          136527           -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13765190         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13770893         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13814965         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          139              -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14018952         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14220178         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14307336         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14307358         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14336700         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14977618         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          16065831         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          16842038         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          16925250         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          18454121         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          18540299         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          195              -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          198              -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          199              -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          200              -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          201              -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          202              -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          21679312         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          2223930          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          226              -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          253              -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          27253287         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          301042           -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          3333673          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          373024           -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          50922297         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          543908           -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          598630           -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          6018899          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          602              -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          603              -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          604              -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          61789513         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          61790145         -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7428480          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7439921          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7439965          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440020          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440360          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440439          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440473          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440484          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7446084          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7446142          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7446277          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7446346          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7488564          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7542098          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7718549          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7722647          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7738945          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7758976          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7775113          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7778509          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7782492          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7783008          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7783075          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7783166          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7783702          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7783791          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7785877          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7786814          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7788967          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7788989          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7789006          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7789062          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7789095          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7789120          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7789426          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7790809          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          78002            -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          8030704          -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          88               -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          92               -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          93               -9   0.00 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          EXH__16065831    -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          EXH__18540299    -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          EXH__7439965     -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          EXH__7440020     -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          PM10             -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: UNIONCARBIDECORPTEXASCITYPLANT: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          PM2_5            -9  77.65 100 100 -9   0801-6 Y R 2021                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: UNIONCARBIDECORPTEXASCITYPLANT: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10025737         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10025919         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10031137         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10034829         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10049055         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10060125         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10099748         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10101505         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10101538         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10101970         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10108642         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10124364         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10124433         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10294403         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10325947         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10377669         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          10588019         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          109              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          11103869         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12018018         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12018198         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12035722         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12054487         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12060003         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12079651         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          125              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12626812         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12640890         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          12710360         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1271289          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1303282          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1304569          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1306190          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1306236          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1307966          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1308061          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1308141          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1308389          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1309600          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1309644          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1313139          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13138459         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1313991          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1314063          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1314416          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1317346          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1317357          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1317368          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1317426          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1327339          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1327533          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1333820          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1335257          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1335326          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1336932          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1345046          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          1345160          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13462889         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13463393         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13510491         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13530659         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13530682         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13586828         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13597994         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          136              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          136527           -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13765190         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13770893         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          13814965         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          139              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14018952         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14220178         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14307336         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14307358         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14336700         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          14977618         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          16065831         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          16842038         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          16925250         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          18454121         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          18540299         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          195              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          198              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          199              -9  94.08 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          200              -9  94.08 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          201              -9  94.08 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          202              -9  94.08 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          21679312         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          2223930          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          226              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          22967926         -9  94.08 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          253              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          27253287         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          301042           -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          3141126          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          3333673          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          373024           -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          50922297         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          543908           -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          593748           -9  94.08 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          598630           -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          6018899          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          602              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          603              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          604              -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          61789513         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          61790145         -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          62384            -9  94.08 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7428480          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7439921          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7439965          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7439976          -9  94.08 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440020          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440360          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440382          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440417          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440439          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440473          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7440484          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7446084          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7446142          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7446277          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7446346          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7487947          -9  94.08 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7488564          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7542098          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7647010          -9  74.09 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7718549          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7722647          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7738945          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7758976          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7775113          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7778394          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7778509          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7782492          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7782505          -9  74.09 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7783008          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7783075          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7783166          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7783702          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7783791          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7784409          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7784421          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7785877          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7786814          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7787475          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7787497          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7788967          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7788989          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7789006          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7789062          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7789095          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7789120          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7789426          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          7790809          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          78002            -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          8030704          -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          88               -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          92               -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          93               -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          EXH__16065831    -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          EXH__18540299    -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          EXH__7439965     -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          EXH__7440020     -9  64.49 100 100 -9   0801-2 Y R 3025                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Union Carbide Corporation  Texas City Pl MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          PM10             -9  77.65 100 100 -9   0801-2 Y R 3025                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: UNIONCARBIDECORPTEXASCITYPLANT: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 0          PM2_5            -9  77.65 100 100 -9   0801-2 Y R 3025                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: UNIONCARBIDECORPTEXASCITYPLANT: NEI_UNIQUE_ID=NEI13261: cdate=2008
48167 10200602   NOX              -9  40.00 100 100 -9   -9     Y R 5                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2008
48167 20200254   NOX              -9  40.00 100 100 -9   -9     Y R 5                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2008
48167 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 5                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2008
48167 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 5                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2007
48167 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          109              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          125              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          136              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          136527           -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          139              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          195              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          198              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          199              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          200              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          201              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          202              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          226              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          253              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          301042           -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          373024           -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          543908           -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          593748           -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          598630           -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          602              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          603              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          604              -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          62384            -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          78002            -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          88               -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          92               -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          93               -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 746                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: TEXAS CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6503: cdate=2008
48167 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 77590MCLCM24015                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6436, Plant=BP (formerly Amoco Oil Co.), Texas City, TX, compliance date: 31DEC2006
48167 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 77590MCLCM24015                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6436, Plant=BP (formerly Amoco Oil Co.), Texas City, TX, compliance date: 31DEC2006
48167 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 77590MCLCM24015                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6436, Plant=BP (formerly Amoco Oil Co.), Texas City, TX, compliance date: 31DEC2006
48167 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 77592TXSCTLOOP1                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12791, Plant=Valero (formerly Basis Petroleum, Inc.), Texas City, TX, compliance date: 31DEC2007
48167 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 77592TXSCTLOOP1                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12791, Plant=Valero (formerly Basis Petroleum, Inc.), Texas City, TX, compliance date: 31DEC2005
48167 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 77592TXSCTLOOP1                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12791, Plant=Valero (formerly Basis Petroleum, Inc.), Texas City, TX, compliance date: 31DEC2005
48167 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 77592TXSCTLOOP1                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12791, Plant=Valero (formerly Basis Petroleum, Inc.), Texas City, TX, compliance date: 31DEC2005
48167 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$11755                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6436, Plant=BP (formerly Amoco Oil Co.), Texas City, TX, compliance date: 31DEC2006
48167 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11755                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6436, Plant=BP (formerly Amoco Oil Co.), Texas City, TX, compliance date: 31DEC2006
48167 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$11755                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6436, Plant=BP (formerly Amoco Oil Co.), Texas City, TX, compliance date: 31DEC2006
48167 10200602   NOX              -9  40.00 100 100 -9   -9     Y R T$11756                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2008
48167 20200254   NOX              -9  40.00 100 100 -9   -9     Y R T$11756                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2008
48167 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$11756                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2008
48167 30600201   NOX              -9  60.00 100 100 -9   -9     Y R T$11756                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12044, Plant=Marathon Ashland Petrol. LCC, Texas City, TX, compliance date: 31DEC2007
48167 30600201   NOX              -9  60.00 100 100 -9   -9     Y R T$17873                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12791, Plant=Valero (formerly Basis Petroleum, Inc.), Texas City, TX, compliance date: 31DEC2007
48167 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$17873                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12791, Plant=Valero (formerly Basis Petroleum, Inc.), Texas City, TX, compliance date: 31DEC2005
48167 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$17873                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12791, Plant=Valero (formerly Basis Petroleum, Inc.), Texas City, TX, compliance date: 31DEC2005
48167 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$17873                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12791, Plant=Valero (formerly Basis Petroleum, Inc.), Texas City, TX, compliance date: 31DEC2005
48179 0          10025737         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10025919         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10031137         -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10034829         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10049055         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10060125         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10099748         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10101505         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10101538         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10101970         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10108642         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10124364         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10124433         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10294403         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10325947         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10377669         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10588019         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          109              -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          11103869         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12018018         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12018198         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12035722         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12054487         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12060003         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12079651         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          125              -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12626812         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12640890         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12710360         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1271289          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1303282          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1304569          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1306190          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1306236          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1307966          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1308061          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1308141          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1308389          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1309600          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1309644          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1313139          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13138459         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1313991          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1314063          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1314416          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1317346          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1317357          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1317368          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1317426          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1327339          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1327533          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1333820          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1335257          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1335326          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1336932          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1345046          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1345160          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13462889         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13463393         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13510491         -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13530659         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13530682         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13586828         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13597994         -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          136              -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          136527           -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13765190         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13770893         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13814965         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          139              -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14018952         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14220178         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14307336         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14307358         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14336700         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14977618         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          16065831         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          16842038         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          16925250         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          18454121         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          18540299         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          195              -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          198              -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          199              -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          200              -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          201              -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          202              -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          21679312         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          2223930          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          226              -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          22967926         -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          253              -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          27253287         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          301042           -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          3141126          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          3333673          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          373024           -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          50922297         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          543908           -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          593748           -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          598630           -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          6018899          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          602              -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          603              -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          604              -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          61789513         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          61790145         -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          62384            -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7428480          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7439921          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7439965          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7439976          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440020          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440360          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440382          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440417          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440439          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440473          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440484          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7446084          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7446142          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7446277          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7446346          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7487947          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7488564          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7542098          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7647010          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7718549          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7722647          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7738945          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7758976          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7775113          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7778394          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7778509          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7782492          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7782505          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7783008          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7783075          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7783166          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7783702          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7783791          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7784409          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7784421          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7785877          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7786814          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7787475          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7787497          -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7788967          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7788989          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7789006          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7789062          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7789095          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7789120          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7789426          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7790809          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          78002            -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          8030704          -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          88               -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          92               -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          93               -9   0.00 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          EXH__16065831    -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          EXH__18540299    -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          EXH__7439965     -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          EXH__7440020     -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          PM10             -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CABOTCORPPAMPAPLANT: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          PM2_5            -9  54.62 100 100 -9   0801-5 Y R 1013                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CABOTCORPPAMPAPLANT: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10025737         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10025919         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10031137         -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10034829         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10049055         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10060125         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10099748         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10101505         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10101538         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10101970         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10108642         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10124364         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10124433         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10294403         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10325947         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10377669         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          10588019         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          109              -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          11103869         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12018018         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12018198         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12035722         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12054487         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12060003         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12079651         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          125              -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12626812         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12640890         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          12710360         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1271289          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1303282          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1304569          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1306190          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1306236          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1307966          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1308061          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1308141          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1308389          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1309600          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1309644          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1313139          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13138459         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1313991          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1314063          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1314416          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1317346          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1317357          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1317368          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1317426          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1327339          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1327533          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1333820          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1335257          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1335326          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1336932          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1345046          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          1345160          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13462889         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13463393         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13510491         -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13530659         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13530682         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13586828         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13597994         -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          136              -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          136527           -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13765190         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13770893         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          13814965         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          139              -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14018952         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14220178         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14307336         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14307358         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14336700         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          14977618         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          16065831         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          16842038         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          16925250         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          18454121         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          18540299         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          195              -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          198              -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          199              -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          200              -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          201              -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          202              -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          21679312         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          2223930          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          226              -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          22967926         -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          253              -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          27253287         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          301042           -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          3141126          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          3333673          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          373024           -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          50922297         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          543908           -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          593748           -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          598630           -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          6018899          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          602              -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          603              -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          604              -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          61789513         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          61790145         -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          62384            -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7428480          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7439921          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7439965          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7439976          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440020          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440360          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440382          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440417          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440439          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440473          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7440484          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7446084          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7446142          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7446277          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7446346          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7487947          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7488564          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7542098          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7647010          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7718549          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7722647          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7738945          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7758976          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7775113          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7778394          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7778509          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7782492          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7782505          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7783008          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7783075          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7783166          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7783702          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7783791          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7784409          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7784421          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7785877          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7786814          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7787475          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7787497          -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7788967          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7788989          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7789006          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7789062          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7789095          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7789120          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7789426          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          7790809          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          78002            -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          8030704          -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          88               -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          92               -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          93               -9   0.00 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          EXH__16065831    -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          EXH__18540299    -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          EXH__7439965     -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          EXH__7440020     -9  46.53 100 100 -9   0801-5 Y R 1014                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PAMPA PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          PM10             -9  54.62 100 100 -9   0801-5 Y R 1014                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CABOTCORPPAMPAPLANT: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 0          PM2_5            -9  54.62 100 100 -9   0801-5 Y R 1014                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CABOTCORPPAMPAPLANT: NEI_UNIQUE_ID=NEI6437: cdate=2008
48179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 2                               ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48179 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$17940                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48201 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10099748         -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10108642         -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10124364         -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10325947         -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          109              -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12060003         -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          125              -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12626812         -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1306190          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1306236          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1309600          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1314416          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317368          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1335257          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1335326          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          136              -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          136527           -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13814965         -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          139              -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          195              -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          198              -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          199              -9  79.71 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          200              -9  79.71 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          201              -9  79.71 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          202              -9  79.71 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          2223930          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          226              -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          22967926         -9  79.71 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          253              -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          27253287         -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          301042           -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          373024           -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          543908           -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          593748           -9  79.71 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          598630           -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          602              -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          603              -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          604              -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          61790145         -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          62384            -9  79.71 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7428480          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439921          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439976          -9  79.71 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440439          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446142          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446277          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7487947          -9  79.71 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789426          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7790809          -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          78002            -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          88               -9  89.52 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          92               -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          93               -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 1002                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          PM10             -9  59.53 100 100 -9   0801-6 Y R 1002                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LYONDELLCHEMICALCO-CHANNELVIEWPLANT: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          PM2_5            -9  59.53 100 100 -9   0801-6 Y R 1002                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LYONDELLCHEMICALCO-CHANNELVIEWPLANT: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10099748         -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10108642         -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10124364         -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10325947         -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          109              -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12060003         -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          125              -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12626812         -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1306190          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1306236          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1309600          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1314416          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317368          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1335257          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1335326          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          136              -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          136527           -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13814965         -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          139              -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          195              -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          198              -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          199              -9  79.81 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          200              -9  79.81 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          201              -9  79.81 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          202              -9  79.81 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          2223930          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          226              -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          22967926         -9  79.81 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          253              -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          27253287         -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          301042           -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          373024           -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          543908           -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          593748           -9  79.81 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          598630           -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          602              -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          603              -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          604              -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          61790145         -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          62384            -9  79.81 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7428480          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439921          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439976          -9  79.81 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440439          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446142          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446277          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7487947          -9  79.81 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789426          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7790809          -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          78002            -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          88               -9  89.52 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          92               -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          93               -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          PM10             -9  59.53 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LYONDELLCHEMICALCO-CHANNELVIEWPLANT: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          PM2_5            -9  59.53 100 100 -9   0801-6 Y R 1002A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LYONDELLCHEMICALCO-CHANNELVIEWPLANT: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10099748         -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10108642         -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10124364         -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10325947         -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          109              -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12060003         -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          125              -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12626812         -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1306190          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1306236          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1309600          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1314416          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317368          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1335257          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1335326          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          136              -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          136527           -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13814965         -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          139              -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          195              -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          198              -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          199              -9  79.81 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          200              -9  79.81 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          201              -9  79.81 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          202              -9  79.81 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          2223930          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          226              -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          22967926         -9  79.81 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          253              -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          27253287         -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          301042           -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          373024           -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          543908           -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          593748           -9  79.81 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          598630           -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          602              -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          603              -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          604              -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          61790145         -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          62384            -9  79.81 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7428480          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439921          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439976          -9  79.81 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440439          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446142          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446277          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7487947          -9  79.81 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789426          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7790809          -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          78002            -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          88               -9  89.52 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          92               -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          93               -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          PM10             -9  59.53 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LYONDELLCHEMICALCO-CHANNELVIEWPLANT: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          PM2_5            -9  59.53 100 100 -9   0801-6 Y R 1002B                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LYONDELLCHEMICALCO-CHANNELVIEWPLANT: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10025737         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10025919         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10031137         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10034829         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10049055         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10060125         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10099748         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101505         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101538         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101970         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10108642         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10124364         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10124433         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10294403         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10325947         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10377669         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10588019         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          109              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          11103869         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12018018         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12018198         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12035722         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12054487         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12060003         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12079651         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          125              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12626812         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12640890         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12710360         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1271289          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1303282          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1304569          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1306190          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1306236          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1307966          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308061          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308141          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308389          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1309600          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1309644          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1313139          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13138459         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1313991          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1314063          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1314416          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317346          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317357          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317368          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317426          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1327339          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1327533          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1333820          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1335257          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1335326          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1336932          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1345046          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1345160          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13462889         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13463393         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13510491         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13530659         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13530682         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13586828         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13597994         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          136              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          136527           -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13765190         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13770893         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13814965         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          139              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14018952         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14220178         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14307336         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14307358         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14336700         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14977618         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16065831         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16842038         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16925250         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          18454121         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          18540299         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          195              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          198              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          199              -9  22.22 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          200              -9  22.22 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          201              -9  22.22 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          202              -9  22.22 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          21679312         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          2223930          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          226              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          22967926         -9  22.22 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          253              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          27253287         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          301042           -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          3141126          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          3333673          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          373024           -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          50922297         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          543908           -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          593748           -9  22.22 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          598630           -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          6018899          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          602              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          603              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          604              -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          61789513         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          61790145         -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          62384            -9  22.22 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7428480          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439921          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439965          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439976          -9  22.22 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440020          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440360          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440382          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440417          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440439          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440473          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440484          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446084          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446142          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446277          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446346          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7487947          -9  22.22 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7488564          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7542098          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7718549          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7722647          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7738945          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7758976          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7775113          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7778394          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7778509          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7782492          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783008          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783075          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783166          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783702          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783791          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7784409          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7784421          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7785877          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7786814          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7787475          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7787497          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7788967          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7788989          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789006          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789062          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789095          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789120          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789426          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7790809          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          78002            -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          8030704          -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          88               -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          92               -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          93               -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__16065831    -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__18540299    -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__7439965     -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__7440020     -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          PM10             -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LYONDELLCHEMICALCO-CHANNELVIEWPLANT: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          PM2_5            -9  59.53 100 100 -9   0801-6 Y R 1003                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LYONDELLCHEMICALCO-CHANNELVIEWPLANT: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10025737         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10025919         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10031137         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10034829         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10049055         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10060125         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10099748         -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101505         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101538         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10101970         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10108642         -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10124364         -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10124433         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10294403         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10325947         -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10377669         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10588019         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          109              -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          11103869         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12018018         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12018198         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12035722         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12054487         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12060003         -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12079651         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          125              -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12626812         -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12640890         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          12710360         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1271289          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1303282          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1304569          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1306190          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1306236          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1307966          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308061          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308141          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1308389          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1309600          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1309644          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1313139          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13138459         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1313991          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1314063          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1314416          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317346          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317357          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317368          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1317426          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1327339          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1327533          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1333820          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1335257          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1335326          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1336932          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1345046          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          1345160          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13462889         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13463393         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13510491         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13530659         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13530682         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13586828         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13597994         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          136              -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          136527           -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13765190         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13770893         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          13814965         -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          139              -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14018952         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14220178         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14307336         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14307358         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14336700         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          14977618         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16065831         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16842038         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          16925250         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          18454121         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          18540299         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          195              -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          198              -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          199              -9  74.23 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          200              -9  74.23 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          201              -9  74.23 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          202              -9  74.23 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          21679312         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          2223930          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          226              -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          22967926         -9  74.23 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          253              -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          27253287         -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          301042           -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          3141126          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          3333673          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          373024           -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          50922297         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          543908           -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          593748           -9  74.23 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          598630           -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          6018899          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          602              -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          603              -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          604              -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          61789513         -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          61790145         -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          62384            -9  74.23 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7428480          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439921          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439965          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7439976          -9  74.23 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440020          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440360          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440382          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440417          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440439          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440473          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7440484          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446084          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446142          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446277          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7446346          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7487947          -9  74.23 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7488564          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7542098          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7718549          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7722647          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7738945          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7758976          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7775113          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7778394          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7778509          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7782492          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783008          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783075          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783166          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783702          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7783791          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7784409          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7784421          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7785877          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7786814          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7787475          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7787497          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7788967          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7788989          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789006          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789062          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789095          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789120          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7789426          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          7790809          -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          78002            -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          8030704          -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          88               -9  86.63 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          92               -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          93               -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__16065831    -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__18540299    -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__7439965     -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          EXH__7440020     -9  20.18 100 100 -9   0801-6 Y R 1004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          PM10             -9  59.53 100 100 -9   0801-6 Y R 1004                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LYONDELLCHEMICALCO-CHANNELVIEWPLANT: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          PM2_5            -9  59.53 100 100 -9   0801-6 Y R 1004                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LYONDELLCHEMICALCO-CHANNELVIEWPLANT: NEI_UNIQUE_ID=NEI11319: cdate=2008
48201 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          109              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          125              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          136              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          136527           -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          139              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          195              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          198              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          226              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          253              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          301042           -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          373024           -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          543908           -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          598630           -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          602              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          603              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          604              -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          78002            -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          88               -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          92               -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          93               -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 1015                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: GEORGIA GULF CORP., PASADENA PLANT SHIP MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7276: cdate=2008
48201 0          10025737         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10025919         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10031137         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10034829         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10049055         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10060125         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10099748         -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10101505         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10101538         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10101970         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10108642         -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10124364         -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10124433         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10294403         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10325947         -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10377669         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          10588019         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          109              -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          11103869         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          12018018         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          12018198         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          12035722         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          12054487         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          12060003         -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          12079651         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          125              -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          12626812         -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          12640890         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          12710360         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1271289          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1303282          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1304569          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1306190          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1306236          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1307966          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1308061          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1308141          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1308389          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1309600          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1309644          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1313139          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13138459         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1313991          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1314063          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1314416          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1317346          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1317357          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1317368          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1317426          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1327339          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1327533          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1333820          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1335257          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1335326          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1336932          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1345046          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          1345160          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13462889         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13463393         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13510491         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13530659         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13530682         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13586828         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13597994         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          136              -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          136527           -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13765190         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13770893         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          13814965         -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          139              -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          14018952         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          14220178         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          14307336         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          14307358         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          14336700         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          14977618         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          16065831         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          16842038         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          16925250         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          18454121         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          18540299         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          195              -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          198              -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          199              -9  95.32 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          200              -9  95.32 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          201              -9  95.32 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          202              -9  95.32 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          21679312         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          2223930          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          226              -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          22967926         -9  95.32 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          253              -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          27253287         -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          301042           -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          3141126          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          3333673          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          373024           -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          50922297         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          543908           -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          593748           -9  95.32 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          598630           -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          6018899          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          602              -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          603              -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          604              -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          61789513         -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          61790145         -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          62384            -9  95.32 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7428480          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7439921          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7439965          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7439976          -9  95.32 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7440020          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7440360          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7440382          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7440417          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7440439          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7440473          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7440484          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7446084          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7446142          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7446277          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7446346          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7487947          -9  95.32 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7488564          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7542098          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7718549          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7722647          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7738945          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7758976          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7775113          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7778394          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7778509          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7782492          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7783008          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7783075          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7783166          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7783702          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7783791          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7784409          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7784421          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7785877          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7786814          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7787475          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7787497          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7788967          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7788989          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7789006          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7789062          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7789095          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7789120          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7789426          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          7790809          -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          78002            -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          8030704          -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          88               -9  77.98 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          92               -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          93               -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          EXH__16065831    -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          EXH__18540299    -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          EXH__7439965     -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          EXH__7440020     -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: SUNOCO INC. (R&M) MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          PM10             -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SUNOCOINC.(R&M): NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 0          PM2_5            -9  53.06 100 100 -9   0801-6 Y R 1017                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SUNOCOINC.(R&M): NEI_UNIQUE_ID=NEI2TXT11625: cdate=2008
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 1535                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 1535                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 50300504   PM10             -9  82.97 100 100 -9   -9     Y R 172                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SAFETYKLEENDEERPARKINCORPORATED: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 50300504   PM2_5            -9  82.97 100 100 -9   -9     Y R 172                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SAFETYKLEENDEERPARKINCORPORATED: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 10100601   NOX              -9  40.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 10200601   NOX              -9  40.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 20100201   NOX              -9  40.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 20200201   NOX              -9  40.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 30600201   NOX              -9  60.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 30JUN2010
48201 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 10100601   SO2              -9  90.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2008
48201 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2008
48201 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2008
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2008
48201 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 27                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2008
48201 0          10025737         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10025919         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10031137         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10034829         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10049055         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10060125         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10099748         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10101505         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10101538         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10101970         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10108642         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10124364         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10124433         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10294403         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10325947         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10377669         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10588019         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          109              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          11103869         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12018018         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12018198         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12035722         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12054487         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12060003         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12079651         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          125              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12626812         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12640890         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12710360         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1271289          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1303282          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1304569          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1306190          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1306236          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1307966          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1308061          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1308141          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1308389          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1309600          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1309644          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1313139          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13138459         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1313991          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1314063          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1314416          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317346          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317357          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317368          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317426          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1327339          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1327533          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1333820          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1335257          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1335326          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1336932          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1345046          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1345160          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13462889         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13463393         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13510491         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13530659         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13530682         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13586828         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13597994         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          136              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          136527           -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13765190         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13770893         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13814965         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          139              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14018952         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14220178         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14307336         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14307358         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14336700         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14977618         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          16065831         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          16842038         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          16925250         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          18454121         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          18540299         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          195              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          198              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          21679312         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          2223930          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          226              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          253              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          27253287         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          301042           -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          3141126          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          3333673          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          373024           -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          50922297         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          543908           -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          598630           -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          6018899          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          602              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          603              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          604              -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          61789513         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          61790145         -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7428480          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7439921          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7439965          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440020          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440360          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440382          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440417          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440439          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440473          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440484          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446084          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446142          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446277          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446346          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7488564          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7542098          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7718549          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7722647          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7738945          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7758976          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7775113          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7778394          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7778509          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7782492          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783008          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783075          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783166          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783702          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783791          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7784409          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7784421          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7785877          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7786814          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7787475          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7787497          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7788967          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7788989          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789006          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789062          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789095          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789120          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789426          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7790809          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          78002            -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          8030704          -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          88               -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          92               -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          93               -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__16065831    -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__18540299    -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__7439965     -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__7440020     -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          PM10             -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AIRPRODUCTSDINITROTOLUENEPLANT: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          PM2_5            -9  80.71 100 100 -9   0801-2 Y R 3026                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AIRPRODUCTSDINITROTOLUENEPLANT: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10025737         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10025919         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10031137         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10034829         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10049055         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10060125         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10099748         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10101505         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10101538         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10101970         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10108642         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10124364         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10124433         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10294403         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10325947         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10377669         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10588019         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          109              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          11103869         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12018018         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12018198         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12035722         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12054487         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12060003         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12079651         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          125              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12626812         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12640890         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12710360         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1271289          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1303282          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1304569          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1306190          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1306236          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1307966          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1308061          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1308141          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1308389          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1309600          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1309644          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1313139          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13138459         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1313991          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1314063          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1314416          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317346          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317357          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317368          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317426          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1327339          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1327533          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1333820          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1335257          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1335326          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1336932          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1345046          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1345160          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13462889         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13463393         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13510491         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13530659         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13530682         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13586828         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13597994         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          136              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          136527           -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13765190         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13770893         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13814965         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          139              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14018952         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14220178         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14307336         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14307358         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14336700         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14977618         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          16065831         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          16842038         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          16925250         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          18454121         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          18540299         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          195              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          198              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          21679312         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          2223930          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          226              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          253              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          27253287         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          301042           -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          3141126          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          3333673          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          373024           -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          50922297         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          543908           -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          598630           -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          6018899          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          602              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          603              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          604              -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          61789513         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          61790145         -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7428480          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7439921          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7439965          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440020          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440360          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440382          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440417          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440439          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440473          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440484          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446084          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446142          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446277          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446346          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7488564          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7542098          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7647010          -9  74.09 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7718549          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7722647          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7738945          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7758976          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7775113          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7778394          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7778509          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7782492          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7782505          -9  74.09 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783008          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783075          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783166          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783702          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783791          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7784409          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7784421          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7785877          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7786814          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7787475          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7787497          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7788967          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7788989          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789006          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789062          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789095          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789120          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789426          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7790809          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          78002            -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          8030704          -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          88               -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          92               -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          93               -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__16065831    -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__18540299    -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__7439965     -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__7440020     -9  70.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          PM10             -9  80.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AIRPRODUCTSDINITROTOLUENEPLANT: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          PM2_5            -9  80.71 100 100 -9   0801-2 Y R 3027                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AIRPRODUCTSDINITROTOLUENEPLANT: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10025737         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10025919         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10031137         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10034829         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10049055         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10060125         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10099748         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10101505         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10101538         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10101970         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10108642         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10124364         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10124433         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10294403         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10325947         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10377669         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10588019         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          109              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          11103869         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12018018         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12018198         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12035722         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12054487         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12060003         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12079651         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          125              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12626812         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12640890         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12710360         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1271289          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1303282          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1304569          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1306190          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1306236          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1307966          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1308061          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1308141          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1308389          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1309600          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1309644          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1313139          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13138459         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1313991          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1314063          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1314416          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1317346          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1317357          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1317368          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1317426          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1327339          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1327533          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1333820          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1335257          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1335326          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1336932          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1345046          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1345160          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13462889         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13463393         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13510491         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13530659         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13530682         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13586828         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13597994         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          136              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          136527           -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13765190         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13770893         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13814965         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          139              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14018952         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14220178         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14307336         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14307358         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14336700         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14977618         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          16065831         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          16842038         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          16925250         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          18454121         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          18540299         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          195              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          198              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          21679312         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          2223930          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          226              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          253              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          27253287         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          301042           -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          3141126          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          3333673          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          373024           -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          50922297         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          543908           -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          598630           -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          6018899          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          602              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          603              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          604              -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          61789513         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          61790145         -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7428480          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7439921          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7439965          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440020          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440360          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440382          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440417          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440439          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440473          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440484          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7446084          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7446142          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7446277          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7446346          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7488564          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7542098          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7647010          -9  87.58 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7718549          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7722647          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7738945          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7758976          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7775113          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7778394          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7778509          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7782492          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7782505          -9  87.58 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7783008          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7783075          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7783166          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7783702          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7783791          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7784409          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7784421          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7785877          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7786814          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7787475          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7787497          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7788967          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7788989          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7789006          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7789062          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7789095          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7789120          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7789426          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7790809          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          78002            -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          8030704          -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          88               -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          92               -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          93               -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          EXH__16065831    -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          EXH__18540299    -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          EXH__7439965     -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          EXH__7440020     -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          PM10             -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: OXYVINYLSLPDEERPARK-VCMPLANT: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          PM2_5            -9  90.11 100 100 -9   0801-2 Y R 3028                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: OXYVINYLSLPDEERPARK-VCMPLANT: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10025737         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10025919         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10031137         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10034829         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10049055         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10060125         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10099748         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10101505         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10101538         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10101970         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10108642         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10124364         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10124433         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10294403         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10325947         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10377669         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10588019         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          109              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          11103869         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12018018         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12018198         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12035722         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12054487         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12060003         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12079651         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          125              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12626812         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12640890         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          12710360         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1271289          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1303282          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1304569          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1306190          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1306236          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1307966          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1308061          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1308141          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1308389          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1309600          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1309644          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1313139          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13138459         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1313991          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1314063          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1314416          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1317346          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1317357          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1317368          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1317426          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1327339          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1327533          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1333820          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1335257          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1335326          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1336932          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1345046          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          1345160          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13462889         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13463393         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13510491         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13530659         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13530682         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13586828         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13597994         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          136              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          136527           -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13765190         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13770893         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          13814965         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          139              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14018952         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14220178         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14307336         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14307358         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14336700         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          14977618         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          16065831         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          16842038         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          16925250         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          18454121         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          18540299         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          195              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          198              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          21679312         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          2223930          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          226              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          253              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          27253287         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          301042           -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          3141126          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          3333673          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          373024           -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          50922297         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          543908           -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          598630           -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          6018899          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          602              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          603              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          604              -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          61789513         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          61790145         -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7428480          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7439921          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7439965          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440020          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440360          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440382          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440417          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440439          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440473          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7440484          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7446084          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7446142          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7446277          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7446346          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7488564          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7542098          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7647010          -9  87.58 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7718549          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7722647          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7738945          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7758976          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7775113          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7778394          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7778509          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7782492          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7782505          -9  87.58 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7783008          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7783075          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7783166          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7783702          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7783791          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7784409          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7784421          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7785877          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7786814          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7787475          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7787497          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7788967          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7788989          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7789006          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7789062          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7789095          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7789120          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7789426          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          7790809          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          78002            -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          8030704          -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          88               -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          92               -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          93               -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          EXH__16065831    -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          EXH__18540299    -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          EXH__7439965     -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          EXH__7440020     -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: DEER PARK V C M PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          PM10             -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: OXYVINYLSLPDEERPARK-VCMPLANT: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          PM2_5            -9  90.11 100 100 -9   0801-2 Y R 3028A                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: OXYVINYLSLPDEERPARK-VCMPLANT: NEI_UNIQUE_ID=NEI12714: cdate=2008
48201 0          10025737         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10025919         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10031137         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10034829         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10049055         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10060125         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10099748         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10101505         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10101538         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10101970         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10108642         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10124364         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10124433         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10294403         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10325947         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10377669         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          10588019         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          109              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          11103869         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          12018018         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          12018198         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          12035722         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          12054487         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          12060003         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          12079651         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          125              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          12626812         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          12640890         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          12710360         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1271289          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1303282          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1304569          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1306190          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1306236          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1307966          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1308061          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1308141          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1308389          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1309600          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1309644          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1313139          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13138459         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1313991          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1314063          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1314416          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1317346          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1317357          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1317368          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1317426          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1327339          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1327533          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1333820          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1335257          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1335326          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1336932          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1345046          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          1345160          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13462889         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13463393         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13510491         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13530659         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13530682         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13586828         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13597994         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          136              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          136527           -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13765190         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13770893         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          13814965         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          139              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          14018952         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          14220178         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          14307336         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          14307358         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          14336700         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          14977618         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          16065831         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          16842038         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          16925250         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          18454121         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          18540299         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          195              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          198              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          199              -9  40.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          200              -9  40.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          201              -9  40.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          202              -9  40.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          21679312         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          2223930          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          226              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          22967926         -9  40.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          253              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          27253287         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          301042           -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          3141126          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          3333673          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          373024           -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          50922297         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          543908           -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          593748           -9  40.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          598630           -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          6018899          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          602              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          603              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          604              -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          61789513         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          61790145         -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          62384            -9  40.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7428480          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7439921          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7439965          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7439976          -9  40.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7440020          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7440360          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7440382          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7440417          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7440439          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7440473          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7440484          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7446084          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7446142          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7446277          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7446346          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7487947          -9  40.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7488564          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7542098          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7718549          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7722647          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7738945          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7758976          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7775113          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7778394          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7778509          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7782492          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7783008          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7783075          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7783166          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7783702          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7783791          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7784409          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7784421          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7785877          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7786814          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7787475          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7787497          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7788967          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7788989          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7789006          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7789062          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7789095          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7789120          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7789426          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          7790809          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          78002            -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          8030704          -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          88               -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          92               -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          93               -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          EXH__16065831    -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          EXH__18540299    -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          EXH__7439965     -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          EXH__7440020     -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Shell Deer Park MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          PM10             -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SHELLOILDEERPARK: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 0          PM2_5            -9  78.95 100 100 -9   0801-6 Y R 3034                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SHELLOILDEERPARK: NEI_UNIQUE_ID=NEI11119: cdate=2008
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 3034                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 3034                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 39                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 39                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 605                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 605                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 0          10025737         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10025919         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10031137         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10034829         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10049055         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10060125         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10099748         -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10101505         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10101538         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10101970         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10108642         -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10124364         -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10124433         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10294403         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10325947         -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10377669         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10588019         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          109              -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          11103869         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          12018018         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          12018198         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          12035722         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          12054487         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          12060003         -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          12079651         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          125              -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          12626812         -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          12640890         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          12710360         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1271289          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1303282          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1304569          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1306190          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1306236          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1307966          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1308061          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1308141          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1308389          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1309600          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1309644          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1313139          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13138459         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1313991          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1314063          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1314416          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1317346          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1317357          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1317368          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1317426          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1327339          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1327533          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1333820          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1335257          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1335326          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1336932          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1345046          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          1345160          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13462889         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13463393         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13510491         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13530659         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13530682         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13586828         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13597994         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          136              -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          136527           -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13765190         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13770893         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          13814965         -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          139              -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          14018952         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          14220178         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          14307336         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          14307358         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          14336700         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          14977618         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          16065831         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          16842038         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          16925250         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          18454121         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          18540299         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          195              -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          198              -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          199              -9  77.45 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          200              -9  77.45 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          201              -9  77.45 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          202              -9  77.45 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          21679312         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          2223930          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          226              -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          22967926         -9  77.45 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          253              -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          27253287         -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          301042           -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          3141126          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          3333673          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          373024           -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          50922297         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          543908           -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          593748           -9  77.45 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          598630           -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          6018899          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          602              -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          603              -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          604              -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          61789513         -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          61790145         -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          62384            -9  77.45 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7428480          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7439921          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7439965          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7439976          -9  77.45 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7440020          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7440360          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7440382          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7440417          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7440439          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7440473          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7440484          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7446084          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7446142          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7446277          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7446346          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7487947          -9  77.45 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7488564          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7542098          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7718549          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7722647          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7738945          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7758976          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7775113          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7778394          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7778509          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7782492          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7783008          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7783075          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7783166          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7783702          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7783791          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7784409          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7784421          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7785877          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7786814          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7787475          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7787497          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7788967          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7788989          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7789006          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7789062          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7789095          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7789120          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7789426          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          7790809          -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          78002            -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          8030704          -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          88               -9  96.10 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          92               -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          93               -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          EXH__16065831    -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          EXH__18540299    -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          EXH__7439965     -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          EXH__7440020     -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Rollins Environmental Services MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          PM10             -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SAFETYKLEENDEERPARKINCORPORATED: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          PM2_5            -9  82.97 100 100 -9   0801-1 Y R 609                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SAFETYKLEENDEERPARKINCORPORATED: NEI_UNIQUE_ID=NEI7162: cdate=2008
48201 0          10025737         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10025919         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10031137         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10034829         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10049055         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10060125         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10099748         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10101505         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10101538         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10101970         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10108642         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10124364         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10124433         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10294403         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10325947         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10377669         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10588019         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          109              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          11103869         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          12018018         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          12018198         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          12035722         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          12054487         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          12060003         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          12079651         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          125              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          12626812         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          12640890         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          12710360         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1271289          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1303282          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1304569          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1306190          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1306236          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1307966          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1308061          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1308141          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1308389          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1309600          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1309644          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1313139          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13138459         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1313991          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1314063          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1314416          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1317346          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1317357          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1317368          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1317426          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1327339          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1327533          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1333820          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1335257          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1335326          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1336932          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1345046          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          1345160          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13462889         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13463393         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13510491         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13530659         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13530682         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13586828         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13597994         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          136              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          136527           -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13765190         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13770893         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          13814965         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          139              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          14018952         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          14220178         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          14307336         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          14307358         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          14336700         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          14977618         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          16065831         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          16842038         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          16925250         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          18454121         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          18540299         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          195              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          198              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          21679312         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          2223930          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          226              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          253              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          27253287         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          301042           -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          3141126          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          3333673          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          373024           -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          50922297         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          543908           -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          598630           -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          6018899          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          602              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          603              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          604              -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          61789513         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          61790145         -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7428480          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7439921          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7439965          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7440020          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7440360          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7440382          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7440417          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7440439          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7440473          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7440484          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7446084          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7446142          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7446277          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7446346          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7488564          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7542098          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7718549          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7722647          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7738945          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7758976          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7775113          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7778394          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7778509          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7782492          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7783008          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7783075          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7783166          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7783702          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7783791          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7784409          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7784421          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7785877          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7786814          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7787475          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7787497          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7788967          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7788989          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7789006          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7789062          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7789095          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7789120          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7789426          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          7790809          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          78002            -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          8030704          -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          88               -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          92               -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          93               -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          EXH__16065831    -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          EXH__18540299    -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          EXH__7439965     -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          EXH__7440020     -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont - Beaumont Works MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          PM10             -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTLAPORTEPLANT: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          PM2_5            -9  93.60 100 100 -9   0801-2 Y R 707                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTLAPORTEPLANT: NEI_UNIQUE_ID=NEI6578: cdate=2008
48201 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          109              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          125              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          136              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          136527           -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          139              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          195              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          198              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          226              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          253              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          301042           -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          373024           -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          543908           -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          598630           -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          602              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          603              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          604              -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          78002            -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          88               -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          92               -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          93               -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 720                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PASADENA PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          PM10             -9  80.71 100 100 -9   0801-6 Y R 720                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AIRPRODUCTSDINITROTOLUENEPLANT: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          PM2_5            -9  80.71 100 100 -9   0801-6 Y R 720                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: AIRPRODUCTSDINITROTOLUENEPLANT: NEI_UNIQUE_ID=NEI7197: cdate=2008
48201 0          10025737         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10031137         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10034829         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10049055         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10060125         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10099748         -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10101538         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10294403         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10588019         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          109              -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          11103869         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          12018018         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          12018198         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          12060003         -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          125              -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          12626812         -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1303282          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1308141          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1308389          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1309600          -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1314416          -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1317368          -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1327533          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1333820          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1335257          -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1335326          -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13530659         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13530682         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          136              -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          136527           -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13765190         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          13814965         -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          139              -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          14018952         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          14307336         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          14307358         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          14977618         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          16065831         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          18454121         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          18540299         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          195              -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          198              -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          199              -9  92.70 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          200              -9  92.70 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          201              -9  92.70 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          202              -9  92.70 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          21679312         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          226              -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          22967926         -9  92.70 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          253              -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          27253287         -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          301042           -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          3141126          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          373024           -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          50922297         -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          543908           -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          593748           -9  92.70 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          598630           -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          602              -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          603              -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          604              -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          61790145         -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          62384            -9  92.70 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7428480          -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7439921          -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7439976          -9  92.70 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7440382          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7440473          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7446142          -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7446277          -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7487947          -9  92.70 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7647010          -9  33.01 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7738945          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7758976          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7775113          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7778394          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7778509          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7782505          -9  33.01 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7784409          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7784421          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7788967          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7788989          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7789006          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7789062          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7789095          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7789120          -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          78002            -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          88               -9  85.60 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          92               -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          93               -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          EXH__16065831    -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          EXH__18540299    -9  54.63 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 724                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: MERISOL-GREENS BAYOU PLT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6824: cdate=2008
48201 0          10025737         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10025919         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10031137         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10034829         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10049055         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10060125         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10099748         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10101505         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10101538         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10101970         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10108642         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10124364         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10124433         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10294403         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10325947         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10377669         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          10588019         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          109              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          11103869         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          12018018         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          12018198         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          12035722         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          12054487         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          12060003         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          12079651         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          125              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          12626812         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          12640890         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          12710360         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1271289          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1303282          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1304569          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1306190          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1306236          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1307966          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1308061          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1308141          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1308389          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1309600          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1309644          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1313139          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13138459         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1313991          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1314063          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1314416          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1317346          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1317357          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1317368          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1317426          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1327339          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1327533          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1333820          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1335257          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1335326          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1336932          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1345046          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          1345160          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13462889         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13463393         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13510491         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13530659         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13530682         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13586828         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13597994         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          136              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          136527           -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13765190         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13770893         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          13814965         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          139              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          14018952         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          14220178         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          14307336         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          14307358         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          14336700         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          14977618         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          16065831         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          16842038         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          16925250         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          18454121         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          18540299         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          195              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          198              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          21679312         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          2223930          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          226              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          253              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          27253287         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          301042           -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          3141126          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          3333673          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          373024           -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          50922297         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          543908           -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          598630           -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          6018899          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          602              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          603              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          604              -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          61789513         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          61790145         -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7428480          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7439921          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7439965          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7440020          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7440360          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7440382          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7440417          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7440439          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7440473          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7440484          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7446084          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7446142          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7446277          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7446346          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7488564          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7542098          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7718549          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7722647          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7738945          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7758976          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7775113          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7778394          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7778509          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7782492          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7783008          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7783075          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7783166          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7783702          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7783791          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7784409          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7784421          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7785877          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7786814          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7787475          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7787497          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7788967          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7788989          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7789006          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7789062          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7789095          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7789120          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7789426          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          7790809          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          78002            -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          8030704          -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          88               -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          92               -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          93               -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          EXH__16065831    -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          EXH__18540299    -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          EXH__7439965     -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          EXH__7440020     -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ROHM & HAAS TEXAS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          PM10             -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROHM&HAASTEXASINC.: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 0          PM2_5            -9  74.61 100 100 -9   0801-6 Y R 740                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ROHM&HAASTEXASINC.: NEI_UNIQUE_ID=NEI8357: cdate=2008
48201 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 77012HLLPT9701M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31MAR2007
48201 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 77012HLLPT9701M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31MAR2007
48201 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 77012HLLPT9701M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31DEC2005
48201 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 77012HLLPT9701M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31DEC2005
48201 30600105   SO2              -9  90.00 100 100 -9   -9     Y R 77012HLLPT9701M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31DEC2005
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 77012HLLPT9701M                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31DEC2005
48201 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10099748         -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10108642         -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10124364         -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10325947         -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          109              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12060003         -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          125              -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12626812         -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1306190          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1306236          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1309600          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1314416          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1317368          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1335257          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1335326          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          136              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          136527           -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13814965         -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          139              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          195              -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          198              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          2223930          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          226              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          253              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          27253287         -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          301042           -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          373024           -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          543908           -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          598630           -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          602              -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          603              -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          604              -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          61790145         -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7428480          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7439921          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440439          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7446142          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7446277          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7789426          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7790809          -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          78002            -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          88               -9  12.67 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          92               -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          93               -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 772                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10099748         -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10108642         -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10124364         -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10325947         -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          109              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12060003         -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          125              -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12626812         -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1306190          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1306236          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1309600          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1314416          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1317368          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1335257          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1335326          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          136              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          136527           -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          13814965         -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          139              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          195              -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          198              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          2223930          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          226              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          253              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          27253287         -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          301042           -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          373024           -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          543908           -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          598630           -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          602              -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          603              -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          604              -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          61790145         -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7428480          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7439921          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440439          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7446142          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7446277          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7789426          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          7790809          -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          78002            -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          88               -9  13.53 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          92               -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          93               -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 772A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: LONZA INCORPORATED MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7279: cdate=2008
48201 0          10025737         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10025919         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10031137         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10034829         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10049055         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10060125         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10099748         -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101505         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101538         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101970         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10108642         -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10124364         -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10124433         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10294403         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10325947         -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10377669         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10588019         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          109              -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          11103869         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12018018         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12018198         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12035722         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12054487         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12060003         -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12079651         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          125              -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12626812         -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12640890         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12710360         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1271289          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1303282          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1304569          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1306190          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1306236          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1307966          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308061          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308141          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308389          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1309600          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1309644          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1313139          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13138459         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1313991          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1314063          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1314416          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317346          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317357          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317368          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317426          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1327339          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1327533          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1333820          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1335257          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1335326          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1336932          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1345046          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1345160          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13462889         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13463393         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13510491         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13530659         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13530682         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13586828         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13597994         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          136              -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          136527           -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13765190         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13770893         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13814965         -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          139              -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14018952         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14220178         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14307336         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14307358         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14336700         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14977618         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16065831         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16842038         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16925250         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          18454121         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          18540299         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          195              -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          198              -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          199              -9  25.66 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          200              -9  25.66 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          201              -9  25.66 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          202              -9  25.66 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          21679312         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          2223930          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          226              -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          22967926         -9  25.66 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          253              -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          27253287         -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          301042           -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          3141126          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          3333673          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          373024           -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          50922297         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          543908           -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          593748           -9  25.66 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          598630           -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          6018899          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          602              -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          603              -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          604              -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          61789513         -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          61790145         -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          62384            -9  25.66 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7428480          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439921          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439965          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439976          -9  25.66 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440020          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440360          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440382          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440417          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440439          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440473          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440484          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446084          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446142          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446277          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446346          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7487947          -9  25.66 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7488564          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7542098          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7718549          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7722647          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7738945          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7758976          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7775113          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7778394          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7778509          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7782492          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783008          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783075          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783166          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783702          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783791          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7784409          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7784421          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7785877          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7786814          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7787475          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7787497          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7788967          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7788989          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789006          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789062          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789095          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789120          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789426          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7790809          -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          78002            -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          8030704          -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          88               -9  77.02 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          92               -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          93               -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__16065831    -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__18540299    -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__7439965     -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__7440020     -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          PM10             -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CHANNELVIEWCOMPLEX: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          PM2_5            -9  63.45 100 100 -9   0801-6 Y R 774                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CHANNELVIEWCOMPLEX: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10025737         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10025919         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10031137         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10034829         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10049055         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10060125         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10099748         -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101505         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101538         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101970         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10108642         -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10124364         -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10124433         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10294403         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10325947         -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10377669         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10588019         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          109              -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          11103869         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12018018         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12018198         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12035722         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12054487         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12060003         -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12079651         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          125              -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12626812         -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12640890         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12710360         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1271289          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1303282          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1304569          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1306190          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1306236          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1307966          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308061          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308141          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308389          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1309600          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1309644          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1313139          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13138459         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1313991          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1314063          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1314416          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317346          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317357          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317368          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317426          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1327339          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1327533          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1333820          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1335257          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1335326          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1336932          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1345046          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1345160          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13462889         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13463393         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13510491         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13530659         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13530682         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13586828         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13597994         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          136              -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          136527           -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13765190         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13770893         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13814965         -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          139              -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14018952         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14220178         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14307336         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14307358         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14336700         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14977618         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16065831         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16842038         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16925250         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          18454121         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          18540299         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          195              -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          198              -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          199              -9  62.83 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          200              -9  62.83 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          201              -9  62.83 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          202              -9  62.83 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          21679312         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          2223930          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          226              -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          22967926         -9  62.83 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          253              -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          27253287         -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          301042           -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          3141126          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          3333673          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          373024           -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          50922297         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          543908           -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          593748           -9  62.83 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          598630           -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          6018899          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          602              -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          603              -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          604              -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          61789513         -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          61790145         -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          62384            -9  62.83 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7428480          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439921          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439965          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439976          -9  62.83 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440020          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440360          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440382          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440417          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440439          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440473          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440484          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446084          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446142          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446277          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446346          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7487947          -9  62.83 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7488564          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7542098          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7718549          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7722647          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7738945          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7758976          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7775113          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7778394          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7778509          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7782492          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783008          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783075          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783166          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783702          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783791          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7784409          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7784421          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7785877          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7786814          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7787475          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7787497          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7788967          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7788989          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789006          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789062          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789095          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789120          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789426          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7790809          -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          78002            -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          8030704          -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          88               -9  76.90 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          92               -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          93               -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__16065831    -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__18540299    -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__7439965     -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__7440020     -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          PM10             -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CHANNELVIEWCOMPLEX: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          PM2_5            -9  63.45 100 100 -9   0801-6 Y R 774A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CHANNELVIEWCOMPLEX: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10025737         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10025919         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10031137         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10034829         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10049055         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10060125         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10099748         -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101505         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101538         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101970         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10108642         -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10124364         -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10124433         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10294403         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10325947         -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10377669         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10588019         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          109              -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          11103869         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12018018         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12018198         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12035722         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12054487         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12060003         -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12079651         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          125              -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12626812         -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12640890         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12710360         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1271289          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1303282          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1304569          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1306190          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1306236          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1307966          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308061          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308141          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308389          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1309600          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1309644          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1313139          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13138459         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1313991          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1314063          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1314416          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317346          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317357          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317368          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317426          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1327339          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1327533          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1333820          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1335257          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1335326          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1336932          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1345046          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1345160          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13462889         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13463393         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13510491         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13530659         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13530682         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13586828         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13597994         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          136              -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          136527           -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13765190         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13770893         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13814965         -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          139              -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14018952         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14220178         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14307336         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14307358         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14336700         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14977618         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16065831         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16842038         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16925250         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          18454121         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          18540299         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          195              -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          198              -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          199              -9  62.83 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          200              -9  62.83 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          201              -9  62.83 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          202              -9  62.83 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          21679312         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          2223930          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          226              -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          22967926         -9  62.83 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          253              -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          27253287         -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          301042           -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          3141126          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          3333673          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          373024           -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          50922297         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          543908           -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          593748           -9  62.83 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          598630           -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          6018899          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          602              -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          603              -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          604              -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          61789513         -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          61790145         -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          62384            -9  62.83 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7428480          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439921          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439965          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439976          -9  62.83 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440020          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440360          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440382          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440417          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440439          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440473          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440484          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446084          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446142          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446277          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446346          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7487947          -9  62.83 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7488564          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7542098          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7718549          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7722647          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7738945          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7758976          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7775113          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7778394          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7778509          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7782492          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783008          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783075          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783166          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783702          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783791          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7784409          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7784421          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7785877          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7786814          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7787475          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7787497          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7788967          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7788989          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789006          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789062          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789095          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789120          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789426          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7790809          -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          78002            -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          8030704          -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          88               -9  76.90 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          92               -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          93               -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__16065831    -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__18540299    -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__7439965     -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__7440020     -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          PM10             -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CHANNELVIEWCOMPLEX: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          PM2_5            -9  63.45 100 100 -9   0801-6 Y R 774B                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CHANNELVIEWCOMPLEX: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10025737         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10025919         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10031137         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10034829         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10049055         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10060125         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10099748         -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101505         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101538         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10101970         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10108642         -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10124364         -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10124433         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10294403         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10325947         -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10377669         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10588019         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          109              -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          11103869         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12018018         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12018198         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12035722         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12054487         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12060003         -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12079651         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          125              -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12626812         -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12640890         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          12710360         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1271289          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1303282          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1304569          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1306190          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1306236          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1307966          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308061          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308141          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1308389          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1309600          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1309644          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1313139          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13138459         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1313991          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1314063          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1314416          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317346          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317357          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317368          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1317426          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1327339          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1327533          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1333820          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1335257          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1335326          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1336932          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1345046          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          1345160          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13462889         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13463393         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13510491         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13530659         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13530682         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13586828         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13597994         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          136              -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          136527           -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13765190         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13770893         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          13814965         -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          139              -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14018952         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14220178         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14307336         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14307358         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14336700         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          14977618         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16065831         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16842038         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          16925250         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          18454121         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          18540299         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          195              -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          198              -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          199              -9  62.83 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          200              -9  62.83 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          201              -9  62.83 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          202              -9  62.83 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          21679312         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          2223930          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          226              -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          22967926         -9  62.83 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          253              -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          27253287         -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          301042           -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          3141126          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          3333673          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          373024           -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          50922297         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          543908           -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          593748           -9  62.83 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          598630           -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          6018899          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          602              -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          603              -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          604              -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          61789513         -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          61790145         -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          62384            -9  62.83 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7428480          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439921          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439965          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7439976          -9  62.83 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440020          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440360          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440382          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440417          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440439          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440473          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7440484          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446084          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446142          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446277          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7446346          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7487947          -9  62.83 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7488564          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7542098          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7718549          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7722647          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7738945          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7758976          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7775113          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7778394          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7778509          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7782492          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783008          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783075          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783166          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783702          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7783791          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7784409          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7784421          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7785877          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7786814          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7787475          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7787497          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7788967          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7788989          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789006          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789062          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789095          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789120          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7789426          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          7790809          -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          78002            -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          8030704          -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          88               -9  76.90 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          92               -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          93               -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__16065831    -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__18540299    -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__7439965     -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          EXH__7440020     -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CHANNELVIEW COMPLEX MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          PM10             -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CHANNELVIEWCOMPLEX: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          PM2_5            -9  63.45 100 100 -9   0801-6 Y R 774C                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CHANNELVIEWCOMPLEX: NEI_UNIQUE_ID=NEITXT$11693: cdate=2008
48201 0          10025737         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10025919         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10031137         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10034829         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10049055         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10060125         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10099748         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10101505         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10101538         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10101970         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10108642         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10124364         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10124433         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10294403         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10325947         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10377669         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10588019         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          109              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          11103869         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12018018         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12018198         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12035722         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12054487         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12060003         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12079651         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          125              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12626812         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12640890         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12710360         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1271289          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1303282          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1304569          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1306190          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1306236          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1307966          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1308061          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1308141          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1308389          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1309600          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1309644          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1313139          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13138459         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1313991          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1314063          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1314416          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1317346          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1317357          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1317368          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1317426          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1327339          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1327533          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1333820          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1335257          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1335326          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1336932          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1345046          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1345160          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13462889         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13463393         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13510491         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13530659         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13530682         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13586828         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13597994         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          136              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          136527           -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13765190         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13770893         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13814965         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          139              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14018952         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14220178         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14307336         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14307358         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14336700         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14977618         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          16065831         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          16842038         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          16925250         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          18454121         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          18540299         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          195              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          198              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          21679312         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          2223930          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          226              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          253              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          27253287         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          301042           -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          3141126          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          3333673          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          373024           -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          50922297         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          543908           -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          598630           -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          6018899          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          602              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          603              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          604              -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          61789513         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          61790145         -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7428480          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7439921          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7439965          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440020          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440360          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440382          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440417          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440439          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440473          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440484          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7446084          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7446142          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7446277          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7446346          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7488564          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7542098          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7718549          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7722647          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7738945          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7758976          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7775113          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7778394          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7778509          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7782492          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7783008          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7783075          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7783166          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7783702          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7783791          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7784409          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7784421          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7785877          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7786814          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7787475          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7787497          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7788967          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7788989          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7789006          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7789062          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7789095          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7789120          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7789426          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7790809          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          78002            -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          8030704          -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          88               -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          92               -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          93               -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          EXH__16065831    -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          EXH__18540299    -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          EXH__7439965     -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          EXH__7440020     -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          PM10             -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: TOTALPETROCHEMICALSUSAINC.: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          PM2_5            -9  69.04 100 100 -9   0801-6 Y R 811                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: TOTALPETROCHEMICALSUSAINC.: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10025737         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10025919         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10031137         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10034829         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10049055         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10060125         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10099748         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10101505         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10101538         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10101970         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10108642         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10124364         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10124433         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10294403         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10325947         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10377669         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          10588019         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          109              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          11103869         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12018018         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12018198         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12035722         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12054487         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12060003         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12079651         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          125              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12626812         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12640890         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          12710360         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1271289          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1303282          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1304569          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1306190          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1306236          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1307966          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1308061          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1308141          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1308389          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1309600          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1309644          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1313139          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13138459         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1313991          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1314063          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1314416          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1317346          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1317357          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1317368          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1317426          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1327339          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1327533          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1333820          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1335257          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1335326          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1336932          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1345046          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          1345160          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13462889         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13463393         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13510491         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13530659         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13530682         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13586828         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13597994         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          136              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          136527           -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13765190         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13770893         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          13814965         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          139              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14018952         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14220178         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14307336         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14307358         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14336700         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          14977618         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          16065831         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          16842038         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          16925250         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          18454121         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          18540299         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          195              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          198              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          199              -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          200              -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          201              -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          202              -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          21679312         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          2223930          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          226              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          253              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          27253287         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          301042           -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          3141126          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          3333673          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          373024           -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          50922297         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          543908           -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          593748           -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          598630           -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          6018899          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          602              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          603              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          604              -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          61789513         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          61790145         -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          62384            -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7428480          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7439921          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7439965          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440020          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440360          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440382          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440417          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440439          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440473          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7440484          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7446084          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7446142          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7446277          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7446346          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7488564          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7542098          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7718549          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7722647          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7738945          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7758976          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7775113          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7778394          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7778509          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7782492          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7783008          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7783075          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7783166          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7783702          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7783791          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7784409          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7784421          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7785877          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7786814          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7787475          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7787497          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7788967          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7788989          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7789006          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7789062          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7789095          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7789120          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7789426          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          7790809          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          78002            -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          8030704          -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          88               -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          92               -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          93               -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          EXH__16065831    -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          EXH__18540299    -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          EXH__7439965     -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          EXH__7440020     -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ATOFINA PETROCHEMICALS INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          PM10             -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: TOTALPETROCHEMICALSUSAINC.: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 0          PM2_5            -9  69.04 100 100 -9   0801-6 Y R 811A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: TOTALPETROCHEMICALSUSAINC.: NEI_UNIQUE_ID=NEITXT$11704: cdate=2008
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R EGU1138                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600904   SO2              -9  90.00 100 100 -9   -9     Y R EGU1138                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R P&R2-2002-6                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600904   SO2              -9  90.00 100 100 -9   -9     Y R P&R2-2002-6                     ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$11485                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31MAR2007
48201 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11485                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31MAR2007
48201 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$11485                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31DEC2005
48201 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$11485                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31DEC2005
48201 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$11485                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31DEC2005
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$11485                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12711, Plant=Valero (formerly Basis Petroleum, Inc.), Houston, TX, compliance date: 31DEC2005
48201 10100601   NOX              -9  40.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 10200601   NOX              -9  40.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 20100201   NOX              -9  40.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 20200201   NOX              -9  40.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 30600201   NOX              -9  60.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 30JUN2010
48201 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 10100601   SO2              -9  90.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2008
48201 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2008
48201 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2008
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2008
48201 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2009
48201 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$11688                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7781, Plant=ExxonMobil Oil Corp (formerly Exxon Co. USA), Baytown, TX, compliance date: 31DEC2008
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$11702                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$11702                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$17853                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48201 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$17853                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI11119, Plant=Shell -Deer Park Refining Limited Partnership, Deer Park, TX, compliance date: 31DEC2010
48203 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 50300501   PM10             -9  78.57 100 100 -9   -9     Y R 19                              ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTEXASOPERATIONS: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 50300506   PM10             -9  78.57 100 100 -9   -9     Y R 19                              ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTEXASOPERATIONS: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 19                              ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 50300501   PM2_5            -9  78.57 100 100 -9   -9     Y R 19                              ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTEXASOPERATIONS: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 50300506   PM2_5            -9  78.57 100 100 -9   -9     Y R 19                              ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTEXASOPERATIONS: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10025737         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10025919         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10031137         -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10034829         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10049055         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10060125         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10099748         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10101505         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10101538         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10101970         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10108642         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10124364         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10124433         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10294403         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10325947         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10377669         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10588019         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          109              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          11103869         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12018018         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12018198         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12035722         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12054487         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12060003         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12079651         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          125              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12626812         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12640890         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12710360         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1271289          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1303282          -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1304569          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1306190          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1306236          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1307966          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1308061          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1308141          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1308389          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1309600          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1309644          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1313139          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13138459         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1313991          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1314063          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1314416          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317346          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317357          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317368          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317426          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1327339          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1327533          -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1333820          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1335257          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1335326          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1336932          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1345046          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1345160          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13462889         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13463393         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13510491         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13530659         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13530682         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13586828         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13597994         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          136              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          136527           -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13765190         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13770893         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13814965         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          139              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14018952         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14220178         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14307336         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14307358         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14336700         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14977618         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          16065831         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          16842038         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          16925250         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          18454121         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          18540299         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          195              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          198              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          199              -9  99.28 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          200              -9  99.28 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          201              -9  99.28 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          202              -9  99.28 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          21679312         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          2223930          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          226              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          22967926         -9  99.28 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          253              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          27253287         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          301042           -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          3141126          -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          3333673          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          373024           -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          50922297         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          543908           -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          593748           -9  99.28 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          598630           -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          6018899          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          602              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          603              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          604              -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          61789513         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          61790145         -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          62384            -9  99.28 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7428480          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7439921          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7439965          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7439976          -9  99.28 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440020          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440360          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440382          -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440417          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440439          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440473          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440484          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446084          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446142          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446277          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446346          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7487947          -9  99.28 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7488564          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7542098          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7718549          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7722647          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7738945          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7758976          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7775113          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7778394          -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7778509          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7782492          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783008          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783075          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783166          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783702          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783791          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7784409          -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7784421          -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7785877          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7786814          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7787475          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7787497          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7788967          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7788989          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789006          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789062          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789095          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789120          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789426          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7790809          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          78002            -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          8030704          -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          88               -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          92               -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          93               -9   0.00 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__16065831    -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__18540299    -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__7439965     -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__7440020     -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 0          PM10             -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTEXASOPERATIONS: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 492                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 0          PM2_5            -9  78.57 100 100 -9   0801-2 Y R 492                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTEXASOPERATIONS: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10025737         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10025919         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10031137         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10034829         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10049055         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10060125         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10099748         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10101505         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10101538         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10101970         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10108642         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10124364         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10124433         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10294403         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10325947         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10377669         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10588019         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          109              -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          11103869         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12018018         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12018198         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12035722         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12054487         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12060003         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12079651         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          125              -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12626812         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12640890         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12710360         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1271289          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1303282          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1304569          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1306190          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1306236          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1307966          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1308061          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1308141          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1308389          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1309600          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1309644          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1313139          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13138459         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1313991          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1314063          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1314416          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317346          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317357          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317368          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317426          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1327339          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1327533          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1333820          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1335257          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1335326          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1336932          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1345046          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1345160          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13462889         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13463393         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13510491         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13530659         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13530682         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13586828         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13597994         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          136              -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          136527           -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13765190         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13770893         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13814965         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          139              -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14018952         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14220178         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14307336         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14307358         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14336700         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14977618         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          16065831         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          16842038         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          16925250         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          18454121         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          18540299         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          195              -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          198              -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          199              -9  94.08 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          200              -9  94.08 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          201              -9  94.08 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          202              -9  94.08 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          21679312         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          2223930          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          226              -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          22967926         -9  94.08 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          253              -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          27253287         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          301042           -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          3141126          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          3333673          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          373024           -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          50922297         -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          543908           -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          593748           -9  94.08 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          598630           -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          6018899          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          602              -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          603              -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          604              -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          61789513         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          61790145         -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          62384            -9  94.08 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7428480          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7439921          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7439965          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7439976          -9  94.08 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440020          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440360          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440382          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440417          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440439          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440473          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440484          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446084          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446142          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446277          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446346          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7487947          -9  94.08 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7488564          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7542098          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7718549          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7722647          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7738945          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7758976          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7775113          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7778394          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7778509          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7782492          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783008          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783075          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783166          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783702          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783791          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7784409          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7784421          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7785877          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7786814          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7787475          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7787497          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7788967          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7788989          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789006          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789062          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789095          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789120          -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789426          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7790809          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          78002            -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          8030704          -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          88               -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          92               -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          93               -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__16065831    -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__18540299    -9  91.10 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__7439965     -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__7440020     -9  80.18 100 100 -9   0801-2 Y R 613                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 0          PM10             -9  78.57 100 100 -9   0801-2 Y R 613                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTEXASOPERATIONS: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 613                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 0          PM2_5            -9  78.57 100 100 -9   0801-2 Y R 613                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTEXASOPERATIONS: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10025737         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10025919         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10031137         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10034829         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10049055         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10060125         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10099748         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10101505         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10101538         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10101970         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10108642         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10124364         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10124433         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10294403         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10325947         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10377669         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          10588019         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          109              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          11103869         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12018018         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12018198         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12035722         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12054487         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12060003         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12079651         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          125              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12626812         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12640890         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          12710360         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1271289          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1303282          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1304569          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1306190          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1306236          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1307966          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1308061          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1308141          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1308389          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1309600          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1309644          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1313139          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13138459         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1313991          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1314063          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1314416          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317346          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317357          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317368          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1317426          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1327339          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1327533          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1333820          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1335257          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1335326          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1336932          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1345046          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          1345160          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13462889         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13463393         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13510491         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13530659         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13530682         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13586828         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13597994         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          136              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          136527           -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13765190         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13770893         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          13814965         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          139              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14018952         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14220178         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14307336         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14307358         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14336700         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          14977618         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          16065831         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          16842038         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          16925250         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          18454121         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          18540299         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          195              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          198              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          199              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          200              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          201              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          202              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          21679312         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          2223930          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          226              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          22967926         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          253              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          27253287         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          301042           -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          3141126          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          3333673          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          373024           -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          50922297         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          543908           -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          593748           -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          598630           -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          6018899          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          602              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          603              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          604              -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          61789513         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          61790145         -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          62384            -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7428480          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7439921          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7439965          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7439976          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440020          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440360          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440382          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440417          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440439          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440473          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7440484          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446084          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446142          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446277          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7446346          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7487947          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7488564          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7542098          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7647010          -9  57.42 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7718549          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7722647          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7738945          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7758976          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7775113          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7778394          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7778509          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7782492          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7782505          -9  57.42 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783008          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783075          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783166          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783702          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7783791          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7784409          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7784421          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7785877          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7786814          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7787475          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7787497          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7788967          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7788989          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789006          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789062          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789095          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789120          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7789426          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          7790809          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          78002            -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          8030704          -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          88               -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          92               -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          93               -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__16065831    -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__18540299    -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__7439965     -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 0          EXH__7440020     -9   0.00 100 100 -9   0801-7 Y R 854                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Texas Eastman MACT=Hazardous Waste Incineration: HCl Production Furnaces: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 0          PM10             -9  78.57 100 100 -9   0801-7 Y R 854                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTEXASOPERATIONS: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 854                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 0          PM2_5            -9  78.57 100 100 -9   0801-7 Y R 854                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: EASTMANCHEMICALCOTEXASOPERATIONS: NEI_UNIQUE_ID=NEI7296: cdate=2008
48203 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48203 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$11301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
48233 10201401   PM10             -9  90.00 100 100 -9   -9     Y R 15                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 15                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R 15                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 15                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 10201401   SO2              -9  99.00 100 100 -9   -9     Y R 15                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30199999   SO2              -9  98.00 100 100 -9   -9     Y R 15                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 30JUN2006
48233 10201401   PM10             -9  90.00 100 100 -9   -9     Y R 79008PHLLPSTATE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 79008PHLLPSTATE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R 79008PHLLPSTATE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 79008PHLLPSTATE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 10201401   SO2              -9  99.00 100 100 -9   -9     Y R 79008PHLLPSTATE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30199999   SO2              -9  98.00 100 100 -9   -9     Y R 79008PHLLPSTATE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 30JUN2006
48233 10201401   PM10             -9  90.00 100 100 -9   -9     Y R T$11956                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$11956                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11956                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11956                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 10201401   SO2              -9  99.00 100 100 -9   -9     Y R T$11956                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30199999   SO2              -9  98.00 100 100 -9   -9     Y R T$11956                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 30JUN2006
48233 10201401   PM10             -9  90.00 100 100 -9   -9     Y R T$11957                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$11957                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11957                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11957                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 10201401   SO2              -9  99.00 100 100 -9   -9     Y R T$11957                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 31DEC2006
48233 30199999   SO2              -9  98.00 100 100 -9   -9     Y R T$11957                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6963, Plant=ConocoPhillips (formerly Phillips Petroleum Co.), Borger, TX, compliance date: 30JUN2006
48245 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          109              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          125              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          136              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          136527           -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          139              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          195              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          198              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          199              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          200              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          201              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          202              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          226              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          253              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          301042           -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          373024           -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          543908           -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          593748           -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          598630           -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          602              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          603              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          604              -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          62384            -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          78002            -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          88               -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          92               -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          93               -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 1005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          109              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          125              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          136              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          136527           -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          139              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          195              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          198              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          199              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          200              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          201              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          202              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          226              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          253              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          301042           -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          373024           -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          543908           -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          593748           -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          598630           -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          602              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          603              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          604              -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          62384            -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          78002            -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          88               -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          92               -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          93               -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 1005A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10099748         -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10108642         -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10124364         -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10325947         -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          109              -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12060003         -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          125              -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12626812         -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1306190          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1306236          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1309600          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1314416          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317368          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1335257          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1335326          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          136              -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          136527           -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13814965         -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          139              -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          195              -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          198              -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          199              -9   6.67 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          200              -9   6.67 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          201              -9   6.67 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          202              -9   6.67 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          2223930          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          226              -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          22967926         -9   6.67 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          253              -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          27253287         -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          301042           -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          373024           -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          543908           -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          593748           -9   6.67 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          598630           -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          602              -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          603              -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          604              -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          61790145         -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          62384            -9   6.67 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7428480          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439921          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439976          -9   6.67 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440439          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446142          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446277          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7487947          -9   6.67 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789426          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7790809          -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          78002            -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          88               -9  70.89 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          92               -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          93               -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 1006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10099748         -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10108642         -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10124364         -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10325947         -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          109              -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12060003         -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          125              -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12626812         -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1306190          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1306236          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1309600          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1314416          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317368          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1335257          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1335326          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          136              -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          136527           -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          13814965         -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          139              -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          195              -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          198              -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          199              -9   6.67 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          200              -9   6.67 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          201              -9   6.67 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          202              -9   6.67 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          2223930          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          226              -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          22967926         -9   6.67 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          253              -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          27253287         -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          301042           -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          373024           -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          543908           -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          593748           -9   6.67 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          598630           -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          602              -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          603              -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          604              -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          61790145         -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          62384            -9   6.67 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7428480          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439921          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7439976          -9   6.67 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440439          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446142          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446277          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7487947          -9   6.67 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7789426          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          7790809          -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          78002            -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          88               -9  70.89 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          92               -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          93               -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 1006A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: PORT NECHES PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12483: cdate=2008
48245 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10099748         -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10108642         -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10124364         -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10325947         -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          109              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          12060003         -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          125              -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          12626812         -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1306190          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1306236          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1309600          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1314416          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1317368          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1335257          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1335326          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          136              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          136527           -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          13814965         -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          139              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          195              -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          198              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          199              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          200              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          201              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          202              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          2223930          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          226              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          253              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          27253287         -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          301042           -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          373024           -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          543908           -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          593748           -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          598630           -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          602              -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          603              -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          604              -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          61790145         -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          62384            -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7428480          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7439921          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7440439          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7446142          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7446277          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7789426          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          7790809          -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          78002            -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          88               -9  96.86 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          92               -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          93               -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 1016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT SITE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI13118: cdate=2008
48245 10100701   NOX              -9  40.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 10201401   NOX              -9  40.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 20200203   NOX              -9  40.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 10201401   PM10             -9  90.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 10201401   SO2              -9  99.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 18                              ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 0          10025737         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10025919         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10031137         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10034829         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10049055         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10060125         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10099748         -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10101505         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10101538         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10101970         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10108642         -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10124364         -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10124433         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10294403         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10325947         -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10377669         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10588019         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          109              -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          11103869         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          12018018         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          12018198         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          12035722         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          12054487         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          12060003         -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          12079651         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          125              -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          12626812         -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          12640890         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          12710360         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1271289          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1303282          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1304569          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1306190          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1306236          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1307966          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1308061          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1308141          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1308389          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1309600          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1309644          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1313139          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13138459         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1313991          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1314063          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1314416          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1317346          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1317357          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1317368          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1317426          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1327339          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1327533          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1333820          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1335257          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1335326          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1336932          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1345046          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          1345160          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13462889         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13463393         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13510491         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13530659         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13530682         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13586828         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13597994         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          136              -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          136527           -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13765190         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13770893         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          13814965         -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          139              -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          14018952         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          14220178         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          14307336         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          14307358         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          14336700         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          14977618         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          16065831         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          16842038         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          16925250         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          18454121         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          18540299         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          195              -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          198              -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          199              -9  95.12 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          200              -9  95.12 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          201              -9  95.12 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          202              -9  95.12 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          21679312         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          2223930          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          226              -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          22967926         -9  95.12 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          253              -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          27253287         -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          301042           -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          3141126          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          3333673          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          373024           -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          50922297         -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          543908           -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          593748           -9  95.12 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          598630           -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          6018899          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          602              -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          603              -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          604              -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          61789513         -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          61790145         -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          62384            -9  95.12 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7428480          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7439921          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7439965          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7439976          -9  95.12 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7440020          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7440360          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7440382          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7440417          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7440439          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7440473          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7440484          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7446084          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7446142          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7446277          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7446346          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7487947          -9  95.12 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7488564          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7542098          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7718549          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7722647          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7738945          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7758976          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7775113          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7778394          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7778509          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7782492          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7783008          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7783075          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7783166          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7783702          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7783791          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7784409          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7784421          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7785877          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7786814          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7787475          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7787497          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7788967          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7788989          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7789006          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7789062          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7789095          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7789120          -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7789426          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          7790809          -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          78002            -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          8030704          -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          88               -9  94.31 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          92               -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          93               -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          EXH__16065831    -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          EXH__18540299    -9  84.39 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          EXH__7439965     -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          EXH__7440020     -9   0.00 100 100 -9   0801-1 Y R 603                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Chemical Waste Management MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEI6631: cdate=2008
48245 0          10025737         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10025919         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10031137         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10034829         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10049055         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10060125         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10099748         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101505         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101538         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101970         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10108642         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10124364         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10124433         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10294403         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10325947         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10377669         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10588019         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          109              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          11103869         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12018018         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12018198         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12035722         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12054487         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12060003         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12079651         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          125              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12626812         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12640890         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12710360         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1271289          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1303282          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1304569          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1306190          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1306236          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1307966          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308061          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308141          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308389          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1309600          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1309644          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1313139          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13138459         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1313991          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1314063          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1314416          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317346          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317357          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317368          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317426          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1327339          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1327533          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1333820          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1335257          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1335326          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1336932          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1345046          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1345160          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13462889         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13463393         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13510491         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13530659         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13530682         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13586828         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13597994         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          136              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          136527           -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13765190         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13770893         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13814965         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          139              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14018952         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14220178         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14307336         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14307358         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14336700         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14977618         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16065831         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16842038         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16925250         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          18454121         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          18540299         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          195              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          198              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          199              -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          200              -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          201              -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          202              -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          21679312         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          2223930          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          226              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          253              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          27253287         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          301042           -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          3141126          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          3333673          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          373024           -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          50922297         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          543908           -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          593748           -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          598630           -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          6018899          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          602              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          603              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          604              -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          61789513         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          61790145         -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          62384            -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7428480          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439921          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439965          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440020          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440360          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440382          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440417          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440439          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440473          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440484          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446084          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446142          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446277          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446346          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7488564          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7542098          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7718549          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7722647          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7738945          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7758976          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7775113          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7778394          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7778509          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7782492          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783008          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783075          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783166          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783702          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783791          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7784409          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7784421          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7785877          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7786814          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7787475          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7787497          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7788967          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7788989          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789006          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789062          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789095          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789120          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789426          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7790809          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          78002            -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          8030704          -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          88               -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          92               -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          93               -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__16065831    -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__18540299    -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__7439965     -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__7440020     -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          PM10             -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GOODYEARTIRE&RUBBERBEAUMONTCHEMICAL: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          PM2_5            -9  74.03 100 100 -9   0801-6 Y R 767                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GOODYEARTIRE&RUBBERBEAUMONTCHEMICAL: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10025737         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10025919         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10031137         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10034829         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10049055         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10060125         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10099748         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101505         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101538         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101970         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10108642         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10124364         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10124433         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10294403         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10325947         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10377669         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10588019         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          109              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          11103869         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12018018         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12018198         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12035722         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12054487         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12060003         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12079651         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          125              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12626812         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12640890         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12710360         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1271289          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1303282          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1304569          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1306190          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1306236          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1307966          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308061          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308141          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308389          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1309600          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1309644          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1313139          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13138459         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1313991          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1314063          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1314416          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317346          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317357          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317368          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317426          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1327339          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1327533          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1333820          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1335257          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1335326          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1336932          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1345046          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1345160          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13462889         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13463393         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13510491         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13530659         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13530682         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13586828         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13597994         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          136              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          136527           -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13765190         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13770893         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13814965         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          139              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14018952         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14220178         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14307336         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14307358         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14336700         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14977618         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16065831         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16842038         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16925250         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          18454121         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          18540299         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          195              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          198              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          199              -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          200              -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          201              -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          202              -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          21679312         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          2223930          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          226              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          253              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          27253287         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          301042           -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          3141126          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          3333673          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          373024           -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          50922297         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          543908           -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          593748           -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          598630           -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          6018899          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          602              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          603              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          604              -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          61789513         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          61790145         -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          62384            -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7428480          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439921          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439965          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440020          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440360          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440382          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440417          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440439          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440473          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440484          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446084          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446142          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446277          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446346          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7488564          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7542098          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7718549          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7722647          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7738945          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7758976          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7775113          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7778394          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7778509          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7782492          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783008          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783075          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783166          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783702          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783791          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7784409          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7784421          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7785877          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7786814          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7787475          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7787497          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7788967          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7788989          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789006          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789062          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789095          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789120          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789426          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7790809          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          78002            -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          8030704          -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          88               -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          92               -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          93               -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__16065831    -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__18540299    -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__7439965     -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__7440020     -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          PM10             -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GOODYEARTIRE&RUBBERBEAUMONTCHEMICAL: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          PM2_5            -9  74.03 100 100 -9   0801-6 Y R 767A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GOODYEARTIRE&RUBBERBEAUMONTCHEMICAL: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10025737         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10025919         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10031137         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10034829         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10049055         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10060125         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10099748         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101505         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101538         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101970         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10108642         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10124364         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10124433         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10294403         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10325947         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10377669         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10588019         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          109              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          11103869         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12018018         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12018198         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12035722         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12054487         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12060003         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12079651         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          125              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12626812         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12640890         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12710360         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1271289          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1303282          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1304569          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1306190          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1306236          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1307966          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308061          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308141          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308389          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1309600          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1309644          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1313139          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13138459         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1313991          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1314063          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1314416          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317346          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317357          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317368          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317426          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1327339          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1327533          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1333820          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1335257          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1335326          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1336932          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1345046          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1345160          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13462889         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13463393         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13510491         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13530659         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13530682         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13586828         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13597994         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          136              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          136527           -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13765190         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13770893         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13814965         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          139              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14018952         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14220178         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14307336         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14307358         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14336700         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14977618         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16065831         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16842038         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16925250         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          18454121         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          18540299         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          195              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          198              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          199              -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          200              -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          201              -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          202              -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          21679312         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          2223930          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          226              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          253              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          27253287         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          301042           -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          3141126          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          3333673          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          373024           -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          50922297         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          543908           -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          593748           -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          598630           -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          6018899          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          602              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          603              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          604              -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          61789513         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          61790145         -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          62384            -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7428480          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439921          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439965          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440020          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440360          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440382          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440417          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440439          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440473          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440484          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446084          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446142          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446277          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446346          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7488564          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7542098          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7718549          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7722647          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7738945          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7758976          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7775113          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7778394          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7778509          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7782492          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783008          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783075          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783166          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783702          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783791          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7784409          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7784421          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7785877          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7786814          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7787475          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7787497          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7788967          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7788989          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789006          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789062          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789095          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789120          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789426          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7790809          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          78002            -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          8030704          -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          88               -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          92               -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          93               -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__16065831    -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__18540299    -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__7439965     -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__7440020     -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          PM10             -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GOODYEARTIRE&RUBBERBEAUMONTCHEMICAL: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          PM2_5            -9  74.03 100 100 -9   0801-6 Y R 767B                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GOODYEARTIRE&RUBBERBEAUMONTCHEMICAL: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10025737         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10025919         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10031137         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10034829         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10049055         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10060125         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10099748         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101505         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101538         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101970         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10108642         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10124364         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10124433         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10294403         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10325947         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10377669         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10588019         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          109              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          11103869         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12018018         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12018198         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12035722         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12054487         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12060003         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12079651         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          125              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12626812         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12640890         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12710360         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1271289          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1303282          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1304569          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1306190          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1306236          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1307966          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308061          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308141          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308389          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1309600          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1309644          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1313139          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13138459         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1313991          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1314063          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1314416          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317346          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317357          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317368          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317426          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1327339          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1327533          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1333820          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1335257          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1335326          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1336932          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1345046          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1345160          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13462889         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13463393         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13510491         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13530659         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13530682         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13586828         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13597994         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          136              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          136527           -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13765190         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13770893         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13814965         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          139              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14018952         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14220178         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14307336         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14307358         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14336700         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14977618         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16065831         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16842038         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16925250         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          18454121         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          18540299         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          195              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          198              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          199              -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          200              -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          201              -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          202              -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          21679312         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          2223930          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          226              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          253              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          27253287         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          301042           -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          3141126          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          3333673          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          373024           -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          50922297         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          543908           -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          593748           -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          598630           -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          6018899          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          602              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          603              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          604              -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          61789513         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          61790145         -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          62384            -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7428480          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439921          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439965          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440020          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440360          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440382          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440417          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440439          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440473          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440484          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446084          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446142          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446277          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446346          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7488564          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7542098          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7718549          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7722647          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7738945          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7758976          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7775113          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7778394          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7778509          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7782492          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783008          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783075          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783166          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783702          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783791          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7784409          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7784421          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7785877          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7786814          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7787475          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7787497          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7788967          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7788989          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789006          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789062          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789095          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789120          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789426          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7790809          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          78002            -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          8030704          -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          88               -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          92               -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          93               -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__16065831    -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__18540299    -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__7439965     -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__7440020     -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          PM10             -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GOODYEARTIRE&RUBBERBEAUMONTCHEMICAL: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          PM2_5            -9  74.03 100 100 -9   0801-6 Y R 767C                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GOODYEARTIRE&RUBBERBEAUMONTCHEMICAL: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10025737         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10025919         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10031137         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10034829         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10049055         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10060125         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10099748         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101505         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101538         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10101970         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10108642         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10124364         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10124433         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10294403         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10325947         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10377669         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          10588019         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          109              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          11103869         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12018018         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12018198         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12035722         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12054487         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12060003         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12079651         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          125              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12626812         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12640890         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          12710360         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1271289          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1303282          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1304569          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1306190          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1306236          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1307966          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308061          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308141          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1308389          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1309600          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1309644          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1313139          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13138459         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1313991          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1314063          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1314416          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317346          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317357          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317368          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1317426          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1327339          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1327533          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1333820          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1335257          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1335326          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1336932          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1345046          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          1345160          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13462889         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13463393         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13510491         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13530659         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13530682         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13586828         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13597994         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          136              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          136527           -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13765190         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13770893         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          13814965         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          139              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14018952         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14220178         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14307336         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14307358         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14336700         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          14977618         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16065831         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16842038         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          16925250         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          18454121         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          18540299         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          195              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          198              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          199              -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          200              -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          201              -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          202              -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          21679312         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          2223930          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          226              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          253              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          27253287         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          301042           -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          3141126          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          3333673          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          373024           -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          50922297         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          543908           -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          593748           -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          598630           -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          6018899          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          602              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          603              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          604              -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          61789513         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          61790145         -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          62384            -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7428480          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439921          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439965          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440020          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440360          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440382          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440417          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440439          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440473          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7440484          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446084          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446142          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446277          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7446346          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7488564          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7542098          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7718549          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7722647          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7738945          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7758976          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7775113          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7778394          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7778509          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7782492          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783008          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783075          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783166          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783702          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7783791          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7784409          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7784421          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7785877          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7786814          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7787475          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7787497          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7788967          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7788989          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789006          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789062          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789095          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789120          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7789426          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          7790809          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          78002            -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          8030704          -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          88               -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          92               -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          93               -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__16065831    -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__18540299    -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__7439965     -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          EXH__7440020     -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BEAUMONT CHEMICAL PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          PM10             -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GOODYEARTIRE&RUBBERBEAUMONTCHEMICAL: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 0          PM2_5            -9  74.03 100 100 -9   0801-6 Y R 767D                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: GOODYEARTIRE&RUBBERBEAUMONTCHEMICAL: NEI_UNIQUE_ID=NEI7039: cdate=2008
48245 10100701   NOX              -9  40.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 10201401   NOX              -9  40.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 20200203   NOX              -9  40.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 10201401   PM10             -9  90.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 10201401   SO2              -9  99.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600401   SO2              -9  90.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 77701BMNTREASTE                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 10100701   NOX              -9  40.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 10201401   NOX              -9  40.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 20200203   NOX              -9  40.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 30600104   NOX              -9  40.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 30600106   NOX              -9  40.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 10201401   PM10             -9  90.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600201   PM10             -9  90.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 10201401   SO2              -9  99.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600104   SO2              -9  90.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600106   SO2              -9  90.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600401   SO2              -9  90.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600904   SO2              -9  90.00 100 100 -9   -9     Y R EGU1160                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 10100701   NOX              -9  40.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 10201401   NOX              -9  40.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 20200203   NOX              -9  40.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 31DEC2009
48245 10201401   PM10             -9  90.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 10201401   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 10201401   SO2              -9  99.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 26AUG2005
48245 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600401   SO2              -9  90.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48245 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$11805                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7233, Plant=ExxonMobil Corp. (formerly Mobil), Beaumont, TX, compliance date: 01APR2008
48251 0          PM10             -9  28.00 100 100 -9   -9     Y R 5                               ! MACT: Lime Manufacturing: TEXAS LIME COMPANY
48251 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 5                               ! MACT: Lime Manufacturing: TEXAS LIME COMPANY
48251 0          SO2              -9  20.00 100 100 -9   -9     Y R 5                               ! MACT: Lime Manufacturing: TEXAS LIME COMPANY
48251 0          PM10             -9  28.00 100 100 -9   -9     Y R 76031TXSLM15865                 ! MACT: Lime Manufacturing: TEXAS LIME COMPANY
48251 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 76031TXSLM15865                 ! MACT: Lime Manufacturing: TEXAS LIME COMPANY
48251 0          SO2              -9  20.00 100 100 -9   -9     Y R 76031TXSLM15865                 ! MACT: Lime Manufacturing: TEXAS LIME COMPANY
48251 0          PM10             -9  28.00 100 100 -9   -9     Y R T$17744                         ! MACT: Lime Manufacturing: TEXAS LIME COMPANY
48251 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$17744                         ! MACT: Lime Manufacturing: TEXAS LIME COMPANY
48251 0          SO2              -9  20.00 100 100 -9   -9     Y R T$17744                         ! MACT: Lime Manufacturing: TEXAS LIME COMPANY
48297 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$11850                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12486, Plant=Valero (formerly Ultramar/Diamond Shamrock Corp.), Three Rivers, TX, compliance date: 31DEC2008
48297 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$11850                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12486, Plant=Valero (formerly Ultramar/Diamond Shamrock Corp.), Three Rivers, TX, compliance date: 31DEC2006
48297 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11850                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12486, Plant=Valero (formerly Ultramar/Diamond Shamrock Corp.), Three Rivers, TX, compliance date: 31DEC2006
48297 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$11850                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12486, Plant=Valero (formerly Ultramar/Diamond Shamrock Corp.), Three Rivers, TX, compliance date: 31DEC2005
48297 30600105   SO2              -9  90.00 100 100 -9   -9     Y R T$11850                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12486, Plant=Valero (formerly Ultramar/Diamond Shamrock Corp.), Three Rivers, TX, compliance date: 31DEC2005
48297 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$11850                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12486, Plant=Valero (formerly Ultramar/Diamond Shamrock Corp.), Three Rivers, TX, compliance date: 31DEC2005
48297 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$11850                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12486, Plant=Valero (formerly Ultramar/Diamond Shamrock Corp.), Three Rivers, TX, compliance date: 31DEC2006
48297 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$11850                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12486, Plant=Valero (formerly Ultramar/Diamond Shamrock Corp.), Three Rivers, TX, compliance date: 31DEC2005
48321 0          10025737         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10025919         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10031137         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10034829         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10049055         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10060125         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10099748         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10101505         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10101538         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10101970         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10108642         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10124364         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10124433         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10294403         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10325947         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10377669         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10588019         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          109              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          11103869         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12018018         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12018198         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12035722         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12054487         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12060003         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12079651         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          125              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12626812         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12640890         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12710360         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1271289          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1303282          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1304569          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1306190          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1306236          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1307966          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1308061          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1308141          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1308389          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1309600          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1309644          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1313139          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13138459         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1313991          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1314063          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1314416          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1317346          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1317357          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1317368          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1317426          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1327339          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1327533          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1333820          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1335257          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1335326          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1336932          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1345046          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1345160          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13462889         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13463393         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13510491         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13530659         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13530682         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13586828         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13597994         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          136              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          136527           -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13765190         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13770893         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13814965         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          139              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14018952         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14220178         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14307336         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14307358         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14336700         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14977618         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          16065831         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          16842038         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          16925250         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          18454121         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          18540299         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          195              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          198              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          199              -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          200              -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          201              -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          202              -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          21679312         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          2223930          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          226              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          253              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          27253287         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          301042           -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          3141126          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          3333673          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          373024           -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          50922297         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          543908           -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          593748           -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          598630           -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          6018899          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          602              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          603              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          604              -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          61789513         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          61790145         -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          62384            -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7428480          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7439921          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7439965          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440020          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440360          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440382          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440417          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440439          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440473          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440484          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7446084          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7446142          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7446277          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7446346          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7488564          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7542098          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7718549          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7722647          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7738945          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7758976          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7775113          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7778394          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7778509          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7782492          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7783008          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7783075          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7783166          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7783702          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7783791          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7784409          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7784421          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7785877          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7786814          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7787475          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7787497          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7788967          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7788989          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7789006          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7789062          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7789095          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7789120          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7789426          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7790809          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          78002            -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          8030704          -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          88               -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          92               -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          93               -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          EXH__16065831    -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          EXH__18540299    -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          EXH__7439965     -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          EXH__7440020     -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          PM10             -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BAYCITYPLANT: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          PM2_5            -9  80.70 100 100 -9   0801-6 Y R 721                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BAYCITYPLANT: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10025737         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10025919         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10031137         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10034829         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10049055         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10060125         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10099748         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10101505         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10101538         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10101970         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10108642         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10124364         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10124433         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10294403         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10325947         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10377669         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          10588019         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          109              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          11103869         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12018018         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12018198         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12035722         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12054487         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12060003         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12079651         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          125              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12626812         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12640890         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          12710360         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1271289          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1303282          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1304569          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1306190          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1306236          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1307966          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1308061          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1308141          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1308389          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1309600          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1309644          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1313139          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13138459         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1313991          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1314063          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1314416          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1317346          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1317357          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1317368          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1317426          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1327339          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1327533          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1333820          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1335257          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1335326          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1336932          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1345046          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          1345160          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13462889         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13463393         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13510491         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13530659         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13530682         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13586828         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13597994         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          136              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          136527           -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13765190         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13770893         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          13814965         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          139              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14018952         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14220178         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14307336         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14307358         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14336700         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          14977618         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          16065831         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          16842038         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          16925250         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          18454121         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          18540299         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          195              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          198              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          199              -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          200              -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          201              -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          202              -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          21679312         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          2223930          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          226              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          253              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          27253287         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          301042           -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          3141126          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          3333673          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          373024           -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          50922297         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          543908           -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          593748           -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          598630           -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          6018899          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          602              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          603              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          604              -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          61789513         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          61790145         -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          62384            -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7428480          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7439921          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7439965          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440020          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440360          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440382          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440417          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440439          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440473          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7440484          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7446084          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7446142          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7446277          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7446346          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7488564          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7542098          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7718549          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7722647          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7738945          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7758976          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7775113          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7778394          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7778509          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7782492          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7783008          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7783075          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7783166          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7783702          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7783791          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7784409          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7784421          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7785877          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7786814          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7787475          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7787497          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7788967          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7788989          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7789006          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7789062          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7789095          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7789120          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7789426          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          7790809          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          78002            -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          8030704          -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          88               -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          92               -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          93               -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          EXH__16065831    -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          EXH__18540299    -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          EXH__7439965     -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          EXH__7440020     -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAY CITY PLANT MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          PM10             -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BAYCITYPLANT: NEI_UNIQUE_ID=NEI12063: cdate=2008
48321 0          PM2_5            -9  80.70 100 100 -9   0801-6 Y R 721A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BAYCITYPLANT: NEI_UNIQUE_ID=NEI12063: cdate=2008
48331 0          NOX              -9  25.89 100 100 -9   -9     Y R 1               000010          ! DOJ settlement: C:\CAIR\GNTL packets\DOJ_QA_2002_with2005v2.xls CE based on matching 2015 expected emissions (old CAIR) for 3 units with SCC=10200301.  Same units from 2002 and emissions in 05v2 fairly simliar so CEs not drastically changed
48331 0          NOX              -9  25.89 100 100 -9   -9     Y R 1               000011          ! DOJ settlement: C:\CAIR\GNTL packets\DOJ_QA_2002_with2005v2.xls CE based on matching 2015 expected emissions (old CAIR) for 3 units with SCC=10200301.  Same units from 2002 and emissions in 05v2 fairly simliar so CEs not drastically changed
48331 0          NOX              -9  25.89 100 100 -9   -9     Y R 1               000012          ! DOJ settlement: C:\CAIR\GNTL packets\DOJ_QA_2002_with2005v2.xls CE based on matching 2015 expected emissions (old CAIR) for 3 units with SCC=10200301.  Same units from 2002 and emissions in 05v2 fairly simliar so CEs not drastically changed
48331 0          SO2              -9  86.10 100 100 -9   -9     Y R 1               000010          ! DOJ settlement: C:\CAIR\GNTL packets\DOJ_QA_2002_with2005v2.xls CE based on matching 2015 expected emissions (old CAIR) for 3 units with SCC=10200301.  Same units from 2002 and emissions in 05v2 fairly simliar so CEs not drastically changed
48331 0          SO2              -9  86.10 100 100 -9   -9     Y R 1               000011          ! DOJ settlement: C:\CAIR\GNTL packets\DOJ_QA_2002_with2005v2.xls CE based on matching 2015 expected emissions (old CAIR) for 3 units with SCC=10200301.  Same units from 2002 and emissions in 05v2 fairly simliar so CEs not drastically changed
48331 0          SO2              -9  86.10 100 100 -9   -9     Y R 1               000012          ! DOJ settlement: C:\CAIR\GNTL packets\DOJ_QA_2002_with2005v2.xls CE based on matching 2015 expected emissions (old CAIR) for 3 units with SCC=10200301.  Same units from 2002 and emissions in 05v2 fairly simliar so CEs not drastically changed
48341 30103204   SO2              -9   0.00 100 100 -9   -9     Y R 79086DMNDSSTARR                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI8139, Plant=Valero (formerly Ultramar/Diamond Shamrock Corp.), Sunray, TX, compliance date: 31DEC2006
48341 30103204   SO2              -9   0.00 100 100 -9   -9     Y R T$11962                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI8139, Plant=Valero (formerly Ultramar/Diamond Shamrock Corp.), Sunray, TX, compliance date: 31DEC2006
48355 0          10025737         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10025919         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10034829         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10049055         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10060125         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10099748         -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10101505         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10101538         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10101970         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10108642         -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10124364         -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10124433         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10294403         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10325947         -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10377669         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          10588019         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          109              -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          11103869         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          12018018         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          12018198         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          12035722         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          12054487         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          12060003         -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          12079651         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          125              -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          12626812         -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          12640890         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          12710360         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1271289          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1306190          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1306236          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1307966          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1308061          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1308141          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1308389          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1309600          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1309644          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1313139          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13138459         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1313991          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1314063          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1314416          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1317346          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1317357          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1317368          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1317426          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1327339          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1333820          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1335257          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1335326          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1336932          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1345046          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          1345160          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13462889         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13463393         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13530659         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13530682         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13586828         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          136              -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          136527           -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13765190         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13770893         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          13814965         -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          139              -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          14018952         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          14220178         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          14307336         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          14307358         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          14336700         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          14977618         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          16065831         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          16842038         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          16925250         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          18454121         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          18540299         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          195              -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          198              -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          199              -9  14.29 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          200              -9  14.29 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          201              -9  14.29 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          202              -9  14.29 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          21679312         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          2223930          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          226              -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          22967926         -9  14.29 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          253              -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          27253287         -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          301042           -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          3333673          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          373024           -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          50922297         -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          543908           -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          593748           -9  14.29 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          598630           -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          6018899          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          602              -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          603              -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          604              -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          61789513         -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          61790145         -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          62384            -9  14.29 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7428480          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7439921          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7439965          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7439976          -9  14.29 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7440020          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7440360          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7440439          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7440473          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7440484          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7446084          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7446142          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7446277          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7446346          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7487947          -9  14.29 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7488564          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7542098          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7718549          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7722647          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7738945          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7758976          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7775113          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7778509          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7782492          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7783008          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7783075          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7783166          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7783702          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7783791          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7785877          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7786814          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7788967          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7788989          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7789006          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7789062          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7789095          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7789120          -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7789426          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          7790809          -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          78002            -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          8030704          -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          88               -9  89.04 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          92               -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          93               -9   0.00 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          EXH__16065831    -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          EXH__18540299    -9  84.70 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          EXH__7439965     -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          EXH__7440020     -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BISHOP FACILITY MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          PM10             -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BISHOPFACILITY: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 0          PM2_5            -9  78.73 100 100 -9   0801-6 Y R 1018                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BISHOPFACILITY: NEI_UNIQUE_ID=NEI7408: cdate=2008
48355 10200601   NOX              -9  40.00 100 100 -9   -9     Y R 115                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 115                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 20200252   NOX              -9  40.00 100 100 -9   -9     Y R 115                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 20200253   NOX              -9  40.00 100 100 -9   -9     Y R 115                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30190004   NOX              -9  40.00 100 100 -9   -9     Y R 115                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 115                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 115                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30SEP2013
48355 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 115                             ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30SEP2013
48355 10200601   NOX              -9  40.00 100 100 -9   -9     Y R 3                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 3                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 20200252   NOX              -9  40.00 100 100 -9   -9     Y R 3                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 20200253   NOX              -9  40.00 100 100 -9   -9     Y R 3                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30190004   NOX              -9  40.00 100 100 -9   -9     Y R 3                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 3                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 3                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30SEP2013
48355 30600201   SO2              -9  50.00 100 100 -9   -9     Y R 3                               ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30SEP2013
48355 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 78403CSTLR1300C                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2011
48355 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 78403CSTLR1300C                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 78403CSTLR1300C                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 78403CSTLR1300C                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 78403CSTLR1300C                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 78403CSTLR1300C                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 78403CSTLR1300C                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 78403CSTLR1300C                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 78469VLRRF5900U                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2011
48355 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 78469VLRRF5900U                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 78469VLRRF5900U                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 78469VLRRF5900U                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 78469VLRRF5900U                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 78469VLRRF5900U                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 78469VLRRF5900U                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 78469VLRRF5900U                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600201   NOX              -9  45.00 100 100 -9   -9     Y R EGU1186                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2011
48355 30600201   PM10             -9  90.00 100 100 -9   -9     Y R EGU1186                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R EGU1186                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 10200701   SO2              -9  90.00 100 100 -9   -9     Y R EGU1186                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600104   SO2              -9  90.00 100 100 -9   -9     Y R EGU1186                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600106   SO2              -9  90.00 100 100 -9   -9     Y R EGU1186                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600201   SO2              -9  99.00 100 100 -9   -9     Y R EGU1186                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 30600904   SO2              -9  90.00 100 100 -9   -9     Y R EGU1186                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$11899                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2011
48355 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$11899                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11899                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$11899                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$11899                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$11899                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$11899                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$11899                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI41863, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 10200601   NOX              -9  40.00 100 100 -9   -9     Y R T$11904                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$11904                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 20200252   NOX              -9  40.00 100 100 -9   -9     Y R T$11904                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 20200253   NOX              -9  40.00 100 100 -9   -9     Y R T$11904                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30190004   NOX              -9  40.00 100 100 -9   -9     Y R T$11904                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$11904                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$11904                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30SEP2013
48355 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$11904                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI7988, Plant=Citgo, Corpus Christi, TX, compliance date: 30SEP2013
48355 10200601   NOX              -9  40.00 100 100 -9   -9     Y R T$11907                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$11907                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 20200252   NOX              -9  40.00 100 100 -9   -9     Y R T$11907                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 20200253   NOX              -9  40.00 100 100 -9   -9     Y R T$11907                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30190004   NOX              -9  40.00 100 100 -9   -9     Y R T$11907                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$11907                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30JUN2011
48355 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$11907                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30SEP2013
48355 30600201   SO2              -9  50.00 100 100 -9   -9     Y R T$11907                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI6617, Plant=Citgo, Corpus Christi, TX, compliance date: 30SEP2013
48355 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$11911                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2011
48355 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$11911                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$11911                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$11911                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$11911                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$11911                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48355 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$11911                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 30DEC2010
48355 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$11911                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI12084, Plant=Valero Refining Co., Corpus Christi, TX, compliance date: 31DEC2005
48361 50300501   PM10             -9  32.56 100 100 -9   -9     Y R 2                               ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 50300501   PM2_5            -9  32.56 100 100 -9   -9     Y R 2                               ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025737         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025919         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10031137         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10034829         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10049055         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10060125         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10099748         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101505         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101538         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101970         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10108642         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124364         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10294403         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10325947         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10377669         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10588019         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          109              -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          11103869         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018018         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018198         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12035722         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12054487         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12060003         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12079651         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          125              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12626812         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12640890         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12710360         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1271289          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1303282          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1304569          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306190          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306236          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308141          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308389          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309600          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309644          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313139          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13138459         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313991          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314063          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314416          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317346          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317357          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317368          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327339          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327533          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1333820          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335257          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335326          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1336932          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345046          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13462889         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13463393         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13510491         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530659         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530682         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13597994         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136              -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136527           -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13765190         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13770893         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13814965         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          139              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14018952         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14220178         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307336         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307358         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14336700         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14977618         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16065831         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16925250         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18454121         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18540299         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          195              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          198              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          199              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          200              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          201              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          202              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          21679312         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          2223930          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          226              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          253              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          27253287         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          301042           -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3141126          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3333673          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          373024           -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          50922297         -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          543908           -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          593748           -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          598630           -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          6018899          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          602              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          603              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          604              -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61790145         -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          62384            -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7428480          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439921          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439965          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440020          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440360          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440382          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440417          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440439          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440473          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446084          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446142          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446277          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446346          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7488564          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7718549          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7722647          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7738945          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7758976          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7775113          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778394          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778509          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782492          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783008          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783075          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783166          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783702          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783791          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784409          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784421          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7785877          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7786814          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787475          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787497          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788967          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788989          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789006          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789062          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789095          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789120          -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789426          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7790809          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          78002            -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          8030704          -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          88               -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          92               -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          93               -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__16065831    -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__18540299    -9  53.93 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7439965     -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7440020     -9   0.00 100 100 -9   0801-2 Y R 338                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM10             -9  32.56 100 100 -9   0801-2 Y R 338                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM2_5            -9  32.56 100 100 -9   0801-2 Y R 338                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025737         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025919         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10031137         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10034829         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10049055         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10060125         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10099748         -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101505         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101538         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101970         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10108642         -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124364         -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124433         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10294403         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10325947         -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10377669         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10588019         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          109              -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          11103869         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018018         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018198         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12035722         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12054487         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12060003         -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12079651         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          125              -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12626812         -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12640890         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12710360         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1271289          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1303282          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1304569          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306190          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306236          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1307966          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308061          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308141          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308389          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309600          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309644          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313139          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13138459         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313991          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314063          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314416          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317346          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317357          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317368          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317426          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327339          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327533          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1333820          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335257          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335326          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1336932          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345046          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345160          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13462889         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13463393         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13510491         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530659         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530682         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13586828         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13597994         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136              -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136527           -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13765190         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13770893         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13814965         -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          139              -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14018952         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14220178         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307336         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307358         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14336700         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14977618         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16065831         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16842038         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16925250         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18454121         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18540299         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          195              -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          198              -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          199              -9  41.32 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          200              -9  41.32 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          201              -9  41.32 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          202              -9  41.32 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          21679312         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          2223930          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          226              -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          22967926         -9  41.32 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          253              -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          27253287         -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          301042           -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3141126          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3333673          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          373024           -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          50922297         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          543908           -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          593748           -9  41.32 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          598630           -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          6018899          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          602              -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          603              -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          604              -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61789513         -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61790145         -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          62384            -9  41.32 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7428480          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439921          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439965          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439976          -9  41.32 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440020          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440360          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440382          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440417          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440439          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440473          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440484          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446084          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446142          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446277          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446346          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7487947          -9  41.32 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7488564          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7542098          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7647010          -9  83.55 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7718549          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7722647          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7738945          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7758976          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7775113          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778394          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778509          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782492          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782505          -9  83.55 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783008          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783075          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783166          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783702          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783791          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784409          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784421          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7785877          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7786814          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787475          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787497          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788967          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788989          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789006          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789062          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789095          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789120          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789426          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7790809          -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          78002            -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          8030704          -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          88               -9  52.31 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          92               -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          93               -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__16065831    -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__18540299    -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7439965     -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7440020     -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM10             -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM2_5            -9  32.56 100 100 -9   0801-6 Y R 759                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025737         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025919         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10031137         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10034829         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10049055         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10060125         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10099748         -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101505         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101538         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101970         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10108642         -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124364         -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124433         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10294403         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10325947         -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10377669         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10588019         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          109              -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          11103869         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018018         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018198         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12035722         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12054487         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12060003         -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12079651         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          125              -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12626812         -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12640890         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12710360         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1271289          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1303282          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1304569          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306190          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306236          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1307966          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308061          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308141          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308389          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309600          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309644          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313139          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13138459         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313991          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314063          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314416          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317346          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317357          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317368          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317426          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327339          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327533          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1333820          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335257          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335326          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1336932          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345046          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345160          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13462889         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13463393         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13510491         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530659         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530682         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13586828         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13597994         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136              -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136527           -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13765190         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13770893         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13814965         -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          139              -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14018952         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14220178         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307336         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307358         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14336700         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14977618         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16065831         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16842038         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16925250         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18454121         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18540299         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          195              -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          198              -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          199              -9  41.32 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          200              -9  41.32 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          201              -9  41.32 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          202              -9  41.32 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          21679312         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          2223930          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          226              -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          22967926         -9  41.32 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          253              -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          27253287         -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          301042           -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3141126          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3333673          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          373024           -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          50922297         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          543908           -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          593748           -9  41.32 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          598630           -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          6018899          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          602              -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          603              -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          604              -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61789513         -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61790145         -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          62384            -9  41.32 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7428480          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439921          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439965          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439976          -9  41.32 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440020          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440360          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440382          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440417          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440439          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440473          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440484          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446084          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446142          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446277          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446346          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7487947          -9  41.32 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7488564          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7542098          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7647010          -9  83.55 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7718549          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7722647          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7738945          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7758976          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7775113          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778394          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778509          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782492          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782505          -9  83.55 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783008          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783075          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783166          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783702          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783791          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784409          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784421          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7785877          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7786814          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787475          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787497          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788967          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788989          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789006          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789062          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789095          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789120          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789426          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7790809          -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          78002            -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          8030704          -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          88               -9  52.31 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          92               -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          93               -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__16065831    -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__18540299    -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7439965     -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7440020     -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM10             -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM2_5            -9  32.56 100 100 -9   0801-6 Y R 759A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025737         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025919         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10031137         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10034829         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10049055         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10060125         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10099748         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101505         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101538         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101970         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10108642         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124364         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124433         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10294403         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10325947         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10377669         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10588019         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          109              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          11103869         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018018         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018198         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12035722         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12054487         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12060003         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12079651         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          125              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12626812         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12640890         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12710360         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1271289          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1303282          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1304569          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306190          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306236          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1307966          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308061          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308141          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308389          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309600          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309644          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313139          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13138459         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313991          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314063          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314416          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317346          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317357          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317368          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317426          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327339          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327533          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1333820          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335257          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335326          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1336932          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345046          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345160          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13462889         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13463393         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13510491         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530659         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530682         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13586828         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13597994         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136527           -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13765190         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13770893         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13814965         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          139              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14018952         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14220178         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307336         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307358         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14336700         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14977618         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16065831         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16842038         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16925250         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18454121         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18540299         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          195              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          198              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          199              -9   0.00 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          200              -9   0.00 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          201              -9   0.00 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          202              -9   0.00 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          21679312         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          2223930          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          226              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          253              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          27253287         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          301042           -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3141126          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3333673          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          373024           -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          50922297         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          543908           -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          593748           -9   0.00 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          598630           -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          6018899          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          602              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          603              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          604              -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61789513         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61790145         -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          62384            -9   0.00 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7428480          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439921          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439965          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440020          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440360          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440382          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440417          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440439          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440473          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440484          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446084          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446142          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446277          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446346          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7488564          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7542098          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7647010          -9  78.95 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7718549          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7722647          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7738945          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7758976          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7775113          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778394          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778509          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782492          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782505          -9  78.95 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783008          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783075          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783166          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783702          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783791          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784409          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784421          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7785877          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7786814          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787475          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787497          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788967          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788989          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789006          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789062          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789095          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789120          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789426          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7790809          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          78002            -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          8030704          -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          88               -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          92               -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          93               -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__16065831    -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__18540299    -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7439965     -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7440020     -9  58.37 100 100 -9   0801-6 Y R 760                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM10             -9  32.56 100 100 -9   0801-6 Y R 760                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM2_5            -9  32.56 100 100 -9   0801-6 Y R 760                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025737         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025919         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10031137         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10034829         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10049055         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10060125         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10099748         -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101505         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101538         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101970         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10108642         -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124364         -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124433         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10294403         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10325947         -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10377669         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10588019         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          109              -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          11103869         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018018         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018198         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12035722         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12054487         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12060003         -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12079651         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          125              -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12626812         -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12640890         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12710360         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1271289          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1303282          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1304569          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306190          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306236          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1307966          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308061          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308141          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308389          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309600          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309644          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313139          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13138459         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313991          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314063          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314416          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317346          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317357          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317368          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317426          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327339          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327533          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1333820          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335257          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335326          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1336932          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345046          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345160          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13462889         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13463393         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13510491         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530659         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530682         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13586828         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13597994         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136              -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136527           -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13765190         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13770893         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13814965         -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          139              -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14018952         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14220178         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307336         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307358         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14336700         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14977618         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16065831         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16842038         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16925250         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18454121         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18540299         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          195              -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          198              -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          199              -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          200              -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          201              -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          202              -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          21679312         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          2223930          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          226              -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          253              -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          27253287         -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          301042           -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3141126          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3333673          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          373024           -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          50922297         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          543908           -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          593748           -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          598630           -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          6018899          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          602              -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          603              -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          604              -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61789513         -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61790145         -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          62384            -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7428480          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439921          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439965          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440020          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440360          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440382          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440417          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440439          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440473          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440484          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446084          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446142          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446277          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446346          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7488564          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7542098          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7718549          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7722647          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7738945          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7758976          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7775113          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778394          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778509          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782492          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783008          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783075          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783166          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783702          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783791          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784409          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784421          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7785877          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7786814          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787475          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787497          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788967          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788989          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789006          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789062          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789095          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789120          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789426          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7790809          -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          78002            -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          8030704          -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          88               -9  87.03 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          92               -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          93               -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__16065831    -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__18540299    -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7439965     -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7440020     -9  29.27 100 100 -9   0801-6 Y R 761                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM10             -9  32.56 100 100 -9   0801-6 Y R 761                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM2_5            -9  32.56 100 100 -9   0801-6 Y R 761                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025737         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10025919         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10031137         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10034829         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10049055         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10060125         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10099748         -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101505         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101538         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10101970         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10108642         -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124364         -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10124433         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10294403         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10325947         -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10377669         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          10588019         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          109              -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          11103869         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018018         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12018198         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12035722         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12054487         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12060003         -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12079651         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          125              -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12626812         -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12640890         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          12710360         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1271289          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1303282          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1304569          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306190          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1306236          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1307966          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308061          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308141          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1308389          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309600          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1309644          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313139          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13138459         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1313991          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314063          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1314416          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317346          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317357          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317368          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1317426          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327339          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1327533          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1333820          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335257          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1335326          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1336932          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345046          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          1345160          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13462889         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13463393         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13510491         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530659         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13530682         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13586828         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13597994         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136              -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          136527           -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13765190         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13770893         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          13814965         -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          139              -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14018952         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14220178         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307336         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14307358         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14336700         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          14977618         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16065831         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16842038         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          16925250         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18454121         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          18540299         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          195              -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          198              -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          199              -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          200              -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          201              -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          202              -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          21679312         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          2223930          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          226              -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          253              -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          27253287         -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          301042           -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3141126          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          3333673          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          373024           -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          50922297         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          543908           -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          593748           -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          598630           -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          6018899          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          602              -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          603              -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          604              -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61789513         -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          61790145         -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          62384            -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7428480          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439921          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439965          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440020          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440360          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440382          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440417          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440439          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440473          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7440484          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446084          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446142          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446277          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7446346          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7488564          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7542098          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7718549          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7722647          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7738945          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7758976          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7775113          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778394          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7778509          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782492          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783008          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783075          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783166          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783702          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7783791          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784409          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7784421          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7785877          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7786814          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787475          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7787497          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788967          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7788989          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789006          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789062          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789095          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789120          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7789426          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          7790809          -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          78002            -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          8030704          -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          88               -9  87.04 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          92               -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          93               -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__16065831    -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__18540299    -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7439965     -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          EXH__7440020     -9  29.27 100 100 -9   0801-6 Y R 761A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Dupont MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM10             -9  32.56 100 100 -9   0801-6 Y R 761A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48361 0          PM2_5            -9  32.56 100 100 -9   0801-6 Y R 761A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: DUPONTSABINERIVERWORKS: NEI_UNIQUE_ID=NEI7409: cdate=2008
48409 0          10025737         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10025919         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10031137         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10034829         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10049055         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10060125         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10099748         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10101505         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10101538         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10101970         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10108642         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10124364         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10124433         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10294403         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10325947         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10377669         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          10588019         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          109              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          11103869         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          12018018         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          12018198         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          12035722         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          12054487         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          12060003         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          12079651         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          125              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          12626812         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          12640890         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          12710360         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1271289          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1303282          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1304569          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1306190          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1306236          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1307966          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1308061          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1308141          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1308389          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1309600          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1309644          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1313139          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13138459         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1313991          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1314063          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1314416          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1317346          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1317357          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1317368          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1317426          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1327339          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1327533          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1333820          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1335257          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1335326          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1336932          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1345046          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          1345160          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13462889         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13463393         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13510491         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13530659         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13530682         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13586828         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13597994         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          136              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          136527           -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13765190         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13770893         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          13814965         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          139              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          14018952         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          14220178         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          14307336         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          14307358         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          14336700         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          14977618         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          16065831         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          16842038         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          16925250         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          18454121         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          18540299         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          195              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          198              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          199              -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          200              -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          201              -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          202              -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          21679312         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          2223930          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          226              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          253              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          27253287         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          301042           -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          3141126          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          3333673          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          373024           -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          50922297         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          543908           -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          593748           -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          598630           -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          6018899          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          602              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          603              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          604              -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          61789513         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          61790145         -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          62384            -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7428480          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7439921          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7439965          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7440020          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7440360          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7440382          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7440417          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7440439          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7440473          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7440484          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7446084          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7446142          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7446277          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7446346          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7488564          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7542098          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7718549          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7722647          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7738945          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7758976          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7775113          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7778394          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7778509          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7782492          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7783008          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7783075          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7783166          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7783702          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7783791          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7784409          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7784421          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7785877          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7786814          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7787475          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7787497          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7788967          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7788989          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7789006          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7789062          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7789095          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7789120          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7789426          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          7790809          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          78002            -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          8030704          -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          88               -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          92               -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          93               -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          EXH__16065831    -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          EXH__18540299    -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          EXH__7439965     -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          EXH__7440020     -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Occidental Chemical Corp MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          PM10             -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: OCCIDENTALCHEMICALCORPORATION/INGLESID: NEI_UNIQUE_ID=NEI11474: cdate=2008
48409 0          PM2_5            -9  52.46 100 100 -9   0801-2 Y R 614                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: OCCIDENTALCHEMICALCORPORATION/INGLESID: NEI_UNIQUE_ID=NEI11474: cdate=2008
48439 0          106990           -9  28.00 100 100 -9   -9     Y R 21                              ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          107028           -9  28.00 100 100 -9   -9     Y R 21                              ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          50000            -9  28.00 100 100 -9   -9     Y R 21                              ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          67561            -9  28.00 100 100 -9   -9     Y R 21                              ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          71432            -9  28.00 100 100 -9   -9     Y R 21                              ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          75070            -9  28.00 100 100 -9   -9     Y R 21                              ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          91203            -9  28.00 100 100 -9   -9     Y R 21                              ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          VOC              -9  28.00 100 100 -9   -9     Y R 21                              ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          106990           -9  28.00 100 100 -9   -9     Y R 76010GNRLM2525E                 ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          107028           -9  28.00 100 100 -9   -9     Y R 76010GNRLM2525E                 ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          50000            -9  28.00 100 100 -9   -9     Y R 76010GNRLM2525E                 ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          67561            -9  28.00 100 100 -9   -9     Y R 76010GNRLM2525E                 ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          71432            -9  28.00 100 100 -9   -9     Y R 76010GNRLM2525E                 ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          75070            -9  28.00 100 100 -9   -9     Y R 76010GNRLM2525E                 ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          91203            -9  28.00 100 100 -9   -9     Y R 76010GNRLM2525E                 ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48439 0          VOC              -9  28.00 100 100 -9   -9     Y R 76010GNRLM2525E                 ! MACT: Autos, plant: GENERALMOTORSCORP, VOC 28%: Auto_2002_projections.xls
48453 0          PM10             -9  28.00 100 100 -9   -9     Y R 1                               ! MACT: Lime Manufacturing: AUSTIN WHITE LIME CO
48453 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 1                               ! MACT: Lime Manufacturing: AUSTIN WHITE LIME CO
48453 0          SO2              -9  20.00 100 100 -9   -9     Y R 1                               ! MACT: Lime Manufacturing: AUSTIN WHITE LIME CO
48453 0          PM10             -9  28.00 100 100 -9   -9     Y R 78727STNWH14001                 ! MACT: Lime Manufacturing: AUSTIN WHITE LIME CO
48453 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 78727STNWH14001                 ! MACT: Lime Manufacturing: AUSTIN WHITE LIME CO
48453 0          SO2              -9  20.00 100 100 -9   -9     Y R 78727STNWH14001                 ! MACT: Lime Manufacturing: AUSTIN WHITE LIME CO
48453 0          PM10             -9  28.00 100 100 -9   -9     Y R T$17927                         ! MACT: Lime Manufacturing: AUSTIN WHITE LIME CO
48453 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$17927                         ! MACT: Lime Manufacturing: AUSTIN WHITE LIME CO
48453 0          SO2              -9  20.00 100 100 -9   -9     Y R T$17927                         ! MACT: Lime Manufacturing: AUSTIN WHITE LIME CO
48469 0          10025737         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10031137         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10034829         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10049055         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10060125         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101538         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10294403         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10588019         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          109              -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          11103869         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12018018         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12018198         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          125              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1303282          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1304569          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308141          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308389          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1327533          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1333820          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13510491         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13530659         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13530682         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13597994         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          136              -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          136527           -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13765190         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          139              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14018952         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14307336         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14307358         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14977618         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16065831         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          18454121         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          18540299         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          195              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          198              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          199              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          200              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          201              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          202              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          21679312         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          226              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          253              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          301042           -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          3141126          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          373024           -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          50922297         -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          543908           -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          598630           -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          602              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          603              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          604              -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440382          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440417          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440473          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7738945          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7758976          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7775113          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7778394          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7778509          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7784409          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7784421          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7787475          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7787497          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7788967          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7788989          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789006          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789062          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789095          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789120          -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          78002            -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          88               -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          92               -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          93               -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__16065831    -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__18540299    -9  49.62 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 2012                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10025737         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10031137         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10034829         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10049055         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10060125         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101538         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10294403         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10588019         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          109              -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          11103869         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12018018         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12018198         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          125              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1303282          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1304569          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308141          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308389          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1327533          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1333820          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13510491         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13530659         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13530682         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13597994         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          136              -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          136527           -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13765190         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          139              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14018952         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14307336         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14307358         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14977618         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16065831         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          18454121         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          18540299         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          195              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          198              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          199              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          200              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          201              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          202              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          21679312         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          226              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          253              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          301042           -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          3141126          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          373024           -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          50922297         -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          543908           -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          598630           -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          602              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          603              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          604              -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440382          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440417          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440473          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7738945          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7758976          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7775113          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7778394          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7778509          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7784409          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7784421          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7787475          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7787497          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7788967          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7788989          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789006          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789062          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789095          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789120          -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          78002            -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          88               -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          92               -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          93               -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__16065831    -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__18540299    -9  49.62 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 2012A                           ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10025737         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10025919         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10034829         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10049055         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10060125         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10099748         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101505         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101538         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101970         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10108642         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10124364         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10124433         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10294403         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10325947         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10377669         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10588019         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          109              -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          11103869         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12018018         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12018198         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12035722         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12054487         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12060003         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12079651         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          125              -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12626812         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12640890         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12710360         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1271289          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1306190          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1306236          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1307966          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308061          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308141          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308389          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1309600          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1309644          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1313139          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13138459         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1313991          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1314063          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1314416          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317346          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317357          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317368          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317426          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1327339          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1333820          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1335257          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1335326          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1336932          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1345046          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1345160          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13462889         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13463393         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13530659         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13530682         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13586828         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          136              -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          136527           -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13765190         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13770893         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13814965         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          139              -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14018952         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14220178         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14307336         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14307358         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14336700         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14977618         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16065831         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16842038         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16925250         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          18454121         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          18540299         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          195              -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          198              -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          199              -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          200              -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          201              -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          202              -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          21679312         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          2223930          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          226              -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          253              -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          27253287         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          301042           -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          3333673          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          373024           -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          50922297         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          543908           -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          593748           -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          598630           -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          6018899          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          602              -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          603              -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          604              -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          61789513         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          61790145         -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          62384            -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7428480          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439921          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439965          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440020          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440360          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440439          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440473          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440484          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446084          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446142          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446277          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446346          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7488564          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7542098          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7718549          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7722647          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7738945          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7758976          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7775113          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7778509          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7782492          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783008          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783075          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783166          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783702          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783791          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7785877          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7786814          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7788967          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7788989          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789006          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789062          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789095          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789120          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789426          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7790809          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          78002            -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          8030704          -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          88               -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          92               -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          93               -9   0.00 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__16065831    -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__18540299    -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__7439965     -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__7440020     -9  80.23 100 100 -9   0801-6 Y R 2013                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10025737         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10034829         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10049055         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10060125         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101538         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10108642         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10124364         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10294403         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10325947         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          10588019         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          109              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          11103869         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12018018         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12018198         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          125              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1306190          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1306236          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308141          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1308389          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1333820          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13530659         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13530682         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          136              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          136527           -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13765190         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          139              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14018952         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14307336         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14307358         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          14977618         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16065831         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          18454121         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          18540299         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          195              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          198              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          199              -9  16.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          200              -9  16.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          201              -9  16.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          202              -9  16.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          21679312         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          2223930          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          226              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          22967926         -9  16.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          253              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          301042           -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          373024           -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          50922297         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          543908           -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          593748           -9  16.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          598630           -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          602              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          603              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          604              -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          62384            -9  16.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7439976          -9  16.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440439          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440473          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7487947          -9  16.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7647010          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7738945          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7758976          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7775113          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7778509          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7782505          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7788967          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7788989          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789006          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789062          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789095          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789120          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7789426          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          7790809          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          78002            -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          88               -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          92               -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          93               -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__16065831    -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__18540299    -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
48469 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 2016                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: EI DU PONT DE NEMOURS MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI6481: cdate=2008
49011 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49011 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49011 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49011 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 28FEB2006
49011 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49011 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49011 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49011 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49011 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49011 30600805   SO2              -9 100.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49011 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 10298                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49023 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12289                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49035 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49035 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49035 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 28FEB2006
49035 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49035 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49035 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49035 30600805   SO2              -9 100.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 10119                           ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 10572                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49035 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49035 20200202   NOX              -9  40.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49035 30600106   NOX              -9  40.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49035 30600201   NOX              -9  45.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 28FEB2006
49035 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49035 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49035 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 30600106   SO2              -9  90.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49035 30600805   SO2              -9 100.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 84116CHVRN2351N                 ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49035 20200202   NOX              -9  40.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49035 30600106   NOX              -9  40.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 30JUN2011
49035 30600201   NOX              -9  45.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 28FEB2006
49035 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49035 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49035 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 30600106   SO2              -9  90.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 31DEC2010
49035 30600805   SO2              -9 100.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49035 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$12248                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42081, Plant=Chevron USA, Salt Lake City, UT, compliance date: 27JUN2005
49039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 10648                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 10654                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18123                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 10676                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 0          PM10             -9  28.00 100 100 -9   -9     Y R 10707                           ! MACT: Lime Manufacturing: GRANTSVILLE PLANT
49045 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 10707                           ! MACT: Lime Manufacturing: GRANTSVILLE PLANT
49045 0          SO2              -9  20.00 100 100 -9   -9     Y R 10707                           ! MACT: Lime Manufacturing: GRANTSVILLE PLANT
49045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 11339                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 11594                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 0          10025737         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10025919         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10031137         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10034829         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10049055         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10060125         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10099748         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101505         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101538         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101970         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10108642         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10124364         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10124433         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10294403         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10325947         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10377669         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10588019         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          109              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          11103869         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12018018         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12018198         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12035722         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12054487         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12060003         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12079651         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          125              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12626812         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12640890         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12710360         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1271289          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1303282          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1304569          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1306190          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1306236          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1307966          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308061          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308141          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308389          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1309600          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1309644          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1313139          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13138459         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1313991          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1314063          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1314416          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317346          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317357          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317368          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317426          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1327339          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1327533          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1333820          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1335257          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1335326          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1336932          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1345046          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1345160          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13462889         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13463393         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13510491         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13530659         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13530682         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13586828         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13597994         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          136              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          136527           -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13765190         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13770893         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13814965         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          139              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14018952         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14220178         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14307336         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14307358         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14336700         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14977618         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16065831         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16842038         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16925250         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          18454121         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          18540299         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          195              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          198              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          199              -9  46.46 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          200              -9  46.46 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          201              -9  46.46 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          202              -9  46.46 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          21679312         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          2223930          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          226              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          22967926         -9  46.46 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          253              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          27253287         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          301042           -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          3141126          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          3333673          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          373024           -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          50922297         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          543908           -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          593748           -9  46.46 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          598630           -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          6018899          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          602              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          603              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          604              -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          61789513         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          61790145         -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          62384            -9  46.46 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7428480          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439921          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439965          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439976          -9  46.46 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440020          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440360          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440382          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440417          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440439          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440473          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440484          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446084          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446142          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446277          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446346          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7487947          -9  46.46 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7488564          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7542098          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7718549          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7722647          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7738945          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7758976          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7775113          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7778394          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7778509          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7782492          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783008          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783075          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783166          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783702          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783791          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7784409          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7784421          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7785877          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7786814          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7787475          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7787497          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7788967          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7788989          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789006          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789062          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789095          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789120          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789426          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7790809          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          78002            -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          8030704          -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          88               -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          92               -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          93               -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__16065831    -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__18540299    -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__7439965     -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__7440020     -9  75.03 100 100 -9   0801-2 Y R 3003                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          PM10             -9  74.49 100 100 -9   0801-2 Y R 3003                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYDESERETCHEMICALDEPOT: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          PM2_5            -9  74.49 100 100 -9   0801-2 Y R 3003                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYDESERETCHEMICALDEPOT: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10025737         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10025919         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10031137         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10034829         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10049055         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10060125         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10099748         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10101505         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10101538         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10101970         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10108642         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10124364         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10294403         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10325947         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10377669         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10588019         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          109              -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          11103869         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12018018         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12018198         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12035722         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12054487         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12060003         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12079651         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          125              -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12626812         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12640890         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12710360         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1271289          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1303282          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1304569          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1306190          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1306236          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1308141          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1308389          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1309600          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1309644          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1313139          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13138459         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1313991          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1314063          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1314416          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317346          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317357          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317368          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1327339          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1327533          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1333820          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1335257          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1335326          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1336932          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1345046          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13462889         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13463393         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13510491         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13530659         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13530682         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13597994         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          136              -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          136527           -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13765190         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13770893         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13814965         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          139              -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14018952         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14220178         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14307336         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14307358         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14336700         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14977618         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          16065831         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          16925250         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          18454121         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          18540299         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          195              -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          198              -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          199              -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          200              -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          201              -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          202              -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          21679312         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          2223930          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          226              -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          253              -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          27253287         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          301042           -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          3141126          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          3333673          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          373024           -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          50922297         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          543908           -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          598630           -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          6018899          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          602              -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          603              -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          604              -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          61790145         -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7428480          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7439921          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7439965          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440020          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440360          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440382          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440417          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440439          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440473          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446084          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446142          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446277          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446346          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7488564          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7718549          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7722647          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7738945          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7758976          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7775113          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7778394          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7778509          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7782492          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783008          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783075          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783166          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783702          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783791          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7784409          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7784421          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7785877          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7786814          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7787475          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7787497          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7788967          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7788989          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789006          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789062          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789095          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789120          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789426          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7790809          -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          78002            -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          8030704          -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          88               -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          92               -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          93               -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__16065831    -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__18540299    -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__7439965     -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__7440020     -9   0.00 100 100 -9   0801-2 Y R 3004                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          PM10             -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYDESERETCHEMICALDEPOT: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          PM2_5            -9  74.49 100 100 -9   0801-2 Y R 3004                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYDESERETCHEMICALDEPOT: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10025737         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10025919         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10031137         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10034829         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10049055         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10060125         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10099748         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10101505         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10101538         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10101970         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10108642         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10124364         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10294403         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10325947         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10377669         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10588019         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          109              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          11103869         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12018018         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12018198         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12035722         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12054487         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12060003         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12079651         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          125              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12626812         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12640890         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12710360         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1271289          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1303282          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1304569          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1306190          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1306236          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1308141          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1308389          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1309600          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1309644          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1313139          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13138459         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1313991          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1314063          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1314416          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317346          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317357          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317368          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1327339          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1327533          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1333820          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1335257          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1335326          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1336932          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1345046          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13462889         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13463393         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13510491         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13530659         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13530682         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13597994         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          136              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          136527           -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13765190         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13770893         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13814965         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          139              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14018952         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14220178         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14307336         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14307358         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14336700         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14977618         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          16065831         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          16925250         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          18454121         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          18540299         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          195              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          198              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          199              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          200              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          201              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          202              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          21679312         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          2223930          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          226              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          253              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          27253287         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          301042           -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          3141126          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          3333673          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          373024           -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          50922297         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          543908           -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          598630           -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          6018899          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          602              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          603              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          604              -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          61790145         -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7428480          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7439921          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7439965          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440020          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440360          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440382          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440417          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440439          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440473          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446084          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446142          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446277          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446346          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7488564          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7718549          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7722647          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7738945          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7758976          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7775113          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7778394          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7778509          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7782492          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783008          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783075          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783166          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783702          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783791          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7784409          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7784421          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7785877          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7786814          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7787475          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7787497          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7788967          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7788989          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789006          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789062          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789095          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789120          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789426          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7790809          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          78002            -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          8030704          -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          88               -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          92               -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          93               -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__16065831    -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__18540299    -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__7439965     -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__7440020     -9   0.00 100 100 -9   0801-2 Y R 3005                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          PM10             -9  74.49 100 100 -9   0801-2 Y R 3005                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYDESERETCHEMICALDEPOT: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          PM2_5            -9  74.49 100 100 -9   0801-2 Y R 3005                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYDESERETCHEMICALDEPOT: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10025737         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10025919         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10031137         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10034829         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10049055         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10060125         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10099748         -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101505         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101538         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101970         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10108642         -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10124364         -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10124433         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10294403         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10325947         -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10377669         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10588019         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          109              -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          11103869         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12018018         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12018198         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12035722         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12054487         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12060003         -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12079651         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          125              -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12626812         -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12640890         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12710360         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1271289          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1303282          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1304569          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1306190          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1306236          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1307966          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308061          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308141          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308389          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1309600          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1309644          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1313139          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13138459         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1313991          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1314063          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1314416          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317346          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317357          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317368          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317426          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1327339          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1327533          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1333820          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1335257          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1335326          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1336932          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1345046          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1345160          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13462889         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13463393         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13510491         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13530659         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13530682         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13586828         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13597994         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          136              -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          136527           -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13765190         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13770893         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13814965         -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          139              -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14018952         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14220178         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14307336         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14307358         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14336700         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14977618         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16065831         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16842038         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16925250         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          18454121         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          18540299         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          195              -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          198              -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          199              -9   0.00 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          200              -9   0.00 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          201              -9   0.00 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          202              -9   0.00 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          21679312         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          2223930          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          226              -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          253              -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          27253287         -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          301042           -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          3141126          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          3333673          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          373024           -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          50922297         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          543908           -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          598630           -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          6018899          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          602              -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          603              -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          604              -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          61789513         -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          61790145         -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7428480          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439921          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439965          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440020          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440360          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440382          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440417          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440439          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440473          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440484          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446084          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446142          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446277          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446346          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7488564          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7542098          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7647010          -9  27.23 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7718549          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7722647          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7738945          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7758976          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7775113          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7778394          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7778509          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7782492          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7782505          -9  27.23 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783008          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783075          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783166          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783702          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783791          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7784409          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7784421          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7785877          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7786814          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7787475          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7787497          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7788967          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7788989          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789006          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789062          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789095          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789120          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789426          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7790809          -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          78002            -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          8030704          -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          88               -9  97.74 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          92               -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          93               -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__16065831    -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__18540299    -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__7439965     -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__7440020     -9  56.50 100 100 -9   0801-2 Y R 3008                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 0          PM10             -9  75.03 100 100 -9   0801-2 Y R 3008                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: TooeleArmyDepot: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 3008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 0          PM2_5            -9  75.03 100 100 -9   0801-2 Y R 3008                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: TooeleArmyDepot: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10025737         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10025919         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10031137         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10034829         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10049055         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10060125         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10099748         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10101505         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10101538         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10101970         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10108642         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10124364         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10124433         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10294403         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10325947         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10377669         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10588019         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          109              -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          11103869         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          12018018         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          12018198         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          12035722         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          12054487         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          12060003         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          12079651         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          125              -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          12626812         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          12640890         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          12710360         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1271289          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1303282          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1304569          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1306190          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1306236          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1307966          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1308061          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1308141          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1308389          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1309600          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1309644          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1313139          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13138459         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1313991          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1314063          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1314416          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1317346          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1317357          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1317368          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1317426          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1327339          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1327533          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1333820          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1335257          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1335326          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1336932          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1345046          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          1345160          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13462889         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13463393         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13510491         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13530659         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13530682         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13586828         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13597994         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          136              -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          136527           -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13765190         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13770893         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          13814965         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          139              -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          14018952         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          14220178         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          14307336         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          14307358         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          14336700         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          14977618         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          16065831         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          16842038         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          16925250         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          18454121         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          18540299         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          195              -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          198              -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          199              -9  97.71 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          200              -9  97.71 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          201              -9  97.71 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          202              -9  97.71 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          21679312         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          2223930          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          226              -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          22967926         -9  97.71 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          253              -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          27253287         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          301042           -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          3141126          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          3333673          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          373024           -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          50922297         -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          543908           -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          593748           -9  97.71 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          598630           -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          6018899          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          602              -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          603              -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          604              -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          61789513         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          61790145         -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          62384            -9  97.71 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7428480          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7439921          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7439965          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7439976          -9  97.71 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7440020          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7440360          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7440382          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7440417          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7440439          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7440473          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7440484          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7446084          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7446142          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7446277          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7446346          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7487947          -9  97.71 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7488564          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7542098          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7647010          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7718549          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7722647          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7738945          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7758976          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7775113          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7778394          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7778509          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7782492          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7782505          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7783008          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7783075          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7783166          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7783702          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7783791          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7784409          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7784421          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7785877          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7786814          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7787475          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7787497          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7788967          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7788989          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7789006          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7789062          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7789095          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7789120          -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7789426          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          7790809          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          78002            -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          8030704          -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          88               -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          92               -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          93               -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          EXH__16065831    -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          EXH__18540299    -9  16.56 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          EXH__7439965     -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          EXH__7440020     -9   0.00 100 100 -9   0801-1 Y R 327                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: HAZARDOUS WASTE STORAGE/INCINERATION MACT=Hazardous Waste Incineration: Commercial: NEI_UNIQUE_ID=NEIUT19459: cdate=2008
49045 0          10025737         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10025919         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10031137         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10034829         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10049055         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10060125         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10099748         -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10101505         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10101538         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10101970         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10108642         -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10124364         -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10294403         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10325947         -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10377669         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10588019         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          109              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          11103869         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12018018         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12018198         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12035722         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12054487         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12060003         -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12079651         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          125              -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12626812         -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12640890         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          12710360         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1271289          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1303282          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1304569          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1306190          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1306236          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1308141          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1308389          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1309600          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1309644          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1313139          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13138459         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1313991          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1314063          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1314416          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317346          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317357          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317368          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1327339          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1327533          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1333820          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1335257          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1335326          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1336932          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1345046          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13462889         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13463393         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13510491         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13530659         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13530682         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13597994         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          136              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          136527           -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13765190         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13770893         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          13814965         -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          139              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14018952         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14220178         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14307336         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14307358         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14336700         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          14977618         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          16065831         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          16925250         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          18454121         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          18540299         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          195              -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          198              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          199              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          200              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          201              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          202              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          21679312         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          2223930          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          226              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          253              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          27253287         -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          301042           -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          3141126          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          3333673          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          373024           -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          50922297         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          543908           -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          593748           -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          598630           -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          6018899          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          602              -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          603              -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          604              -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          61790145         -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          62384            -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7428480          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7439921          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7439965          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440020          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440360          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440382          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440417          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440439          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440473          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446084          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446142          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446277          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7446346          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7488564          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7718549          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7722647          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7738945          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7758976          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7775113          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7778394          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7778509          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7782492          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783008          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783075          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783166          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783702          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7783791          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7784409          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7784421          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7785877          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7786814          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7787475          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7787497          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7788967          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7788989          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789006          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789062          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789095          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789120          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7789426          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          7790809          -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          78002            -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          8030704          -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          88               -9  50.81 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          92               -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          93               -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__16065831    -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__18540299    -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__7439965     -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          EXH__7440020     -9   0.00 100 100 -9   0801-2 Y R 347                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army South MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 0          PM10             -9  75.03 100 100 -9   0801-2 Y R 347                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: TooeleArmyDepot: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 347                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 0          PM2_5            -9  75.03 100 100 -9   0801-2 Y R 347                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: TooeleArmyDepot: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10025737         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10025919         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10031137         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10034829         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10049055         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10060125         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10099748         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101505         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101538         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101970         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10108642         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10124364         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10124433         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10294403         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10325947         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10377669         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10588019         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          109              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          11103869         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12018018         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12018198         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12035722         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12054487         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12060003         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12079651         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          125              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12626812         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12640890         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12710360         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1271289          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1303282          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1304569          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1306190          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1306236          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1307966          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308061          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308141          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308389          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1309600          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1309644          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1313139          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13138459         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1313991          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1314063          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1314416          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317346          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317357          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317368          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317426          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1327339          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1327533          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1333820          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1335257          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1335326          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1336932          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1345046          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1345160          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13462889         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13463393         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13510491         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13530659         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13530682         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13586828         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13597994         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          136              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          136527           -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13765190         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13770893         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13814965         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          139              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14018952         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14220178         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14307336         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14307358         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14336700         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14977618         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16065831         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16842038         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16925250         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          18454121         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          18540299         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          195              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          198              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          199              -9  96.92 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          200              -9  96.92 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          201              -9  96.92 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          202              -9  96.92 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          21679312         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          2223930          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          226              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          22967926         -9  96.92 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          253              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          27253287         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          301042           -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          3141126          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          3333673          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          373024           -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          50922297         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          543908           -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          593748           -9  96.92 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          598630           -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          6018899          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          602              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          603              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          604              -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          61789513         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          61790145         -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          62384            -9  96.92 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7428480          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439921          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439965          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439976          -9  96.92 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440020          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440360          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440382          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440417          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440439          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440473          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440484          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446084          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446142          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446277          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446346          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7487947          -9  96.92 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7488564          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7542098          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7718549          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7722647          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7738945          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7758976          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7775113          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7778394          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7778509          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7782492          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783008          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783075          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783166          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783702          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783791          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7784409          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7784421          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7785877          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7786814          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7787475          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7787497          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7788967          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7788989          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789006          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789062          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789095          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789120          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789426          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7790809          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          78002            -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          8030704          -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          88               -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          92               -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          93               -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__16065831    -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__18540299    -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__7439965     -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__7440020     -9   0.00 100 100 -9   0801-2 Y R 493                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          PM10             -9  74.49 100 100 -9   0801-2 Y R 493                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYDESERETCHEMICALDEPOT: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          PM2_5            -9  74.49 100 100 -9   0801-2 Y R 493                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYDESERETCHEMICALDEPOT: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          10025737         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10025919         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10031137         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10034829         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10049055         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10060125         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10099748         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101505         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101538         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10101970         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10108642         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10124364         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10124433         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10294403         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10325947         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10377669         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          10588019         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          109              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          11103869         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12018018         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12018198         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12035722         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12054487         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12060003         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12079651         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          125              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12626812         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12640890         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          12710360         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1271289          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1303282          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1304569          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1306190          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1306236          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1307966          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308061          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308141          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1308389          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1309600          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1309644          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1313139          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13138459         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1313991          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1314063          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1314416          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317346          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317357          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317368          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1317426          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1327339          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1327533          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1333820          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1335257          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1335326          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1336932          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1345046          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          1345160          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13462889         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13463393         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13510491         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13530659         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13530682         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13586828         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13597994         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          136              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          136527           -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13765190         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13770893         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          13814965         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          139              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14018952         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14220178         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14307336         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14307358         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14336700         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          14977618         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16065831         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16842038         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          16925250         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          18454121         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          18540299         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          195              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          198              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          199              -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          200              -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          201              -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          202              -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          21679312         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          2223930          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          226              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          253              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          27253287         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          301042           -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          3141126          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          3333673          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          373024           -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          50922297         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          543908           -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          593748           -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          598630           -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          6018899          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          602              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          603              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          604              -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          61789513         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          61790145         -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          62384            -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7428480          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439921          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439965          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440020          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440360          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440382          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440417          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440439          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440473          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7440484          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446084          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446142          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446277          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7446346          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7488564          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7542098          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7718549          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7722647          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7738945          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7758976          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7775113          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7778394          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7778509          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7782492          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783008          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783075          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783166          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783702          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7783791          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7784409          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7784421          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7785877          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7786814          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7787475          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7787497          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7788967          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7788989          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789006          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789062          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789095          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789120          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7789426          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          7790809          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          78002            -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          8030704          -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          88               -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          92               -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          93               -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__16065831    -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__18540299    -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__7439965     -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          EXH__7440020     -9  91.77 100 100 -9   0801-2 Y R 494                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Department Of The Army North MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIUT11594: cdate=2008
49045 0          PM10             -9  74.49 100 100 -9   0801-2 Y R 494                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYDESERETCHEMICALDEPOT: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          PM2_5            -9  74.49 100 100 -9   0801-2 Y R 494                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: U.S.ARMYDESERETCHEMICALDEPOT: NEI_UNIQUE_ID=NEIUT11339: cdate=2008
49045 0          PM10             -9  28.00 100 100 -9   -9     Y R 84029CHMCLOLDHW                 ! MACT: Lime Manufacturing: GRANTSVILLE PLANT
49045 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 84029CHMCLOLDHW                 ! MACT: Lime Manufacturing: GRANTSVILLE PLANT
49045 0          SO2              -9  20.00 100 100 -9   -9     Y R 84029CHMCLOLDHW                 ! MACT: Lime Manufacturing: GRANTSVILLE PLANT
49045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12221                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 10790                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 10796                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1225                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
49049 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$12209                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2632                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51021 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00005                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00098                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51029 0          10025737         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10025919         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10031137         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10034829         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10049055         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10060125         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10099748         -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10101505         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10101538         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10101970         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10108642         -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10124364         -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10124433         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10294403         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10325947         -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10377669         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10588019         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          109              -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          11103869         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12018018         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12018198         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12035722         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12054487         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12060003         -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12079651         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          125              -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12626812         -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12640890         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12710360         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1271289          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1303282          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1304569          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1306190          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1306236          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1307966          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1308061          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1308141          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1308389          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1309600          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1309644          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1313139          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13138459         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1313991          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1314063          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1314416          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1317346          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1317357          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1317368          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1317426          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1327339          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1327533          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1333820          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1335257          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1335326          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1336932          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1345046          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1345160          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13462889         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13463393         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13510491         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13530659         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13530682         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13586828         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13597994         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          136              -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          136527           -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13765190         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13770893         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13814965         -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          139              -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14018952         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14220178         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14307336         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14307358         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14336700         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14977618         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          16065831         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          16842038         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          16925250         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          18454121         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          18540299         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          195              -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          198              -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          199              -9  68.45 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          200              -9  68.45 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          201              -9  68.45 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          202              -9  68.45 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          21679312         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          2223930          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          226              -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          22967926         -9  68.45 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          253              -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          27253287         -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          301042           -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          3141126          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          3333673          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          373024           -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          50922297         -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          543908           -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          593748           -9  68.45 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          598630           -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          6018899          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          602              -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          603              -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          604              -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          61789513         -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          61790145         -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          62384            -9  68.45 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7428480          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7439921          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7439965          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7439976          -9  68.45 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440020          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440360          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440382          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440417          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440439          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440473          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440484          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7446084          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7446142          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7446277          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7446346          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7487947          -9  68.45 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7488564          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7542098          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7647010          -9  81.93 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7718549          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7722647          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7738945          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7758976          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7775113          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7778394          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7778509          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7782492          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7782505          -9  81.93 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7783008          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7783075          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7783166          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7783702          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7783791          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7784409          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7784421          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7785877          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7786814          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7787475          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7787497          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7788967          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7788989          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7789006          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7789062          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7789095          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7789120          -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7789426          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7790809          -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          78002            -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          8030704          -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          88               -9  90.53 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          92               -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          93               -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          EXH__16065831    -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          EXH__18540299    -9  83.21 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          EXH__7439965     -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          EXH__7440020     -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          PM10             -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SoliteLLC: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          PM2_5            -9  69.92 100 100 -9   0801-4 Y R 313                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SoliteLLC: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10025737         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10025919         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10031137         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10034829         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10049055         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10060125         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10099748         -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10101505         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10101538         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10101970         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10108642         -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10124364         -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10124433         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10294403         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10325947         -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10377669         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          10588019         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          109              -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          11103869         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12018018         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12018198         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12035722         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12054487         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12060003         -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12079651         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          125              -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12626812         -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12640890         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          12710360         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1271289          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1303282          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1304569          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1306190          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1306236          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1307966          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1308061          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1308141          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1308389          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1309600          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1309644          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1313139          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13138459         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1313991          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1314063          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1314416          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1317346          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1317357          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1317368          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1317426          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1327339          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1327533          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1333820          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1335257          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1335326          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1336932          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1345046          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          1345160          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13462889         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13463393         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13510491         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13530659         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13530682         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13586828         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13597994         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          136              -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          136527           -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13765190         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13770893         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          13814965         -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          139              -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14018952         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14220178         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14307336         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14307358         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14336700         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          14977618         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          16065831         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          16842038         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          16925250         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          18454121         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          18540299         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          195              -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          198              -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          199              -9  68.45 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          200              -9  68.45 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          201              -9  68.45 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          202              -9  68.45 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          21679312         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          2223930          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          226              -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          22967926         -9  68.45 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          253              -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          27253287         -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          301042           -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          3141126          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          3333673          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          373024           -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          50922297         -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          543908           -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          593748           -9  68.45 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          598630           -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          6018899          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          602              -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          603              -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          604              -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          61789513         -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          61790145         -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          62384            -9  68.45 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7428480          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7439921          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7439965          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7439976          -9  68.45 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440020          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440360          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440382          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440417          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440439          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440473          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7440484          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7446084          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7446142          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7446277          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7446346          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7487947          -9  68.45 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7488564          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7542098          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7647010          -9  71.59 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7718549          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7722647          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7738945          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7758976          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7775113          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7778394          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7778509          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7782492          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7782505          -9  71.59 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7783008          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7783075          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7783166          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7783702          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7783791          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7784409          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7784421          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7785877          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7786814          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7787475          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7787497          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7788967          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7788989          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7789006          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7789062          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7789095          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7789120          -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7789426          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          7790809          -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          78002            -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          8030704          -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          88               -9  89.26 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          92               -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          93               -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          EXH__16065831    -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          EXH__18540299    -9  84.14 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          EXH__7439965     -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          EXH__7440020     -9  73.56 100 100 -9   0801-4 Y R 314                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          PM10             -9  69.92 100 100 -9   0801-4 Y R 314                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SoliteLLC: NEI_UNIQUE_ID=NEI17512: cdate=2008
51029 0          PM2_5            -9  69.92 100 100 -9   0801-4 Y R 314                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: SoliteLLC: NEI_UNIQUE_ID=NEI17512: cdate=2008
51031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2633                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00081                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1231                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51041 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2492                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51067 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00023                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51069 0          PM10             -9  28.00 100 100 -9   -9     Y R 00034                           ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 00034                           ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          SO2              -9  20.00 100 100 -9   -9     Y R 00034                           ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          PM10             -9  28.00 100 100 -9   -9     Y R 00059                           ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 00059                           ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          SO2              -9  20.00 100 100 -9   -9     Y R 00059                           ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          PM10             -9  28.00 100 100 -9   -9     Y R 22624GLBLSONEQU                 ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 22624GLBLSONEQU                 ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          SO2              -9  20.00 100 100 -9   -9     Y R 22624GLBLSONEQU                 ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          PM10             -9  28.00 100 100 -9   -9     Y R T$13833                         ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$13833                         ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51069 0          SO2              -9  20.00 100 100 -9   -9     Y R T$13833                         ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51071 0          PM10             -9  28.00 100 100 -9   -9     Y R 00001                           ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY - KIMBALLTON P
51071 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 00001                           ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY - KIMBALLTON P
51071 0          SO2              -9  20.00 100 100 -9   -9     Y R 00001                           ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY - KIMBALLTON P
51071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00004                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 24124HCHSTRT460                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 0          PM10             -9  28.00 100 100 -9   -9     Y R 24150CHMCL2093B                 ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY - KIMBALLTON P
51071 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 24150CHMCL2093B                 ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY - KIMBALLTON P
51071 0          SO2              -9  20.00 100 100 -9   -9     Y R 24150CHMCL2093B                 ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY - KIMBALLTON P
51071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1235                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 0          PM10             -9  28.00 100 100 -9   -9     Y R T$13892                         ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY - KIMBALLTON P
51071 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$13892                         ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY - KIMBALLTON P
51071 0          SO2              -9  20.00 100 100 -9   -9     Y R T$13892                         ! MACT: Lime Manufacturing: CHEMICAL LIME COMPANY - KIMBALLTON P
51071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2557                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51075 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00007                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 23867GRGPCALLEN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51081 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2513                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00042                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51085 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2417                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00033                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00037                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51089 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2570                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00006                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1238                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2503                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 23181CHSPK19THM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1240                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51101 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2421                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51121 0          PM10             -9  18.69 100 100 -9   0801-2 Y R 00006                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ALLIANTAMMUNITION&POWDERCOMPANYLLC: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          PM2_5            -9  18.69 100 100 -9   0801-2 Y R 00006                           ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ALLIANTAMMUNITION&POWDERCOMPANYLLC: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10025737         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10025919         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10031137         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10034829         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10049055         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10060125         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10099748         -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10101505         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10101538         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10101970         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10108642         -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10124364         -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10124433         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10294403         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10325947         -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10377669         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10588019         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          109              -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          11103869         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12018018         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12018198         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12035722         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12054487         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12060003         -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12079651         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          125              -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12626812         -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12640890         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12710360         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1271289          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1303282          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1304569          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1306190          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1306236          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1307966          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1308061          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1308141          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1308389          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1309600          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1309644          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1313139          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13138459         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1313991          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1314063          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1314416          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1317346          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1317357          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1317368          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1317426          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1327339          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1327533          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1333820          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1335257          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1335326          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1336932          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1345046          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1345160          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13462889         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13463393         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13510491         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13530659         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13530682         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13586828         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13597994         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          136              -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          136527           -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13765190         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13770893         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13814965         -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          139              -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14018952         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14220178         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14307336         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14307358         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14336700         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14977618         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          16065831         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          16842038         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          16925250         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          18454121         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          18540299         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          195              -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          198              -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          199              -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          200              -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          201              -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          202              -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          21679312         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          2223930          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          226              -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          253              -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          27253287         -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          301042           -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          3141126          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          3333673          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          373024           -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          50922297         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          543908           -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          593748           -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          598630           -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          6018899          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          602              -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          603              -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          604              -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          61789513         -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          61790145         -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          62384            -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7428480          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7439921          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7439965          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440020          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440360          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440382          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440417          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440439          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440473          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440484          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7446084          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7446142          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7446277          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7446346          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7488564          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7542098          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7718549          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7722647          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7738945          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7758976          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7775113          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7778394          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7778509          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7782492          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7783008          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7783075          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7783166          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7783702          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7783791          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7784409          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7784421          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7785877          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7786814          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7787475          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7787497          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7788967          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7788989          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7789006          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7789062          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7789095          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7789120          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7789426          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7790809          -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          78002            -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          8030704          -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          88               -9  75.60 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          92               -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          93               -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          EXH__16065831    -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          EXH__18540299    -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          EXH__7439965     -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          EXH__7440020     -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          PM10             -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ALLIANTAMMUNITION&POWDERCOMPANYLLC: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          PM2_5            -9  18.69 100 100 -9   0801-2 Y R 349                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ALLIANTAMMUNITION&POWDERCOMPANYLLC: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10025737         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10025919         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10031137         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10034829         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10049055         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10060125         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10099748         -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10101505         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10101538         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10101970         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10108642         -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10124364         -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10124433         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10294403         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10325947         -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10377669         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          10588019         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          109              -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          11103869         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12018018         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12018198         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12035722         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12054487         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12060003         -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12079651         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          125              -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12626812         -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12640890         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          12710360         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1271289          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1303282          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1304569          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1306190          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1306236          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1307966          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1308061          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1308141          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1308389          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1309600          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1309644          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1313139          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13138459         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1313991          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1314063          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1314416          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1317346          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1317357          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1317368          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1317426          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1327339          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1327533          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1333820          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1335257          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1335326          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1336932          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1345046          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          1345160          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13462889         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13463393         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13510491         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13530659         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13530682         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13586828         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13597994         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          136              -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          136527           -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13765190         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13770893         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          13814965         -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          139              -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14018952         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14220178         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14307336         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14307358         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14336700         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          14977618         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          16065831         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          16842038         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          16925250         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          18454121         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          18540299         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          195              -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          198              -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          199              -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          200              -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          201              -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          202              -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          21679312         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          2223930          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          226              -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          253              -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          27253287         -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          301042           -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          3141126          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          3333673          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          373024           -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          50922297         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          543908           -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          593748           -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          598630           -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          6018899          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          602              -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          603              -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          604              -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          61789513         -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          61790145         -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          62384            -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7428480          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7439921          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7439965          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440020          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440360          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440382          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440417          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440439          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440473          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7440484          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7446084          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7446142          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7446277          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7446346          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7488564          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7542098          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7718549          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7722647          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7738945          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7758976          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7775113          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7778394          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7778509          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7782492          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7783008          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7783075          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7783166          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7783702          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7783791          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7784409          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7784421          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7785877          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7786814          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7787475          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7787497          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7788967          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7788989          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7789006          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7789062          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7789095          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7789120          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7789426          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          7790809          -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          78002            -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          8030704          -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          88               -9  75.60 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          92               -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          93               -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          EXH__16065831    -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          EXH__18540299    -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          EXH__7439965     -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          EXH__7440020     -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: ALLIANT AMMUNITION & POWDER COMPANY  LLC MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          PM10             -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ALLIANTAMMUNITION&POWDERCOMPANYLLC: NEI_UNIQUE_ID=NEI768: cdate=2008
51121 0          PM2_5            -9  18.69 100 100 -9   0801-2 Y R 349A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: ALLIANTAMMUNITION&POWDERCOMPANYLLC: NEI_UNIQUE_ID=NEI768: cdate=2008
51135 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51135 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00029                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2572                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 0          10025737         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10025919         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10031137         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10034829         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10049055         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10060125         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10099748         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10101505         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10101538         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10101970         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10108642         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10124364         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10124433         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10294403         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10325947         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10377669         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10588019         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          109              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          11103869         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12018018         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12018198         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12035722         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12054487         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12060003         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12079651         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          125              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12626812         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12640890         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12710360         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1271289          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1303282          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1304569          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1306190          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1306236          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1307966          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1308061          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1308141          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1308389          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1309600          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1309644          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1313139          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13138459         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1313991          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1314063          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1314416          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317346          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317357          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317368          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317426          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1327339          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1327533          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1333820          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1335257          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1335326          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1336932          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1345046          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1345160          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13462889         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13463393         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13510491         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13530659         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13530682         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13586828         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13597994         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          136              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          136527           -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13765190         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13770893         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13814965         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          139              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14018952         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14220178         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14307336         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14307358         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14336700         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14977618         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          16065831         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          16842038         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          16925250         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          18454121         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          18540299         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          195              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          198              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          199              -9  68.45 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          200              -9  68.45 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          201              -9  68.45 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          202              -9  68.45 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          21679312         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          2223930          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          226              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          22967926         -9  68.45 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          253              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          27253287         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          301042           -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          3141126          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          3333673          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          373024           -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          50922297         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          543908           -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          593748           -9  68.45 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          598630           -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          6018899          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          602              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          603              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          604              -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          61789513         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          61790145         -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          62384            -9  68.45 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7428480          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7439921          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7439965          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7439976          -9  68.45 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440020          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440360          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440382          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440417          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440439          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440473          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440484          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446084          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446142          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446277          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446346          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7487947          -9  68.45 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7488564          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7542098          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7647010          -9  79.02 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7718549          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7722647          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7738945          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7758976          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7775113          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7778394          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7778509          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7782492          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7782505          -9  79.02 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783008          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783075          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783166          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783702          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783791          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7784409          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7784421          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7785877          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7786814          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7787475          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7787497          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7788967          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7788989          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789006          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789062          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789095          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789120          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789426          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7790809          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          78002            -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          8030704          -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          88               -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          92               -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          93               -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__16065831    -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__18540299    -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__7439965     -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__7440020     -9   0.00 100 100 -9   0801-4 Y R 311                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10025737         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10025919         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10031137         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10034829         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10049055         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10060125         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10099748         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10101505         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10101538         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10101970         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10108642         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10124364         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10124433         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10294403         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10325947         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10377669         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10588019         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          109              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          11103869         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12018018         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12018198         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12035722         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12054487         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12060003         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12079651         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          125              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12626812         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12640890         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12710360         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1271289          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1303282          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1304569          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1306190          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1306236          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1307966          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1308061          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1308141          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1308389          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1309600          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1309644          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1313139          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13138459         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1313991          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1314063          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1314416          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317346          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317357          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317368          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317426          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1327339          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1327533          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1333820          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1335257          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1335326          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1336932          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1345046          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1345160          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13462889         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13463393         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13510491         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13530659         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13530682         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13586828         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13597994         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          136              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          136527           -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13765190         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13770893         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13814965         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          139              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14018952         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14220178         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14307336         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14307358         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14336700         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14977618         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          16065831         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          16842038         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          16925250         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          18454121         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          18540299         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          195              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          198              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          199              -9  68.45 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          200              -9  68.45 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          201              -9  68.45 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          202              -9  68.45 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          21679312         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          2223930          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          226              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          22967926         -9  68.45 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          253              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          27253287         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          301042           -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          3141126          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          3333673          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          373024           -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          50922297         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          543908           -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          593748           -9  68.45 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          598630           -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          6018899          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          602              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          603              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          604              -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          61789513         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          61790145         -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          62384            -9  68.45 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7428480          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7439921          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7439965          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7439976          -9  68.45 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440020          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440360          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440382          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440417          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440439          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440473          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440484          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446084          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446142          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446277          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446346          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7487947          -9  68.45 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7488564          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7542098          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7647010          -9  77.87 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7718549          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7722647          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7738945          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7758976          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7775113          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7778394          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7778509          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7782492          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7782505          -9  77.87 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783008          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783075          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783166          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783702          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783791          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7784409          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7784421          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7785877          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7786814          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7787475          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7787497          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7788967          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7788989          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789006          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789062          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789095          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789120          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789426          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7790809          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          78002            -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          8030704          -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          88               -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          92               -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          93               -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__16065831    -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__18540299    -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__7439965     -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__7440020     -9   0.00 100 100 -9   0801-4 Y R 312                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10025737         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10025919         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10031137         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10034829         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10049055         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10060125         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10099748         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10101505         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10101538         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10101970         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10108642         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10124364         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10124433         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10294403         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10325947         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10377669         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          10588019         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          109              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          11103869         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12018018         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12018198         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12035722         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12054487         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12060003         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12079651         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          125              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12626812         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12640890         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          12710360         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1271289          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1303282          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1304569          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1306190          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1306236          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1307966          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1308061          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1308141          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1308389          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1309600          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1309644          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1313139          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13138459         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1313991          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1314063          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1314416          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317346          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317357          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317368          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1317426          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1327339          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1327533          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1333820          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1335257          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1335326          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1336932          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1345046          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          1345160          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13462889         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13463393         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13510491         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13530659         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13530682         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13586828         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13597994         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          136              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          136527           -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13765190         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13770893         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          13814965         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          139              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14018952         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14220178         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14307336         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14307358         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14336700         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          14977618         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          16065831         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          16842038         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          16925250         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          18454121         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          18540299         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          195              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          198              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          199              -9  68.45 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          200              -9  68.45 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          201              -9  68.45 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          202              -9  68.45 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          21679312         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          2223930          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          226              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          22967926         -9  68.45 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          253              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          27253287         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          301042           -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          3141126          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          3333673          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          373024           -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          50922297         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          543908           -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          593748           -9  68.45 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          598630           -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          6018899          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          602              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          603              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          604              -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          61789513         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          61790145         -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          62384            -9  68.45 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7428480          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7439921          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7439965          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7439976          -9  68.45 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440020          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440360          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440382          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440417          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440439          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440473          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7440484          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446084          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446142          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446277          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7446346          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7487947          -9  68.45 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7488564          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7542098          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7647010          -9  79.51 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7718549          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7722647          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7738945          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7758976          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7775113          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7778394          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7778509          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7782492          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7782505          -9  79.51 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783008          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783075          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783166          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783702          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7783791          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7784409          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7784421          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7785877          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7786814          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7787475          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7787497          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7788967          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7788989          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789006          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789062          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789095          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789120          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7789426          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          7790809          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          78002            -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          8030704          -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          88               -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          92               -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          93               -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__16065831    -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__18540299    -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__7439965     -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 0          EXH__7440020     -9   0.00 100 100 -9   0801-4 Y R 336                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Solite MACT=Hazardous Waste Incineration: Lightweight Aggregate Kilns: NEI_UNIQUE_ID=NEI17526: cdate=2008
51143 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51143 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2647                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51163 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13914                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 22827MRCKCHIGHW                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51165 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2408                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51171 0          PM10             -9  28.00 100 100 -9   -9     Y R 00003                           ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51171 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 00003                           ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51171 0          SO2              -9  20.00 100 100 -9   -9     Y R 00003                           ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51171 0          PM10             -9  28.00 100 100 -9   -9     Y R 22657GLBLS1696O                 ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51171 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 22657GLBLS1696O                 ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51171 0          SO2              -9  20.00 100 100 -9   -9     Y R 22657GLBLS1696O                 ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51171 0          PM10             -9  28.00 100 100 -9   -9     Y R T$13835                         ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51171 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$13835                         ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51171 0          SO2              -9  20.00 100 100 -9   -9     Y R T$13835                         ! MACT: Lime Manufacturing: GLOBAL STONE CHEMSTONE CORPORATION
51550 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00038                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51550 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00048                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1251                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51580 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2605                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00002                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 24541DNRVR1100W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51590 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2641                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00018                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00036                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00058                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00061                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2592                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2593                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51640 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2595                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51650 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00010                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00003                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 0          10025737         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10025919         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10031137         -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10034829         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10049055         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10060125         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10099748         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10101505         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10101538         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10101970         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10108642         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10124364         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10124433         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10294403         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10325947         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10377669         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          10588019         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          109              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          11103869         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          12018018         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          12018198         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          12035722         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          12054487         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          12060003         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          12079651         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          125              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          12626812         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          12640890         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          12710360         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1271289          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1303282          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1304569          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1306190          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1306236          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1307966          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1308061          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1308141          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1308389          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1309600          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1309644          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1313139          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13138459         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1313991          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1314063          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1314416          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1317346          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1317357          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1317368          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1317426          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1327339          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1327533          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1333820          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1335257          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1335326          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1336932          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1345046          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          1345160          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13462889         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13463393         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13510491         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13530659         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13530682         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13586828         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13597994         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          136              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          136527           -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13765190         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13770893         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          13814965         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          139              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          14018952         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          14220178         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          14307336         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          14307358         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          14336700         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          14977618         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          16065831         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          16842038         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          16925250         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          18454121         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          18540299         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          195              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          198              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          199              -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          200              -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          201              -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          202              -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          21679312         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          2223930          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          226              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          253              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          27253287         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          301042           -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          3141126          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          3333673          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          373024           -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          50922297         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          543908           -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          593748           -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          598630           -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          6018899          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          602              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          603              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          604              -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          61789513         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          61790145         -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          62384            -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7428480          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7439921          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7439965          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7440020          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7440360          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7440382          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7440417          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7440439          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7440473          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7440484          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7446084          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7446142          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7446277          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7446346          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7488564          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7542098          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7718549          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7722647          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7738945          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7758976          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7775113          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7778394          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7778509          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7782492          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7783008          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7783075          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7783166          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7783702          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7783791          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7784409          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7784421          -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7785877          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7786814          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7787475          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7787497          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7788967          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7788989          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7789006          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7789062          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7789095          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7789120          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7789426          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          7790809          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          78002            -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          8030704          -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          88               -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          92               -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          93               -9   0.00 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          EXH__16065831    -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          EXH__18540299    -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          EXH__7439965     -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          EXH__7440020     -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Allied Fibers MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          PM10             -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: HONEYWELLINTERNATIONALINCHOPEWELLPLA: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 0          PM2_5            -9  96.29 100 100 -9   0801-2 Y R 465                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: HONEYWELLINTERNATIONALINCHOPEWELLPLA: NEI_UNIQUE_ID=NEIVA6700002: cdate=2008
51670 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1254                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51670 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2512                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00097                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51680 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2621                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51710 0          106990           -9  28.00 100 100 -9   -9     Y R 00009                           ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          107028           -9  28.00 100 100 -9   -9     Y R 00009                           ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          50000            -9  28.00 100 100 -9   -9     Y R 00009                           ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          67561            -9  28.00 100 100 -9   -9     Y R 00009                           ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          71432            -9  28.00 100 100 -9   -9     Y R 00009                           ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          75070            -9  28.00 100 100 -9   -9     Y R 00009                           ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          91203            -9  28.00 100 100 -9   -9     Y R 00009                           ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          VOC              -9  28.00 100 100 -9   -9     Y R 00009                           ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          106990           -9  28.00 100 100 -9   -9     Y R 23523FRDMT2424S                 ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          107028           -9  28.00 100 100 -9   -9     Y R 23523FRDMT2424S                 ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          50000            -9  28.00 100 100 -9   -9     Y R 23523FRDMT2424S                 ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          67561            -9  28.00 100 100 -9   -9     Y R 23523FRDMT2424S                 ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          71432            -9  28.00 100 100 -9   -9     Y R 23523FRDMT2424S                 ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          75070            -9  28.00 100 100 -9   -9     Y R 23523FRDMT2424S                 ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          91203            -9  28.00 100 100 -9   -9     Y R 23523FRDMT2424S                 ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51710 0          VOC              -9  28.00 100 100 -9   -9     Y R 23523FRDMT2424S                 ! MACT: Autos, plant: FordMotorCompanyNorfolkPlant, VOC 28%: Auto_2002_projections.xls
51730 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51730 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00001                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00012                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00087                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00308                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51760 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2439                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00083                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00088                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51770 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2526                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51810 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00013                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 00009                           ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
51820 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2412                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 0          10025737         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10025919         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10031137         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10034829         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10049055         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10060125         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10099748         -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10101505         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10101538         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10101970         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10108642         -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10124364         -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10124433         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10294403         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10325947         -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10377669         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          10588019         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          109              -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          11103869         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          12018018         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          12018198         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          12035722         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          12054487         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          12060003         -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          12079651         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          125              -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          12626812         -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          12640890         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          12710360         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1271289          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1303282          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1304569          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1306190          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1306236          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1307966          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1308061          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1308141          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1308389          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1309600          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1309644          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1313139          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13138459         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1313991          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1314063          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1314416          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1317346          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1317357          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1317368          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1317426          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1327339          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1327533          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1333820          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1335257          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1335326          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1336932          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1345046          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          1345160          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13462889         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13463393         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13510491         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13530659         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13530682         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13586828         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13597994         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          136              -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          136527           -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13765190         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13770893         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          13814965         -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          139              -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          14018952         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          14220178         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          14307336         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          14307358         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          14336700         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          14977618         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          16065831         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          16842038         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          16925250         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          18454121         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          18540299         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          195              -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          198              -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          199              -9  73.66 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          200              -9  73.66 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          201              -9  73.66 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          202              -9  73.66 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          21679312         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          2223930          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          226              -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          22967926         -9  73.66 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          253              -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          27253287         -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          301042           -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          3141126          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          3333673          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          373024           -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          50922297         -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          543908           -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          593748           -9  73.66 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          598630           -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          6018899          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          602              -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          603              -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          604              -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          61789513         -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          61790145         -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          62384            -9  73.66 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7428480          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7439921          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7439965          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7439976          -9  73.66 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7440020          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7440360          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7440382          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7440417          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7440439          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7440473          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7440484          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7446084          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7446142          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7446277          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7446346          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7487947          -9  73.66 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7488564          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7542098          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7647010          -9  82.01 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7718549          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7722647          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7738945          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7758976          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7775113          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7778394          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7778509          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7782492          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7782505          -9  82.01 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7783008          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7783075          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7783166          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7783702          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7783791          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7784409          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7784421          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7785877          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7786814          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7787475          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7787497          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7788967          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7788989          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7789006          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7789062          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7789095          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7789120          -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7789426          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          7790809          -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          78002            -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          8030704          -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          88               -9  23.34 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          92               -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          93               -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          EXH__16065831    -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          EXH__18540299    -9  94.93 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          EXH__7439965     -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 0          EXH__7440020     -9   0.00 100 100 -9   0801-6 Y R 771                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: NOVEAN KALAMA, INC. MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEI54314: cdate=2008
53015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 98632WYRHS3401I                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1258                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13597                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53053 0          PM10             -9  28.00 100 100 -9   -9     Y R 11820                           ! MACT: Lime Manufacturing: GRAYMONT WESTERN US INC
53053 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 11820                           ! MACT: Lime Manufacturing: GRAYMONT WESTERN US INC
53053 0          SO2              -9  20.00 100 100 -9   -9     Y R 11820                           ! MACT: Lime Manufacturing: GRAYMONT WESTERN US INC
53053 0          PM10             -9  28.00 100 100 -9   -9     Y R 98421CNTNN1220A                 ! MACT: Lime Manufacturing: GRAYMONT WESTERN US INC
53053 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 98421CNTNN1220A                 ! MACT: Lime Manufacturing: GRAYMONT WESTERN US INC
53053 0          SO2              -9  20.00 100 100 -9   -9     Y R 98421CNTNN1220A                 ! MACT: Lime Manufacturing: GRAYMONT WESTERN US INC
53053 0          PM10             -9  28.00 100 100 -9   -9     Y R T$18763                         ! MACT: Lime Manufacturing: GRAYMONT WESTERN US INC
53053 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$18763                         ! MACT: Lime Manufacturing: GRAYMONT WESTERN US INC
53053 0          SO2              -9  20.00 100 100 -9   -9     Y R T$18763                         ! MACT: Lime Manufacturing: GRAYMONT WESTERN US INC
53057 30600201   PM10             -9  90.00 100 100 -9   -9     Y R 0003                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42382, Plant=Shell Oil (formerly Equilon Enterprises, formerly Te, Anacortes, WA, compliance date: 31DEC2006
53057 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R 0003                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42382, Plant=Shell Oil (formerly Equilon Enterprises, formerly Te, Anacortes, WA, compliance date: 31DEC2006
53057 30600201   SO2              -9  99.00 100 100 -9   -9     Y R 0003                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42382, Plant=Shell Oil (formerly Equilon Enterprises, formerly Te, Anacortes, WA, compliance date: 31DEC2006
53057 30600201   PM10             -9  90.00 100 100 -9   -9     Y R T$13532                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42382, Plant=Shell Oil (formerly Equilon Enterprises, formerly Te, Anacortes, WA, compliance date: 31DEC2006
53057 30600201   PM2_5            -9  90.00 100 100 -9   -9     Y R T$13532                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42382, Plant=Shell Oil (formerly Equilon Enterprises, formerly Te, Anacortes, WA, compliance date: 31DEC2006
53057 30600201   SO2              -9  99.00 100 100 -9   -9     Y R T$13532                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42382, Plant=Shell Oil (formerly Equilon Enterprises, formerly Te, Anacortes, WA, compliance date: 31DEC2006
53073 10200701   NOX              -9  40.00 100 100 -9   -9     Y R 0007                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 18JAN2015
53073 20200203   NOX              -9  40.00 100 100 -9   -9     Y R 0007                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 18JAN2015
53073 30600104   NOX              -9  40.00 100 100 -9   -9     Y R 0007                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 18JAN2015
53073 10200701   SO2              -9  90.00 100 100 -9   -9     Y R 0007                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 30SEP2005
53073 30600104   SO2              -9  90.00 100 100 -9   -9     Y R 0007                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 30SEP2005
53073 30600904   SO2              -9  90.00 100 100 -9   -9     Y R 0007                            ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 30SEP2005
53073 10200701   NOX              -9  40.00 100 100 -9   -9     Y R T$13545                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 18JAN2015
53073 20200203   NOX              -9  40.00 100 100 -9   -9     Y R T$13545                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 18JAN2015
53073 30600104   NOX              -9  40.00 100 100 -9   -9     Y R T$13545                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 18JAN2015
53073 10200701   SO2              -9  90.00 100 100 -9   -9     Y R T$13545                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 30SEP2005
53073 30600104   SO2              -9  90.00 100 100 -9   -9     Y R T$13545                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 30SEP2005
53073 30600904   SO2              -9  90.00 100 100 -9   -9     Y R T$13545                         ! Brenda Shine Refinery plant/SCC controls, NEIFACID=NEI42413, Plant=BP (formerly Atlantic Richfield Co. (ARCO)), Ferndale, WA, compliance date: 30SEP2005
53075 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0008                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100101   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100102   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100201   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100202   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100203   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100204   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100205   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100211   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100212   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100215   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100217   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100218   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100221   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100222   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100223   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100224   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100225   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100226   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100235   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100237   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100238   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100300   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100301   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100302   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100303   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100304   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100306   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100316   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100317   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100318   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200101   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200104   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200107   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200117   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200201   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200202   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200203   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200204   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200205   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200206   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200210   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200212   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200213   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200217   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200218   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200219   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200221   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200222   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200223   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200224   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200225   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200226   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200229   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200300   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200301   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200302   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200303   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200304   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200306   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200307   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200802   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200804   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300101   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300102   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300103   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300200   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300203   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300205   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300206   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300207   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300208   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300209   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300211   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300214   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300216   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300217   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300218   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300221   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300222   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300223   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300224   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300225   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300226   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300300   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300305   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300306   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300307   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300309   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000100   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000189   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000199   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000200   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000201   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000203   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000288   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000289   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000299   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000389   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000399   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000801   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000889   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000899   PM10             -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
53075 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R MWI-117                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5401900001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1268                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54019 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2656                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403700007                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0007                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 25303NNCRB437MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5403900003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 0          10025737         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10025919         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10034829         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10049055         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10060125         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10101505         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10101538         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10101970         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10108642         -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10124364         -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10124433         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10294403         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10325947         -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10377669         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10588019         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          109              -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          11103869         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12018018         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12018198         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12035722         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12054487         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12079651         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          125              -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12640890         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12710360         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1271289          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1306190          -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1306236          -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1307966          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1308061          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1308141          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1308389          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1309644          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1313139          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13138459         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1313991          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1314063          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1317346          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1317357          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1317426          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1327339          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1333820          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1336932          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1345046          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1345160          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13462889         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13463393         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13530659         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13530682         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13586828         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          136              -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          136527           -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13765190         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13770893         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          139              -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14018952         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14220178         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14307336         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14307358         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14336700         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14977618         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          16065831         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          16842038         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          16925250         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          18454121         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          18540299         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          195              -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          198              -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          199              -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          200              -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          201              -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          202              -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          21679312         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          2223930          -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          226              -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          253              -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          301042           -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          3333673          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          373024           -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          50922297         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          543908           -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          593748           -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          598630           -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          6018899          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          602              -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          603              -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          604              -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          61789513         -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          62384            -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7439965          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440020          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440360          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440439          -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440473          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440484          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7446084          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7446346          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7488564          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7542098          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7647010          -9  80.50 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7718549          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7722647          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7738945          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7758976          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7775113          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7778509          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7782492          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7782505          -9  80.50 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7783008          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7783075          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7783166          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7783702          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7783791          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7785877          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7786814          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7788967          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7788989          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7789006          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7789062          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7789095          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7789120          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7789426          -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7790809          -9  88.71 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          78002            -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          8030704          -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          88               -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          92               -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          93               -9   0.00 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          EXH__16065831    -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          EXH__18540299    -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          EXH__7439965     -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          EXH__7440020     -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          PM10             -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BAYERCROPSCIENCELP: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          PM2_5            -9  51.40 100 100 -9   0801-6 Y R 819                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BAYERCROPSCIENCELP: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10025737         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10025919         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10031137         -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10034829         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10049055         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10060125         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10099748         -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10101505         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10101538         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10101970         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10108642         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10124364         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10124433         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10294403         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10325947         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10377669         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10588019         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          109              -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          11103869         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12018018         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12018198         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12035722         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12054487         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12060003         -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12079651         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          125              -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12626812         -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12640890         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          12710360         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1271289          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1303282          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1304569          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1306190          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1306236          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1307966          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1308061          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1308141          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1308389          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1309600          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1309644          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1313139          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13138459         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1313991          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1314063          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1314416          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1317346          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1317357          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1317368          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1317426          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1327339          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1327533          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1333820          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1335257          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1335326          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1336932          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1345046          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          1345160          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13462889         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13463393         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13510491         -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13530659         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13530682         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13586828         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13597994         -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          136              -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          136527           -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13765190         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13770893         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          13814965         -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          139              -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14018952         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14220178         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14307336         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14307358         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14336700         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          14977618         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          16065831         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          16842038         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          16925250         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          18454121         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          18540299         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          195              -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          198              -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          199              -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          200              -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          201              -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          202              -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          21679312         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          2223930          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          226              -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          22967926         -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          253              -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          27253287         -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          301042           -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          3141126          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          3333673          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          373024           -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          50922297         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          543908           -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          593748           -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          598630           -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          6018899          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          602              -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          603              -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          604              -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          61789513         -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          61790145         -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          62384            -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7428480          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7439921          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7439965          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7439976          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440020          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440360          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440382          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440417          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440439          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440473          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7440484          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7446084          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7446142          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7446277          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7446346          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7487947          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7488564          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7542098          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7647010          -9  80.50 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7718549          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7722647          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7738945          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7758976          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7775113          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7778394          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7778509          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7782492          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7782505          -9  80.50 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7783008          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7783075          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7783166          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7783702          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7783791          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7784409          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7784421          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7785877          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7786814          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7787475          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7787497          -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7788967          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7788989          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7789006          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7789062          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7789095          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7789120          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7789426          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          7790809          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          78002            -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          8030704          -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          88               -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          92               -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          93               -9   0.00 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          EXH__16065831    -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          EXH__18540299    -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          EXH__7439965     -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          EXH__7440020     -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CROPSCIENCE MACT=Hazardous Waste Incineration: Liquid Fuel Boilers: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          PM10             -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BAYERCROPSCIENCELP: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          PM2_5            -9  51.40 100 100 -9   0801-6 Y R 819A                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BAYERCROPSCIENCELP: NEI_UNIQUE_ID=NEIWV0390007: cdate=2008
54039 0          10025737         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10025919         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10031137         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10034829         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10049055         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10060125         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10099748         -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10101505         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10101538         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10101970         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10108642         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10124364         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10124433         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10294403         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10325947         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10377669         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          10588019         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          109              -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          11103869         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          12018018         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          12018198         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          12035722         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          12054487         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          12060003         -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          12079651         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          125              -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          12626812         -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          12640890         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          12710360         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1271289          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1303282          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1304569          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1306190          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1306236          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1307966          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1308061          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1308141          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1308389          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1309600          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1309644          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1313139          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13138459         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1313991          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1314063          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1314416          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1317346          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1317357          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1317368          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1317426          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1327339          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1327533          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1333820          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1335257          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1335326          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1336932          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1345046          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          1345160          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13462889         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13463393         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13510491         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13530659         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13530682         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13586828         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13597994         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          136              -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          136527           -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13765190         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13770893         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          13814965         -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          139              -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          14018952         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          14220178         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          14307336         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          14307358         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          14336700         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          14977618         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          16065831         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          16842038         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          16925250         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          18454121         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          18540299         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          195              -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          198              -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          199              -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          200              -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          201              -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          202              -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          21679312         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          2223930          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          226              -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          22967926         -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          253              -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          27253287         -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          301042           -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          3141126          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          3333673          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          373024           -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          50922297         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          543908           -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          593748           -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          598630           -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          6018899          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          602              -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          603              -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          604              -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          61789513         -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          61790145         -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          62384            -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7428480          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7439921          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7439965          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7439976          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7440020          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7440360          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7440382          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7440417          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7440439          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7440473          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7440484          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7446084          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7446142          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7446277          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7446346          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7487947          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7488564          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7542098          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7647010          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7718549          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7722647          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7738945          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7758976          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7775113          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7778394          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7778509          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7782492          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7782505          -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7783008          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7783075          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7783166          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7783702          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7783791          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7784409          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7784421          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7785877          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7786814          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7787475          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7787497          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7788967          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7788989          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7789006          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7789062          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7789095          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7789120          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7789426          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          7790809          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          78002            -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          8030704          -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          88               -9   0.00 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          92               -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          93               -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          EXH__16065831    -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          EXH__18540299    -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          EXH__7439965     -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 0          EXH__7440020     -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: UNION CARBIDE (DOW) SO. CHARLESTON PLANT MACT=Hazardous Waste Incineration: Solid Fuel Boilers: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 0          PM10             -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: UNIONCARBIDECORPSOUTHCHARLESTONPLAN: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 908                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 0          PM2_5            -9  70.05 100 100 -9   0801-5 Y R 908                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: UNIONCARBIDECORPSOUTHCHARLESTONPLAN: NEI_UNIQUE_ID=NEI45600: cdate=2008
54039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-202                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R ES0603-203                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2662                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54039 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2681                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 0          10025737         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10025919         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10031137         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10034829         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10049055         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10060125         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10099748         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10101505         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10101538         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10101970         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10108642         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10124364         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10124433         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10294403         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10325947         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10377669         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          10588019         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          109              -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          11103869         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          12018018         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          12018198         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          12035722         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          12054487         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          12060003         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          12079651         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          125              -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          12626812         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          12640890         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          12710360         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1271289          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1303282          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1304569          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1306190          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1306236          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1307966          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1308061          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1308141          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1308389          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1309600          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1309644          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1313139          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13138459         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1313991          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1314063          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1314416          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1317346          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1317357          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1317368          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1317426          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1327339          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1327533          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1333820          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1335257          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1335326          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1336932          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1345046          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          1345160          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13462889         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13463393         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13510491         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13530659         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13530682         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13586828         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13597994         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          136              -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          136527           -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13765190         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13770893         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          13814965         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          139              -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          14018952         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          14220178         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          14307336         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          14307358         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          14336700         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          14977618         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          16065831         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          16842038         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          16925250         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          18454121         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          18540299         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          195              -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          198              -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          199              -9  13.19 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          200              -9  13.19 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          201              -9  13.19 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          202              -9  13.19 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          21679312         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          2223930          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          226              -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          22967926         -9  13.19 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          253              -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          27253287         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          301042           -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          3141126          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          3333673          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          373024           -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          50922297         -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          543908           -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          593748           -9  13.19 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          598630           -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          6018899          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          602              -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          603              -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          604              -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          61789513         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          61790145         -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          62384            -9  13.19 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7428480          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7439921          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7439965          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7439976          -9  13.19 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7440020          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7440360          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7440382          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7440417          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7440439          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7440473          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7440484          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7446084          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7446142          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7446277          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7446346          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7487947          -9  13.19 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7488564          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7542098          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7647010          -9   5.59 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7718549          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7722647          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7738945          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7758976          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7775113          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7778394          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7778509          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7782492          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7782505          -9   5.59 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7783008          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7783075          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7783166          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7783702          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7783791          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7784409          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7784421          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7785877          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7786814          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7787475          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7787497          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7788967          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7788989          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7789006          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7789062          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7789095          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7789120          -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7789426          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          7790809          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          78002            -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          8030704          -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          88               -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          92               -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          93               -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          EXH__16065831    -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          EXH__18540299    -9  69.04 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          EXH__7439965     -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          EXH__7440020     -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: BAYER CORPORATION MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          PM10             -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MilesInc: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 0          PM2_5            -9  61.82 100 100 -9   0801-2 Y R 340                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MilesInc: NEI_UNIQUE_ID=NEI43420: cdate=2008
54051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1279                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54051 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2734                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0011                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 26726LLGNYWESTV                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5405700011                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54057 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2767                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54071 0          PM10             -9  28.00 100 100 -9   -9     Y R 0001                            ! MACT: Lime Manufacturing: GREER LIME FACILITY
54071 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 0001                            ! MACT: Lime Manufacturing: GREER LIME FACILITY
54071 0          SO2              -9  20.00 100 100 -9   -9     Y R 0001                            ! MACT: Lime Manufacturing: GREER LIME FACILITY
54073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0003                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 0          10025737         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10025919         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10031137         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10034829         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10049055         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10060125         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10099748         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10101505         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10101538         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10101970         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10108642         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10124364         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10124433         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10294403         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10325947         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10377669         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          10588019         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          109              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          11103869         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          12018018         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          12018198         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          12035722         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          12054487         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          12060003         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          12079651         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          125              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          12626812         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          12640890         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          12710360         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1271289          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1303282          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1304569          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1306190          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1306236          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1307966          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1308061          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1308141          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1308389          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1309600          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1309644          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1313139          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13138459         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1313991          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1314063          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1314416          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1317346          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1317357          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1317368          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1317426          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1327339          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1327533          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1333820          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1335257          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1335326          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1336932          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1345046          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          1345160          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13462889         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13463393         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13510491         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13530659         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13530682         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13586828         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13597994         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          136              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          136527           -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13765190         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13770893         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          13814965         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          139              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          14018952         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          14220178         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          14307336         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          14307358         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          14336700         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          14977618         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          16065831         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          16842038         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          16925250         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          18454121         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          18540299         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          195              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          198              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          199              -9  87.54 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          200              -9  87.54 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          201              -9  87.54 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          202              -9  87.54 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          21679312         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          2223930          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          226              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          22967926         -9  87.54 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          253              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          27253287         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          301042           -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          3141126          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          3333673          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          373024           -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          50922297         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          543908           -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          593748           -9  87.54 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          598630           -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          6018899          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          602              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          603              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          604              -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          61789513         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          61790145         -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          62384            -9  87.54 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7428480          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7439921          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7439965          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7439976          -9  87.54 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7440020          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7440360          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7440382          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7440417          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7440439          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7440473          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7440484          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7446084          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7446142          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7446277          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7446346          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7487947          -9  87.54 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7488564          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7542098          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7718549          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7722647          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7738945          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7758976          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7775113          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7778394          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7778509          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7782492          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7783008          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7783075          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7783166          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7783702          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7783791          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7784409          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7784421          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7785877          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7786814          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7787475          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7787497          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7788967          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7788989          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7789006          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7789062          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7789095          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7789120          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7789426          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          7790809          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          78002            -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          8030704          -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          88               -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          92               -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          93               -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          EXH__16065831    -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          EXH__18540299    -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          EXH__7439965     -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          EXH__7440020     -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CYTEC INDUSTRIES - REDACTED NON-CONFID MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          PM10             -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CYTECINDUSTRIES-REDACTEDNON-CONFID: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 0          PM2_5            -9  92.98 100 100 -9   0801-2 Y R 3007                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CYTECINDUSTRIES-REDACTEDNON-CONFID: NEI_UNIQUE_ID=NEI42447: cdate=2008
54073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R A21                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2743                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2665                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54079 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2666                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54095 0          10025737         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10025919         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10031137         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10034829         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10049055         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10060125         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10099748         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10101505         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10101538         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10101970         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10108642         -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10124364         -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10124433         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10294403         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10325947         -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10377669         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          10588019         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          109              -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          11103869         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          12018018         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          12018198         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          12035722         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          12054487         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          12060003         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          12079651         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          125              -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          12626812         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          12640890         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          12710360         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1271289          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1303282          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1304569          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1306190          -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1306236          -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1307966          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1308061          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1308141          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1308389          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1309600          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1309644          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1313139          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13138459         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1313991          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1314063          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1314416          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1317346          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1317357          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1317368          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1317426          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1327339          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1327533          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1333820          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1335257          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1335326          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1336932          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1345046          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          1345160          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13462889         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13463393         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13510491         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13530659         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13530682         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13586828         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13597994         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          136              -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          136527           -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13765190         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13770893         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          13814965         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          139              -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          14018952         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          14220178         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          14307336         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          14307358         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          14336700         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          14977618         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          16065831         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          16842038         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          16925250         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          18454121         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          18540299         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          195              -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          198              -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          199              -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          200              -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          201              -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          202              -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          21679312         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          2223930          -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          226              -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          253              -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          27253287         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          301042           -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          3141126          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          3333673          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          373024           -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          50922297         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          543908           -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          598630           -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          6018899          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          602              -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          603              -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          604              -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          61789513         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          61790145         -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7428480          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7439921          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7439965          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7440020          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7440360          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7440382          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7440417          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7440439          -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7440473          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7440484          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7446084          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7446142          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7446277          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7446346          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7488564          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7542098          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7647010          -9  78.40 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7718549          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7722647          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7738945          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7758976          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7775113          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7778394          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7778509          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7782492          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7782505          -9  78.40 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7783008          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7783075          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7783166          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7783702          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7783791          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7784409          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7784421          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7785877          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7786814          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7787475          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7787497          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7788967          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7788989          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7789006          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7789062          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7789095          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7789120          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7789426          -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          7790809          -9   0.00 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          78002            -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          8030704          -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          88               -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          92               -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          93               -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          EXH__16065831    -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          EXH__18540299    -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          EXH__7439965     -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          EXH__7440020     -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: CROMPTON CORP. SISTERSVILLE PLANT MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          PM10             -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CROMPTONCORP.SISTERSVILLEPLANT: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54095 0          PM2_5            -9  93.60 100 100 -9   0801-2 Y R 3006                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: CROMPTONCORP.SISTERSVILLEPLANT: NEI_UNIQUE_ID=NEIWV0001: cdate=2008
54099 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0010                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54099 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$13944                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0001                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 26180DPNTWDUPON                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 455                             ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5410700001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54107 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2738                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 0002                            ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
54109 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$2652                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032650                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 405032870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 0          PM10             -9  28.00 100 100 -9   -9     Y R 405033970                       ! MACT: Lime Manufacturing: WESTERN LIME CORPORATION
55009 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 405033970                       ! MACT: Lime Manufacturing: WESTERN LIME CORPORATION
55009 0          SO2              -9  20.00 100 100 -9   -9     Y R 405033970                       ! MACT: Lime Manufacturing: WESTERN LIME CORPORATION
55009 0          PM10             -9  28.00 100 100 -9   -9     Y R 405041560                       ! MACT: Lime Manufacturing: GREAT LAKES CALCIUM CORPORATION
55009 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 405041560                       ! MACT: Lime Manufacturing: GREAT LAKES CALCIUM CORPORATION
55009 0          SO2              -9  20.00 100 100 -9   -9     Y R 405041560                       ! MACT: Lime Manufacturing: GREAT LAKES CALCIUM CORPORATION
55009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54115NCLTP200MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54302GRNBY1601N                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 0          PM10             -9  28.00 100 100 -9   -9     Y R 54303WSTRN101JA                 ! MACT: Lime Manufacturing: WESTERN LIME CORPORATION
55009 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 54303WSTRN101JA                 ! MACT: Lime Manufacturing: WESTERN LIME CORPORATION
55009 0          SO2              -9  20.00 100 100 -9   -9     Y R 54303WSTRN101JA                 ! MACT: Lime Manufacturing: WESTERN LIME CORPORATION
55009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54307FRTHW1919S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 0          PM10             -9  28.00 100 100 -9   -9     Y R T$16745                         ! MACT: Lime Manufacturing: WESTERN LIME CORPORATION
55009 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$16745                         ! MACT: Lime Manufacturing: WESTERN LIME CORPORATION
55009 0          SO2              -9  20.00 100 100 -9   -9     Y R T$16745                         ! MACT: Lime Manufacturing: WESTERN LIME CORPORATION
55009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8493                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8537                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55009 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8548                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037220                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55017 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 609037660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 113008390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014000                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 113014550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55025 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 113023570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55027 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 114012030                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 0          PM10             -9  28.00 100 100 -9   -9     Y R 54880CLMCRHILLA                 ! MACT: Lime Manufacturing: C L M CORPORATION-SUPERIOR
55031 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 54880CLMCRHILLA                 ! MACT: Lime Manufacturing: C L M CORPORATION-SUPERIOR
55031 0          SO2              -9  20.00 100 100 -9   -9     Y R 54880CLMCRHILLA                 ! MACT: Lime Manufacturing: C L M CORPORATION-SUPERIOR
55031 0          PM10             -9  28.00 100 100 -9   -9     Y R 816036430                       ! MACT: Lime Manufacturing: C L M CORPORATION-SUPERIOR
55031 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 816036430                       ! MACT: Lime Manufacturing: C L M CORPORATION-SUPERIOR
55031 0          SO2              -9  20.00 100 100 -9   -9     Y R 816036430                       ! MACT: Lime Manufacturing: C L M CORPORATION-SUPERIOR
55031 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 816037530                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55031 0          PM10             -9  28.00 100 100 -9   -9     Y R T$16780                         ! MACT: Lime Manufacturing: C L M CORPORATION-SUPERIOR
55031 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$16780                         ! MACT: Lime Manufacturing: C L M CORPORATION-SUPERIOR
55031 0          SO2              -9  20.00 100 100 -9   -9     Y R T$16780                         ! MACT: Lime Manufacturing: C L M CORPORATION-SUPERIOR
55033 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55033 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 617013320                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55035 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 618027080                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55039 0          PM10             -9  28.00 100 100 -9   -9     Y R 420042480                       ! MACT: Lime Manufacturing: WESTERN LIME CORP - EDEN PLANT
55039 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 420042480                       ! MACT: Lime Manufacturing: WESTERN LIME CORP - EDEN PLANT
55039 0          SO2              -9  20.00 100 100 -9   -9     Y R 420042480                       ! MACT: Lime Manufacturing: WESTERN LIME CORP - EDEN PLANT
55039 0          PM10             -9  28.00 100 100 -9   -9     Y R 53019WSTRNN4520                 ! MACT: Lime Manufacturing: WESTERN LIME CORP - EDEN PLANT
55039 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 53019WSTRNN4520                 ! MACT: Lime Manufacturing: WESTERN LIME CORP - EDEN PLANT
55039 0          SO2              -9  20.00 100 100 -9   -9     Y R 53019WSTRNN4520                 ! MACT: Lime Manufacturing: WESTERN LIME CORP - EDEN PLANT
55039 0          PM10             -9  28.00 100 100 -9   -9     Y R T$16624                         ! MACT: Lime Manufacturing: WESTERN LIME CORP - EDEN PLANT
55039 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$16624                         ! MACT: Lime Manufacturing: WESTERN LIME CORP - EDEN PLANT
55039 0          SO2              -9  20.00 100 100 -9   -9     Y R T$16624                         ! MACT: Lime Manufacturing: WESTERN LIME CORP - EDEN PLANT
55043 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55043 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 122005840                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 123012670                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 53522RQSFNHWYMA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55045 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16704                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55063 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 632028210                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 735008010                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1301                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55069 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8600                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 0          PM10             -9  28.00 100 100 -9   -9     Y R 436034390                       ! MACT: Lime Manufacturing: ROCKWELL LIME COMPANY
55071 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 436034390                       ! MACT: Lime Manufacturing: ROCKWELL LIME COMPANY
55071 0          SO2              -9  20.00 100 100 -9   -9     Y R 436034390                       ! MACT: Lime Manufacturing: ROCKWELL LIME COMPANY
55071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 436036700                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 436041870                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 0          PM10             -9  28.00 100 100 -9   -9     Y R 54220RCKWL4110R                 ! MACT: Lime Manufacturing: ROCKWELL LIME COMPANY
55071 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 54220RCKWL4110R                 ! MACT: Lime Manufacturing: ROCKWELL LIME COMPANY
55071 0          SO2              -9  20.00 100 100 -9   -9     Y R 54220RCKWL4110R                 ! MACT: Lime Manufacturing: ROCKWELL LIME COMPANY
55071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54221MNTWC2401S                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 0          PM10             -9  28.00 100 100 -9   -9     Y R T$16737                         ! MACT: Lime Manufacturing: ROCKWELL LIME COMPANY
55071 0          PM2_5            -9  28.00 100 100 -9   -9     Y R T$16737                         ! MACT: Lime Manufacturing: ROCKWELL LIME COMPANY
55071 0          SO2              -9  20.00 100 100 -9   -9     Y R T$16737                         ! MACT: Lime Manufacturing: ROCKWELL LIME COMPANY
55071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8528                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55071 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8532                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54455MSNPP100MA                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54476JCSCM900AL                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 737009570                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 737079640                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16757                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55073 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8579                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039360                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 438039910                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54151NGRFW1101M                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1306                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55075 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8508                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54507RHNLN515WE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 744008100                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 744139660                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1310                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55085 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8608                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 445030960                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031180                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 445031290                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 445038550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54113PPLTN540PR                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54130THLMNTHILM                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54136MDTCPNMAIN                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1311                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1312                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8491                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8499                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8501                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55087 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8670                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55093 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 648015170                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54481CNSLD2627W                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 750008710                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 750036760                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55097 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8594                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54552FLMBP200NO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 851009390                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55099 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8609                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 0          106990           -9  28.00 100 100 -9   -9     Y R 154002860                       ! MACT: Autos, plant: GM-NAOJANESVILLE-TRUCKPLATFORM, VOC 28%: Auto_2002_projections.xls
55105 0          107028           -9  28.00 100 100 -9   -9     Y R 154002860                       ! MACT: Autos, plant: GM-NAOJANESVILLE-TRUCKPLATFORM, VOC 28%: Auto_2002_projections.xls
55105 0          50000            -9  28.00 100 100 -9   -9     Y R 154002860                       ! MACT: Autos, plant: GM-NAOJANESVILLE-TRUCKPLATFORM, VOC 28%: Auto_2002_projections.xls
55105 0          67561            -9  28.00 100 100 -9   -9     Y R 154002860                       ! MACT: Autos, plant: GM-NAOJANESVILLE-TRUCKPLATFORM, VOC 28%: Auto_2002_projections.xls
55105 0          71432            -9  28.00 100 100 -9   -9     Y R 154002860                       ! MACT: Autos, plant: GM-NAOJANESVILLE-TRUCKPLATFORM, VOC 28%: Auto_2002_projections.xls
55105 0          75070            -9  28.00 100 100 -9   -9     Y R 154002860                       ! MACT: Autos, plant: GM-NAOJANESVILLE-TRUCKPLATFORM, VOC 28%: Auto_2002_projections.xls
55105 0          91203            -9  28.00 100 100 -9   -9     Y R 154002860                       ! MACT: Autos, plant: GM-NAOJANESVILLE-TRUCKPLATFORM, VOC 28%: Auto_2002_projections.xls
55105 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 154002860                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 0          VOC              -9  28.00 100 100 -9   -9     Y R 154002860                       ! MACT: Autos, plant: GM-NAOJANESVILLE-TRUCKPLATFORM, VOC 28%: Auto_2002_projections.xls
55105 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55105 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8418                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 157003550                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 53959GRDFN700AS                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55111 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$16720                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55127 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 265005400                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 471034190                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55139 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 471037490                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54457NKSMLMARKE                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD621BI                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 54494CNSLD950FO                 ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 772009480                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010140                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 772010690                       ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1319                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1320                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1321                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8582                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8603                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
55141 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$8604                          ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56001 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600100005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56003 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600300006                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56005 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600500004                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56007 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5600700012                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56011 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601100003                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5601500001                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100101   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100102   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100201   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100202   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100203   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100204   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100205   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100211   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100212   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100215   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100217   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100218   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100221   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100222   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100223   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100224   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100225   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100226   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100235   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100237   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100238   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100300   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100301   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100302   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100303   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100304   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100306   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100316   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100317   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100318   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200101   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200104   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200107   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200117   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200201   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200202   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200203   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200204   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200205   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200206   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200210   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200212   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200213   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200217   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200218   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200219   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200221   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200222   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200223   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200224   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200225   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200226   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200229   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200300   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200301   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200302   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200303   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200304   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200306   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200307   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200802   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200804   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300101   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300102   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300103   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300200   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300203   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300205   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300206   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300207   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300208   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300209   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300211   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300214   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300216   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300217   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300218   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300221   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300222   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300223   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300224   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300225   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300226   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300300   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300305   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300306   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300307   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300309   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000100   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000189   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000199   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000200   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000201   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000203   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000288   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000289   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000299   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000389   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000399   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000801   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000889   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000899   PM10             -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56015 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R T$18037                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56029 0          PM10             -9  28.00 100 100 -9   -9     Y R 5602900014                      ! MACT: Lime Manufacturing: DAKOTA COAL CO._FRANNIE LIME PLANT
56029 0          PM2_5            -9  28.00 100 100 -9   -9     Y R 5602900014                      ! MACT: Lime Manufacturing: DAKOTA COAL CO._FRANNIE LIME PLANT
56029 0          SO2              -9  20.00 100 100 -9   -9     Y R 5602900014                      ! MACT: Lime Manufacturing: DAKOTA COAL CO._FRANNIE LIME PLANT
56037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700002                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700005                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700010                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R 5603700048                      ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100215   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100235   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100237   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100238   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100316   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100317   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100318   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200104   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200107   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200117   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200202   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200204   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200210   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200212   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200213   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200219   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200229   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200301   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200302   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200303   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200304   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200802   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200804   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300101   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300102   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300103   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300205   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300206   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300207   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300208   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300209   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300211   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300214   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300216   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300217   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300218   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300221   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300222   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300223   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300224   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300225   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300226   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300300   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300305   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300306   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300307   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300309   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000100   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000189   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000199   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000200   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000201   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000203   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000288   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000289   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000299   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000389   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000399   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000801   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000889   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000899   PM10             -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100215   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100235   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100237   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100238   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100316   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100317   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10100318   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200104   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200107   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200117   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200202   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200204   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200210   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200212   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200213   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200219   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200229   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200301   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200302   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200303   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200304   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200802   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10200804   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300101   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300102   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300103   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300205   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300206   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300207   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300208   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300209   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300211   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300214   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300216   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300217   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300218   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300221   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300222   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300223   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300224   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300225   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300226   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300300   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300305   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300306   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300307   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 10300309   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000100   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000189   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000199   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000200   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000201   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000203   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000288   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000289   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000299   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000389   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000399   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000801   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000889   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
56037 39000899   PM2_5            -9  87.00 100 100 -9   -9     Y R EGU1328                         ! Industrial Boiler/Process Heater: via Jim Eddinger, plant/SCC6-based PM controls via 1jun2007
72017 0          10025737         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10025919         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10031137         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10034829         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10049055         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10060125         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10099748         -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10101505         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10101538         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10101970         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10108642         -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10124364         -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10124433         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10294403         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10325947         -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10377669         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          10588019         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          109              -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          11103869         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          12018018         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          12018198         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          12035722         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          12054487         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          12060003         -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          12079651         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          125              -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          12626812         -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          12640890         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          12710360         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1271289          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1303282          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1304569          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1306190          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1306236          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1307966          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1308061          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1308141          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1308389          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1309600          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1309644          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1313139          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13138459         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1313991          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1314063          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1314416          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1317346          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1317357          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1317368          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1317426          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1327339          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1327533          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1333820          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1335257          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1335326          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1336932          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1345046          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          1345160          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13462889         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13463393         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13510491         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13530659         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13530682         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13586828         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13597994         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          136              -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          136527           -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13765190         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13770893         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          13814965         -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          139              -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          14018952         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          14220178         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          14307336         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          14307358         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          14336700         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          14977618         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          16065831         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          16842038         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          16925250         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          18454121         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          18540299         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          195              -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          198              -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          199              -9   0.00 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          200              -9   0.00 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          201              -9   0.00 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          202              -9   0.00 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          21679312         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          2223930          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          226              -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          253              -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          27253287         -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          301042           -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          3141126          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          3333673          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          373024           -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          50922297         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          543908           -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          598630           -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          6018899          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          602              -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          603              -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          604              -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          61789513         -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          61790145         -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7428480          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7439921          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7439965          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7440020          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7440360          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7440382          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7440417          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7440439          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7440473          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7440484          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7446084          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7446142          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7446277          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7446346          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7488564          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7542098          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7647010          -9  78.40 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7718549          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7722647          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7738945          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7758976          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7775113          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7778394          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7778509          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7782492          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7782505          -9  78.40 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7783008          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7783075          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7783166          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7783702          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7783791          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7784409          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7784421          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7785877          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7786814          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7787475          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7787497          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7788967          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7788989          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7789006          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7789062          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7789095          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7789120          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7789426          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          7790809          -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          78002            -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          8030704          -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          88               -9  94.86 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          92               -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          93               -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          EXH__16065831    -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          EXH__18540299    -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          EXH__7439965     -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          EXH__7440020     -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Merck Sharp & Dohme Quimica MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          PM10             -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MERCKSHARP&DOHMEQUIMICADEPUERTORI: NEI_UNIQUE_ID=NEI46570: cdate=2008
72017 0          PM2_5            -9  92.70 100 100 -9   0801-2 Y R 3021                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: MERCKSHARP&DOHMEQUIMICADEPUERTORI: NEI_UNIQUE_ID=NEI46570: cdate=2008
72069 0          10025737         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10025919         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10031137         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10034829         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10049055         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10060125         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10099748         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10101505         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10101538         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10101970         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10108642         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10124364         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10124433         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10294403         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10325947         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10377669         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10588019         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          109              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          11103869         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12018018         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12018198         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12035722         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12054487         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12060003         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12079651         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          125              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12626812         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12640890         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12710360         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1271289          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1303282          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1304569          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1306190          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1306236          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1307966          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1308061          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1308141          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1308389          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1309600          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1309644          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1313139          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13138459         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1313991          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1314063          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1314416          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1317346          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1317357          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1317368          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1317426          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1327339          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1327533          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1333820          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1335257          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1335326          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1336932          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1345046          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1345160          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13462889         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13463393         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13510491         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13530659         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13530682         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13586828         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13597994         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          136              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          136527           -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13765190         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13770893         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13814965         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          139              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14018952         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14220178         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14307336         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14307358         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14336700         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14977618         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          16065831         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          16842038         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          16925250         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          18454121         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          18540299         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          195              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          198              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          199              -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          200              -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          201              -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          202              -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          21679312         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          2223930          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          226              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          253              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          27253287         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          301042           -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          3141126          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          3333673          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          373024           -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          50922297         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          543908           -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          598630           -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          6018899          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          602              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          603              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          604              -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          61789513         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          61790145         -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7428480          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7439921          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7439965          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440020          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440360          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440382          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440417          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440439          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440473          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440484          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7446084          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7446142          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7446277          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7446346          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7488564          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7542098          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7718549          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7722647          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7738945          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7758976          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7775113          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7778394          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7778509          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7782492          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7783008          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7783075          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7783166          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7783702          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7783791          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7784409          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7784421          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7785877          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7786814          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7787475          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7787497          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7788967          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7788989          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7789006          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7789062          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7789095          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7789120          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7789426          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7790809          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          78002            -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          8030704          -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          88               -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          92               -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          93               -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          EXH__16065831    -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          EXH__18540299    -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          EXH__7439965     -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          EXH__7440020     -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          PM10             -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BRISTOLMYERSSQUIBBMANUFACTURINGCO: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          PM2_5            -9  95.95 100 100 -9   0801-2 Y R 3018                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BRISTOLMYERSSQUIBBMANUFACTURINGCO: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10025737         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10025919         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10031137         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10034829         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10049055         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10060125         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10099748         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10101505         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10101538         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10101970         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10108642         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10124364         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10124433         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10294403         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10325947         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10377669         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          10588019         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          109              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          11103869         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12018018         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12018198         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12035722         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12054487         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12060003         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12079651         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          125              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12626812         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12640890         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          12710360         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1271289          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1303282          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1304569          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1306190          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1306236          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1307966          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1308061          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1308141          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1308389          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1309600          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1309644          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1313139          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13138459         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1313991          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1314063          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1314416          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1317346          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1317357          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1317368          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1317426          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1327339          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1327533          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1333820          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1335257          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1335326          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1336932          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1345046          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          1345160          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13462889         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13463393         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13510491         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13530659         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13530682         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13586828         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13597994         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          136              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          136527           -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13765190         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13770893         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          13814965         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          139              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14018952         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14220178         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14307336         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14307358         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14336700         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          14977618         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          16065831         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          16842038         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          16925250         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          18454121         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          18540299         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          195              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          198              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          199              -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          200              -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          201              -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          202              -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          21679312         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          2223930          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          226              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          253              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          27253287         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          301042           -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          3141126          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          3333673          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          373024           -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          50922297         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          543908           -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          593748           -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          598630           -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          6018899          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          602              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          603              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          604              -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          61789513         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          61790145         -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          62384            -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7428480          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7439921          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7439965          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440020          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440360          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440382          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440417          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440439          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440473          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7440484          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7446084          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7446142          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7446277          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7446346          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7488564          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7542098          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7718549          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7722647          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7738945          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7758976          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7775113          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7778394          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7778509          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7782492          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7783008          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7783075          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7783166          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7783702          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7783791          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7784409          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7784421          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7785877          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7786814          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7787475          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7787497          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7788967          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7788989          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7789006          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7789062          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7789095          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7789120          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7789426          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          7790809          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          78002            -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          8030704          -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          88               -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          92               -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          93               -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          EXH__16065831    -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          EXH__18540299    -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          EXH__7439965     -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          EXH__7440020     -9  87.15 100 100 -9   0801-2 Y R 3019                            ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Squibb Manufacturing  Inc MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          PM10             -9  95.95 100 100 -9   0801-2 Y R 3019                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BRISTOLMYERSSQUIBBMANUFACTURINGCO: NEI_UNIQUE_ID=NEI46514: cdate=2008
72069 0          PM2_5            -9  95.95 100 100 -9   0801-2 Y R 3019                            ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: BRISTOLMYERSSQUIBBMANUFACTURINGCO: NEI_UNIQUE_ID=NEI46514: cdate=2008
72097 0          10025737         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10025919         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10031137         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10034829         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10049055         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10060125         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10099748         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10101505         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10101538         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10101970         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10108642         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10124364         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10124433         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10294403         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10325947         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10377669         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          10588019         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          109              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          11103869         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          12018018         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          12018198         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          12035722         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          12054487         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          12060003         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          12079651         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          125              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          12626812         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          12640890         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          12710360         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1271289          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1303282          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1304569          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1306190          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1306236          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1307966          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1308061          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1308141          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1308389          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1309600          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1309644          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1313139          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13138459         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1313991          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1314063          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1314416          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1317346          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1317357          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1317368          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1317426          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1327339          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1327533          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1333820          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1335257          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1335326          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1336932          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1345046          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          1345160          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13462889         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13463393         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13510491         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13530659         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13530682         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13586828         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13597994         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          136              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          136527           -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13765190         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13770893         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          13814965         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          139              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          14018952         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          14220178         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          14307336         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          14307358         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          14336700         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          14977618         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          16065831         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          16842038         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          16925250         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          18454121         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          18540299         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          195              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          198              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          199              -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          200              -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          201              -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          202              -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          21679312         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          2223930          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          226              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          22967926         -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          253              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          27253287         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          301042           -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          3141126          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          3333673          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          373024           -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          50922297         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          543908           -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          593748           -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          598630           -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          6018899          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          602              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          603              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          604              -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          61789513         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          61790145         -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          62384            -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7428480          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7439921          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7439965          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7439976          -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7440020          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7440360          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7440382          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7440417          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7440439          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7440473          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7440484          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7446084          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7446142          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7446277          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7446346          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7487947          -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7488564          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7542098          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7647010          -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7718549          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7722647          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7738945          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7758976          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7775113          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7778394          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7778509          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7782492          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7782505          -9   0.00 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7783008          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7783075          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7783166          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7783702          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7783791          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7784409          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7784421          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7785877          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7786814          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7787475          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7787497          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7788967          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7788989          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7789006          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7789062          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7789095          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7789120          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7789426          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          7790809          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          78002            -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          8030704          -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          88               -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          92               -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          93               -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          EXH__16065831    -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          EXH__18540299    -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          EXH__7439965     -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          EXH__7440020     -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/MACT/poll Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips/2005v2-plantid for plant: Eli Lilly And Company MACT=Hazardous Waste Incineration: On-Site: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          PM10             -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LILLYDELCARIBEINC.: NEI_UNIQUE_ID=NEI46546: cdate=2008
72097 0          PM2_5            -9  93.34 100 100 -9   0801-2 Y R 728                             ! HWI plant/SCC/pollutant Reduction from Anne Pope via xref (haz waste ids_ram.xls) by fips and nei_unique_id for plant: LILLYDELCARIBEINC.: NEI_UNIQUE_ID=NEI46546: cdate=2008
